[Federal Register Volume 81, Number 235 (Wednesday, December 7, 2016)]
[Rules and Regulations]
[Page 88098]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-29078]
[[Page 88098]]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
10 CFR Parts 429 and 431
[Docket No. EERE-2014-BT-TP-0006]
RIN 1904-AD16
Energy Conservation Program: Test Procedure for Commercial
Packaged Boilers; Withdrawal
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy.
ACTION: Final rule; withdrawal.
-----------------------------------------------------------------------
SUMMARY: The U.S. Department of Energy (DOE) is withdrawing its final
rule to amend its test procedure for commercial packaged boilers which
published in the Federal Register on Thursday, November 10, 2016. The
final rule published on November 10, 2016 contained errors. Therefore,
DOE is withdrawing the final rule in its entirety and will republish
the final rule amending its test procedure for commercial packaged
boilers.
DATES: Effective December 7, 2016, the final rule published November
10, 2016 (81 FR 79224), effective December 12, 2016, is withdrawn.
FOR FURTHER INFORMATION CONTACT: Mr. James Raba, U.S. Department of
Energy, Office of Energy Efficiency and Renewable Energy, Building
Technologies Office, EE-5B, 1000 Independence Avenue SW., Washington,
DC 20585-0121. Telephone: (202) 586-8654. Email:
[email protected].
SUPPLEMENTARY INFORMATION: DOE is withdrawing its final rule to amend
its test procedure for commercial packaged boilers which published in
the Federal Register on Thursday, November 10, 2016 (81 FR 79224).
Among other amendments, the final rule incorporates by reference
certain sections of the American National Standards Institute (ANSI)/
Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Standard
1500, ``2015 Standard for Performance Rating of Commercial Space
Heating Boilers,'' provides an optional field test for commercial
packaged boilers with rated input greater than 5,000,000 Btu/h, and
modifies the inlet water temperatures during tests of hot water
commercial packaged boilers.
Because the November 10, 2016, rule contained errors, DOE is
withdrawing the final rule in its entirety and will republish the final
rule amending its test procedure for commercial packaged boilers.
Issued in Washington, DC, on November 29, 2016.
Kathleen B. Hogan,
Deputy Assistant Secretary for Energy Efficiency, Energy Efficiency and
Renewable Energy.
[FR Doc. 2016-29078 Filed 12-6-16; 8:45 am]
BILLING CODE 6450-01-P