[Federal Register Volume 80, Number 246 (Wednesday, December 23, 2015)]
[Rules and Regulations]
[Pages 79695-79705]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32216]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R08-OAR-2015-0429; FRL-9939-87-Region 8]


Air Plan Approval; SD; Update to Materials Incorporated by 
Reference

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule; administrative change.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is updating the 
materials that are incorporated by reference (IBR) into the South 
Dakota State Implementation Plan (SIP). The Regulations affected by 
this update have been previously submitted by the South Dakota 
Department of Environment and Natural Resources (SD DENR) and approved 
by the EPA. In this action, the EPA is also notifying the public of 
corrections to typographical errors and minor formatting changes to the 
IBR tables. This update affects the SIP materials that are available 
for public inspection at the EPA Regional Office.

DATES: This action is effective December 23, 2015.

ADDRESSES: The EPA has established a docket for this action under 
Docket Identification Number EPA-R08-OAR-2015-0429. All documents in 
the docket are listed on the http://www.regulations.gov Web site. 
Although listed in the index, some information may not be publicly 
available, i.e., Confidential Business Information or other information 
the disclosure of which is restricted by statute. Certain other 
material, such as copyrighted material, is not placed on the Internet 
and will be publicly available only in the hard copy form. Publicly 
available

[[Page 79696]]

docket materials are available either electronically through http://www.regulations.gov or in hard copy at EPA Region 8, Office of 
Partnerships and Regulatory Assistance, Air Program, 1595 Wynkoop 
Street, Denver, Colorado, 80202-1129. The EPA requests that you contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section to 
view the hard copy of the docket. An electronic copy of the State's SIP 
compilation is also available at http://www.epa.gov/region8/air/sip.html.

FOR FURTHER INFORMATION CONTACT: Kathy Ayala, Air Program, U.S. 
Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595 
Wynkoop Street, Denver, Colorado 80202-1129, (303) 312-6142, 
[email protected].

SUPPLEMENTARY INFORMATION:

I. Background

    The SIP is a living document which a state revises as necessary to 
address its unique air pollution problems. Therefore, the EPA, from 
time to time, must take action on SIP revisions containing new and/or 
revised regulations as being part of the SIP. On May 22, 1997 (62 FR 
27968), the EPA revised the procedures for incorporating by reference 
Federally-approved SIPs, as a result of consultation between the EPA 
and the Office of the Federal Register (OFR). The description of the 
revised SIP document, IBR procedures and ``Identification of Plan'' 
format are discussed in further detail in the May 22, 1997, Federal 
Register document. On March 8, 2005 (70 FR 11125) the EPA published the 
revised format of the IBR material for South Dakota as of November 15, 
2004. Today's action is an update to the March 8, 2005 document.

II. EPA Action

    In this action, the EPA is announcing the update to the IBR 
material as of October 1, 2015. The EPA is also correcting 
typographical errors, including omission and other minor errors in 
subsection 52.2170, paragraphs (c), (d), and (e).

III. Incorporation by Reference

    In this action, EPA is finalizing regulatory text that includes 
incorporation by reference. In accordance with requirements of 1 CFR 
51.5, EPA is finalizing the incorporation by reference of the South 
Dakota regulations described in the amendments to 40 CFR part 52 set 
forth below. EPA has made, and will continue to make, these documents 
generally available electronically through www.regulations.gov and/or 
in hard copy at the appropriate EPA office (see the ADDRESSES section 
of this preamble for more information).

IV. Good Cause Exemption

    EPA has determined that today's action falls under the ``good 
cause'' exemption in section 553(b)(3)(B) of the Administrative 
Procedure Act (APA) which, upon a finding of ``good cause'' authorizes 
agencies to dispense with public participation, and section 553(d)(3), 
which allows an agency to make a rule effective immediately (thereby 
avoiding the 30-day delayed effective date otherwise provided for in 
the APA). Today's action simply updates the codification of provisions 
which are already in effect as a matter of law.
    Under section 553 of the APA, an agency may find good cause where 
procedures are ``impractical, unnecessary, or contrary to the public 
interest.'' Public comment is ``unnecessary'' and ``contrary to the 
public interest'' since the codification only reflects existing law. 
Likewise, there is no purpose served by delaying the effective date of 
this action.

