Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulations governing the operation of the
Atlantic Beach Bridge, mile 0.4, across Reynolds Channel, at Lawrence,
New York. The deviation is necessary to facilitate structural repairs
at the bridge. This temporary deviation authorizes the Atlantic Beach
Bridge to operate under an alternate schedule to complete the
structural repairs at the bridge.
DATES: This deviation is effective from March 24, 2014 through May 23,
2014.
ADDRESSES: The docket for this deviation, [USCG-2013-1088] is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, [email protected], or (212) 668-
7165. If you have questions on viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Atlantic Beach Bridge, across Reynolds
Channel, mile 0.4, at Lawrence, New York, has a vertical clearance in
the closed position of 25 feet at mean high water and 30 feet at mean
low water. The existing drawbridge operation regulations are listed at
33 CFR 117.799(e).
The waterway is transited by commercial and seasonal recreational
vessels of various sizes.
The owner of the bridge, Nassau County Bridge Authority, requested
approval to operate the bridge under a temporary operating schedule to
facilitate structural repairs at the bridge.
Under this temporary deviation the draw of the Atlantic Beach
Bridge at mile 0.4, across Reynolds Channel shall operate, under the
following operating schedule:
March 24, 2014 through April 20, 2014, Monday through Friday, the
bridge shall operate a single span on signal between 6:30 a.m. and 4
p.m. From 4 p.m. through 6:30 a.m. the bridge shall open both spans on
signal.
Weekends and holidays, from 4 p.m. on Friday through 6:30 a.m. on
Monday the bridge shall operate two spans on signal.
April 21, 2014 through May 23, 2014, Monday through Friday, the
bridge shall remain in the closed position; except that, the draw shall
open on signal at 12 p.m. provided at least a one hour notice is given.
Weekends and holidays, from 4 p.m. on Friday through 6:30 a.m. on
Monday the bridge shall operate two spans on signal.
The bridge shall open on signal at all times for commercial vessel
traffic after at least a 48 hour advance notice is given by calling the
number posted at the bridge.
The Coast Guard contacted all known commercial waterway users
regarding this deviation and no objections were received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.