[Federal Register Volume 80, Number 246 (Wednesday, December 23, 2015)]
[Rules and Regulations]
[Pages 79695-79705]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32216]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R08-OAR-2015-0429; FRL-9939-87-Region 8]
Air Plan Approval; SD; Update to Materials Incorporated by
Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; administrative change.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is updating the
materials that are incorporated by reference (IBR) into the South
Dakota State Implementation Plan (SIP). The Regulations affected by
this update have been previously submitted by the South Dakota
Department of Environment and Natural Resources (SD DENR) and approved
by the EPA. In this action, the EPA is also notifying the public of
corrections to typographical errors and minor formatting changes to the
IBR tables. This update affects the SIP materials that are available
for public inspection at the EPA Regional Office.
DATES: This action is effective December 23, 2015.
ADDRESSES: The EPA has established a docket for this action under
Docket Identification Number EPA-R08-OAR-2015-0429. All documents in
the docket are listed on the http://www.regulations.gov Web site.
Although listed in the index, some information may not be publicly
available, i.e., Confidential Business Information or other information
the disclosure of which is restricted by statute. Certain other
material, such as copyrighted material, is not placed on the Internet
and will be publicly available only in the hard copy form. Publicly
available
[[Page 79696]]
docket materials are available either electronically through http://www.regulations.gov or in hard copy at EPA Region 8, Office of
Partnerships and Regulatory Assistance, Air Program, 1595 Wynkoop
Street, Denver, Colorado, 80202-1129. The EPA requests that you contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section to
view the hard copy of the docket. An electronic copy of the State's SIP
compilation is also available at http://www.epa.gov/region8/air/sip.html.
FOR FURTHER INFORMATION CONTACT: Kathy Ayala, Air Program, U.S.
Environmental Protection Agency (EPA), Region 8, Mailcode 8P-AR, 1595
Wynkoop Street, Denver, Colorado 80202-1129, (303) 312-6142,
[email protected].
SUPPLEMENTARY INFORMATION:
I. Background
The SIP is a living document which a state revises as necessary to
address its unique air pollution problems. Therefore, the EPA, from
time to time, must take action on SIP revisions containing new and/or
revised regulations as being part of the SIP. On May 22, 1997 (62 FR
27968), the EPA revised the procedures for incorporating by reference
Federally-approved SIPs, as a result of consultation between the EPA
and the Office of the Federal Register (OFR). The description of the
revised SIP document, IBR procedures and ``Identification of Plan''
format are discussed in further detail in the May 22, 1997, Federal
Register document. On March 8, 2005 (70 FR 11125) the EPA published the
revised format of the IBR material for South Dakota as of November 15,
2004. Today's action is an update to the March 8, 2005 document.
II. EPA Action
In this action, the EPA is announcing the update to the IBR
material as of October 1, 2015. The EPA is also correcting
typographical errors, including omission and other minor errors in
subsection 52.2170, paragraphs (c), (d), and (e).
III. Incorporation by Reference
In this action, EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation by reference of the South
Dakota regulations described in the amendments to 40 CFR part 52 set
forth below. EPA has made, and will continue to make, these documents
generally available electronically through www.regulations.gov and/or
in hard copy at the appropriate EPA office (see the ADDRESSES section
of this preamble for more information).
IV. Good Cause Exemption
EPA has determined that today's action falls under the ``good
cause'' exemption in section 553(b)(3)(B) of the Administrative
Procedure Act (APA) which, upon a finding of ``good cause'' authorizes
agencies to dispense with public participation, and section 553(d)(3),
which allows an agency to make a rule effective immediately (thereby
avoiding the 30-day delayed effective date otherwise provided for in
the APA). Today's action simply updates the codification of provisions
which are already in effect as a matter of law.
Under section 553 of the APA, an agency may find good cause where
procedures are ``impractical, unnecessary, or contrary to the public
interest.'' Public comment is ``unnecessary'' and ``contrary to the
public interest'' since the codification only reflects existing law.
