[Federal Register Volume 78, Number 235 (Friday, December 6, 2013)] [Rules and Regulations] [Pages 73424-73434] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2013-28516] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 40 [Docket No. RM13-8-000; Order No. 788] Retirement of Requirements in Reliability Standards AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. ----------------------------------------------------------------------- SUMMARY: Pursuant to section 215 of the Federal Power Act, the Commission approves the retirement of 34 requirements within 19 Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. The requirements approved for retirement either: Provide little protection for Bulk-Power System reliability; or are redundant with other aspects of the Reliability Standards. In addition, the Commission withdraws 41 Commission directives that NERC develop modifications to Reliability Standards. This rule is part of the Commission's ongoing effort to review its requirements and reduce unnecessary burdens by eliminating requirements that are not necessary to the performance of the Commission's regulatory responsibilities. DATES: Effective Date: This rule will become effective January 21, 2014. FOR FURTHER INFORMATION CONTACT: Kevin Ryan (Legal Information), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, Telephone: (202) 502-6840 [[Page 73425]] Michael Gandolfo (Technical Information), Office of Electric Reliability, Division of Reliability Standards and Security, Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426, Telephone: (202) 502-6817. SUPPLEMENTARY INFORMATION: 145 FERC ] 61,147 Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony Clark. Final Rule (Issued November 21, 2013) 1. Pursuant to section 215(d) of the Federal Power Act (FPA),\1\ the Commission approves the retirement of 34 requirements within 19 Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization (ERO). The retirement of these provisions meet the benchmarks set forth in the Commission's March 15, 2012 order that requirements proposed for retirement either: (1) Provide little protection for Bulk-Power System reliability or (2) are redundant with other aspects of the Reliability Standards.\2\ Consistent with the Commission's proposal in the March 2012 Order, we conclude that the requirements approved for retirement can ``be removed from the Reliability Standards with little effect on reliability and an increase in efficiency of the ERO compliance program.'' \3\ --------------------------------------------------------------------------- \1\ 16 U.S.C. 824o(d) (2006). \2\ See North American Electric Reliability Corp., 138 FERC ] 61,193, at P 81 (March 2012 Order), order on reh'g and clarification, 139 FERC ] 61,168 (2012). \3\ Id. P 81. --------------------------------------------------------------------------- 2. In addition, in this Final Rule, we withdraw 41 directives that NERC develop modifications to Reliability Standards.\4\ In Order No. 693 and subsequent final rules, the Commission has identified various issues and directed NERC to develop modifications to the Reliability Standards or take other action to address those issues.\5\ While NERC has addressed many of these directives, over 150 directives remain outstanding. The withdrawal of these directives will enhance the efficiency of the Reliability Standards development process, with little or no impact on Bulk-Power System reliability. --------------------------------------------------------------------------- \4\ The 41 withdrawn directives are listed in Attachment A to this Final Rule. \5\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g, Order No. 693-A, 120 FERC ] 61,053 (2007). See also Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System, Order No. 729, 129 FERC ] 61,155 (2009), order on clarification, Order No. 729-A, 131 FERC ] 61,109 (2010), order on reh'g and reconsideration, Order No. 729-B, 132 FERC ] 61,027 (2010). --------------------------------------------------------------------------- 3. Pursuant to Executive Order 13579, the Commission issued a plan to identify regulations that warrant repeal or modification, or strengthening, complementing, or modernizing where necessary or appropriate.\6\ In the Plan, the Commission also stated that it voluntarily and routinely, albeit informally, reviews its regulations to ensure that they achieve their intended purpose and do not impose undue burdens on regulated entities or unnecessary costs on those entities or their customers. The action in this Final Rule is a part of the Commission's ongoing effort to review its requirements and reduce unnecessary burdens by eliminating requirements that are not necessary to the performance of the Commission's regulatory responsibilities. --------------------------------------------------------------------------- \6\ Plan for Retrospective Analysis of Existing Rules, Docket No. AD12-6-000 (Nov. 8, 2011). Executive Order 13579 requests that independent agencies issue public plans for periodic retrospective analysis of their existing ``significant regulations.'' Retrospective analysis should identify ``significant regulations'' that may be outmoded, ineffective, insufficient, or excessively burdensome, and to modify, streamline, expand, or repeal them in order to achieve the agency's regulatory objective. --------------------------------------------------------------------------- I. Background A. Section 215 of the FPA 4. Section 215 of the FPA requires the Commission-certified ERO to develop mandatory and enforceable Reliability Standards, subject to Commission review and approval. Once approved, the Reliability Standards may be enforced in the United States by the ERO subject to Commission oversight or by the Commission independently.\7\ --------------------------------------------------------------------------- \7\ See 16 U.S.C. 824o(e)(3). --------------------------------------------------------------------------- Pursuant to the requirements of FPA section 215, the Commission established a process to select and certify an ERO \8\ and, subsequently, certified NERC as the ERO.\9\ --------------------------------------------------------------------------- \8\ Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204, order on reh'g, Order No. 672-A, FERC Stats. & Regs. ] 31,212 (2006). \9\ North American Electric Reliability Corp., 116 FERC ] 61,062, order on reh'g and compliance, 117 FERC ] 61,126 (2006), aff'd sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009). --------------------------------------------------------------------------- B. March 2012 Order 5. In the March 2012 Order, the Commission accepted, with conditions, NERC's ``Find, Fix, Track and Report'' (FFT) initiative. The FFT process, inter alia, provides NERC and the Regional Entities the flexibility to address lower-risk possible violations through an FFT informational filing as opposed to issuing and filing a Notice of Penalty. In addition, the Commission raised the prospect of revising or removing requirements of Reliability Standards that ``provide little protection for Bulk-Power System reliability or may be redundant.'' \10\ Specifically, the Commission stated: --------------------------------------------------------------------------- \10\ March 2012 Order, 138 FERC ] 61,193 at P 81. . . . NERC's FFT initiative is predicated on the view that many violations of requirements currently included in Reliability Standards pose lesser risk to the Bulk-Power System. If so, some current requirements likely provide little protection for Bulk-Power System reliability or may be redundant. The Commission is interested in obtaining views on whether such requirements could be removed from the Reliability Standards with little effect on reliability and an increase in efficiency of the ERO compliance program. If NERC believes that specific Reliability Standards or specific requirements within certain Standards should be revised or removed, we invite NERC to make specific proposals to the Commission identifying the Standards or requirements and setting forth in detail the technical basis for its belief. In addition, or in the alternative, we invite NERC, the Regional Entities and other interested entities to propose appropriate mechanisms to identify and remove from the Commission-approved Reliability Standards unnecessary or redundant requirements.\11\ --------------------------------------------------------------------------- \11\ Id. In response, NERC initiated a review, referred to as the ``P 81 project,'' to identify requirements that could be removed from Reliability Standards without impacting the reliability of the Bulk- Power System. C. NERC Petition 6. In a February 28, 2013 petition, NERC requested Commission approval of the retirement of 34 requirements within 19 Reliability Standards. According to NERC, the 34 requirements proposed for retirement ``are redundant or otherwise unnecessary'' and that ``violations of these requirements . . . pose a lesser risk to the reliability of the Bulk-Power System.'' \12\ NERC stated that the proposed retirement of the 34 requirements ``will allow industry stakeholders to focus their resources appropriately on reliability risks and will increase the efficiency of the ERO compliance program.'' \13\ --------------------------------------------------------------------------- \12\ Petition at 2. \13\ Id. --------------------------------------------------------------------------- [[Page 73426]] 7. NERC explained that the ``P 81 Team'' developed three criteria for its review: (1) Criterion A: An overarching criteria designed to determine that there is no reliability gap created by the proposed retirement; (2) Criterion B: Consists of seven separate identifying criteria designed to recognize requirements appropriate for retirement (administrative; data collection/data retention; documentation; reporting; periodic updates; commercial or business practice; and redundant); and (3) Criterion C: Consists of seven separate questions designed to assist the P 81 Team in making an informed decision regarding whether requirements are appropriate to propose for retirement.\14\ --------------------------------------------------------------------------- \14\ Id. at 4. See also id. n. 8 (setting forth the seven questions of Criterion C). --------------------------------------------------------------------------- 8. NERC explained that the project team focused on the identification of ``lower-level facilitating requirements that are either redundant with other requirements or where evidence retention is burdensome and the requirement is unnecessary'' because the reliability goal is achieved through other standards or mechanisms.\15\ According to NERC, the proposed retirement of documentation requirements will not create a gap in reliability because ``NERC and the Regional Entities can enforce reporting obligations pursuant to section 400 of NERC's Rules of Procedure and Appendix 4C to ensure that necessary data continues to be submitted for compliance and enforcement purposes.'' \16\ NERC asserts that, although the P 81 project proposes to retire requirements associated with data retention or documentation, ``the simple fact that a requirement includes a data retention or documentation element does not signify that it should be considered for retirement or is otherwise inappropriately designated as a requirement.'' \17\ --------------------------------------------------------------------------- \15\ Id. at 7. \16\ Id. at 8 (citing North American Electric Reliability Corp., 141 FERC ] 61,241, at P 82 (2012) (approving proposed revisions to NERC's Rules of Procedure)). \17\ Id. at 9 (emphasis in original). --------------------------------------------------------------------------- 9. Based on this approach, NERC identified the following 34 requirements within 19 Reliability Standards for potential retirement:BAL-005-0.2b, Requirement R2--Automatic Generation Control CIP-003-3, -4, Requirement R1.2--Cyber Security--Security Management Controls \18\ --------------------------------------------------------------------------- \18\ NERC explains that although only eight requirements in the Critical Infrastructure Protection (CIP) body of Reliability Standards are proposed for retirement, NERC proposes the retirement of those eight requirements in both CIP versions 3 and 4. Therefore, the total number of CIP requirements proposed for retirement is sixteen. --------------------------------------------------------------------------- CIP-003-3, -4, Requirements R3, R3.1, R3.2, and R3.3--Cyber Security--Security Management Controls CIP-003-3, -4, Requirement R4.2--Cyber Security--Security Management Controls CIP-005-3a, -4a, Requirement R2.6--Cyber Security--Electronic Security Perimeter(s) CIP-007-3, -4, Requirement R7.3--Cyber Security--Systems Security Management EOP-005-2, Requirement R3.1--System Restoration From Blackstart Services FAC-002-1, Requirement R2--Coordination of Plans for New Facilities FAC-008-3, Requirements R4 and R5--Facility Ratings FAC-010-2.1, Requirement R5--System Operating Limits Methodology for the Planning Horizon FAC-011-2.1, Requirement R5--System Operating Limits Methodology for the Operations Horizon FAC-013-2, Requirement R3--Assessment of Transfer Capability for the Near-term Transmission Planning Horizon INT-007-1, Requirement R1.2--Interchange Confirmation IRO-016-1, Requirement R2--Coordination of Real-Time Activities Between Reliability Coordinators NUC-001-2, Requirements R9.1, R9.1.1, R9.1.2, R9.1.3, and R1.9.4--Nuclear Plant Interface Coordination PRC-010-0, Requirement R2--Assessment of the Design and Effectiveness of UVLS Programs PRC-022-1, Requirement R2--Under-Voltage Load Shedding Program Performance VAR-001-2, Requirement R5--Voltage and Reactive Control 10. NERC also requested that the Commission approve the implementation plan, provided as Exhibit C to NERC's petition, which provided that the identified requirements will be retired immediately upon Commission approval. 