Drawbridge Operation Regulation; Mullica River, Green Bank, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Green Bank Bridge (Green Bank Road/
CR563) across the Mullica River, mile 18.0, at Green Bank, NJ. The
deviation is necessary to perform bridge repairs. This deviation allows
the bridge to remain in the closed-to-navigation position.
DATES: This deviation is effective from 7:30 a.m. on June 20, 2016,
through 3:30 p.m. on June 23, 2016.
[[Page 38952]]
ADDRESSES: The docket for this deviation, [USCG-2016-0497] is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Hal R. Pitts, Bridge
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6222, email [email protected].
SUPPLEMENTARY INFORMATION: Atlantic County, NJ, that owns and operates
the Green Bank Bridge (Green Bank Road/CR563), has requested a
temporary deviation from the current operating regulations to perform
urgent repairs to the bridge operating machinery. The bridge is a
bascule draw bridge and has a vertical clearance in the closed position
of 5 feet above mean high water.
The current operating schedule is set out in 33 CFR 117.731(b).
Under this temporary deviation, the bridge will remain in the closed-
to-navigation position from 7:30 a.m. on June 20, 2016, through 3:30
p.m. on June 23, 2016. At all other times the bridge will operate per
33 CFR 117.731(b).
The Mullica River is used by a variety of vessels including small
U.S. government vessels, small commercial vessels, and recreational
vessels. The Coast Guard has carefully considered the nature and volume
of vessel traffic on the waterway in publishing this temporary
deviation.
Vessels able to pass through the bridge in the closed position may
do so. The bridge will not be able to open for emergencies and there is
no immediate alternate route for vessels to pass. The Coast Guard will
also inform the users of the waterways through our Local and Broadcast
Notices to Mariners of the change in operating schedule for the bridge
so that vessel operators can arrange their transit to minimize any
impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: June 9, 2016.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2016-14064 Filed 6-14-16; 8:45 am]