Likewise, there is no purpose served by delaying the effective date of
this action.
V. Statutory and Executive Order Reviews
A. General Requirements
Under Executive Order 12866 (58 FR 51735, October 4, 1993), this
action is not a ``significant regulatory action'' and is therefore not
subject to review by the Office of Management and Budget. This rule is
not subject to Executive Order 13211, ``Actions Concerning Regulations
That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR
28355, May 22, 2001) because it is not a significant regulatory action
under Executive Order 12866. Because the agency has made a ``good
cause'' finding that this action is not subject to notice-and-comment
requirements under the Administrative Procedure Act or any other
statute as indicated in the SUPPLEMENTARY INFORMATION section, it is
not subject to the regulatory flexibility provisions of the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.), or to sections 202 and 205 of
the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104-4). In
addition, this action does not significantly or uniquely affect small
governments or impose a significant intergovernmental mandate, as
described in sections 203 and 204 of UMRA. This rule also does not have
a substantial direct effect on one or more Indian tribes, on the
relationship between the federal government and Indian tribes, or on
the distribution of power and responsibilities between the federal
government and Indian tribes, as specified by Executive Order 13175 (65
FR 67249, November 9, 2000), nor will it have substantial direct
effects on the states, on the relationship between the national
government and the states, or on the distribution of power and
responsibilities among the various levels of government, as specified
in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also
is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997),
because it is not economically significant. This rule does not involve
technical standards; thus the requirements of section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) do not apply. The rule also does not involve special
consideration of environmental justice related issues as required by
Executive Order 12898 (59 FR 7629, February 16, 1994). This rule does
not impose an information collection burden under the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). EPA's compliance with
these statutes and Executive Orders for the underlying rules are
discussed in previous actions taken on the state's rules.
B. Submission to Congress and the Comptroller General
The Congressional Review Act (5 U.S.C. 801 et seq.), as added by
the Small Business Regulatory Enforcement Fairness Act of 1996,
generally provides that before a rule may take effect, the agency
promulgating the rule must submit a rule report, which includes a copy
of the rule, to each House of the Congress and to the Comptroller
General of the United States. Section 808 allows the issuing agency to
make a rule effective sooner than otherwise provided by the CRA if the
agency makes a good cause finding that notice and public procedure is
impracticable, unnecessary or contrary to the public interest. This
action simply codifies provisions which are already in effect as a
matter of law in federal and approved state programs. 5 U.S.C. 808(2).
As stated previously, EPA has made such a good cause finding and
established an effective date of December 23, 2015. EPA will submit a
report containing this rule and other required information to the U.S.
Senate, the U.S. House of Representatives, and the Comptroller General
of the United States prior to publication of the rule in the Federal
Register. This change to the identification of plan for South Dakota is
not a ``major rule'' as defined by 5 U.S.C. 804(2).
[[Page 79697]]
In this rule, EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation by reference of the South
Dakota regulations described in the amendments to 40 CFR part 52 set
forth below. EPA has made, and will continue to make, these documents
generally available electronically through www.regulations.gov and/or
in hard copy at the appropriate EPA office (see the ADDRESSES section
of this preamble for more information).
C. Petitions for Judicial Review
EPA has also determined that the provisions of section 307(b)(1) of
the Clean Air Act pertaining to petitions for judicial review are not
applicable to this action. Prior EPA rulemaking actions for each
individual component of the South Dakota SIP compilation had previously
afforded interested parties the opportunity to file a petition for
judicial review in the United States Court of Appeals for the
appropriate circuit within 60 days of such rulemaking action. Thus, EPA
sees no need in this action to reopen the 60-day period for filing such
petitions for judicial review for this ``Identification of plan''
update action for South Dakota.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: December 4, 2015.
Shaun L. McGrath,
Regional Administrator, Region 8.