11. NERC stated that it will apply the ``concepts'' from the P 81 project to improve the drafting of Reliability Standards going forward. Specifically, NERC explained that Reliability Standards development projects ``will involve stronger examination for duplication of requirements across the NERC body of Reliability Standards and the technical basis and necessity for each and every requirement will continue to be evaluated.'' \19\ According to NERC, requirements that were proposed and ultimately not included in the immediate filing will be mapped for consideration in future standards projects. --------------------------------------------------------------------------- \19\ Petition at 9. --------------------------------------------------------------------------- D. Notice of Proposed Rulemaking 12. On June 20, 2013, the Commission issued a Notice of Proposed Rulemaking (NOPR) proposing to approve the retirement of the 34 requirements within 19 Reliability Standards, consistent with NERC's petition.\20\ In addition, the Commission proposed to withdraw 41 outstanding Commission directives that NERC develop modifications to Reliability Standards. --------------------------------------------------------------------------- \20\ Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards, Notice of Proposed Rulemaking, 78 FR 38,851 (June 28, 2013), 143 FERC ] 61,251 (2013) (NOPR), errata, 78 FR 41,339 (July 10, 2013). --------------------------------------------------------------------------- 13. Comments on the NOPR were due by August 27, 2013. Seven entities filed comments, identified in Attachment B to the Final Rule. II. Discussion A. Retirement of Requirements NOPR Proposal 14. In the NOPR, the Commission proposed to approve the retirement of the 34 requirements within 19 Reliability Standards identified by NERC. In the NOPR, for each of the 34 requirements, the Commission provided NERC's rationale supporting retirement, and the Commission's explanation for proposing to approve the retirement.\21\ --------------------------------------------------------------------------- \21\ See NOPR, 143 FERC ] 61,251 at PP 17-83. --------------------------------------------------------------------------- Comments 15. Commenters unanimously support approval of the NOPR proposal. Trade Associations, CEA and ITC concur that the retirement of the 34 requirements will have little to no effect on reliability. NRECA, ISO/ RTO Council, CEA and ITC support continuance of the ``P 81'' process as a high priority going forward and the identification of additional candidate requirements for retirement or streamlining. 16. ISO/RTO Council comments that, while the criteria used by NERC to identify candidate requirements for retirement are appropriate, additional criteria would ensure that streamlining of the Reliability Standards will continue. [[Page 73427]] Commission Determination 17. Pursuant to section 215 of the FPA, we approve the retirement of the 34 requirements within 19 Reliability Standards identified by NERC as just, reasonable, not unduly discriminatory or preferential, and in the public interest. Likewise, we approve the implementation plan and effective date set forth in NERC's petition. 18. In the March 2012 Order, the Commission explained that ``some current requirements likely provide little protection for Bulk-Power System reliability or may be redundant. The Commission is interested in obtaining views on whether such requirements could be removed from the Reliability Standards with little effect on reliability and an increase in efficiency of the ERO compliance program.'' \22\ In general, we conclude that the requirements identified by NERC for retirement satisfy the expectations set forth in the March 2012 Order; namely, the requirements proposed for retirement either: (1) Provide little protection for Bulk-Power System reliability or (2) are redundant with other aspects of the Reliability Standards.\23\ --------------------------------------------------------------------------- \22\ March 2012 Order, 138 FERC ] 61,193 at P 81. \23\ Further, we adopt the rationale for the retirement of each requirement as set forth in the NOPR, 143 FERC ] 61,251 at PP 17-83. --------------------------------------------------------------------------- 19. We agree with NERC that the elimination of certain requirements that pertain to information collection or documentation will not result in a reliability gap. No commenter disputes NERC's rationale. Section 400 and Appendix 4C (Uniform Compliance Monitoring and Enforcement Program) of the NERC Rules of Procedure provide NERC and the Regional Entities the authority to enforce reporting obligations necessary to support reliability.\24\ This authority, used in the appropriate manner, justifies retiring certain documentation-related requirements that provide limited, if any, support for reliability. The retirement of such requirements should enhance the efficiency of the ERO compliance program, as well as the efficiency of individual registered entity compliance programs. --------------------------------------------------------------------------- \24\ See North American Electric Reliability Corp., 141 FERC ] 61,241 at P 82. --------------------------------------------------------------------------- 20. We agree with commenters that NERC should continue the process of identifying additional Reliability Standards and requirements as candidates for retirement or streamlining. We support NERC's continuing efforts in this regard. Efficiencies can be gained from further consolidation or retirement of some requirements or components of requirements that are justified based on technical analysis of either existing requirements, new proposed requirements or modifications. Such analyses would take into account the interrelationship between standards and among categories of standards, in order to determine that when retirements or consolidations are made the reliability benefits of the currently effective requirements would be preserved. 21. With regard to ISO/RTO Council's comment, we will not direct NERC to develop additional criteria for identifying candidate requirements for retirement. ISO/RTO Council does not identify any specific concern or defect regarding the criteria applied by NERC.\25\ ISO/RTO Council may raise its proposal directly with NERC if it so chooses. --------------------------------------------------------------------------- \25\ Moreover, while NERC provided the criteria in the February 2013 petition, NERC also made clear that the criteria were provided only for informational purposes. See NERC Petition at 4. --------------------------------------------------------------------------- B. Outstanding Directives NOPR Proposal 22. In the NOPR, the Commission proposed to withdraw 41 outstanding Commission directives that NERC develop modifications to Reliability Standards. Attachment A of the NOPR identified the 41 Commission directives, the source (i.e., Final Rule) of the directive, and a justification for the proposed withdrawal.\26\ The Commission explained that it applied the following three criteria in identifying outstanding directives for withdrawal: (1) The reliability concern underlying the outstanding directive has been addressed in some manner, rendering the directive stale; (2) the outstanding directive provides general guidance for standards development rather than a specific directive; and (3) the outstanding directive is redundant with another directive.