V. Statutory and Executive Order Reviews

A. General Requirements

    Under Executive Order 12866 (58 FR 51735, October 4, 1993), this 
action is not a ``significant regulatory action'' and is therefore not 
subject to review by the Office of Management and Budget. This rule is 
not subject to Executive Order 13211, ``Actions Concerning Regulations 
That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR 
28355, May 22, 2001) because it is not a significant regulatory action 
under Executive Order 12866. Because the agency has made a ``good 
cause'' finding that this action is not subject to notice-and-comment 
requirements under the Administrative Procedure Act or any other 
statute as indicated in the SUPPLEMENTARY INFORMATION section, it is 
not subject to the regulatory flexibility provisions of the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.), or to sections 202 and 205 of 
the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104-4). In 
addition, this action does not significantly or uniquely affect small 
governments or impose a significant intergovernmental mandate, as 
described in sections 203 and 204 of UMRA. This rule also does not have 
a substantial direct effect on one or more Indian tribes, on the 
relationship between the federal government and Indian tribes, or on 
the distribution of power and responsibilities between the federal 
government and Indian tribes, as specified by Executive Order 13175 (65 
FR 67249, November 9, 2000), nor will it have substantial direct 
effects on the states, on the relationship between the national 
government and the states, or on the distribution of power and 
responsibilities among the various levels of government, as specified 
in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also 
is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), 
because it is not economically significant. This rule does not involve 
technical standards; thus the requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) do not apply. The rule also does not involve special 
consideration of environmental justice related issues as required by 
Executive Order 12898 (59 FR 7629, February 16, 1994). This rule does 
not impose an information collection burden under the Paperwork 
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). EPA's compliance with 
these statutes and Executive Orders for the underlying rules are 
discussed in previous actions taken on the state's rules.

B. Submission to Congress and the Comptroller General

    The Congressional Review Act (5 U.S.C. 801 et seq.), as added by 
the Small Business Regulatory Enforcement Fairness Act of 1996, 
generally provides that before a rule may take effect, the agency 
promulgating the rule must submit a rule report, which includes a copy 
of the rule, to each House of the Congress and to the Comptroller 
General of the United States. Section 808 allows the issuing agency to 
make a rule effective sooner than otherwise provided by the CRA if the 
agency makes a good cause finding that notice and public procedure is 
impracticable, unnecessary or contrary to the public interest. This 
action simply codifies provisions which are already in effect as a 
matter of law in federal and approved state programs. 5 U.S.C. 808(2). 
As stated previously, EPA has made such a good cause finding and 
established an effective date of December 23, 2015. EPA will submit a 
report containing this rule and other required information to the U.S. 
Senate, the U.S. House of Representatives, and the Comptroller General 
of the United States prior to publication of the rule in the Federal 
Register. This change to the identification of plan for South Dakota is 
not a ``major rule'' as defined by 5 U.S.C. 804(2).

[[Page 79697]]

    In this rule, EPA is finalizing regulatory text that includes 
incorporation by reference. In accordance with requirements of 1 CFR 
51.5, EPA is finalizing the incorporation by reference of the South 
Dakota regulations described in the amendments to 40 CFR part 52 set 
forth below. EPA has made, and will continue to make, these documents 
generally available electronically through www.regulations.gov and/or 
in hard copy at the appropriate EPA office (see the ADDRESSES section 
of this preamble for more information).

C. Petitions for Judicial Review

    EPA has also determined that the provisions of section 307(b)(1) of 
the Clean Air Act pertaining to petitions for judicial review are not 
applicable to this action. Prior EPA rulemaking actions for each 
individual component of the South Dakota SIP compilation had previously 
afforded interested parties the opportunity to file a petition for 
judicial review in the United States Court of Appeals for the 
appropriate circuit within 60 days of such rulemaking action. Thus, EPA 
sees no need in this action to reopen the 60-day period for filing such 
petitions for judicial review for this ``Identification of plan'' 
update action for South Dakota.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen 
dioxide, Ozone, Particulate matter, Reporting and recordkeeping 
requirements, Sulfur oxides, Volatile organic compounds.

    Dated: December 4, 2015.
Shaun L. McGrath,
Regional Administrator, Region 8.

