[Federal Register Volume 80, Number 194 (Wednesday, October 7, 2015)]
[Notices]
[Pages 60647-60657]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-25586]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
One-Time Deauthorization of Water Resources Projects
AGENCY: Army Corps of Engineers, DoD.
ACTION: Notice of Interim Deauthorization List.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers is publishing an Interim
Deauthorization List of water resources development projects and
separable elements that have been identified for deauthorization in
accordance with section 6001(c) of the Water Resources Reform and
Development Act of 2014, Public Law 113-121, 128 STAT. 1346-1347 (WRRDA
2014), and is soliciting comments from the public on the list for 90
calendar days. Comments should be provided to the contact named below
by January 4, 2016.
FOR FURTHER INFORMATION CONTACT: Mr. Joseph W. Aldridge, Headquarters,
U.S. Army Corps of Engineers, Attention: CECW-IP, Washington, DC 20314-
1000. Tel. (202) 761-4130 or [email protected].
SUPPLEMENTARY INFORMATION: Interim Deauthorization List required by
Sec. 6001(c).
Section 6001(c) provides that the Secretary shall develop an
Interim Deauthorization List that identifies each water resources
development project, or separable element of a project, that meets the
following criteria. Projects and separable elements eligible for
deauthorization are those uncompleted construction projects and
separable elements meeting all of the following criteria: (1) They were
authorized for construction before November 8, 2007, or their most
recent modification of the construction authorization predates November
8, 2007; (2) their construction has not been initiated, or, if
construction has been initiated, there have been no obligations of
Federal or non-federal funds for construction in the current fiscal
year or any of the past 6 fiscal years; and, (3) there has been no
funding for a post-authorization study in the current fiscal year or
any of the past 6 fiscal years. As specifically provided in section
6001(f)(1)(B) of WRRDA 2014, water resources development projects
include environmental infrastructure assistance projects and programs
of the U.S. Army Corps of Engineers. In accordance with section 103(f)
of the Water Resources Development Act of 1986, separable elements is
defined as ``a portion of a project--
(1) which is physically separable from other portions of the
project; and
(2) which--
(A) achieves hydrologic effects, or
(B) produces physical or economic benefits, which are separately
identifiable from those produced by other portions of the project.''
The following elements of an authorized water resources development
project also qualify as separable elements: An element for which there
is an executed design agreement or project partnership agreement
specific to that element; an element that has received funding
specified for that element; an element that was authorized separately
from or as an amendment to the authorization for the remainder of the
water resources development project, that was separately identified in
the authorization for the water resources development project, or for
which a statute specifies an authorized cost, estimated cost, or amount
authorized to be appropriated; an element that has been placed in
service or for which the Government or the non-federal partner has
assumed operation and maintenance; an element that has been
deauthorized; or the remaining portion of the water resources
development project apart from other separable elements. Following a
90-day public review period of the Interim Deauthorization List, the
Assistant Secretary of the Army for Civil Works (ASA(CW)) will publish
a Final Deauthorization List in the Federal Register. Section
6001(d)(2)(A) of WRRDA 2014 requires that the Secretary shall include
on the Final Deauthorization List projects and separable elements of
projects that have, in the aggregate, an estimated Federal cost to
complete that is at least $18 billion. The ASA(CW) has strived to meet
the requirements of Section 6001, but was not able to identify projects
that totaled $18 billion.
The projects and elements on the Final Deauthorization List will be
deauthorized automatically after 180 days following the date that the
ASA(CW) submits the Final Deauthorization List to Congress, unless
[[Page 60648]]
the Congress passes a joint resolution disapproving the Final
Deauthorization List or the non-Federal interest for the project or
separable element of the project provides sufficient funds to complete
the project or separable element. The amount shown as the Federal
Balance to complete is a working estimate generally based on the
authorization and as such any non-Federal interests considering
providing sufficient funds to complete a project or separable element
should contact the appropriate District Commander to discuss the
process necessary to develop a final cost to complete a project or
separable element.
The Interim Deauthorization List follows below in Table 1.
[[Page 60649]]
Table 1 (Interim Deauthorization List)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Latest fiscal Federal balance
Public law of Project/element year of federal to complete
State Business line Corps Congressional Project/element Project/element authorization Section of phase and status or non-federal (subject to
district districts name type \(1)\ or latest public law \(2)\ obligations for Section 902 where
amendment construction applicable)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
AL........... NAV.......... SAM.......... AL 2, 3 & 4....... ALABAMA-COOSA PROJECT........... 99-662 813........... CONSTRUCTION NOT 1986............. $3,781,921,691
RIVER AND INITIATED.
TRIBUTARIES, AL
(COOSA RIVER
BETWEEN
MONTGOMERY AND
GADSDEN).
AL........... EI........... SAM.......... AL 4.............. DUCK RIVER, AL.... PROJECT........... 106-554 108a.......... CONSTRUCTION NOT NO OBLIGATION FOR 5,000,000
INITIATED. CONSTRUCTION.
AR........... EI........... MVK.......... AR 4.............. UNION COUNTY, AR.. PROJECT........... 106-554 108d.......... CONSTRUCTION NOT 2008............. 51,247,100
INITIATED.
