DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14687-000]
Energy Resources USA Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On June 25, 2015, the Energy Resources USA Inc. filed an
application for a preliminary permit under section 4(f) of the Federal
Power Act proposing to study the feasibility of the proposed Lock and
Dam No.11 Hydroelectric Project No. 14687-000, to be located at the
existing Mississippi River Lock and Dam No. 11 on the Mississippi
River, near the City of Dubuque, in Grant County, Wisconsin. The
Mississippi River Lock and Dam No. 11 is owned by the United States
government and operated by the U.S. Army Corps of Engineers.
The sole purpose of a preliminary permit, if issued, is to grant
the permit holder priority to file a license application during the
permit term. A preliminary permit does not authorize the permit holder
to perform any land-disturbing activities or otherwise enter upon lands
or waters owned by others without the owners' express permission.
The proposed project would consist of: (1) A new 770-foot-long by
300-foot-wide earthen intake area; (2) a new 220-foot by 90-foot
concrete powerhouse containing four 2.5-megawatt hydropower turbine-
generators having a total combined generating capacity of 10 megawatts;
(3) one new 1000-foot-long by 220-foot-wide tailrace; (4) a new intake
retaining wall and new tailrace retaining wall each measuring 85-foot-
long by 43-foot-high by 3-foot-thick; (5) a new 50-foot by 60-foot
switchyard; (6) a new 1.52-mile-long, 69-kilovolt transmission line;
and (7) appurtenant facilities. The project would have an estimated
annual generation of 119,655 megawatt-hours.
Applicant Contact: Mr. Ander Gonzalez, 2655 Le Jeune Road, Suite
804, Coral Gables, Florida 33134; telephone +34 932523840.
FERC Contact: Tyrone A. Williams, (202) 502-6331.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. The Commission strongly encourages electronic filing.
Please file comments, motions to intervene, notices of intent, and
competing applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14687-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14687) in the docket number field to access
the document. For assistance, contact FERC Online Support at 1-866-208-
3676.
Dated: August 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-21261 Filed 8-26-15; 8:45 am]
BILLING CODE 6717-01-P