    40 CFR part 52 is amended as follows:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority:  42 U.S.C. 7401 et seq.

Subpart QQ--South Dakota

0
2. In Sec.  52.2170 paragraphs (b), (c), (d) and (e) are revised to 
read as follows:


Sec.  52.2170  Identification of plan.

* * * * *
    (b) Incorporation by reference. (1) Material listed in paragraphs 
(c) and (d) of this section with an EPA approval date prior to October 
1, 2015, was approved for incorporation by reference by the Director of 
the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 
51. Material is incorporated as it exists on the date of the approval, 
and notice of any change in the material will be published in the 
Federal Register. Entries in paragraphs (c) and (d) of this section 
with EPA approval dates after October 1, 2015, will be incorporated by 
reference in the next update to the SIP compilation.
    (2) EPA Region 8 certifies that the rules/regulations provided by 
EPA in the SIP compilation at the addresses in paragraph (b)(3) of this 
section are an exact duplicate of the officially promulgated state 
rules/regulations which have been approved as part of the SIP as of 
October 1, 2015.
    (3) Copies of the materials incorporated by reference may be 
inspected at the EPA Region 8 Office, Office of Partnerships and 
Regulatory Assistance (OPRA), Air Program, 1595 Wynkoop Street, Denver, 
Colorado 80202-1129.
    (c) EPA-approved regulations.

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        State       EPA effective
           Rule No.                 Rule title     effective date       date            Final rule citation, date                   Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                        Statewide
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                    74:09:01. Procedures--Board of Minerals and Environment, Contested Case Procedure
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:09:01:20...................  Board member              5/29/14          3/2/15  80 FR 4799, 1/29/15...............
                                 conflict of
                                 interest.
74:09:01:21...................  Board member              5/29/14          3/2/15  80 FR 4799, 1/29/15...............
                                 potential
                                 conflict of
                                 interests.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                  74:36:01. Definitions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:01:01...................  Definitions......         6/25/13         11/2/15  80 FR 59620, 10/2/15..............
74:36:01:03...................  Administrative             4/4/99          5/7/03  68 FR 16726, 4/7/03...............
                                 permit amendment
                                 defined.
74:36:01:04...................  Affected states           4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 defined.
74:36:01:05...................  Applicable                6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 requirements of
                                 Clean Air Act
                                 defined.
74:36:01:06...................  Complete                  4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 application
                                 defined.
74:36:01:08...................  Major source               4/4/99         5/19/14  79 FR 21852, 4/18/14..............
                                 defined.
74:36:01:09...................  Categories of              1/2/05        10/13/06  71 FR 46403, 8/14/06..............
                                 sources defined.
74:36:01:10...................  Modification              6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 defined.
74:36:01:11...................  National ambient          4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 air quality
                                 standard (NAAQS).
74:36:01:12...................  Potential to emit         4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 defined.
74:36:01:13...................  Process weight            4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 rate defined.

[[Page 79698]]

 
74:36:01:15...................  Regulated air              1/5/95         5/19/14  79 FR 21852, 4/18/14..............
                                 pollutant
                                 defined.
74:36:01:16...................  Responsible                1/2/05        10/13/06  71 FR 46403, 8/14/06..............
                                 official defined.
74:36:01:18...................  Municipal solid          12/29/96        12/18/98  63 FR 55804, 10/19/98.............
                                 waste landfill
                                 defined.
74:36:01:19...................  Existing                 12/29/96        12/18/98  63 FR 55804, 10/19/98.............
                                 municipal solid
                                 waste landfill
                                 defined.
74:36:01:20...................  Physical change           6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 or change in the
                                 method of
                                 operation
                                 defined.
74:36:01:21...................  Commence                  6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 construction
                                 defined.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                              74:36:02. Ambient Air Quality
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:02:01...................  Air quality goals         4/22/93        12/18/98  63 FR 55804, 10/19/98.............
74:36:02:02...................  Ambient air               6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 quality
                                 standards.
74:36:02:03...................  Methods of                6/25/13         11/2/15  80 FR 59620,10/2/15...............
                                 sampling and
                                 analysis.
74:36:02:04...................  Air quality               6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 monitoring
                                 network.
74:36:02:05...................  Air quality               6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 monitoring
                                 requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             74:36:03. Air Quality Episodes
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:03:01...................  Air pollution             6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 emergency
                                 episode.
74:36:03:02...................  Episode emergency         6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 contingency plan.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                      74:36:04. Operating Permits for Minor Sources
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:04:01...................  Applicability....         4/22/93        12/18/98  63 FR 55804, 10/19/98.............
74:36:04:02...................  Minor source              6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 operating permit
                                 required.
74:36:04:02.01................  Minor source              6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 operating permit
                                 exemption.
74:36:04:03...................  Emission unit             6/28/10         7/28/14  79 FR 36419, 6/28/14..............
                                 exemptions.
74:36:04:04...................  Standard for              6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 issuance of a
                                 minor source
                                 operating permit.
74:36:04:05...................  Time period for           6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 operating
                                 permits and
                                 renewals.
74:36:04:06...................  Timely and                6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 complete
                                 application for
                                 operating permit
                                 required.
74:36:04:07...................  Required contents         6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 of complete
                                 application for
                                 operating permit.
74:36:04:08...................  Applicant                  1/5/95        12/18/98  63 FR 55804, 10/19/98.............
                                 required to
                                 supplement or
                                 correct
                                 application.
74:36:04:09...................  Permit                    6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 application--Com
                                 pleteness review.
74:36:04:10...................  Time period for           6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 department's
                                 recommendation.