40 CFR part 52 is amended as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart QQ--South Dakota
0
2. In Sec. 52.2170 paragraphs (b), (c), (d) and (e) are revised to
read as follows:
Sec. 52.2170 Identification of plan.
* * * * *
(b) Incorporation by reference. (1) Material listed in paragraphs
(c) and (d) of this section with an EPA approval date prior to October
1, 2015, was approved for incorporation by reference by the Director of
the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part
51. Material is incorporated as it exists on the date of the approval,
and notice of any change in the material will be published in the
Federal Register. Entries in paragraphs (c) and (d) of this section
with EPA approval dates after October 1, 2015, will be incorporated by
reference in the next update to the SIP compilation.
(2) EPA Region 8 certifies that the rules/regulations provided by
EPA in the SIP compilation at the addresses in paragraph (b)(3) of this
section are an exact duplicate of the officially promulgated state
rules/regulations which have been approved as part of the SIP as of
October 1, 2015.
(3) Copies of the materials incorporated by reference may be
inspected at the EPA Region 8 Office, Office of Partnerships and
Regulatory Assistance (OPRA), Air Program, 1595 Wynkoop Street, Denver,
Colorado 80202-1129.
(c) EPA-approved regulations.
--------------------------------------------------------------------------------------------------------------------------------------------------------
State EPA effective
Rule No. Rule title effective date date Final rule citation, date Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
Statewide
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:09:01. Procedures--Board of Minerals and Environment, Contested Case Procedure
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:09:01:20................... Board member 5/29/14 3/2/15 80 FR 4799, 1/29/15...............
conflict of
interest.
74:09:01:21................... Board member 5/29/14 3/2/15 80 FR 4799, 1/29/15...............
potential
conflict of
interests.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:01. Definitions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:01:01................... Definitions...... 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
74:36:01:03................... Administrative 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
permit amendment
defined.
74:36:01:04................... Affected states 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
defined.
74:36:01:05................... Applicable 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
requirements of
Clean Air Act
defined.
74:36:01:06................... Complete 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
application
defined.
74:36:01:08................... Major source 4/4/99 5/19/14 79 FR 21852, 4/18/14..............
defined.
74:36:01:09................... Categories of 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
sources defined.
74:36:01:10................... Modification 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
defined.
74:36:01:11................... National ambient 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
air quality
standard (NAAQS).
74:36:01:12................... Potential to emit 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
defined.
74:36:01:13................... Process weight 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
rate defined.
[[Page 79698]]
74:36:01:15................... Regulated air 1/5/95 5/19/14 79 FR 21852, 4/18/14..............
pollutant
defined.
74:36:01:16................... Responsible 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
official defined.
74:36:01:18................... Municipal solid 12/29/96 12/18/98 63 FR 55804, 10/19/98.............
waste landfill
defined.
74:36:01:19................... Existing 12/29/96 12/18/98 63 FR 55804, 10/19/98.............
municipal solid
waste landfill
defined.
74:36:01:20................... Physical change 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
or change in the
method of
operation
defined.
74:36:01:21................... Commence 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
construction
defined.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:02. Ambient Air Quality
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:02:01................... Air quality goals 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
74:36:02:02................... Ambient air 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
quality
standards.
74:36:02:03................... Methods of 6/25/13 11/2/15 80 FR 59620,10/2/15...............
sampling and
analysis.
74:36:02:04................... Air quality 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
monitoring
network.
74:36:02:05................... Air quality 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
monitoring
requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:03. Air Quality Episodes
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:03:01................... Air pollution 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
emergency
episode.
74:36:03:02................... Episode emergency 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
contingency plan.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:04. Operating Permits for Minor Sources
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:04:01................... Applicability.... 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
74:36:04:02................... Minor source 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
operating permit
required.
74:36:04:02.01................ Minor source 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
operating permit
exemption.
74:36:04:03................... Emission unit 6/28/10 7/28/14 79 FR 36419, 6/28/14..............
exemptions.
74:36:04:04................... Standard for 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
issuance of a
minor source
operating permit.
