DEPARTMENT OF DEFENSE
Office of the Secretary
[Docket ID: DoD-2015-OS-0032]
Notice of Availability for a Finding of No Significant Impact for
the Environmental Assessment Addressing the Upgrade and Storage of
Beryllium at the DLA Strategic Materials Depot in Hammond, IN
AGENCY: Defense Logistics Agency (DLA), DoD.
ACTION: Notice of Availability (NOA) for a Finding of No Significant
Impact (FONSI) for the Environmental Assessment (EA) Addressing the
Upgrade and Storage of Beryllium at the DLA Strategic Materials Depot
in Hammond, IN.
-----------------------------------------------------------------------
SUMMARY: On April 10, 2015, DLA published a NOA in the Federal Register
(80 FR 19290) announcing the publication of the EA Addressing the
Upgrade and Storage of Beryllium at the DLA Strategic Materials Depot
in Hammond, IN. The EA was available for a 30-day public comment period
that ended May 11, 2015. The EA was prepared as required under the
National Environmental Policy Act (NEPA) of 1969. In addition, the EA
complied with DLA Regulation 1000.22. No comments were received during
the public comment period. This FONSI documents the decision of DLA to
proceed with the Upgrade and Storage of Beryllium at the DLA Strategic
Materials Depot in Hammond, IN. DLA has determined that the Proposed
Action is not a major Federal action significantly affecting the
quality of the human environment within the context of NEPA and that no
significant impacts on the human environment are associated with this
decision.
FOR FURTHER INFORMATION CONTACT: Ira Silverberg at 703-767-0705 during
normal business hours Monday through Friday, from 8:00 a.m. to 4:30
p.m. (EST) or by email: [email protected].
SUPPLEMENTARY INFORMATION: DLA completed an EA to address the potential
environmental consequences associated with the proposed upgrade and
storage of beryllium at the DLA Strategic Materials Depot in Hammond,
IN. This FONSI incorporates the EA by reference and summarizes the
results of the analyses in the EA.
Purpose and Need for Action: The purpose of the Proposed Action is
to upgrade and store a portion of the existing U.S. National Defense
Stockpile (NDS) of beryllium. DLA Strategic Materials has determined
that a portion of the existing beryllium billets are not in forms
readily useable by the U.S. Department of Defense (DoD) or its
subcontractors in times of national emergency. The proposed upgrade
would convert the existing beryllium billets into one or more final
products that would meet current specifications for many modern DoD
applications. The upgraded and converted beryllium is also expected to
be applicable to these same manufacturing processes for the foreseeable
future.
Proposed Action and Alternatives: Under the proposed action, the
DLA Strategic Materials would have up to 20 tons (18,140 kg) of the
existing NDS beryllium billets upgraded and converted at one or more
off-site commercial facilities and then will return the converted
beryllium to the Hammond Depot for continued safe and environmentally
sound long-term storage.
Each crate containing a single beryllium billet would be removed
from its storage location at the Hammond Depot by forklift and loaded
onto a truck located adjacent to the storage structure. The truck would
then transport the crate/billet to an off-site commercial facility
where the upgrade and conversion process would occur. All such upgrade
and conversion activities would be conducted at the off-site facilities
in compliance with all applicable state, local and federal laws,
regulations, requirements and permits. The upgraded billet would then
be returned and received for storage at the Hammond Depot. DLA
Strategic Materials expects to complete the beryllium upgrade and
conversion portion of the Proposed Action within a five-year period and
before the end of calendar year 2020.
Under the Proposed Action, long-term storage of the upgraded and
converted forms of beryllium at the Hammond Depot would then continue
after that date. A minimally intrusive inspection methodology would be
employed by DLA Strategic Materials for the periodic, on-going quality
surveillance of the upgraded and converted beryllium and to verify the
continued integrity of the storage containers, the internal inert
atmosphere status, and the product quality for the duration of the
long-term storage period.
The proposed beryllium upgrade and conversion would result in the
creation of forms of beryllium that are highly compatible with the
inputs required for current and future manufacturing processes. The
Proposed Action is also required to ensure that the installation is
able to meet its current and future mission requirements.
Description of the No Action Alternative: Under the No Action
Alternative, DLA would not upgrade the beryllium. The NDS beryllium
stockpile would continue to be stored at the Hammond Depot in its
current billet form. In the event the beryllium was needed to satisfy
future critical U.S. security, military or aerospace uses, it would not
be available in the forms required as input to current manufacturing
processes, and the billets would likely require conversion at that
time. DLA Strategic Materials has obtained estimates that it takes
about 10 weeks to turn beryllium billets into powder. Hence, the
usefulness of the beryllium in billet form would be questionable for
any such future U.S. critical needs. The No Action Alternative would
not meet the purpose of and need for the Proposed Action.
Potential Environmental Impacts: No significant effects on
environmental resources would be expected from the Proposed Action.
Potential insignificant, adverse effects on transportation, land use,
water resources, and ecological resources, air quality, and waste
management could be expected. No effects on environmental justice,
cultural resources, noise, recreation, socioeconomics, or aesthetics
would be expected. Details of the environmental consequences are
discussed in the EA, which is hereby incorporated by reference.
Determination: Based on the analysis of the Proposed Action's
potential impacts to the human environment from routine operations, it
was concluded that the Proposed Action would produce no significant
adverse impacts. Human environment was interpreted comprehensively to
include the natural and physical environment and the relationship of
people with that environment. No significant cumulative effects were
identified. Implementation of the Proposed Action will not violate any
Federal, state, or local laws. Based on the results of the analyses
performed during preparation of the EA, Ms. Mary D. Miller, Director,
DLA Installation
[[Page 51248]]
Support, concludes that the Upgrade and Storage of Beryllium at the DLA
Strategic Materials Depot in Hammond, IN does not constitute a major
Federal action significantly affecting the quality of the human
environment within the context of NEPA. Therefore, an environmental
impact statement for the Proposed Action is not required.
Dated: August 19, 2015.
Aaron Siegel,
Alternate OSD Federal Register Liaison Officer, Department of Defense.