[[Page 79699]]

 
74:36:04:11...................  Department's               4/4/99          5/7/03  68 FR 16726, 4/7/03...............
                                 recommendation
                                 on operating
                                 permit.
74:36:04:12...................  Public                    6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 participation in
                                 permitting
                                 process.
74:36:04:12.01................  Public review of          6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 department's
                                 draft permit.
74:36:04:13...................  Final permit              6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 decision--Notice
                                 to interested
                                 persons.
74:36:04:14...................  Right to petition         6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 for contested
                                 case hearing.
74:36:04:15...................  Contents of               6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 operating permit.
74:36:04:16...................  Operating permit          6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 expiration.
74:36:04:17...................  Renewal of                6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 operating permit.
74:36:04:18...................  Operating permit          6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 revision.
74:36:04:19...................  Administrative             4/4/99          5/7/03  68 FR 16726, 4/7/03...............
                                 permit amendment.
74:36:04:20...................  Procedures for            6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 administrative
                                 permit
                                 amendments.
74:36:04:20.01................  Minor permit              6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 amendment
                                 required.
74:36:04:20.02................  Requirements for           1/5/95        12/18/98  63 FR 55804, 10/19/98.............
                                 minor permit
                                 amendment.
74:36:04:20.03................  Application for            1/5/95        12/18/98  63 FR 55804, 10/19/98.............
                                 minor permit
                                 amendment.
74:36:04:20.04................  Department                6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 deadline to
                                 approve minor
                                 permit amendment.
74:36:04:21...................  Permit                     1/5/95        12/18/98  63 FR 55804, 10/19/98.............
                                 modifications.
74:36:04:22...................  Source status              4/4/99          5/7/03  68 FR 16726, 4/7/03...............
                                 change--new
                                 permit required.
74:36:04:23...................  Reopening                 6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 operating permit
                                 for cause.
74:36:04:24...................  Procedures to             4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 reopen operating
                                 permit.
74:36:04:27...................  Operating permit          6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 termination,
                                 revision, and
                                 revocation.
74:36:04:28...................  Notice of                 4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 operating
                                 noncompliance--C
                                 ontents.
74:36:04:29...................  Petition for              4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 contested case
                                 on alleged
                                 violation.
74:36:04:31...................  Circumvention of          4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 emissions not
                                 allowed.
74:36:04:32...................  General permits..         6/28/10         7/28/14  79 FR 36419, 6/27/14..............
74:36:04:33...................  Secretary may              9/1/03          7/9/04  69 FR 25839, 5/10/04..............
                                 require an
                                 individual
                                 permit.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                       74:36:06. Regulated Air Pollutant Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:06:01...................  Applicability....          1/5/95        12/18/98  63 FR 55804, 10/19/98.............