AR........... FRM.......... MVM.......... AR 1.............. L'ANGUILLE RIVER PROJECT........... 99-662 103........... CONSTRUCTION NOT 2004............. 19,466,768
BASIN, AR. INITIATED.
AR........... FRM.......... SWL.......... AR 1, 2, 3 & 4; OK ARKANSAS RIVER PROJECT........... 101-640 110(a1)....... NEVER FUNDED..... NO OBLIGATION FOR 591,605
1. LEVEES, AR. CONSTRUCTION.
AR........... AER.......... SWL.......... AR 3.............. BEAVER DAM , AR SEPARABLE ELEMENT. 94-587 105........... NEVER FUNDED..... NO OBLIGATION FOR 5,990,000
(TROUT PRODUCTION CONSTRUCTION.
CENTER).
AR........... EI........... SWL.......... AR 3.............. BEAVER LAKE, SEPARABLE ELEMENT. 104-303 523........... CONSTRUCTION 2002............. 5,000,000
BENTON/WASH, AR. PAUSED.
CA........... EI........... SPK.......... CA 4.............. CALAVERAS COUNTY, PROJECT........... 104-303 526........... NEVER FUNDED..... NO OBLIGATION FOR 1,500,000
CA. CONSTRUCTION.
CA........... EI........... SPK.......... CA 3 & 5.......... CLEAR LAKE BASIN, PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CA. CONSTRUCTION.
CA........... FRM.......... SPK.......... CA 3.............. COLUSA TROUGH PROJECT........... 99-662 830........... NEVER FUNDED..... NO OBLIGATION FOR 18,900,846
DRAINAGE CANAL, CONSTRUCTION.
SACRAMENTO RIVER
AND TRIBUTARIES,
CA.
CA........... EI........... SPK.......... CA 21............. PINE FLAT DAM, CA. PROJECT........... 106-541 101b(7)....... NEVER FUNDED..... NO OBLIGATION FOR 41,502,918
CONSTRUCTION.
CA........... EI........... SPL.......... CA 39............. CHINO HILLS, CA... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
CA........... EI........... SPL.......... CA 39 & 45........ EASTERN MUNICIPAL PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
WATER DISTRICT, CONSTRUCTION.
CA.
CA........... FRM.......... SPL.......... CA 24............. GOLETA & VICINITY, PROJECT........... 102-580 102b.......... CONSTRUCTION 1984............. 1,233,626
CA. PAUSED.
CA........... EI........... SPL.......... CA 44............. LOS ANGELES HARBOR/ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 6,500,000
TERMINAL ISLAND, CONSTRUCTION.
CA.
CA........... FRM.......... SPL.......... CA 24............. LOWER MISSION PROJECT........... 100-676 3a............ NEVER FUNDED..... NO OBLIGATION FOR 14,625,971
CREEK, CA. CONSTRUCTION.
CA........... EI........... SPL.......... CA 26, 27 & 29.... SAN DIEGO AREA PROJECT........... 102-580 217c(2)....... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
WATER REUSE CONSTRUCTION.
DEMOSTRATION
FACILITIES, CA.
CA........... EI........... SPL.......... CA 52............. SAN DIEGO COUNTY, PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CA (CORONADO CONSTRUCTION.
TRANSBAY
WASTEWATER
PIPELINE).
CA........... EI........... SPL.......... CA 26, 27 & 29.... SOUTHERN PROJECT........... 102-580 217c(1)....... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
CALIFORNIA CONSTRUCTION.
COMPREHENSIVE
WATER REUSE
SYSTEM, CA.
[[Page 60650]]
CT........... EI........... NAE.......... CT 4.............. BRIDGEPORT PROJECT........... 106-53 502b.......... CONSTRUCTION NOT NO OBLIGATION FOR 10,000,000
COMBINED SEWER INITIATED. CONSTRUCTION.
OVERFLOW PTOJECT,
CT.
CT........... EI........... NAE.......... CT 1.............. HARTFORD, CT...... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CONSTRUCTION.
CT........... EI........... NAE.......... CT 3.............. NEW HAVEN, CT..... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CONSTRUCTION.
CT, ME, MA, AER.......... NAE.......... CT 1, 2, 3, 4 & 5; NEW ENGLAND WATER PROJECT........... 106-541 507........... NEVER FUNDED..... NO OBLIGATION FOR (3)0
NH, RI & VT. ME 1, & 2; MA 1, RESOURCES AND CONSTRUCTION.
2, 3, 4, 5, 6, 7, ECOSYSTEM
8, & 9; NH 1 & 2; RESTORATION, CT,
RI 1 & 2; VT AT ME, MA, NH, RI &
LARGE. VT.
DC & MD...... EI........... NAB.......... .................. WASHINGTON DC AND PROJECT........... 106-554 108d.......... CONSTRUCTION NOT 1998............. 14,807,000
MARYLAND, D.C. & INITIATED.
MD.
FL........... AER.......... SAJ.......... FL 17, 18, 19, 20, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2biiii... CONSTRUCTION NOT 2005............. 17,000,000
21, 22 & 23. EVERGLADES INITIATED.
