DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14793-000]


The Domestic and Foreign Missionary Society of the Protestant 
Episcopal Diocese of Alabama; Notice of Application Tendered for Filing 
With the Commission and Establishing Procedural Schedule for Licensing 
and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: 10 Megawatt Exemption.
    b. Project No.: 14793-000.
    c. Date filed: July 12, 2016.
    d. Applicant: The Domestic and Foreign Missionary Society of the 
Protestant Episcopal Diocese of Alabama.
    e. Name of Project: Camp McDowell Project.
    f. Location: On Clear Creek, near Nauvoo in Winston County, 
Alabama. The project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Frazier Christy, 3621 Kingshill Road, 
Birmingham, Alabama 35223.
    i. FERC Contact: Michael Spencer, (202) 502-6093, 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The proposed project would consist of: (1) an Archimedean Screw 
installed in the spillway of the dam; (2) a 10 acre reservoir; (3) a 
powerhouse containing a generator with a total installed capacity of 
140 kilowatts; and (4) a transmission line. The project is estimated to 
generate an average of 950 megawatt-hours annually.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready     October 2016.
 for Environmental Analysis.
Filing of recommendations, preliminary   December 2016.
 terms and conditions, and fishway
 prescriptions.
Commission issues EA...................  June 2017.
Comments on EA.........................  July 2017.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: July 27, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18579 Filed 8-4-16; 8:45 am]