[Federal Register Volume 79, Number 105 (Monday, June 2, 2014)]
[Notices]
[Pages 31318-31319]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2014-12642]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14581-000]


Turlock Irrigation District Modesto Irrigation District; Notice 
of Filing of Pre-Application Document (PAD), Commencement of Pre-Filing 
Process, and Scoping; Request for Comments on the PAD and Scoping 
Document, and Identification of Issues and Associated Study Requests

    a. Type of Filing: Notice of PAD Filing and Commencing Pre-Filing 
Process for Application for an Original License.
    b. Project No.: 14581-000.
    c. Dated Filed: March 24, 2014.\1\
---------------------------------------------------------------------------

    \1\ In a letter filed March 24, 2014, the Districts indicated 
that they were no longer interested in pursuing the Traditional 
Licensing Process. Therefore, March 24, 2014 was established as the 
pre-filing process start date for the Integrated Licensing Process.
---------------------------------------------------------------------------

    d. Submitted By: Turlock Irrigation District and Modesto Irrigation 
District.
    e. Name of Project: La Grange Hydroelectric Project.
    f. Location: The La Grange Project facilities are located on the 
Tuolomne River in Tuolomne County, California. Portions of the Don 
Pedro Project occupy lands of the Bureau of Land Management Sierra 
Resource Management Unit.
    g. Filed Pursuant to: 18 CFR Part 5 of the Commission's 
Regulations.
    h. Potential Applicant Contact: Steven Boyd, Director of Water 
Resources, Turlock Irrigation District, P.O. Box 949, Turlock, 
California 95381, 209-883-8364 and Greg Dias, Project Manager, Modesto 
Irrigation District, P.O. Box 4060, Modesto, California 95352, 209-526-
7566.
    i. FERC Contact: Jim Hastreiter at (503) 552-2760 or 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item o below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See 94 FERC ] 
61,076 (2001).
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under 
section 7 of the Endangered Species Act and the joint agency 
regulations thereunder at 50 CFR, Part 402 and (b) the California State 
Historic Preservation Officer, as required by section 106, National 
Historical Preservation Act, and the implementing regulations of the 
Advisory Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating the Turlock Irrigation 
District and Modesto Irrigation District as the Commission's non-
federal representative for carrying out informal consultation, pursuant 
to section 7 of the Endangered Species Act and section 106 of the 
National Historic Preservation Act.
    m. Turlock Irrigation District and Modesto Irrigation District 
filed with the Commission a Pre-Application Document (PAD; including a 
proposed process plan and schedule), pursuant to 18 CFR 5.6 of the 
Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(http://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected] or toll free at 1-866-208-3676, or for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. With this notice, we are soliciting comments on the PAD and 
Commission's staff Scoping Document 1 (SD1), as well as study requests. 
All comments on the PAD and SD1, and study requests should be sent to 
the address above in paragraph h. In addition, all comments on the PAD 
and SD1, study requests, requests for cooperating agency status, and 
all communications to and from Commission staff related to the merits 
of the potential application must be filed with the Commission. 
Documents may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/

[[Page 31319]]

ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support. Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426.
    All filings with the Commission must include on the first page, the 
project name (La Grange Hydroelectric Project) and number (P-14581-
000), and bear the appropriate heading: ``Comments on Pre-Application 
Document,'' ``Study Requests,'' ``Comments on Scoping Document 1,'' 
``Request for Cooperating Agency Status,'' or ``Communications to and 
from Commission Staff.'' Any individual or entity interested in 
submitting study requests, commenting on the PAD or SD1, and any agency 
requesting cooperating status must do so by July 22, 2014.
    p. Our current intent is to prepare an Environmental Assessment 
(EA). This meeting will satisfy the NEPA scoping requirements.

Scoping Meetings and Environmental Site Review

    Commission staff will hold two scoping meetings in the vicinity of 
the project at the time and place noted below. The daytime meeting will 
focus on resource agency, Indian tribes, and non-governmental 
organization concerns, while the evening meeting is primarily for 
receiving input from the public. We invite all interested individuals, 
organizations, and agencies to attend one or both of the meetings, and 
to assist staff in identifying particular study needs, as well as the 
scope of environmental issues to be addressed in the environmental 
document. The times and locations of these meetings are as follows:

Daytime Scoping Meeting

    Date and Time: Wednesday, June 18, 2014, 10:00 a.m. (PST)
    Location: CSU-Stanislaus, University Student Union-Events Center, 
801 W. Monte Vista, Turlock, California 95382.

Evening Scoping Meeting

    Date and Time: Wednesday, June 18, 2014, 7:00 p.m. (PST)
    Location: Double Tree Hotel-Modesto, Ballroom 4, 1150 Ninth Street, 
Modesto, California 95354

Environmental Site Review

    Date and Time: Thursday, June 19, 2014, 10:00 a.m. (PST)
    Location: meet at the La Grange Rodeo Grounds, 4999 State Hwy. 132, 
La Grange, CA, 95329.
    Please notify Jim Hastreiter at 503-552-2760 or 
[email protected] by June 2, 2014, if you plan to attend the 
site visit.
    Scoping Document 1 (SD1), which outlines the subject areas to be 
addressed in the environmental document, was mailed to the individuals 
and entities on the Commission's and Turlock Irrigation District and 
Modesto Irrigation District mailing lists. Copies of SD1 will be 
available at the scoping meetings, or may be viewed on the web at 
http://www.ferc.gov, using the ``eLibrary'' link. Follow the directions 
for accessing information in paragraph n. Based on all oral and written 
comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a 
revised process plan and schedule, as well as a list of issues, 
identified through the scoping process.

Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the 
issues; (2) review and discuss existing conditions and resource 
management objectives; (3) review and discuss existing information and 
identify preliminary information and study needs; (4) review and 
discuss the process plan and schedule for pre-filing activity that 
incorporates the time frames provided for in Part 5 of the Commission's 
regulations and, to the extent possible, maximizes coordination of 
federal, state, and tribal permitting and certification processes; and 
(5) discuss the appropriateness of any federal or state agency or 
Indian tribe acting as a cooperating agency for development of an 
environmental document.
    Meeting participants should come prepared to discuss their issues 
and/or concerns. Please review the PAD in preparation for the scoping 
meetings. Directions on how to obtain a copy of the PAD and SD1 are 
included in item n. of this document.

Meeting Procedures

    The meetings will be recorded by a stenographer and will be placed 
in the public record of the project.

    Dated: May 23, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-12642 Filed 5-30-14; 8:45 am]
BILLING CODE 6717-01-P