RESTORATION PLAN,
FL (LAKE BELT
GROUND RESERVOIR
TECHNOLOGY).
FL........... AER.......... SAJ.......... FL 17, 18, 20, 21, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cix..... NEVER FUNDED..... NO OBLIGATION FOR 67,150,000
22, 23, 25, 26 & EVERGLADES CONSTRUCTION.
27. RESTORATION PLAN,
FL (NORTH NEW
RIVER
IMPROVEMENTS).
FL........... AER.......... SAJ.......... FL 18, 20, 21, 22, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cviii... NEVER FUNDED..... NO OBLIGATION FOR 21,500,000
23, 24, 25, 26 & EVERGLADES CONSTRUCTION.
27. RESTORATION PLAN,
FL (RAISE AND
BRIDGE EAST
PORTION OF
TAMIAMI TRAIL AND
FILL MIAMI CANAL
WITHIN WATER)
(CONSEVATION AREA
3).
FL........... AER.......... SAJ.......... FL 16 & 23........ COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2cvii.... CONSTRUCTION NOT NO OBLIGATION FOR 67,800,000
EVERGLADES INITIATED. CONSTRUCTION.
RESTORATION PLAN,
FL (TAYLOR CREEK/
NUBBIN SLOUGH
STORAGE AND
TREATMENT AREA).
FL........... AER.......... SAJ.......... FL 17, 18, 20, 21, COMPREHENSIVE SEPARABLE ELEMENT. 106-541 601 b2biiii... CONSTRUCTION NOT 2005............. 20,500,000
22, 23, 25, 26 & EVERGLADES INITIATED.
27. RESTORATION PLAN,
FL (WASTEWATER
REUSE TECHNOLOGY).
FL........... NAV.......... SAJ.......... FL 12............. HUDSON RIVER, FL.. PROJECT........... 81-516 101........... NEVER FUNDED..... NO OBLIGATION FOR 3,650,000
CONSTRUCTION.
[[Page 60651]]
FL........... EI........... SAJ.......... FL 27............. KEY BISCAYNE, FL.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
FL........... FRM.......... SAJ.......... FL 14............. LITTLE TALBOT PROJECT........... 106-53 101b7......... CONSTRUCTION 2000............. 6,786,030
ISLAND, FL. PAUSED.
FL........... EI........... SAJ.......... FL 14............. SOUTH TAMPA, FL... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
FL........... NAV.......... SAJ.......... FL 10, 11, 12 & 13 TAMPA HARBOR, PROJECT........... 106-554 107........... CONSTRUCTION NOT 2006............. 64,771,847
ALAFIA RIVER, FL. INITIATED.
FL........... NAV.......... SAJ.......... FL 10, 11, 12 & 13 TAMPA HARBOR, FL SEPARABLE ELEMENT. 99-662 858........... NEVER FUNDED..... NO OBLIGATION FOR 8,434,881
((PORT SUTTON CONSTRUCTION.
TURNING BASIN)
WIDENING TO AN
ADDITIONAL 105
FEET TO THE
FENDER LINE ALONG
PENDOLA POINT).
HI........... FRM.......... POH.......... HI 1.............. WAIKIKI EROSION PROJECT........... 89-298 301........... NEVER FUNDED..... NO OBLIGATION FOR 16,584,000
CONTROL, HI. CONSTRUCTION.
IL........... EI........... LRC.......... IL 11 & 14........ AURORA, IL........ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000
CONSTRUCTION.
IL........... FRM.......... LRC.......... IL 9, 10 & 14..... DES PLAINES RIVER, SEPARABLE ELEMENT. 106-53 101b10........ NEVER FUNDED..... NO OBLIGATION FOR 5,795,400
IL (NORTH FORK CONSTRUCTION.
MILL CREEK DAM
MODIFICATION).
IN........... EI........... LRE.......... IN 3.............. FORT WAYNE, IN.... PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,529,324
CONSTRUCTION.
IN........... EI........... LRL.......... IN 7.............. INDIANAPOLIS, IN.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
KY........... FRM.......... LRH.......... KY 5.............. BEAVER CREEK PROJECT........... 89-298 204........... NEVER FUNDED..... NO OBLIGATION FOR 20,873,500
BASIN, KY. CONSTRUCTION.
KY & TN...... AER.......... MVM.......... TN 8; KY 1........ REELFOOT LAKE, TN PROJECT........... 106-53 101b11........ NEVER FUNDED..... NO OBLIGATION FOR 33,072,769
& KY. CONSTRUCTION.
LA........... FRM.......... MVK.......... LA 1.............. PEARL RIVER, PROJECT........... 99-662 401b.......... CONSTRUCTION NOT 2002............. 29,311,000
SLIDELL, SAINT INITIATED.
TAMMANY PARISH,
LA.
LA........... FRM.......... MVN.......... LA 1, 2 & 6....... AMITE RIVER AND PROJECT........... 102-580 101(11)....... NEVER FUNDED..... NO OBLIGATION FOR 38,058,405
TRIBUTARIES, LA. CONSTRUCTION.
LA........... FRM.......... MVN.......... LA 6.............. BAYOU COCODRIE AND PROJECT........... 93-251 87............ CONSTRUCTION 1987............. 345,472,000
TRIBUTARIES, LA. PAUSED.
