ENVIRONMENTAL PROTECTION AGENCY

[EPA-HQ-OECA-2014-0078; FRL-9925-08-OEI]


Information Collection Request Submitted to OMB for Review and 
Approval; Comment Request; NESHAP for Metal Coil Surface Coating Plants 
(Renewal)

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) has submitted an 
information collection request (ICR), ``NESHAP for Metal Coil Surface 
Coating Plants (40 CFR part 63, subpart SSSS) (Renewal)'' (EPA ICR No. 
1957.07, OMB Control No. 2060-0487) to the Office of Management and 
Budget (OMB) for review and approval in accordance with the Paperwork 
Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed extension of 
the ICR, which is currently approved through April 30, 2015. Public 
comments were previously requested via the Federal Register (79 FR 
30117) on May 27, 2014 during a 60-day comment period. This notice 
allows for an additional 30 days for public comments. A fuller 
description of the ICR is given below, including its estimated burden 
and cost to the public. An Agency may not conduct or sponsor and a 
person is not required to respond to a collection of information unless 
it displays a currently valid OMB control number.

DATES: Additional comments may be submitted on or before April 27, 
2015.

ADDRESSES: Submit your comments, referencing Docket ID Number EPA-HQ-
OECA-2014-0078, to (1) EPA online using www.regulations.gov (our 
preferred method), by email to [email protected], or by mail to: EPA 
Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 
Pennsylvania Ave. NW., Washington, DC 20460, and (2) OMB via email to 
[email protected]. Address comments to OMB Desk Officer for 
EPA.
    EPA's policy is that all comments received will be included in the 
public docket without change including any personal information 
provided, unless the comment includes profanity, threats, information 
claimed to be Confidential Business Information (CBI) or other 
information whose disclosure is restricted by statute.

FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, 
Assistance, and Media Programs Division, Office of Compliance, Mail 
Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. 
NW., Washington, DC 20460; telephone number: (202) 564-2970; fax 
number: (202) 564-0050; email address: [email protected].

SUPPLEMENTARY INFORMATION: Supporting documents, which explain in 
detail the information that the EPA will be collecting, are available 
in the public docket for this ICR. The docket can be viewed online at 
www.regulations.gov or in person at the EPA Docket Center, EPA West, 
Room 3334, 1301 Constitution Ave., NW., Washington, DC. The telephone 
number for the Docket Center is 202-566-1744. For additional 
information about EPA's public docket, visit http://www.epa.gov/dockets.
    Abstract: This ICR affects respondents from new and existing coil 
coating line facilities that are major sources of hazardous air 
pollutant (HAP). Coil coating line is the process in which special 
equipment is used to apply an organic coating to the surface of metal 
coils. All NESHAP standards require initial notifications, performance 
tests, and periodic reports by the owners/operators of the affected 
facilities. Respondents are also required to maintain records of the 
occurrence and duration of any startup, shutdown, or malfunction in the 
operation of an affected facility, or any period during which the 
monitoring system is inoperative. The provisions of this Subpart do not 
apply to coil coating lines that are part of research or laboratory 
equipment, or coil coating

[[Page 16374]]

lines in which 85 percent of the metal coil coated; unless the coating 
line is controlled by a common control device. The required semiannual 
reports are used to determine periods of excess emissions, identify 
problems at the facility, verify operation/maintenance procedures and 
for compliance determinations. This information is being collected to 
assure compliance with 40 CFR part 63, Subpart SSSS.
    Form Numbers: None.
    Respondents/affected entities: Metal coil surface coating plants.
    Respondent's obligation to respond: Mandatory (40 CFR part 63, 
Subpart SSSS).
    Estimated number of respondents: 89 (total).
    Frequency of response: Initially, semiannually, and occasionally.
    Total estimated burden: 25,145 hours (per year). Burden is defined 
at 5 CFR 1320.3(b).
    Total estimated cost: $2,552,959 (per year), includes $91,200 
annualized capital or operation & maintenance costs.
    Changes in the Estimates: There is an increase of 5,244 hours in 
the total estimated respondent burden compared with the ICR currently 
approved by OMB. This increase is due to an adjustment of burden 
estimates based on industry comment received from consultation during 
the renewal of this ICR.

Courtney Kerwin,
Acting Director, Collection Strategies Division.
[FR Doc. 2015-07027 Filed 3-26-15; 8:45 am]