[Federal Register Volume 79, Number 66 (Monday, April 7, 2014)]
[Rules and Regulations]
[Page 18996]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2014-07607]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2014-0191]
Drawbridge Operation Regulation; Willamette River, Portland, OR
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Broadway Bridge across the
Willamette River, mile 11.7, at Portland, OR. The deviation is
necessary to accommodate the Portland Race for the Roses event. This
deviation allows the bridge to remain in the down or closed position to
facilitate safe movement of event participants.
DATES: This deviation is effective from 4:30 a.m. to 9:30 a.m. April
13, 2014.
ADDRESSES: The docket for this deviation, [USCG-2014-0191] is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Steven Fischer, Bridge
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282,
email [email protected]. If you have questions on viewing the
docket, call Cheryl Collins, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: Multnomah County has requested that the
Broadway Bascule Bridge remain closed to vessel traffic to facilitate
safe, uninterrupted roadway passage of participants in the Portland
Race for the Roses event. The Broadway Bridge crosses the Willamette
River at mile 11.7 and provides 90 feet of vertical clearance above
Columbia River Datum 0.0 while in the closed position. Vessels able to
pass through the bridge in the closed positions may do so at anytime.
The bridge will be able to open for emergencies and there is no
immediate alternate route for vessels to pass.
Under normal conditions this bridge operates in accordance with 33
CFR 117.897, which allows for the bridge to remain closed between 7
a.m. and 9 a.m. and 4 p.m. and 6 p.m. Monday through Friday and also
requires advance notification when a bridge opening is needed. This
deviation allows the bascule span of the Broadway Bridge across the
Willamette River, mile 11.7, to remain in the closed position and need
not open for maritime traffic from 4:30 a.m. April 13, 2014 to 9:30
a.m. April 13, 2014. The bridge shall operate in accordance to 33 CFR
117.897 at all other times.
Waterway usage on this stretch of the Willamette River includes
vessels ranging from commercial tug and barge to small pleasure craft.
Mariners will be notified and kept informed of the bridges' operational
status via the Coast Guard Notice to Mariners publication and Broadcast
Notice to Mariners as appropriate. The bridge will be required to open,
if needed, for vessels engaged in emergency response operations during
this closure period.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: March 19, 2014.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2014-07607 Filed 4-4-14; 8:45 am]
BILLING CODE 9110-04-P