74:36:04:05................... Time period for 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
operating
permits and
renewals.
74:36:04:06................... Timely and 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
complete
application for
operating permit
required.
74:36:04:07................... Required contents 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
of complete
application for
operating permit.
74:36:04:08................... Applicant 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
required to
supplement or
correct
application.
74:36:04:09................... Permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
application--Com
pleteness review.
74:36:04:10................... Time period for 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
department's
recommendation.
[[Page 79699]]
74:36:04:11................... Department's 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
recommendation
on operating
permit.
74:36:04:12................... Public 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
participation in
permitting
process.
74:36:04:12.01................ Public review of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
department's
draft permit.
74:36:04:13................... Final permit 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
decision--Notice
to interested
persons.
74:36:04:14................... Right to petition 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
for contested
case hearing.
74:36:04:15................... Contents of 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
operating permit.
74:36:04:16................... Operating permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
expiration.
74:36:04:17................... Renewal of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
operating permit.
74:36:04:18................... Operating permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
revision.
74:36:04:19................... Administrative 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
permit amendment.
74:36:04:20................... Procedures for 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
administrative
permit
amendments.
74:36:04:20.01................ Minor permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
amendment
required.
74:36:04:20.02................ Requirements for 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
minor permit
amendment.
74:36:04:20.03................ Application for 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
minor permit
amendment.
74:36:04:20.04................ Department 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
deadline to
approve minor
permit amendment.
74:36:04:21................... Permit 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
modifications.
74:36:04:22................... Source status 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
change--new
permit required.
74:36:04:23................... Reopening 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
operating permit
for cause.
74:36:04:24................... Procedures to 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
reopen operating
permit.
74:36:04:27................... Operating permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
termination,
revision, and
revocation.
74:36:04:28................... Notice of 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
operating
noncompliance--C
ontents.
74:36:04:29................... Petition for 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
contested case
on alleged
violation.
74:36:04:31................... Circumvention of 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
emissions not
allowed.
74:36:04:32................... General permits.. 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
74:36:04:33................... Secretary may 9/1/03 7/9/04 69 FR 25839, 5/10/04..............
require an
individual
permit.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:06. Regulated Air Pollutant Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:06:01................... Applicability.... 1/5/95 12/18/98 63 FR 55804, 10/19/98.............
[[Page 79700]]
74:36:06:02................... Allowable 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
emissions for
fuel-burning
units.
74:36:06:03................... Allowable 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
emissions for
process industry
units.
74:36:06:04................... Particulate 1/2/05 10/13/06 71 FR 46403,8/14/06...............
emission
restrictions for
incinerators and
waste wood
burners.
74:36:06:05................... Most stringent 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
interpretation
applicable.
74:36:06:06................... Stack performance 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
test.
74:36:06:07................... Open burning 4/4/99 5/7/03 68 FR 16726, 4/7/03...............
practices
prohibited.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:07. New Source Performance Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:07:08................... Ash disposal 12/29/96 6/21/00 65 FR 32033, 5/22/00..............
requirements.
74:36:07:29................... Operating 4/22/93 11/6/95 60 FR 46222, 9/6/95...............
requirements for
wire reclamation
furnaces.
74:36:07:30................... Monitoring 4/22/93 11/6/95 60 FR 46222, 9/6/95...............
requirements for
wire reclamation
furnaces.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:09. Prevention of Significant Deterioration
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:09:01................... Applicability.... 9/18/06 1/22/08 72 FR 72617, 12/21/07.............
74:36:09:01.01................ Prevention of 9/18/06 1/22/08 72 FR 72617, 12/21/07.............
significant
deterioration
permit required.
74:36:09:02................... Prevention of 6/25/13 3/2/15 80 FR 4799, 1/29/15...............
significant
deterioration.
74:36:09:03................... Public 6/25/13 3/2/15 80 FR 4799, 1/29/15...............
participation.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:10. New Source Review
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:10:01................... Applicability.... 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
74:36:10:02................... Definitions...... 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
74:36:10:03.01................ New source review 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
preconstruction
permit required.