[[Page 79700]]

 
74:36:06:02...................  Allowable                  4/4/99          5/7/03  68 FR 16726, 4/7/03...............
                                 emissions for
                                 fuel-burning
                                 units.
74:36:06:03...................  Allowable                  4/4/99          5/7/03  68 FR 16726, 4/7/03...............
                                 emissions for
                                 process industry
                                 units.
74:36:06:04...................  Particulate                1/2/05        10/13/06  71 FR 46403,8/14/06...............
                                 emission
                                 restrictions for
                                 incinerators and
                                 waste wood
                                 burners.
74:36:06:05...................  Most stringent            4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 interpretation
                                 applicable.
74:36:06:06...................  Stack performance          1/2/05        10/13/06  71 FR 46403, 8/14/06..............
                                 test.
74:36:06:07...................  Open burning               4/4/99          5/7/03  68 FR 16726, 4/7/03...............
                                 practices
                                 prohibited.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                       74:36:07. New Source Performance Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:07:08...................  Ash disposal             12/29/96         6/21/00  65 FR 32033, 5/22/00..............
                                 requirements.
74:36:07:29...................  Operating                 4/22/93         11/6/95  60 FR 46222, 9/6/95...............
                                 requirements for
                                 wire reclamation
                                 furnaces.
74:36:07:30...................  Monitoring                4/22/93         11/6/95  60 FR 46222, 9/6/95...............
                                 requirements for
                                 wire reclamation
                                 furnaces.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                    74:36:09. Prevention of Significant Deterioration
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:09:01...................  Applicability....         9/18/06         1/22/08  72 FR 72617, 12/21/07.............
74:36:09:01.01................  Prevention of             9/18/06         1/22/08  72 FR 72617, 12/21/07.............
                                 significant
                                 deterioration
                                 permit required.
74:36:09:02...................  Prevention of             6/25/13          3/2/15  80 FR 4799, 1/29/15...............
                                 significant
                                 deterioration.
74:36:09:03...................  Public                    6/25/13          3/2/15  80 FR 4799, 1/29/15...............
                                 participation.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                               74:36:10. New Source Review
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:10:01...................  Applicability....         4/22/93        12/18/98  63 FR 55804, 10/19/98.............
74:36:10:02...................  Definitions......         6/25/13         7/28/14  79 FR 36419, 6/27/14..............
74:36:10:03.01................  New source review         6/25/13         7/28/14  79 FR 36419, 6/27/14..............
                                 preconstruction
                                 permit required.
74:36:10:05...................  New source review         6/25/13         7/28/14  79 FR 36419, 6/27/14..............
                                 preconstruction
                                 permit.
74:36:10:06...................  Causing or                 9/1/03          7/9/04  69 FR 25839, 5/10/04..............
                                 contributing to
                                 violation of any
                                 national ambient
                                 air quality
                                 standard.
74:36:10:07...................  Determining               6/25/13         7/28/14  79 FR 36419, 6/27/14..............
                                 credit for
                                 emission offsets.
74:36:10:08...................  Projected actual          6/25/13         7/28/14  79 FR 36419, 6/27/14..............
                                 emissions.
74:36:10:09...................  Clean unit test            1/2/05        10/13/06  71 FR 46403, 8/14/06..............
                                 for emission
                                 units subject to
                                 lowest
                                 achievable
                                 emission rate.
74:36:10:10...................  Clean unit test            1/2/05        10/13/06  71 FR 46403, 8/14/06..............
                                 for emission
                                 units comparable
                                 to lowest
                                 achievable
                                 emission rate.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 79701]]