\27\ The Commission stated that each of the 41 outstanding directives identified in Attachment A of the NOPR satisfies one or more of the criteria. --------------------------------------------------------------------------- \26\ The same table is provided as Attachment A to the Final Rule. Each directive identified in Attachment A includes a ``NERC Reference Number.'' Commission staff and NERC staff have developed a common approach to identifying and tracking outstanding Commission directives. The NERC Reference Numbers reflect this joint tracking process. \27\ NOPR, 143 FERC ] 61,251 at P 86. --------------------------------------------------------------------------- Comments 23. NERC and all other commenters support the withdrawal of the 41 outstanding Commission directives. 24. Trade Associations recommend that the Commission consider alternative criteria for the withdrawal of outstanding directives to more closely align the criteria with those developed by NERC for retirement of Reliability Standard requirements. According to Trade Associations, ``simple logic suggests that the basis for retirement of requirements and withdrawal of Commission reliability directives should be consistent, if not uniform.'' \28\ --------------------------------------------------------------------------- \28\ Trade Associations Comments at 7. --------------------------------------------------------------------------- Commission Determination 25. We find that it is appropriate to withdraw the 41 directives requiring that NERC develop modifications to Reliability Standards. As explained in the NOPR, the withdrawal of the identified directives should result in more efficient use of NERC's and the Commission's resources and reduce unnecessary burdens, without impacting the reliable operation of the Bulk-Power System.\29\ All commenters agree with the withdrawal of the 41 directives and the resulting efficiencies. Accordingly, we withdraw the 41 directives requiring that NERC develop modifications to Reliability Standards, identified in Attachment A of the Final Rule. --------------------------------------------------------------------------- \29\ See NOPR, 143 FERC ] 61,251 at PP 85-87. --------------------------------------------------------------------------- 26. We are not persuaded by Trade Associations' comments that there is a need to more closely align the criteria applied by the Commission in determining whether to withdraw an outstanding reliability directive with those criteria developed by NERC for retirement of Reliability Standard requirements. Unlike the NERC review of Reliability Standard requirements, without precluding possible future Commission action, we have no plans for ongoing review of outstanding Commission reliability directives. We have reviewed the catalogue of outstanding reliability directives and have taken appropriate action in this proceeding. Further, while Trade Associations assert that such convergence of criteria is ``logical,'' we do not believe that the retirement of Reliability Standards requirements and withdrawal of a Commission directive is an apples-to-apples comparison that necessitates the suggested ``alignment.'' III. Information Collection Statement 27. The Office of Management and Budget (OMB) regulations require that OMB approve certain reporting and recordkeeping (collections of information) imposed by an agency.\30\ Upon approval of a collection(s) of information, OMB will assign an OMB control number and expiration date. Respondents subject to the filing [[Page 73428]] requirements of this rule will not be penalized for failing to respond to these collection(s) of information unless the collections of information display a valid OMB control number. --------------------------------------------------------------------------- \30\ 5 CFR 1320.11. --------------------------------------------------------------------------- 28. The Commission is submitting these revisions to the reporting and recordkeeping requirements to OMB for its review and approval under section 3507(d) of the Paperwork Reduction Act of 1995.\31\ The Commission solicited comments on the need for and the purpose of the information contained in NERC's February 2013 petition and the corresponding burdens to implement NERC's proposed retirement of 34 requirements within 19 Reliability Standards. The Commission received comments generally supporting the efficiency gains and reductions in burden resulting from the retirement of specific requirements, which we address in the Final Rule. However, the Commission did not receive comments on the reporting estimates. The Final Rule approves the retirement of the 34 requirements within 19 Reliability Standards and, in addition, the withdrawal of 41 Commission directives that NERC develop modifications to Reliability Standards. --------------------------------------------------------------------------- \31\ 44 U.S.C. 3507(d). --------------------------------------------------------------------------- 29. Public Reporting Burden: The estimate below for the number of respondents is based on the NERC Compliance Registry as of April 30, 2013.\32\ According to the registry, there are 132 balancing authorities (BA), 544 distribution providers (DP), 898 generator owners (GO), 859 generator operators (GOP), 56 interchange authorities (IA), 515 load serving entities (LSE), 80 planning authorities/planning coordinators (PA or PC), 677 purchasing selling entities (PSE), 21 reliability coordinators (RC), 346 transmission owners (TO), 185 transmission operators (TOP), 185 transmission planners (TP), and 93 transmission service providers (TSP). --------------------------------------------------------------------------- \32\ The estimates for the retired CIP requirements are based on February 28, 2013 registry data in order to provide consistency with burden estimates provided in the Commission's recent CIP version 5 Notice of Proposed Rulemaking in Docket No. RM13-5-000. --------------------------------------------------------------------------- 30. The Commission estimates that the burden will be reduced for each requirement as detailed in the chart below, for a total estimated annual reduction in burden cost of $518,220. The Commission based the burden reduction estimates on staff experience, knowledge, and expertise. ---------------------------------------------------------------------------------------------------------------- Estimated average Estimated Estimated Standard, requirement number, Type of Number of reduction in total annual total annual and FERC Collection Number respondents respondents burden hours reduction in reduction in \33\ per respondent burden (in cost per year hours) [A] [B] [A x B] [A x B x $60/ hour \34\] ---------------------------------------------------------------------------------------------------------------- EOP-005-2, R3.1 (FERC-725A)... TOP............. 185 1 185 $11,100 FAC-008-3, R4 (FERC-725A)..... TO, GO.......... 1,151 1 1,151 69,060 FAC-008-3, R5 (FERC-725A)..... TO, GO.......... 1,151 1 1,151 69,060 FAC-010-2.1, R5 (FERC-725D)... PA.............. 80 20 1,600 96,000 FAC-011-2, R5 (FERC-725D)..... RC.............. 21 20 420 25,200 FAC-013-2, R3 (FERC-725A)..... PC.............. 80 8 640 38,400 INT-007-1, R1.2 (FERC-725A)... IA.............. 56 20 1,120 67,200 IRO-016-1, R2 (FERC-725A)..... RC.............. 21 20 420 25,200 CIP-003-3, -4, R1.2 (FERC- RC, BA, IA, TSP, 325 1 325 19,500 725B). TO, TOP, GO, GOP,LSE. CIP-003-3, -4, R3, R3.1, R3.2, RC, BA, IA, TSP, 325 1 325 19,500 R3.3 (FERC-725B). TO, TOP, GO, GOP,LSE. CIP-005-3, -4, R2.6 (FERC- RC, BA, IA, TSP, 325 4 1300 78,000 725B). TO, TOP, GO, GOP,LSE. --------------------------------------------------------------- Total..................... ................ .............. .............. 8,637 518,220 ---------------------------------------------------------------------------------------------------------------- 31. The above chart does not include BAL-005-0.2b, Requirement R2; CIP-003-3, -4, Requirement R4.2; CIP-007-3, -4, Requirement R7.3; FAC- 002-1, Requirement R2; PRC-010-0, Requirement R2; PRC-022-1, Requirement R2; and VAR-001-2, Requirement R5 because those requirements were found redundant with other requirements.\35\ Since the action required within them is required elsewhere, there is no change in the overall burden in retiring these requirements. Likewise, NUC-001-2, Requirement R9.1; NUC-001-2, Requirement R9.1.1; NUC-001-2, Requirement R9.1.2; NUC-001-2, Requirement R9.1.3; and NUC-001-2, Requirement R9.1.4 are not included because these requirements require that the applicable entities include ``boiler plate'' language into their agreements that is normally included in all legal contracts.\36\ Since this action will be taken regardless if it is required by a Reliability Standard, there is no reduction in burden. --------------------------------------------------------------------------- \33\ This number was calculated by adding all the applicable entities while removing double counting caused by entities registered under multiple functions. \34\ The estimated hourly loaded cost (salary plus benefits) for an engineer is assumed to be $60/hour, based on salaries as reported by the Bureau of Labor Statistics (BLS) (http://bls.gov/oes/current/naics2_22.htm). Loaded costs are BLS rates divided by 0.703 and rounded to the nearest dollar (http://www.bls.gov/news.release/ecec.nr0.htm). \35\ The reporting requirements in these standards are part of the FERC-725A information collection. \36\ The reporting requirements in this standard are part of the FERC-725F information collection. --------------------------------------------------------------------------- Titles: FERC-725A, Mandatory Reliability Standards for the Bulk Power System; FERC-725B, Mandatory Reliability Standards for Critical Infrastructure Protection; FERC-725D, Facilities, Design, Connections, and Maintenance Reliability Standards; and FERC-725F, Mandatory Reliability Standards for Nuclear Plant Interface Coordination. Action: Revisions to Collections of Information. OMB Control Nos: 1902-0244, 1902-0248, 1902-0247, and 1902-0249. Respondents: Business or other for-profit, and not-for-profit institutions. Frequency of Responses: On occasion. [[Page 73429]] Necessity of the Information: This proceeding approves the retirement of the 34 requirements within 19 Reliability Standards identified by NERC. The retirements either: (1) Provide little protection for Bulk-Power System reliability or (2) are redundant with other aspects of the Reliability Standards. In addition, we withdraw the 41 Commission directives listed in Attachment A in the interest of enhancing the efficiency of the ERO standard development and compliance programs, as well as the efficiency of individual registered entity compliance programs. Internal review: The Commission has reviewed NERC's proposal and determined that the action is necessary to implement section 215 of the FPA. The Commission has assured itself, by means of its internal review, that there is specific, objective support for the burden reduction estimates associated with the retired information requirements. 32. Interested persons may obtain information on the reporting requirements by contacting the Federal Energy Regulatory Commission, Office of the Executive Director, 888 First Street NE., Washington, DC 20426 [Attention: Ellen Brown, email: [email protected], phone: (202) 502-8663, fax: (202) 273-0873]. 33. Comments concerning the information collections and the associated burden estimates should be sent to the Commission in this docket and to the Office of Management and Budget, Office of Information and Regulatory Affairs [Attention: Desk Officer for the Federal Energy Regulatory Commission]. For security reasons, comments should be sent by email to OMB at: [email protected]. Please indicate the OMB Control Numbers and Docket No. RM13-8-000 in your submittal. IV. Environmental Analysis 34. The Commission is required to prepare an Environmental Assessment or an Environmental Impact Statement for any action that may have a significant adverse effect on the human environment.\37\ The Commission has categorically excluded certain actions from this requirement as not having a significant effect on the human environment. Included in the exclusion are rules that are clarifying, corrective, or procedural or that do not substantially change the effect of the regulations being amended.\38\ The actions proposed here fall within this categorical exclusion in the Commission's regulations. --------------------------------------------------------------------------- \37\ Regulations Implementing the National Environmental Policy Act, Order No. 486 52 FR 47897 (Dec. 17, 1987), FERC Stats. & Regs. Regulations Preambles 1986-1990 ] 30,783 (1987). \38\ 18 CFR 380.4(a)(2)(ii) (2013). --------------------------------------------------------------------------- V. Regulatory Flexibility Act 35. The Regulatory Flexibility Act of 1980 (RFA) \39\ generally requires a description and analysis of final rules that will have significant economic impact on a substantial number of small entities. The RFA mandates consideration of regulatory alternatives that accomplish the stated objectives of a proposed rule and that minimize any significant economic impact on a substantial number of small entities. The Small Business Administration's Office of Size Standards develops the numerical definition of a small business.\40\ The Small Business Administration has established a size standard for electric utilities, stating that a firm is small if, including its affiliates, it is primarily engaged in the transmission, generation and/or distribution of electric energy for sale and its total electric output for the preceding twelve months did not exceed four million megawatt hours.\41\ --------------------------------------------------------------------------- \39\ 5 U.S.C. 601-612. \40\ 13 CFR 121.101. \41\ 13 CFR 121.201, Sector 22, Utilities & n.1. --------------------------------------------------------------------------- 36. The Commission estimates the total reduction in burden for all small entities to be $32,460. The Commission estimates that small planning authorities/planning coordinators will see a reduction of $1,680 per entity per year, greater than for other types of affected small entities.