[Federal Register Volume 81, Number 109 (Tuesday, June 7, 2016)]
[Notices]
[Pages 36534-36535]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-13354]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2203-015-AL]


Alabama Power Company; Notice of Availability of Environmental 
Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission (Commission or FERC) 
regulations, 18 Code of Federal Regulations (CFR) part 380, the Office 
of Energy Projects has reviewed Alabama Power Company's application for 
a new license for the 46.9-megawatt (MW) Holt Hydroelectric Project 
(FERC Project No. 2203). The project is located at the U.S. Army Corps 
of Engineers' (Corps) Holt Lock and Dam on the Black Warrior River near 
the City of Tuscaloosa, in Tuscaloosa County, Alabama. The project 
occupies 36.81 acres of federal land administered by the Corps.
    Staff has prepared an environmental assessment (EA) that analyzes 
the potential environmental effects of continued project operation. 
Based on staff's analysis with appropriate environmental protective 
measures, relicensing the project would not constitute a major federal 
action that would significantly affect the quality of the human 
environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected] or toll-free at 1-866-208-3676, or for TTY, 
202-502-8659.
    You may also register online at www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Comments should be filed within 30 days from the date of this 
notice. The Commission strongly encourages electronic filing. Please 
file comments using the Commission's eFiling system at http://
www.ferc.gov/docs-filing/

[[Page 36535]]

efiling.asp. For assistance, please contact FERC Online Support at 
[email protected] or toll-free at 1-866-208-3676, or for TTY, 
202-502-8659. In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426. The first page of any filing should include 
Holt Hydroelectric Project No. 2203-015.
    For further information, contact Jeanne Edwards by telephone at 
202-502-6181 or by email at [email protected].

    Dated: May 31, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13354 Filed 6-6-16; 8:45 am]
BILLING CODE 6717-01-P