Drawbridge Operation Regulation; Upper Mississippi River, Rock
Island, IL
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Rock Island Railroad and Highway
Drawbridge across the Upper Mississippi River, mile 482.9, at Rock
Island, Illinois. The deviation is necessary to allow the bridge owner
time to facilitate repairs to the locking mechanisms on the rail deck
of the bridge. This deviation allows the bridge to be maintained in the
closed-to-navigation position for critical repairs that are essential
to the continued safe operation of the drawbridge.
DATES: This deviation is effective from 5 a.m. on September 14, 2016 to
5 a.m. on September 15, 2016.
ADDRESSES: The docket for this deviation, USCG-2016-0768, is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Eric A. Washburn, Bridge
Administrator, Western Rivers, Coast Guard; telephone (314) 269-2378,
email [email protected].
SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested
a temporary deviation for the Rock Island Railroad and Highway
Drawbridge, mile 482.9, at Rock Island, Illinois across the Upper
Mississippi River. It has a vertical clearance of 23.8 feet above
normal pool in the closed-to-navigation position. Navigation on the
waterway consists primarily of commercial tows and recreational
watercraft. The Rock Island Railroad and Highway Drawbridge currently
operates in accordance with 33 CFR 117.5, which states the general
requirement that drawbridges shall open promptly and fully for the
passage of vessels when a request to open is given in accordance with
the subpart.
The deviation period is from 5 a.m. on September 14, 2016 to 5 a.m.
on September 15, 2016 when the draw span will remain in the closed-to-
navigation position. During this time the bridge owner will facilitate
critical repairs to the locking mechanisms on the rail deck of the
bridge that are essential to the continued safe operation of the
drawbridge. The bridge will not be able to open for emergencies and
there is no immediate alternate route for vessels to pass this section
of the Upper Mississippi River. The Coast Guard will also inform the
users of the waterway through our Local and Broadcast Notices to
Mariners of the change in operating schedule for the bridge so that
vessels can arrange their transits to minimize any impact caused by the
temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.