LA........... NAV.......... MVN.......... LA 1, 2, 3 & 6.... GULF INTRACOASTAL PROJECT........... 87-874 101........... NEVER FUNDED..... NO OBLIGATION FOR 201,422,000
WATERWAY, LA-TX CONSTRUCTION.
SECTION, LA & TX.
LA........... EI........... MVN.......... LA 1 & 2.......... KENNER, LA........ PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
CONSTRUCTION.
LA........... EI........... MVN.......... LA 1 & 2.......... ST. CHARLES, ST. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
BERNARD, AND CONSTRUCTION.
PLAQUEMINES
PARISHES, LA.
LA........... EI........... MVN.......... LA 2 & 6.......... ST. JOHN THE PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
BAPTIST AND ST. CONSTRUCTION.
JAMES PARISHES,
LA.
LA........... FRM.......... MVN.......... LA 1.............. TANGIPAHOA, PROJECT........... 99-662 401........... NEVER FUNDED..... NO OBLIGATION FOR 21,723,000
TCHEFUNCTE, AND CONSTRUCTION.
TICKFAW RIVERS,
LA.
MA........... EI........... NAE.......... MA 9.............. FALL RIVER AND NEW PROJECT........... 106-554 108c.......... NEVER FUNDED..... NO OBLIGATION FOR 35,000,000
BEDFORD, MA. CONSTRUCTION.
[[Page 60652]]
MA........... FRM.......... NAE.......... MA 4, 7 & 8....... MUDDY RIVER, SEPARABLE ELEMENT. 106-541 522........... NEVER FUNDED..... NO OBLIGATION FOR 24,050,000
BROOKLINE AND CONSTRUCTION.
BOSTON, MA
(AQUATIC
ECOSYSTEM
RESTORATION
FEATURES).
MI........... NAV.......... LRE.......... MI 1.............. ALPENA HARBOR, MI PROJECT........... 104-303 363d.......... NEVER FUNDED..... NO OBLIGATION FOR 4,063,120
(25 FOOT CHANNEL). CONSTRUCTION.
MI........... NAV.......... LRE.......... MI 5.............. BAY CITY, MI...... PROJECT........... 101-640 105........... NEVER FUNDED..... NO OBLIGATION FOR 8,466,275
CONSTRUCTION.
MI........... EI........... LRE.......... MI 6.............. BENTON HARBOR, ST PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 1,500,000
JOSEPH WASTEWATER CONSTRUCTION.
TREATMENT PLANT,
ST JOSEPH, MI.
MI........... NAV.......... LRE.......... MI 1.............. CHARLEVOIX, MI SEPARABLE ELEMENT. 106-53 373........... NEVER FUNDED..... NO OBLIGATION FOR 52,500
(REVETMENT CONSTRUCTION.
CONNECTION).
MI........... NAV.......... LRE.......... MI 1.............. ONTONAGON HARBOR, PROJECT........... 104-303 363e.......... NEVER FUNDED..... NO OBLIGATION FOR 37,134,623
ONTONAGON COUNTY CONSTRUCTION.
MI.
MI........... FRM.......... LRE.......... MI 5.............. SAGINAW RIVER AND SEPARABLE ELEMENT. 106-53 364(3)........ NEVER FUNDED..... NO OBLIGATION FOR 13,909,394
TRIBUTARIES, MI CONSTRUCTION.
(CASS RIVER AT
VASSAR).
MI........... FRM.......... LRE.......... MI 4 & 5.......... SAGINAW RIVER AND SEPARABLE ELEMENT. 99-662 845........... NEVER FUNDED..... NO OBLIGATION FOR 720,653
TRIBUTARIES, MI CONSTRUCTION.
(CURTIS ROAD
BRIDGE).
MI........... FRM.......... LRE.......... MI 5.............. SAGINAW RIVER AND SEPARABLE ELEMENT. 104-303 329........... NEVER FUNDED..... NO OBLIGATION FOR 571,781
TRIBUTARIES, MI CONSTRUCTION.
(FLINT RIVER AT
FLINT).
MI........... FRM.......... LRE.......... MI 4 & 5.......... SAGINAW RIVER AND SEPARABLE ELEMENT. 106-53 364(4)........ NEVER FUNDED..... NO OBLIGATION FOR 106,825,583
TRIBUTARIES, MI CONSTRUCTION.
(SHIAWASSEE
FLATS).
MI, MN & WI.. NAV.......... LRE.......... MI 1; MN 8; WI 7.. GREAT LAKES PROJECT........... 101-640 101a15........ NEVER FUNDED..... NO OBLIGATION FOR 17,938,174
CONNECTING CONSTRUCTION.
CHANNELS &
HARBORS, MN, MI &
WI.
MN........... NAV.......... LRE.......... MN 8.............. DULUTH, MN PROJECT........... 104-303 541a/b........ NEVER FUNDED..... NO OBLIGATION FOR 1,000,000
(ALTERNATIVE CONSTRUCTION.
TECHNOLOGY
PROJECT).
MN........... EI........... LRE.......... MN 8.............. LAKE SUPERIOR PROJECT........... 104-303 542........... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CENTER, MN. CONSTRUCTION.
