[Federal Register Volume 78, Number 251 (Tuesday, December 31, 2013)]
[Notices]
[Page 79707]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-31304]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

[133R0680R1, RR.17549897.1000000.01, RC0ZCUPCA0]


 Office of the Assistant Secretary--Water and Science; 
Environmental Assessment of the Olmsted Hydroelectric Power Plant 
Replacement Project

AGENCY: Central Utah Project Completion Act Completion Office, 
Interior.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The Department of the Interior and the Central Utah Water 
Conservancy District (District), as joint leads, are preparing an 
Environmental Assessment (EA) to evaluate the impacts of a proposed 
project to replace the Olmsted Hydroelectric Power Plant.

DATES: Please submit scoping comments by January 31, 2014.

ADDRESSES: A Scoping Document associated with this effort is available 
at www.cuwcd.com and www.cupcao.gov. Send written comments to Mr. Chris 
Elison, 355 W. University Parkway, Orem, UT 84058-7303; by email to 
[email protected]; or by facsimile to the attention of Mr. Chris Elison 
at 801-226-7171.

FOR FURTHER INFORMATION CONTACT: Mr. Lee Baxter, Central Utah Project 
Completion Act Office, 302 East 1860 South, Provo, Utah 84606; by 
calling 801-379-1174; or email at [email protected].

SUPPLEMENTARY INFORMATION: The proposed project is located in Orem, 
Utah near the mouth of Provo Canyon. In October 2015, the District will 
assume the responsibility for operation and maintenance of the Olmsted 
power plant as a component of the Bonneville Unit of the Central Utah 
Project. The EA will provide the necessary analysis for determining 
potential environmental impacts associated with replacement of the 
Olmsted power plant and its continued operation. Principal components 
of the proposed project include construction of a new powerhouse; 
replacement of existing penstocks; incorporating the existing 10 
million gallon equalization reservoir into the power plant 
configuration with potential impacts to the existing pressure box, 
raising the existing spillway, and lining a portion of the Olmsted 
Flowline tunnel.

    Dated: December 24, 2013.
Reed R. Murray,
Program Director, Central Utah Project Completion Act, Department of 
the Interior.
[FR Doc. 2013-31304 Filed 12-30-13; 8:45 am]