[Federal Register Volume 79, Number 190 (Wednesday, October 1, 2014)]
[Notices]
[Page 59360]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2014-23344]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Transit Administration


Limitation on Claims Against Proposed Public Transportation 
Projects; Correction

AGENCY: Federal Transit Administration (FTA), DOT.

ACTION: Notice; correction.

-----------------------------------------------------------------------

SUMMARY: The Federal Transit Administration (FTA) published a notice in 
the Federal Register on September 16, 2014, concerning a limitation on 
claims for certain specified public transportation projects. The prior 
notice contained an error regarding one of the project descriptions. 
This notice serves to correct the error.

FOR FURTHER INFORMATION CONTACT: Nancy-Ellen Zusman, Assistant Chief 
Counsel, Office of Chief Counsel, (312) 353-2577 or Terence Plaskon, 
Environmental Protection Specialist, Office of Planning and 
Environment, (202) 366-0442. FTA is located at 1200 New Jersey Avenue 
SE., Washington, DC 20590. Office hours are from 9:00 a.m. to 5:30 
p.m., Monday through Friday, except Federal holidays.
    Correction: In the Federal Register notice dated September 16, 
2014, FR Doc. 2014-22065, on page 55528, in the third column, the 
Vasona Corridor Light Rail Transit Extension Project was incorrectly 
described as extending the existing line 11.6 miles from the existing 
Winchester Station to a new Vasona Junction Station. A corrected 
description should read:
    Project description: The FTA issued a Record of Decision (ROD) for 
the Vasona Corridor Light Rail Transit (LRT) project in June 2000. 
Construction between downtown San Jose and Winchester Station in 
Campbell began in 2001. Passenger service started in 2005. The 
southernmost portion of the project between the Winchester Station and 
the Vasona Junction Station in Los Gatos was not constructed due to 
insufficient funding. The Vasona Corridor LRT Extension Project would 
complete the line as originally planned by extending the existing line 
1.6 miles from the existing Winchester Station to a new Vasona Junction 
Station. The extension includes constructing a double set of LRT 
tracks; lengthening the six existing station platforms along the Vasona 
Corridor to accommodate longer train sets; increasing parking capacity 
and improving pedestrian access at Winchester Station; constructing a 
new Hacienda Station with an optional park-and-ride lot; a new Vasona 
Junction Station with a park-and-ride lot, as well as end-of-the-line 
facilities.
    This notice serves to revise the prior project description. This 
notice does not affect the FTA's previous decisions for this project. 
The correction does not alter the statute of limitations (SOL) for 
modifications to the Vasona Corridor Light Rail Transit Extension 
Project previously noticed on September 16, 2014, and described above. 
The SOL on claims will still expire on February 13, 2015.

    Issued on: September 24, 2014.
Lucy Garliauskas,
Associate Administrator for Planning and Environment.
[FR Doc. 2014-23344 Filed 9-30-14; 8:45 am]