MN........... EI........... MVP.......... MN 5.............. MISSISSIPPI PLACE, PROJECT........... 106-53 577........... CONSTRUCTION NOT 2006............. 2,968,178
MN. INITIATED.
MN & WI...... NAV.......... LRE.......... MN 8; WI 7........ DULUTH--SUPERIOR PROJECT........... 99-662 201a.......... CONSTRUCTION 1995............. 14,064,481
CHANNEL PAUSED.
EXTENSION, MN &
WI.
MO........... EI........... NWK.......... MO 4 & 6.......... KANSAS CITY, MO... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 15,000,000
CONSTRUCTION.
[[Page 60653]]
MO & IL...... NAV.......... MVS.......... MO 1, 2, 3, & 8; ST LOUIS HARBOR, PROJECT........... 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 43,253,100
IL 12 & 13. MO & IL. CONSTRUCTION.
MS........... FRM.......... MVK.......... MS 2.............. YAZOO BASIN, PROJECT........... 89-298 204........... CONSTRUCTION 2007............. 233,490,728
TRIBUTARIES, MS. PAUSED.
MS........... NAV.......... MVK.......... MS 2.............. YAZOO RIVER, MS SEPARABLE ELEMENT. 99-662 822........... NEVER FUNDED..... NO OBLIGATION FOR 2,011,094
(SHEPARDSTOWN CONSTRUCTION.
BRIDGE).
MS & LA...... AER.......... MVN.......... LA 2.............. MISSISSIPPI AND PROJECT........... 100-676 3(a)8......... CONSTRUCTION NOT 2003............. 70,668,540
LOUISIANA INITIATED.
ESTUARINE AREAS,
MS & LA.
NC........... EI........... SAW.......... NC 8.............. LUMBERTON, NC..... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 1,700,000
CONSTRUCTION.
NC........... EI........... SAW.......... NC 8 & 9.......... UNION COUNTY, NC.. PROJECT........... 106-554 108a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
NC & SC...... FRM.......... SAW.......... NC 9 & 12......... SUGAR CREEK BASIN, PROJECT........... 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 54,523,100
NC & SC. CONSTRUCTION.
NH........... EI........... NAE.......... NH 2.............. NASHUA, NH PROJECT........... 106-53 502b.......... CONSTRUCTION NOT NO OBLIGATION FOR 19,853,000
(COMBINED SEWER INITIATED. CONSTRUCTION.
OVERFLOW).
NH........... EI........... NAE.......... NH 1.............. ROCHESTER, NH..... PROJECT........... 104-303 504(e) (4).... CONSTRUCTION NOT NO OBLIGATION FOR 10,897,120
INITIATED. CONSTRUCTION.
NJ........... EI........... NAN.......... NJ 8.............. ELIZABETH, NJ..... PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 20,000,000
CONSTRUCTION.
NJ........... EI........... NAN.......... NJ 8.............. NORTH HUDSON, NJ.. PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 20,000,000
CONSTRUCTION.
NJ........... EI........... NAN.......... NJ 9.............. PATTERSON AND PROJECT........... 106-554 108c.......... NEVER FUNDED..... NO OBLIGATION FOR 30,000,000
PASSAIC COUNTY, CONSTRUCTION.
NJ.
NJ........... EI........... NAP.......... NJ 4, 6 & 12...... STATE OF NEW PROJECT........... 102-580 219c (10)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
JERSEY AND NEW CONSTRUCTION.
JERSEY WASTEWATER
TREATMENT TRUST,
NJ.
NJ........... EI........... NAP.......... NJ 5.............. TOWN OF NEWTON, NJ PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 7,000,000
CONSTRUCTION.
NV........... FRM.......... SPL.......... NV 4.............. LAS VEGAS WASH AND PROJECT........... 102-580 101(13)....... CONSTRUCTION NOT NO OBLIGATION FOR 3,360,938
TRIBUTARIES, NV. INITIATED. CONSTRUCTION.
NV........... FRM.......... SPL.......... NV 4.............. LAS VEGAS, NV..... PROJECT........... 109-103 115........... NEVER FUNDED..... NO OBLIGATION FOR 20,000,000
CONSTRUCTION.
NY........... EI........... LRB.......... NY26 & 27......... ERIE COUNTY, SEPARABLE ELEMENT. 102-580 221........... NEVER FUNDED..... NO OBLIGATION FOR 7,000,000
BUFFALO AMHRST, CONSTRUCTION.
NY.
NY........... EI........... LRB.......... NY 26 & 27........ ERIE COUNTY, NY PROJECT........... 102-580 219c (12)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
(SLUDGE DISPOSAL). CONSTRUCTION.
NY........... EI........... LRB.......... NY 26 & 27........ ERIE COUNTY, NY PROJECT........... 102-580 219c (11)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
(WATER QUALITY CONSTRUCTION.
TUNNEL).
NY........... EI........... LRB.......... NY26 & 27......... LEWISTON SEPARABLE ELEMENT. 102-580 222........... NEVER FUNDED..... NO OBLIGATION FOR 200,000
STORMWATER, NY. CONSTRUCTION.