 
                                                              74:36:11. Performance Testing
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:11:01...................  Stack performance         6/25/13         11/2/15  80 FR 59620,10/2/15...............
                                 testing or other
                                 testing methods.
74:36:11:02...................  Secretary may            12/29/96        12/18/98  63 FR 55804, 10/19/98.............
                                 require
                                 performance
                                 tests.
74:36:11:03...................  Notice to                12/29/96        12/18/98  63 FR 55804, 10/19/98.............
                                 department of
                                 performance test.
74:36:11:04...................  Testing new fuels          4/4/99          4/3/00  65 FR 5264, 2/3/00................
                                 or raw materials.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                         74:36:12. Control of Visible Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:12:01...................  Restrictions on           6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 visible
                                 emissions.
74:36:12:02...................  Exceptions to             6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 restrictions.
74:36:12:03...................  Exceptions                6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 granted to
                                 alfalfa
                                 pelletizers or
                                 dehydrators.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                    74:36:13. Continuous Emission Monitoring Systems
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:13:01...................  Secretary may             4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 require
                                 continuous
                                 emission
                                 monitoring
                                 systems (CEMS).
74:36:13:02...................  Minimum                   6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 performance
                                 specifications
                                 for all
                                 continuous
                                 emission
                                 monitoring
                                 systems.
74:36:13:03...................  Reporting                 6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 requirements.
74:36:13:04...................  Notice to                 6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 department of
                                 exceedance.
74:36:13:05...................  Compliance                4/22/93        12/18/98  63 FR 55804, 10/19/98.............
                                 determined by
                                 data from
                                 continuous
                                 emission monitor.
74:36:13:06...................  Compliance                6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 certification.
74:36:13:07...................  Credible evidence         6/25/13         11/2/15  80 FR 59620, 10/2/15..............
74:36:13:08...................  Compliance                6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 assurance
                                 monitoring.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                     74:36:17. Rapid City Street Sanding and Deicing
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:17:01...................  Applicability....         2/11/96          8/9/02  67 FR 39619, 6/10/02..............
74:36:17:02...................  Reasonable                2/11/96          8/9/02  67 FR 39619, 6/10/02..............
                                 available
                                 control
                                 technology.
74:36:17:03...................  Street sanding            2/11/96          8/9/02  67 FR 39619, 6/10/02..............
                                 specifications.
74:36:17:04...................  Street deicing            2/11/96          8/9/02  67 FR 39619, 6/10/02..............
                                 and maintenance
                                 plan.
74:36:17:05...................  Street sanding            2/11/96          8/9/02  67 FR 39619, 6/10/02..............
                                 and sweeping
                                 recordkeeping.
74:36:17:06...................  Inspection                2/11/96          8/9/02  67 FR 39619, 6/10/02..............
                                 authority.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                            74:36:18. Regulations for State Facilities in the Rapid City Area
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:18:01...................  Definitions......          7/1/02         3/22/04  69 FR 2671,1/20/04................
74:36:18:02...................  Applicability....          7/1/02         3/22/04  69 FR 2671, 1/20/04...............
74:36:18:03...................  Permit required..          7/1/02         3/22/04  69 FR 2671, 1/20/04...............

[[Page 79702]]

 
74:36:18:04...................  Time period for           6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 permits and
                                 renewals.
74:36:18:05...................  Required contents         6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 of a complete
                                 application for
                                 a permit.
74:36:18:06...................  Contents of               6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 permit.
74:36:18:07...................  Permit expiration          7/1/02         3/22/04  69 FR 2671, 1/20/04...............
74:36:18:08...................  Renewal of permit          7/1/02         3/22/04  69 FR 2671, 1/20/04...............
74:36:18:09...................  Reasonably                 7/1/02         3/22/04  69 FR 2671, 1/20/04...............
                                 available
                                 control
                                 technology
                                 required.
74:36:18:10...................  Visible emission          6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 limit for
                                 construction and
                                 continuous
                                 operation
                                 activities.
74:36:18:11...................  Exception to              6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 visible emission
                                 limit.
74:36:18:12...................  Notice of                 6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 operating
                                 noncompliance--C
                                 ontents.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                             74:36:20. Construction Permits for New Sources or Modifications
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36.20.01...................  Applicability....         6/28/10         7/28/14  79 FR 36419, 6/27/14..............
74:36:20:02...................  Construction              4/20/11         7/28/14  79 FR 36419, 6/27/14..............
                                 permit required.
74:36:20:03...................  Construction              6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 permit exemption.
74:36:20:04...................  Emission unit             6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 exemptions.
74:36:20:05...................  Standard for              6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 issuance of
                                 construction
                                 permit.
74:36:20:06...................  Timely and                6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 complete
                                 application for
                                 a construction
                                 permit required.
74:36:20:07...................  Required contents         6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 of complete
                                 application for
                                 a construction
                                 permit.
74:36:20:08...................  Applicant                 6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 required to
                                 supplement or
                                 correct
                                 application.
74:36:20:09...................  Permit                    6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 application--Com
                                 pleteness review.
74:36:20:10...................  Time period for           6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 department's
                                 recommendation.
74:36:20:11...................  Public                    6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 participation in
                                 permitting
                                 process.
74:36:20:12...................  Public review of          6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 department's
                                 draft permit.
74:36:20:13...................  Final permit              6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 decision--Notice
                                 to interested
                                 persons.
74:36:20:14...................  Right to petition         6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 for contested
                                 case hearing.
74:36:20:15...................  Contents of               6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 construction
                                 permit.
74:36:20:16...................  Administrative            6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 permit amendment.
74:36:20:17...................  Procedures for            6/28/10         7/28/14  79 FR 36149, 6/27/14..............
                                 administrative
                                 permit
                                 amendments.