\42\ The Commission does not consider a reduction of $1,680 per year to be a significant economic impact. The Commission believes that, in addition to the estimated economic impact, the proposed retirement of the 34 requirements of mandatory Reliability Standards will provide small entities with relief from having to track compliance with these provisions and preparing to show compliance in response to a potential compliance audit by a Regional Entity or other regulator. --------------------------------------------------------------------------- \42\ The burden reduction for planning authorities/planning coordinators is based on the retirement of FAC-010-2.1, Requirement R5 and FAC-013-2, Requirement R3. Based on the NERC Compliance Registry and Energy Information Administration Form EIA-861 data, the Commission estimates that 5 out of the 80 planning authorities/ planning coordinators meet the definition of a small entity. --------------------------------------------------------------------------- 37. Based on the above, the Commission certifies that the changes to the Reliability Standards will not have a significant impact on a substantial number of small entities. Accordingly, no regulatory flexibility analysis is required. VI. Document Availability 38. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the Internet through FERC's Home Page (http://www.ferc.gov) and in FERC's Public Reference Room during normal business hours (8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE., Room 2A, Washington DC 20426. 39. From FERC's Home Page on the Internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field. 40. User assistance is available for eLibrary and the FERC's Web site during normal business hours from FERC Online Support at (202) 502-6652 (toll free at 1-866-208-3676) or email at [email protected], or the Public Reference Room at (202) 502- 8371, TTY (202) 502-8659. Email the Public Reference Room at [email protected]. VII. Effective Date and Congressional Notification 41. These regulations are effective January 21, 2014. The Commission has determined that, with the concurrence of the Administrator of the Office of Information and Regulatory Affairs of OMB, this rule is not a ``major rule'' as defined in section 351 of the Small Business Regulatory Enforcement Fairness Act of 1996. By the Commission. Nathaniel J. Davis, Sr., Deputy Secretary. Note: Attachment A will not appear in the Code of Federal Regulations. Attachment A Withdrawn Commission Directives [[Page 73430]] ---------------------------------------------------------------------------------------------------------------- No. Standard Order No. Para Directive Justification ---------------------------------------------------------------------------------------------------------------- Group A--The reliability concern underlying the outstanding directive has been addressed in some manner, rendering the directive stale ---------------------------------------------------------------------------------------------------------------- 1........... BAL-006....................... 693 P 428 ``Add measures NERC replaced concerning the levels of non- accumulation of compliance with large inadvertent violation interchange severity levels balances and (VSLs). NERC has levels of non- designated VSLs compliance.'' for BAL-006. (NERC Reference No. 10036). 2........... EOP-001....................... 693 P 565 ``The Commission The VSLs listed in agrees with ISO- EOP-001-2.1b and NE that the the Reliability Reliability Standard Audit Standard should Worksheet for EOP- be clarified to 001 require indicate that the evidence of this actual emergency consideration. plan elements, and not the ``for consideration'' elements of Attachment 1, should be the basis for compliance. However, all of the elements should be considered when the emergency plan is put together.'' (NERC Reference No. 10065). 3........... INT-004....................... 693 P 843 ``Consider adding NERC replaced levels of non- levels of non- compliance to the compliance with standard.'' (NERC VSLs. VSLs for Reference No. INT-004 have been 10134). developed and approved by the Commission. 4........... INT-005....................... 693 P 848 ``Consider adding NERC replaced levels of non- levels of non- compliance to the compliance with standard.'' (NERC VSLs. VSLs for Reference No. INT-005 have been 10135). developed and approved by the Commission. 5........... MOD-010 through MOD-025....... 693 P 1147 ``Direct the ERO The concern to use its underlying the authority directive has pursuant to Sec. been addressed 39.2(d) of our through section regulations to 1600 (Requests require users, for Data or owners and Information) of operators to NERC's Rules of provide to the Procedure. The Regional Entity Commission the information approved Section related to data 1600 of NERC's gathering, data Rules on February maintenance, 21, 2008. reliability assessments and other process- type functions.'' (NERC Reference No. 10266). 6........... MOD-010....................... 693 P 1152 ``Address critical This directive is energy no longer infrastructure necessary in confidentiality light of section issues as part of 1500 the standard (Confidential development Information) of process.'' (NERC NERC's Rules of Reference No. Procedure 10268). addressing treatment of confidential information. 7........... MOD-010....................... 693 P 1163 ``Direct the ERO The concern to develop a Work underlying the Plan that will directive has facilitate been addressed ongoing through NERC's collection of the Reliability steady-state Standards modeling and Development Plan: simulation data 2013-2015. This specified in MOD- plan was provided 011-0.'' (NERC to the Commission Reference No. in an 10270). informational filing on December 31, 2012. It contains an action plan to merge, upgrade, and expand existing requirements in the modeling data (MOD-010 through MOD-015) and demand data (MOD- 016 through MOD- 021) Reliability Standards. 8........... PRC-017....................... 693 P 1546 ``Require Requirement R2 of documentation PRC-017 already identified in requires affected Requirement R2 be entities to routinely provide provided to NERC documentation of or the regional the special entity that protection system includes a program and its requirement that implementation to documentation the appropriate identified in Regional Requirement R2 Reliability shall be Organization and routinely NERC within 30 provided to the calendar days of ERO.'' (NERC a request. If Reference No. either the 10363). Regional Entity or NERC determine that they need and will use the information on a regular schedule, they have the authority to establish a schedule under the current requirement. 9........... Glossary...................... 693 P 1895 ``Modification to The concern the glossary that underlying the enhances the directive has definition of been addressed ``generator through the NERC operator'' to registration reflect concerns process. See of the commenters Order No. 693 at [``to include P 145. aspects unique to ISOs, RTOs and pooled resource organizations'']. '' (NERC Reference No. 10005). [[Page 73431]] 10.......... Glossary...................... 