NY........... EI........... LRB.......... NY 24............. LIVERPOOL, NY..... PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000
CONSTRUCTION.
NY........... EI........... NAN.......... NY 10 & 11; NJ 8.. INNER HARBOR PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 15,000,000
PROJECT, NEW CONSTRUCTION.
YORK, NY.
NY........... FRM.......... NAN.......... NY 17, 18, 19 & 20 LOWER HUDSON RIVER PROJECT........... 106-53 212e.......... NEVER FUNDED..... NO OBLIGATION FOR 30,000,000
& TRIBUTARIES, NY. CONSTRUCTION.
NY........... EI........... NAN.......... NY 6 & 11......... OUTER HARBOR PROJECT........... 106-53 502(f)........ NEVER FUNDED..... NO OBLIGATION FOR 15,000,000
PROJECT, NEW CONSTRUCTION.
YORK, NY.
[[Page 60654]]
NY/NJ........ NAV.......... NAN.......... NJ 6, 9 & 13; NY NEW YORK HARBOR PROJECT........... 101-640 102........... CONSTRUCTION 2005............. 201,549,768
7, 8, 9, 12, COLLECTION AND PAUSED.
13,14 & 15. REMOVAL OF DRIFT,
NY & NJ.
OH........... NAV.......... LRB.......... OH 9.............. OTTAWA RIVER PROJECT........... 101-640 107a7......... CONSTRUCTION NOT 2006............. 13,218,200
HARBOR, OH. INITIATED.
OH........... FRM.......... LRH.......... OH 15............. HOCKING RIVER, PROJECT........... 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 16,282,709
LOGAN, OH. CONSTRUCTION.
OH........... FRM.......... LRL.......... OH 8.............. MIAMI RIVER BASIN, PROJECT........... 99-662 401a.......... CONSTRUCTION NOT NO OBLIGATION FOR 18,041,480
PLEASANT RUN, INITIATED. CONSTRUCTION.
VICINITY
FAIRFIELD, OH.
OK........... HYD.......... SWT.......... OK 2.............. FORT GIBSON LAKE, SEPARABLE ELEMENT. 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 45,485,000
OK (POWER UNITS 5 CONSTRUCTION.
& 6).
OR........... EI........... NWP.......... OR 1.............. ASTORIA, OR....... PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
CONSTRUCTION.
OR........... EI........... NWP.......... OR 2.............. HOOD RIVER, OR.... PROJECT........... 106-554 108a (36)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
OR........... EI........... NWP.......... OR 2.............. MEDFORD, OR....... PROJECT........... 106-554 108a (37)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
OR........... EI........... NWP.......... OR 1 & 2.......... PORTLAND, OR...... PROJECT........... 106-554 108a (38)..... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
PA........... EI........... LRP.......... PA 5.............. COUDERSPORT, PA... PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
CONSTRUCTION.
PA........... EI........... LRP.......... PA 18............. FINDLAY TOWNSHIP, PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 11,000,000
PA. CONSTRUCTION.
PA........... EI........... LRP.......... PA 9.............. GREENSBORO AND PROJECT........... 102-580 219c(15)...... NEVER FUNDED..... NO OBLIGATION FOR 1,543,324
GLASSWORKS, PA. CONSTRUCTION.
PA........... EI........... LRP.......... PA 9.............. JEFFERSON PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 1,000,000
TOWNSHIP, GREENE CONSTRUCTION.
COUNTY, PA.
PA........... EI........... LRP.......... PA 18............. NORTH FAYETTE PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 500,000
TOWNSHIP, CONSTRUCTION.
ALLEGHENY COUNTY,
PA.
PA........... EI........... LRP.......... PA 18............. ROBINSON TOWNSHIP, PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 1,200,000
PA. CONSTRUCTION.
PA........... EI........... LRP.......... PA 14............. SPRINGDALE PROJECT........... 106-53 502........... NEVER FUNDED..... NO OBLIGATION FOR 500,000
BOROUGH, PA. CONSTRUCTION.
PA........... EI........... LRP.......... PA 3.............. TITUSVILLE, PA.... PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 7,300,000
CONSTRUCTION.
PA........... EI........... LRP.......... PA 9, 12, 14 & 18. WASHINGTON, PROJECT........... 106-554 108........... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000
GREENE, CONSTRUCTION.
WESTMORELAND, AND
FAYETTE COUNTIES,
PA.
PA........... EI........... NAB.......... PA 10............. BRADFORD AND SEPARABLE ELEMENT. 106-53 548........... NEVER FUNDED..... NO OBLIGATION FOR 13,000,000
SULLIVAN CONSTRUCTION.
COUNTIES, PA.
PA........... EI........... NAB.......... PA 11 & 15........ DAUPHIN COUNTY, PA PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000
CONSTRUCTION.
PA........... EI........... NAB.......... PA 4.............. DILLSBURG BOROUGH PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 2,000,000
AUTHORITY, PA. CONSTRUCTION.
PA........... EI........... NAB.......... PA 4.............. HAMPDEN TOWNSHIP, PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 3,000,000
PA. CONSTRUCTION.
