DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14548-000]


Hydro Green Energy, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On August 15, 2013, Hydro Green Energy, LLC, filed an application 
for a

[[Page 78354]]

preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Pendleton South 
Project to be located near Camp Pendleton South in San Diego County, 
California. The sole purpose of a preliminary permit, if issued, is to 
grant the permit holder priority to file a license application during 
the permit term. A preliminary permit does not authorize the permit 
holder to perform any land-disturbing activities or otherwise enter 
upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) A 30-foot-
high, 5,108-foot-long upper earthen embankment constructed with rubber 
sheet and asphalt lining; (2) an upper reservoir having a total/usable 
storage capacity of 8,894 acre-feet at normal maximum operation 
elevation of 1,032 feet above mean sea level; (3) eight approximately 
25,000-foot-long by 10-foot-diameter steel lined penstocks; (4) a 500-
foot-long, 250-foot-diameter concrete lined tailrace; (5) a concrete 
and steel lined pressure shaft; (6) eight 154-megawatt, reversible 
variable-speed pump-turbines; (7) a new powerhouse and substation 
located approximately 100 feet below ground and approximately 250 feet 
long by 75 feet wide by 100 feet high; (8) a vertical access tunnel 
approximately 400 feet high and 30 feet in diameter; (9) a breakwater 
constructed from precast concrete tetrapods; and (10) a new single-
circuit 230-kilovolt transmission line approximately 9 miles in length. 
The estimated annual generation of the Pendleton South Project would be 
approximately 3,607 gigawatt-hours.
    Applicant Contact: Mr. Mark Stover, Hydro Green, LLC, 900 Oakmont 
Lane, Suite 310, Westmont, IL 60559; phone: (877) 556-6566 ext. 709.
    FERC Contact: Mary Greene; phone: (202) 502-8865.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14548-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14548) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: December 19, 2013.
 Kimberly D. Bose,
 Secretary.