693 P 1895 ``Modification to The concern the glossary that underlying the enhances the directive has definition of been addressed ``transmission through the NERC operator'' to registration reflect concerns process. See of the commenters Order No. 693 at [``to include P 145. aspects unique to ISOs, RTOs and pooled resource organizations'']. '' (NERC Reference No. 10006). ---------------------------------------------------------------------------------------------------------------- Group B--The outstanding directive provides general guidance for standards development rather than a specific directive ---------------------------------------------------------------------------------------------------------------- 11.......... BAL-005....................... 693 P 406 ``The Commission This paragraph is understands that not a directive it may be to change or technically modify a possible for DSM standard. to meet equivalent requirements as conventional generators and expects the Reliability Standards development process to provide the qualifications they must meet to participate.'' (NERC Reference No. 10033). 12.......... BAL-006....................... 693 P 438 ``Examine the WECC This paragraph is time error not a directive correction to change or procedure as a modify a possible guide . standard. . . the Commission asks the ERO, when filing the new Reliability Standard, to explain how the new Reliability Standard satisfies the Commission's concerns.'' (NERC Reference No. 10037). 13.......... COM-001....................... 693 P 507 ``Although we This paragraph is direct that the not a directive regional to change or reliability modify a organization standard. should not be the compliance monitor for NERCNet, we leave it to the ERO to determine whether it is the appropriate compliance monitor or if compliance should be monitored by the Regional Entities for NERCNet User Organizations.'' (NERC Reference No. 10051). 14.......... MOD-001....................... 729 P 20 ``We encourage the This paragraph is ERO to consider not a directive Midwest ISO's and to change or Entegra's modify a comments when standard. developing other modifications to the MOD Reliability Standards pursuant to the EROs Reliability Standards development procedure.'' [See also P 198-199] (NERC Reference No. 10216). 15.......... MOD -001, -004, -008, -028, - 729 P 160 ``In developing This paragraph is 029, -030. the modifications not a directive to the MOD to change or Reliability modify a Standards standard. directed in this Final Rule, the ERO should consider generator nameplate ratings and transmission line ratings including the comments raised by Entegra and ISO/RTO Council.'' [Also see P 154] (NERC Reference No. 10207). 16.......... MOD-001....................... 729 P 179 ``The Commission This paragraph is directs the ERO not a directive to consider to change or Entegra's request modify a regarding more standard. frequent updates for constrained facilities through its Reliability Standards development process.'' (see Order No. 729 at P 177 for Entegra's comments). (NERC Reference No. 10211). 17.......... MOD-028....................... 729 P 231 ``The Commission This paragraph directs the ERO clarifies the to develop a Commission's modification sub- understanding of requirement R2.2 the phrase pursuant to its ``adjacent and Reliability beyond Standards Reliability development Coordination process to area.'' Since the clarify the Commission's phrase `adjacent understanding of and beyond the language is Reliability clearly Coordination expressed, and areas.''' (NERC the matter has Reference No. little impact on 10219). reliability, there is no reason to go forward with the directive. [[Page 73432]] 18.......... MOD-028....................... 729 P 234 ``The Commission This paragraph is agrees that a not a directive graduated time to change or frame for modify a reposting could standard. be reasonable in some situations. Accordingly, the ERO should consider this suggestion when making future modifications to the Reliability Standards.'' (NERC Reference No. 10220). 19.......... MOD-029....................... 729 P 246 ``The ERO should This paragraph is consider Puget not a directive Sound's concerns to change or on this issue modify a when making standard. future modifications to the Reliability Standards.'' [See also P 245] (NERC Reference No. 10222). 20.......... MOD-030....................... 729 P 269 ``The Commission This paragraph is also directs the not a directive ERO to make to change or explicit such modify a [effective date] standard. detail in any future version of this or any other Reliability Standard.'' (NERC Reference No. 10223). 21.......... MOD-024....................... 693 P 1310 ``Similarly, we This paragraph is respond to not a directive Constellation to change or that any modify a modification of standard. the Levels of Non- Compliance in this Reliability Standard should be reviewed in the ERO Reliability Standards development process.'' (NERC Reference No. 10318). 22.......... PER-002....................... 693 P 1375 ``Training This paragraph is programs for not a directive operations to change or planning and modify a operations standard. support staff must be tailored to the needs of the function, the tasks performed and personnel involved.'' (NERC Reference No. 10329). 23.......... VAR-001....................... 693 P 1863 ``The Commission This paragraph is expects that the not a directive appropriate power to change or factor range modify a developed for the standard. interface between the bulk electric system and the load-serving entity from VAR- 001-1 would be used as an input to the transmission and operations planning Reliability Standards.'' (NERC Reference No. 10441). 24.......... VAR-001....................... 693 P 1869 ``We recognize This paragraph is that our proposed not a directive modification does to change or not identify what modify a definitive standard. requirements the Reliability Standard should use for established limits and sufficient reactive resources.'' (NERC Reference No. 10434). 25.......... TPL and FAC series............ 705 P 49 ``Direct that any This paragraph revised TPL provides guidance Reliability on an ongoing Standards must implementation reflect issue and is not consistency in a directive to the lists of change or modify contingencies.'' a standard. (NERC Reference No. 10601). ---------------------------------------------------------------------------------------------------------------- Group C--The outstanding directive is redundant with another directive ---------------------------------------------------------------------------------------------------------------- 26.......... MOD-012....................... 693 P 1177 ``Direct the ERO This directive is to use its redundant with authority the directive in pursuant to Sec. paragraph 1147, 39.2(d) of our which has already regulations to been addressed require users, and is reflected owners, and in section A operators to above. provide to the Regional Entities the information related to data gathering, data maintenance, reliability assessments and other process type functions.'' (NERC Reference No. 10275). 27.......... MOD-012....................... 693 P 1177 ``Develop a Work This directive is Plan and submit a redundant with compliance filing the directive in that will paragraph 1163, facilitate which has already ongoing been addressed collection of the and is reflected dynamics system in section A modeling and above. simulation data.'' (NERC Reference No. 10279). 