[[Page 60655]]
PA........... EI........... NAB.......... PA 4 & 11......... MOUNT JOY TOWNSHIP PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 8,300,000
AND CONEWAGO CONSTRUCTION.
TOWNSHIP, PA.
PA........... EI........... NAB.......... PA 5.............. PATTON TOWNSHIP, PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 1,400,000
PA. CONSTRUCTION.
PA........... EI........... NAB.......... PA 4.............. UPPER ALLEN PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 3,400,000
TOWNSHIP, PA. CONSTRUCTION.
PA........... FRM.......... NAP.......... PA 17............. DELAWARE RIVER PROJECT........... 93-251 2............. CONSTRUCTION NOT 1993............. 13,194,000
BASIN--WABASH INITIATED.
CREEK, BOROUGH OF
TAMAQUA, PA.
PA........... FRM.......... NAP.......... PA 2 & 3.......... PHILADELPHIA, PA PROJECT........... 104-303 564e.......... NEVER FUNDED..... NO OBLIGATION FOR 900,000
(FRANKFORD DAM). CONSTRUCTION.
PA........... FRM.......... NAP.......... PA 1, 2, 3 & 13... PHILADELPHIA, PA PROJECT........... 104-303 564d.......... NEVER FUNDED..... NO OBLIGATION FOR 15,000,000
(PENNYPACK PARK). CONSTRUCTION.
PA........... FRM.......... NAP.......... PA 2 & 3.......... PHILADELPHIA, PA PROJECT........... 104-303 564a.......... NEVER FUNDED..... NO OBLIGATION FOR 1,000,000
(WATER WORKS CONSTRUCTION.
RESTORATION).
PA........... EI........... NAP.......... PA 6.............. PHOENIXVILLE PROJECT........... 106-554 108d.......... NEVER FUNDED..... NO OBLIGATION FOR 2,400,000
BOROUGH, CHESTER CONSTRUCTION.
COUNTY, PA.
PA........... EI........... NAP.......... PA 8.............. TOWAMENCIN PROJECT........... 106-53 502b.......... CONSTRUCTION NOT 2005............. 1,462,000
TOWNSHIP, PA. INITIATED.
PR........... FRM.......... SAJ.......... PR AT LARGE....... GUANAJIBO RIVER, PROJECT........... 106-53 101........... NEVER FUNDED..... NO OBLIGATION FOR 33,495,941
PR. CONSTRUCTION.
PR........... FRM.......... SAJ.......... PR AT LARGE....... RIO NIGUA AT PROJECT........... 106-53 101........... NEVER FUNDED..... NO OBLIGATION FOR 12,145,000
SALINAS, PR. CONSTRUCTION.
RI........... EI........... NAE.......... RI 2.............. CRANSTON, RI...... PROJECT........... 101-640 54............ NEVER FUNDED..... NO OBLIGATION FOR 6,000,000
CONSTRUCTION.
RI........... EI........... NAE.......... RI 1 & 2.......... DREDGING OF SALT PROJECT........... 106-53 578........... NEVER FUNDED..... NO OBLIGATION FOR 1,100,000
PONDS IN THE CONSTRUCTION.
STATE OF RHODE
ISLAND, RI.
SC........... EI........... SAC.......... SC 1.............. CHARLESTON, SC.... PROJECT........... 108-137 127........... NEVER FUNDED..... NO OBLIGATION FOR 10,000,000
CONSTRUCTION.
TN........... NAV.......... MVM.......... TN 9.............. MEMPHIS HARBOR, PROJECT........... 106-53 364........... NEVER FUNDED..... NO OBLIGATION FOR 110,044,000
MEMPHIS, TN. CONSTRUCTION.
TN........... FRM.......... MVM.......... TN 8.............. NONCONNAH CREEK, SEPARABLE ELEMENT. 106-541 334........... CONSTRUCTION NOT 2004............. 36,188,000
TN & MS INITIATED.
(EXTENSION).
TX........... FRM.......... SWF.......... TX 8 & 17......... NAVASOTA RIVER SEPARABLE ELEMENT. 90-483 203........... CONSTRUCTION NOT 1983............. 778,421,000
BASIN, TX INITIATED.
(MILLICAN LAKE,
TX).
TX........... FRM.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 19,985,000
TRIBUTARIES, TX INITIATED.
(LIBERTY LOCAL
PROTECTION
PROJECT).
TX........... NAV.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 5,412,060,000
TRIBUTARIES, TX INITIATED.
(NAVIGATION
CHANNEL ABOVE
LIBERTY).
TX........... FRM.......... SWF.......... TX 2, 8 & 14...... TRINITY RIVER AND SEPARABLE ELEMENT. 108-447 116........... CONSTRUCTION NOT 1981............. 119,408,000
TRIBUTARIES, TX INITIATED.
(WEST FORK
FLOODWAY).
TX........... FRM.......... SWG.......... TX 2, 7, 8, 10, 18 BUFFALO BAYOU AND SEPARABLE ELEMENT. 101-640 101(21)....... NEVER FUNDED..... NO OBLIGATION FOR 112,536,000
& 29. TRIBUTARIES, TX CONSTRUCTION.
(HALLS BAYOU).
