DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14661-000]


Adam Robert Rousselle, II; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On February 5, 2015, Adam Robert Rousselle, II filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act (FPA), proposing to study the feasibility of the Nockamixon Dam 
Water Power Project (project) to be located on Tohickon Creek, in Bucks 
County, Pennsylvania. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) The 
existing Nockamixon dam, which is 1,511 feet long and approximately 112 
feet high discharging into Tohickon Creek; (2) Nockamixon dam impounds 
a reservoir of 40,000 acre-feet with a surface area of 1,450 acres, at 
a pool elevation of 395.0 feet mean sea level; (3) a proposed 
reinforced concrete powerhouse housing three pump turbine generating 
units with a total installed capacity of 150 kilowatts; (4) a proposed 
826-foot-long, 34.5-kilovolt primary transmission line connected to 
Metropolitan Edison Company; and (5) appurtenant facilities. The 
estimated annual generation of the project would be 834,000 
kilowatthours.
    Applicant Contact: Mr. Adam Robert Rousselle, II, 104 Autumn Trace 
Drive, New Hope, PA 18938, phone: 215-485-1708.
    FERC Contact: Tim Looney; phone: (202) 502-6096.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior

[[Page 11193]]

registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-14661-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14661) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: February 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-04244 Filed 2-27-15; 8:45 am]
BILLING CODE 6717-01-P