[[Page 79703]]

 
74:36:20:18...................  Reopening                 6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 construction
                                 permit for cause.
74:36:20:19...................  Procedures to             6/28/10         7/28/14  79 FR 36149, 6/27/14..............
                                 reopen
                                 construction
                                 permit.
74:36:20:20...................  Construction              6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 permit does not
                                 exempt from
                                 other
                                 requirements.
74:36:20:21...................  Expiration of a           6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 construction
                                 permit.
74:36:20:22...................  Notice of                 6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 constructing or
                                 operating
                                 noncompliance--C
                                 ontents.
74:36:20:23...................  Petition for              6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 contested case
                                 on alleged
                                 violation.
74:36:20:24...................  Circumvention of          6/28/10         7/28/14  79 FR 36419, 6/27/14..............
                                 emissions not
                                 allowed.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                             74:36:21. Regional Haze Program
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:21:01...................  Applicability....         12/7/10         5/29/12  77 FR 24845, 4/26/12..............
74:36:21:02...................  Definitions......         6/25/13         11/2/15  80 FR 59620, 10/2/15..............
74:36:21:03...................  Existing                  12/7/10         5/29/12  77 FR 24845, 4/26/12..............
                                 stationary
                                 facility defined.
74:36:21:04...................  Visibility impact         6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 analysis.
74:36:21:05...................  BART                      6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 determination.
74:36:21:06...................  BART                      9/19/11         5/29/12  77 FR 24845, 4/26/12..............
                                 determination
                                 for a BART-
                                 eligible coal-
                                 fired power
                                 plant.
74:36:21:07...................  Installation of           12/7/10         5/29/12  77 FR 24845, 4/26/12..............
                                 controls based
                                 on visibility
                                 impact analysis
                                 or BART
                                 determination.
74:36:21:08...................  Operation and             12/7/10         5/29/12  77 FR 24845, 4/26/12..............
                                 maintenance of
                                 controls.
74:36:21:09...................  Monitoring,               6/25/13         11/2/15  80 FR 59620, 10/2/15..............
                                 recordkeeping,
                                 and reporting.
74:36:21:10...................  Permit to                 12/7/10         5/29/12  77 FR 24845, 4/26/12..............
                                 construct.
74:36:21:11...................  Permit required           12/7/10         5/29/12  77 FR 24845, 4/26/12..............
                                 for BART
                                 determination.
74:36:21:12...................  Federal land              12/7/10         5/29/12  77 FR 24845, 4/26/12..............
                                 manager
                                 notification and
                                 review.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Pennington
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                          Ordinance #12--Fugitive Dust Regulation--1.0 Control of Fugitive Dust
--------------------------------------------------------------------------------------------------------------------------------------------------------
1.1...........................  Applicability....        12/12/78         7/13/79  44 FR 44494, 7/30/79..............
1.2...........................  Definitions......        12/12/78         7/13/79  44 FR 44494, 7/30/79..............
1.3...........................  Standard of              12/12/78         7/13/79  44 FR 44494, 7/30/79..............
                                 compliance.
1.4...........................  Reasonably               12/12/78         7/13/79  44 FR 44494, 7/30/79..............
                                 available
                                 control
                                 technology
                                 required.
1.5...........................  Fugitive dust            12/12/78         7/13/79  44 FR 44494, 7/30/79..............
                                 control permits
                                 required for
                                 construction
                                 activities,
                                 i.e., temporary
                                 operations.

[[Page 79704]]

 
1.6...........................  Compliance plans         12/12/78         7/13/79  44 FR 44494, 7/30/79..............
                                 and schedules
                                 required, i.e.,
                                 continuous
                                 operations.
1.7...........................  Enforcement              12/12/78         7/13/79  44 FR 44494, 7/30/79..............
                                 procedures.
1.8...........................  Establishment of         12/12/78         7/13/79  44 FR 44494, 7/30/79..............
                                 administrative
                                 mechanisms.
1.9...........................  Separability.....        12/12/78         7/13/79  44 FR 44494, 7/30/79..............
--------------------------------------------------------------------------------------------------------------------------------------------------------

    (d) EPA-approved source specific requirements.