74:36:10:05................... New source review 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
preconstruction
permit.
74:36:10:06................... Causing or 9/1/03 7/9/04 69 FR 25839, 5/10/04..............
contributing to
violation of any
national ambient
air quality
standard.
74:36:10:07................... Determining 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
credit for
emission offsets.
74:36:10:08................... Projected actual 6/25/13 7/28/14 79 FR 36419, 6/27/14..............
emissions.
74:36:10:09................... Clean unit test 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
for emission
units subject to
lowest
achievable
emission rate.
74:36:10:10................... Clean unit test 1/2/05 10/13/06 71 FR 46403, 8/14/06..............
for emission
units comparable
to lowest
achievable
emission rate.
--------------------------------------------------------------------------------------------------------------------------------------------------------
[[Page 79701]]
74:36:11. Performance Testing
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:11:01................... Stack performance 6/25/13 11/2/15 80 FR 59620,10/2/15...............
testing or other
testing methods.
74:36:11:02................... Secretary may 12/29/96 12/18/98 63 FR 55804, 10/19/98.............
require
performance
tests.
74:36:11:03................... Notice to 12/29/96 12/18/98 63 FR 55804, 10/19/98.............
department of
performance test.
74:36:11:04................... Testing new fuels 4/4/99 4/3/00 65 FR 5264, 2/3/00................
or raw materials.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:12. Control of Visible Emissions
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:12:01................... Restrictions on 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
visible
emissions.
74:36:12:02................... Exceptions to 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
restrictions.
74:36:12:03................... Exceptions 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
granted to
alfalfa
pelletizers or
dehydrators.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:13. Continuous Emission Monitoring Systems
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:13:01................... Secretary may 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
require
continuous
emission
monitoring
systems (CEMS).
74:36:13:02................... Minimum 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
performance
specifications
for all
continuous
emission
monitoring
systems.
74:36:13:03................... Reporting 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
requirements.
74:36:13:04................... Notice to 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
department of
exceedance.
74:36:13:05................... Compliance 4/22/93 12/18/98 63 FR 55804, 10/19/98.............
determined by
data from
continuous
emission monitor.
74:36:13:06................... Compliance 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
certification.
74:36:13:07................... Credible evidence 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
74:36:13:08................... Compliance 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
assurance
monitoring.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:17. Rapid City Street Sanding and Deicing
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:17:01................... Applicability.... 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
74:36:17:02................... Reasonable 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
available
control
technology.
74:36:17:03................... Street sanding 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
specifications.
74:36:17:04................... Street deicing 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
and maintenance
plan.
74:36:17:05................... Street sanding 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
and sweeping
recordkeeping.
74:36:17:06................... Inspection 2/11/96 8/9/02 67 FR 39619, 6/10/02..............
authority.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:18. Regulations for State Facilities in the Rapid City Area
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:18:01................... Definitions...... 7/1/02 3/22/04 69 FR 2671,1/20/04................
74:36:18:02................... Applicability.... 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
74:36:18:03................... Permit required.. 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
[[Page 79702]]
74:36:18:04................... Time period for 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
permits and
renewals.
74:36:18:05................... Required contents 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
of a complete
application for
a permit.
74:36:18:06................... Contents of 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
permit.
74:36:18:07................... Permit expiration 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
74:36:18:08................... Renewal of permit 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
74:36:18:09................... Reasonably 7/1/02 3/22/04 69 FR 2671, 1/20/04...............
available
control
technology
required.
74:36:18:10................... Visible emission 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
limit for
construction and
continuous
operation
activities.
74:36:18:11................... Exception to 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
visible emission
limit.
74:36:18:12................... Notice of 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
operating
noncompliance--C
ontents.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:20. Construction Permits for New Sources or Modifications
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36.20.01................... Applicability.... 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
74:36:20:02................... Construction 4/20/11 7/28/14 79 FR 36419, 6/27/14..............
permit required.