28.......... MOD-012....................... 693 P 1181 ``Direct the ERO This directive is to address redundant with confidentiality the directive in issues and modify paragraph 1152, the standard as which has already necessary through been addressed its Reliability and is reflected Standards in section A development above. process.'' (NERC Reference No. 10277). [[Page 73433]] 29.......... MOD-013....................... 693 P 1200 ``Direct the ERO This directive is to develop a Work redundant with Plan that will the directive in facilitate paragraph 1163, ongoing which has already collection of the been addressed dynamics system and is reflected modeling and in section A simulation data above. specified in MOD- 013-1, and submit a compliance filing containing this Work Plan to the Commission.'' (NERC Reference No. 10283). 30.......... MOD-014....................... 693 P 1212 ``Direct the ERO This directive is to use its redundant with authority the directive in pursuant to Sec. paragraph 1147, 39.2(d) of our which has already regulations to been addressed require users, and is reflected owners and in section A operators to above. provide the validated models to regional reliability organizations.'' (NERC Reference No. 10288). 31.......... MOD-014....................... 693 P 1212 ``Direct the ERO This directive is to develop a Work redundant with Plan that will the directive in facilitate paragraph 1163, ongoing which has already validation of been addressed steady-state and is reflected models and submit in section A a compliance above. filing containing the Work Plan with the Commission.'' (NERC Reference No. 10289). 32.......... MOD-015....................... 693 P 1221 ``Direct the ERO This directive is to use its redundant with authority the directive in pursuant to Sec. paragraph 1147, 39.2(d) of our which has already regulations to been addressed require users, and is reflected owners and in section A operators to above. provide to the Regional Entity the validated dynamics system models while MOD- 015-0 is being modified.'' (NERC Reference No. 10291). 33.......... MOD-015....................... 693 P 1221 ``Require the ERO This directive is to develop a Work redundant with Plan that will the directive in enable continual paragraph 1163, validation of which has already dynamics system been addressed models and submit and is reflected a compliance in section A filing with the above. Commission.'' (NERC Reference No. 10292). 34.......... MOD-017....................... 693 P 1247 ``Provide a Work This directive is Plan and redundant with compliance filing the directive in regarding the paragraph 1163, collection of which has already information been addressed specified under and is reflected standards that in section A are deferred, in above. this instance, data on the accuracy, error and bias of the forecast.'' (NERC Reference No.10299). 35.......... MOD-018....................... 693 P 1264 ``Require the ERO This directive is to provide a Work redundant with Plan and the directive in compliance filing paragraph 1163, regarding which has already collection of been addressed information and is reflected specified under in section A standards that above. are deferred, and believe there should be no difficulties complying with this Reliability Standard.'' (NERC Reference No. 10303). 36.......... MOD-019....................... 693 P 1275 ``Direct the ERO This directive is to use its redundant with authority the directive in pursuant to Sec. paragraph 1147, 39.2(d) of our which has already regulations to been addressed require users, and is reflected owners and in section A operators to above. provide to the Regional Entity information related to forecasts of interruptible demands and direct control load management.'' (NERC Reference No. 10305). 37.......... MOD-021....................... 693 1297 ``Direct the ERO This directive is to provide a Work redundant with Plan and the directive in compliance filing paragraph 1163, regarding which has already collection of been addressed information and is reflected specified under in section A related standards above. that are deferred, and believe there should be no difficulty complying with this Reliability Standard.'' (NERC Reference No. 10309). 38.......... MOD-021....................... 693 P 1297 ``Direct the ERO This directive is to use its redundant with authority the directive in pursuant to Sec. paragraph 1147, 39.2(d) of our which has already regulations to been addressed require users, and is reflected owners and in section A operators to above. provide to the Regional Entity the information required by this Reliability Standard.'' (NERC Reference No. 10313). [[Page 73434]] 39.......... MOD-024....................... 693 P 1308 ``In order to This directive is continue redundant with verifying and the directive in reporting gross paragraph 1147, and net real which has already power generating been addressed capability needed and is reflected for reliability in section A assessment and above. future plans, we direct the ERO to develop a Work Plan and submit a compliance filing.'' (NERC Reference No. 10317). 40.......... MOD-024....................... 693 P 1312 ``Direct the ERO This directive is to use its redundant with authority the directive in pursuant to Sec. paragraph 1147, 39.2(d) of our which has already regulations to been addressed require users, and is reflected owners and in section A operators to above. provide this information.'' (NERC Reference No. 10314). 41.......... MOD-025....................... 693 P 1320 ``In order to This directive is continue redundant with verifying and the directive in reporting gross paragraph 1147, and net reactive which has already power generating been addressed capability needed and is reflected for reliability in section A assessment and above. future plans, we direct the ERO to develop a Work Plan as defined in the Common Issues section.'' (NERC Reference No. 10321). ---------------------------------------------------------------------------------------------------------------- Note: Attachment B will not appear in the Code of Federal Regulations. Attachment B Commenters on the Notice of Proposed Rulemaking The American Public Power Association, Edison Electric Institute, Electricity Consumers Resource Council, Electric Power Supply Association, Large Public Power Council, and Transmission Access Policy Group (collectively, Trade Associations) Canadian Electricity Association (CEA) Dominion Resources Services, Inc., on behalf of Virginia Electric and Power Company, doing business as Dominion Virginia Power; Dominion Nuclear Connecticut, Inc.; Dominion Energy Brayton Point, LLC; Dominion Energy Manchester Street, Inc.; Elwood Energy, LLC; Kincaid Generation, LLC; and Fairless Energy, LLC International Transmission Company d/b/a ITCTransmission, Michigan Electric Transmission Company, LLC, ITC Midwest LLC and ITC Great Plains, LLC (ITC) ISO/RTO Council National Rural Electric Cooperative Association (NRECA) North American Electric Reliability Corporation (NERC) [FR Doc. 2013-28516 Filed 12-5-13; 8:45 am] BILLING CODE 6717-01-P