[Federal Register Volume 81, Number 74 (Monday, April 18, 2016)]
[Notices]
[Pages 22588-22589]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-08860]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14758-000]
Energy Resources USA Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On February 19, 2016, Energy Resources USA Inc. filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Bosher Dam Hydroelectric Project (Bosher Project or project) to be
located at the existing Bosher Dam on the James River, about 2 miles
southwest of Tuckahoe, in Henrico County, Virginia. The sole purpose of
a preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) An
existing 12-foot-high dam; (2) an 1,000-acre-size impoundment with a
storage capacity of 2,100-acre-foot and drainage area of 6,753 square
miles; (3) a new 700-foot-long, 180-foot-wide intake; (4) a new 300-
foot-long, 180-foot-wide tailrace; (5) four new 2-megawatt (MW)
turbines; (6) a new 65-foot-long, 197-foot-wide powerhouse; (7) a new
60-foot-long, 50-foot-wide substation; (8) a new 528-foot-long, 69-
kilovolt transmission line; and (9) appurtenant facilities. The
estimated annual generation of the Bosher Project would be 68,500
megawatt-hours.
Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc.,
350 Lincoln Road, 2nd Floor, Miami Beach, FL 33139; phone: (954) 248-
5425.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14758-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary''
[[Page 22589]]
link of the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-14758) in the docket number
field to access the document. For assistance, contact FERC Online
Support.
Dated: April 6, 2016.
Kimberly D. Bose,
Secretary.