74:36:20:03................... Construction 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
permit exemption.
74:36:20:04................... Emission unit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
exemptions.
74:36:20:05................... Standard for 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
issuance of
construction
permit.
74:36:20:06................... Timely and 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
complete
application for
a construction
permit required.
74:36:20:07................... Required contents 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
of complete
application for
a construction
permit.
74:36:20:08................... Applicant 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
required to
supplement or
correct
application.
74:36:20:09................... Permit 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
application--Com
pleteness review.
74:36:20:10................... Time period for 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
department's
recommendation.
74:36:20:11................... Public 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
participation in
permitting
process.
74:36:20:12................... Public review of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
department's
draft permit.
74:36:20:13................... Final permit 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
decision--Notice
to interested
persons.
74:36:20:14................... Right to petition 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
for contested
case hearing.
74:36:20:15................... Contents of 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
construction
permit.
74:36:20:16................... Administrative 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
permit amendment.
74:36:20:17................... Procedures for 6/28/10 7/28/14 79 FR 36149, 6/27/14..............
administrative
permit
amendments.
[[Page 79703]]
74:36:20:18................... Reopening 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
construction
permit for cause.
74:36:20:19................... Procedures to 6/28/10 7/28/14 79 FR 36149, 6/27/14..............
reopen
construction
permit.
74:36:20:20................... Construction 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
permit does not
exempt from
other
requirements.
74:36:20:21................... Expiration of a 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
construction
permit.
74:36:20:22................... Notice of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
constructing or
operating
noncompliance--C
ontents.
74:36:20:23................... Petition for 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
contested case
on alleged
violation.
74:36:20:24................... Circumvention of 6/28/10 7/28/14 79 FR 36419, 6/27/14..............
emissions not
allowed.
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:21. Regional Haze Program
--------------------------------------------------------------------------------------------------------------------------------------------------------
74:36:21:01................... Applicability.... 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
74:36:21:02................... Definitions...... 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
74:36:21:03................... Existing 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
stationary
facility defined.
74:36:21:04................... Visibility impact 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
analysis.
74:36:21:05................... BART 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
determination.
74:36:21:06................... BART 9/19/11 5/29/12 77 FR 24845, 4/26/12..............
determination
for a BART-
eligible coal-
fired power
plant.
74:36:21:07................... Installation of 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
controls based
on visibility
impact analysis
or BART
determination.
74:36:21:08................... Operation and 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
maintenance of
controls.
74:36:21:09................... Monitoring, 6/25/13 11/2/15 80 FR 59620, 10/2/15..............
recordkeeping,
and reporting.
74:36:21:10................... Permit to 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
construct.
74:36:21:11................... Permit required 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
for BART
determination.
74:36:21:12................... Federal land 12/7/10 5/29/12 77 FR 24845, 4/26/12..............
manager
notification and
review.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Pennington
--------------------------------------------------------------------------------------------------------------------------------------------------------
Ordinance #12--Fugitive Dust Regulation--1.0 Control of Fugitive Dust
--------------------------------------------------------------------------------------------------------------------------------------------------------
1.1........................... Applicability.... 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
1.2........................... Definitions...... 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
1.3........................... Standard of 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
compliance.
1.4........................... Reasonably 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
available
control
technology
required.
1.5........................... Fugitive dust 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
control permits
required for
construction
activities,
i.e., temporary
operations.
[[Page 79704]]
1.6........................... Compliance plans 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
and schedules
required, i.e.,
continuous
operations.
1.7........................... Enforcement 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
procedures.
1.8........................... Establishment of 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
administrative
mechanisms.
1.9........................... Separability..... 12/12/78 7/13/79 44 FR 44494, 7/30/79..............
--------------------------------------------------------------------------------------------------------------------------------------------------------
(d) EPA-approved source specific requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
State EPA effective
Rule No. Rule title effective date date Final rule citation, date Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
(AQ 79-02.)................... South Dakota 3/18/82 8/7/83 48 FR 31199, 7/7/83...............