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        State       EPA effective
           Rule No.                 Rule title     effective date       date            Final rule citation, date                   Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
(AQ 79-02.)...................  South Dakota              3/18/82          8/7/83  48 FR 31199, 7/7/83...............
                                 State University
                                 steam generating
                                 plant.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    (e) EPA-approved nonregulatory provisions.

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                           State       EPA effective
             Rule title               effective date       date               Final rule citation, date                         Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
I.A. Introduction...................         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
I.B. Legal Authority................         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
I.C. Control Strategy...............         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
I.D. Compliance Schedule............         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
I.E. Prevention of Air Pollution             1/17/72         7/13/72  37 FR 15080, 7/27/72....................
 Emergency Episodes.
I.F. Air Quality Surveillance.......         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
I.G. Review of New Sources and               1/17/72         7/13/72  37 FR 15080, 7/27/72....................
 Modifications.
I.H. Source Surveillance............         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
I.I. Resources......................         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
I.J. Intergovernmental Cooperation..         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
I. Appendix A. South Dakota Compiled         1/17/72         7/13/72  37 FR 15080, 7/27/72....................
 Laws.
II. Part D Plan for Total Suspended         12/27/78         8/30/79  44 FR 44494, 7/30/79....................
 Particulate.
III. SIP to meet Air Quality                 1/21/80         10/4/80  45 FR 58528, 9/4/80.....................
 Monitoring and public notification
 requirements.
IV. Lead (Pb) SIP...................          5/4/84        10/26/84  49 FR 37752, 9/26/84....................
V. Stack Height Demonstration                8/20/86          7/7/89  54 FR 24334, 6/7/89.....................
 Analysis.
VI. Commitment to revise stack               5/11/88         10/2/88  53 FR 34077, 9/2/88.....................
 height rules.
VII. PM10 Committal SIP.............         7/12/88         11/5/90  55 FR 40831, 10/5/90....................
VIII. Small Business Technical and           1/12/94        12/27/94  59 FR 53589, 10/25/94...................
 Environmental Compliance Program.
IX. Commitment regarding permit             11/16/95         7/10/02  67 FR 39619, 6/10/02....................
 exceedances of the PM10 standard in
 Rapid City.
X. CAA 110(a)(D)(2)(i) Interstate            4/19/07          7/7/08  73 FR 26019, 5/8/08.....................
 Transport Requirements for the 1997
 8-hr Ozone and PM2.5 NAAQS.
XI. 1997 Ozone NAAQS Infrastructure           2/1/08         8/22/11  76 FR 43912, 7/22/11....................
 Certification.
XII. South Dakota Regional Haze              4/26/12         5/29/12  77 FR 24845, 4/26/12....................
 State Implementation Plan, Amended.
XIII. Section 110(a)(2)                       3/4/11          3/2/15  80 FR 4799, 1/29/15.....................
 Infrastructure Requirements for the
 1997 and 2006 PM2.5 NAAQS.
XIV. Section 110(a)(2)                      10/10/12          3/2/15  80 FR 4799, 1/29/15.....................
 Infrastructure Requirements for the
 2008 Lead NAAQS.
XV. Section 110(a)(3) Infrastructure         5/21/13          3/2/15  80 FR 4799, 1/29/15.....................
 Requirements for the 2008 8-hour
 Ozone NAAQS.
XVI. Section 110(a)(2)                      10/23/13          3/2/15  80 FR 4799, 1/29/15.....................
 Infrastructure Requirements for the
 2010 NO2 NAAQS.
XVII. SDCL (South Dakota Codified             3/2/15          3/2/15  80 FR 4799, 1/29/15.....................
 Laws), 1-40-25.1.
XVIII. South Dakota Codified Laws,            7/1/93        12/27/94  59 FR 53589, 10/25/94...................
 34-A-1-57, 34-A-1-58, 34-A-1-59,
 and 34-A-1-60.
--------------------------------------------------------------------------------------------------------------------------------------------------------


[[Page 79705]]

[FR Doc. 2015-32216 Filed 12-22-15; 8:45 am]
 BILLING CODE 6560-50-P