SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the South Park Highway Bridge across
the Duwamish Waterway, mile 3.8, at Seattle, Washington. The deviation
is necessary to enable timely completion of drawbridge construction.
This deviation allows the drawbridge to remain closed to mariners
needing a full channel, double bascule leaf drawbridge opening unless
12 hours advance notice is provided. Mariners that only require a
single leaf, half channel drawbridge opening will be given an opening
upon signal.
DATES: This deviation is effective without actual notice from April 15,
2014 until 11:59 p.m. on September 1, 2014. For the purposes of
enforcement, actual notice will be used from 12:01 a.m. on March 30,
2014, until April 15, 2014.
ADDRESSES: The docket for this deviation, [USCG-2014-0237] is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Steven M. Fischer, Thirteenth
District Bridge Administrator, Coast Guard; telephone 206-220-7282,
email: [email protected]. If you have questions on viewing the
docket, call Cheryl Collins, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The South Park Highway double bascule span
drawbridge replacement project has progressed to the point where both
bascule spans have been installed. King County Road Services Division
requested a deviation to the drawbridge operation schedule to enable
timely completion of the bridge construction project. The South Park
Highway Double Bascule Bridge is located at Duwamish Waterway, mile
3.8, in the city of Seattle, Washington, and provides 34.8 feet of
vertical clearance above at center span while in the closed position
and 30 feet of vertical clearance at the extreme east and west ends of
the navigable channel and unlimited vertical clearance with the bascule
bridge in the fully open position. Vertical clearances are referenced
to mean high-water elevation (MHW). Horizontal clearance is 128 feet.
However, horizontal clearance may be restricted by construction barges.
As such, mariners are advised to consult the Local Notice to Mariners
for current conditions.
[[Page 21129]]
The normal operation schedule for the bridge is in 33 CFR 117.1041,
which specifies that the draws of each bridge across the Duwamish
Waterway shall open on signal, except the draw of the South Park
highway bridge, mile 3.8, which need not be opened for the passage of
vessels from 6:30 a.m. to 8:00 a.m. and 3:30 p.m. to 5:00 p.m., Monday
through Friday, excluding Federal holidays. The South Park highway
bridge shall open on the specified signal of one prolonged blast
followed quickly by one short blast and one prolonged blast. When fog
prevails by day or by night, the drawtender of the South Park highway
bridge, after giving the acknowledging signal to open, shall toll a
bell continuously during the approach and passage of vessels.
The deviation period is effective from 12:01 a.m. on March 30, 2014
to 11:59 p.m. on September 1, 2014, and allows the drawbridge to remain
closed to mariners needing a full channel, double bascule leaf
drawbridge opening unless 12 hours advance notice is provided. Mariners
that only require a single leaf half channel drawbridge opening will be
given an opening upon signal. A drawtender will be present 24 hours a
day, 7 days week. To request a single leaf opening, mariners may
utilize any of the following methods: (1) via VHF maritime radio
channel 13; (2) telephone, with the numbers posted in the Notice to
Mariners; (3) one prolonged blast followed quickly by one short blast
and one prolonged blast. All double leaf openings require 12 hour
notification by VHF maritime radio channel 13 or telephone; double leaf
openings will not be granted when requested by signal.
Waterborne traffic on this stretch of the Duwamish waterway
consists of vessels ranging from small pleasure craft, sailboats, small
tribal fishing boats, and commercial tug and tow, and mega yachts.
Vessels able to pass through the bridge in the closed positions may do
so at anytime but are advised to use caution as the area surrounding
the bridge has numerous construction craft and equipment in the water.
The bridge will not be able to open for emergencies and there is no
immediate alternate route for vessels to pass. The Coast Guard will
also inform the users of the waterways through our Local and Broadcast
Notices to Mariners of the change in operating schedule for the bridge
so that vessels can arrange their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: March 30, 2014.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2014-08550 Filed 4-14-14; 8:45 am]
BILLING CODE 9110-04-P