State University
steam generating
plant.
--------------------------------------------------------------------------------------------------------------------------------------------------------
(e) EPA-approved nonregulatory provisions.
--------------------------------------------------------------------------------------------------------------------------------------------------------
State EPA effective
Rule title effective date date Final rule citation, date Comments
--------------------------------------------------------------------------------------------------------------------------------------------------------
I.A. Introduction................... 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.B. Legal Authority................ 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.C. Control Strategy............... 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.D. Compliance Schedule............ 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.E. Prevention of Air Pollution 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
Emergency Episodes.
I.F. Air Quality Surveillance....... 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.G. Review of New Sources and 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
Modifications.
I.H. Source Surveillance............ 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.I. Resources...................... 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I.J. Intergovernmental Cooperation.. 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
I. Appendix A. South Dakota Compiled 1/17/72 7/13/72 37 FR 15080, 7/27/72....................
Laws.
II. Part D Plan for Total Suspended 12/27/78 8/30/79 44 FR 44494, 7/30/79....................
Particulate.
III. SIP to meet Air Quality 1/21/80 10/4/80 45 FR 58528, 9/4/80.....................
Monitoring and public notification
requirements.
IV. Lead (Pb) SIP................... 5/4/84 10/26/84 49 FR 37752, 9/26/84....................
V. Stack Height Demonstration 8/20/86 7/7/89 54 FR 24334, 6/7/89.....................
Analysis.
VI. Commitment to revise stack 5/11/88 10/2/88 53 FR 34077, 9/2/88.....................
height rules.
VII. PM10 Committal SIP............. 7/12/88 11/5/90 55 FR 40831, 10/5/90....................
VIII. Small Business Technical and 1/12/94 12/27/94 59 FR 53589, 10/25/94...................
Environmental Compliance Program.
IX. Commitment regarding permit 11/16/95 7/10/02 67 FR 39619, 6/10/02....................
exceedances of the PM10 standard in
Rapid City.
X. CAA 110(a)(D)(2)(i) Interstate 4/19/07 7/7/08 73 FR 26019, 5/8/08.....................
Transport Requirements for the 1997
8-hr Ozone and PM2.5 NAAQS.
XI. 1997 Ozone NAAQS Infrastructure 2/1/08 8/22/11 76 FR 43912, 7/22/11....................
Certification.
XII. South Dakota Regional Haze 4/26/12 5/29/12 77 FR 24845, 4/26/12....................
State Implementation Plan, Amended.
XIII. Section 110(a)(2) 3/4/11 3/2/15 80 FR 4799, 1/29/15.....................
Infrastructure Requirements for the
1997 and 2006 PM2.5 NAAQS.
XIV. Section 110(a)(2) 10/10/12 3/2/15 80 FR 4799, 1/29/15.....................
Infrastructure Requirements for the
2008 Lead NAAQS.
XV. Section 110(a)(3) Infrastructure 5/21/13 3/2/15 80 FR 4799, 1/29/15.....................
Requirements for the 2008 8-hour
Ozone NAAQS.
XVI. Section 110(a)(2) 10/23/13 3/2/15 80 FR 4799, 1/29/15.....................
Infrastructure Requirements for the
2010 NO2 NAAQS.
XVII. SDCL (South Dakota Codified 3/2/15 3/2/15 80 FR 4799, 1/29/15.....................
Laws), 1-40-25.1.
XVIII. South Dakota Codified Laws, 7/1/93 12/27/94 59 FR 53589, 10/25/94...................
34-A-1-57, 34-A-1-58, 34-A-1-59,
and 34-A-1-60.
--------------------------------------------------------------------------------------------------------------------------------------------------------
[[Page 79705]]
[FR Doc. 2015-32216 Filed 12-22-15; 8:45 am]
BILLING CODE 6560-50-P