Hydro Green Energy, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On August 15, 2013, Hydro Green Energy, LLC, filed an application
for a
[[Page 78354]]
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Pendleton South
Project to be located near Camp Pendleton South in San Diego County,
California. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) A 30-foot-
high, 5,108-foot-long upper earthen embankment constructed with rubber
sheet and asphalt lining; (2) an upper reservoir having a total/usable
storage capacity of 8,894 acre-feet at normal maximum operation
elevation of 1,032 feet above mean sea level; (3) eight approximately
25,000-foot-long by 10-foot-diameter steel lined penstocks; (4) a 500-
foot-long, 250-foot-diameter concrete lined tailrace; (5) a concrete
and steel lined pressure shaft; (6) eight 154-megawatt, reversible
variable-speed pump-turbines; (7) a new powerhouse and substation
located approximately 100 feet below ground and approximately 250 feet
long by 75 feet wide by 100 feet high; (8) a vertical access tunnel
approximately 400 feet high and 30 feet in diameter; (9) a breakwater
constructed from precast concrete tetrapods; and (10) a new single-
circuit 230-kilovolt transmission line approximately 9 miles in length.
The estimated annual generation of the Pendleton South Project would be
approximately 3,607 gigawatt-hours.
Applicant Contact: Mr. Mark Stover, Hydro Green, LLC, 900 Oakmont
Lane, Suite 310, Westmont, IL 60559; phone: (877) 556-6566 ext. 709.
FERC Contact: Mary Greene; phone: (202) 502-8865.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14548-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14548) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: December 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-30830 Filed 12-24-13; 8:45 am]
BILLING CODE 6717-01-P