[[Page 60656]]
TX........... FRM.......... SWG.......... TX 15 & 34........ LOWER RIO GRANDE SEPARABLE ELEMENT. 99-662 401a.......... CONSTRUCTION NOT 2005............. 207,183,000
BASIN, TEXAS INITIATED.
(SOUTH MAIN
CHANNEL), TX.
TX & OK...... NAV.......... SWT.......... TX 4; OK 2........ RED RIVER WATERWAY SEPARABLE ELEMENT. 90-483 101........... CONSTRUCTION NOT 2004............. 685,324,228
(BANK INITIATED.
STABILIZATION
FEATURES).
UT........... EI........... SPK.......... UT 1.............. CACHE COUNTY, UT.. PROJECT........... 106-53 502b.......... NEVER FUNDED..... NO OBLIGATION FOR 5,000,000
CONSTRUCTION.
UT........... FRM.......... SPK.......... UT 4.............. UPPER JORDAN PROJECT........... 106-53 357........... CONSTRUCTION NOT 2004............. 11,087,268
RIVER, UT. INITIATED.
VA........... FRM.......... LRH.......... VA 9.............. LEVISA AND TUG SEPARABLE ELEMENT. 104-303 353........... CONSTRUCTION NOT 1989............. 185,915,319
FORKS AND UPPER INITIATED.
CUMBERLAND RIVER
VA, WV, KY (HAYSI
LAKE, VA).
VA........... NAV.......... NAO.......... VA 3.............. NORFOLK HARBOR PROJECT........... 101-640 107a13........ NEVER FUNDED..... NO OBLIGATION FOR 63,130,000
ANCHORAGES, VA. CONSTRUCTION.
VA........... FRM.......... NAO.......... VA 2.............. WALLOPS ISLAND, VA PROJECT........... 106-53 567........... NEVER FUNDED..... NO OBLIGATION FOR 8,000,000
CONSTRUCTION.
WA........... REC.......... NWW.......... WA 5.............. SNAKE RIVER PROJECT........... 108-137 124........... CONSTRUCTION NOT 2004............. 3,750,044
INTERPRETIVE INITIATED.
CENTER,
CLARKSTON, WA.
WA........... AER.......... NWS.......... WA 1 & 2.......... STILLAGUMAISH PROJECT........... 106-541 101b (27)..... NEVER FUNDED..... NO OBLIGATION FOR 26,047,966
RIVER BASIN, WA. CONSTRUCTION.
WV........... FRM.......... LRH.......... WV 2.............. CABIN CREEK LPP, PROJECT........... 99-662 601a.......... NEVER FUNDED..... NO OBLIGATION FOR 10,409,900
WV. CONSTRUCTION.
WV........... FRM.......... LRH.......... WV 3.............. ISLAND CREEK SEPARABLE ELEMENT. 99-662 401a.......... NEVER FUNDED..... NO OBLIGATION FOR 107,707,600
BASIN, VICINITY CONSTRUCTION.
OF LOGAN, WV (NON-
STRUCTURAL
FEATURES).
WV........... NAV.......... LRH.......... WV 1.............. WEST VIRGINIA PORT PROJECT........... 106-53 557(3)........ NEVER FUNDED..... NO OBLIGATION FOR 24,144,000
DEVELOPMENT, WV. CONSTRUCTION.
WV........... NAV.......... LRP.......... WV 1.............. WEIRTON PORT, WV.. PROJECT........... 106-53 557(2)........ NEVER FUNDED..... NO OBLIGATION FOR 15,274,778
CONSTRUCTION.
--------------------------------------------------------------------------------------------------------------------------------
............. ............. .................. # PROJECTS........ 147............... .............. .............. ................. TOTAL............ 14,348,670,778
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NOTES:
(1) PROJECT/ELEMENT TYPE: PROJECT = WATER RESOURCES DEVELOPMENT PROJECT AUTHORIZED FOR CONSTRUCTION, INCLUDING AUTHORIZED ENVIRONMENTAL INFRASTRUCTURE ASSISTANCE PROGRAM IN ACCORDANCE WITH
WRRDA 2014, SECTION 6001(f)(1)(B).
(2) PROJECT/ELEMENT PHASE AND STATUS: NEVER FUNDED = NEVER FUNDED FOR CONSTRUCTION, INCLUDING PROJECTS IN PRECONSTRUCTION ENGINEERING AND DESIGN; CONSTRUCTION NOT INITIATED = CONSTRUCTION
FUNDED BUT PHYSICAL CONSTRUCTION NOT INITIATED; CONSTRUCTION PAUSED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION PAUSED.
(3) PER PUBLIC LAW 106-541, SEC. 507, NO CRITICAL RESTORATION PROJECT MAY BE INITIATED UNDER THIS SUBSECTION AFTER SEPTEMBER 30, 2005.
[[Page 60657]]
Authority: This notice is required by Sec. 6001(c) of the Water
Resources Reform and Development Act of 2014, Public Law 113-121,
128 STAT 1346-1347.
Dated: September 30, 2015.
Jo-Ellen Darcy,
Assistant Secretary of the Army (Civil Works).
[FR Doc. 2015-25586 Filed 10-6-15; 8:45 am]