[Federal Register Volume 82, Number 41 (Friday, March 3, 2017)]
[Rules and Regulations]
[Page 12415]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-04125]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2017-0101]
Drawbridge Operation Regulation; Gulf Intracoastal Waterway,
Galveston, TX
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Galveston Causeway Railroad
Vertical Lift Bridge across the Gulf Intracoastal Waterway (GIWW), mile
357.2 West of Harvey Locks (WHL), at Galveston, Galveston County,
Texas. The deviation is necessary to conduct cable lubing and
maintenance on the bridge. This deviation allows the bridge to remain
in the down position for two four-hour periods, on five consecutive
days during day-light hours.
DATES: This deviation is effective from 7 a.m. on March 6, 2017 through
5 p.m. on March 10, 2017.
ADDRESSES: The docket for this deviation, [USCG-2017-0101] is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Giselle MacDonald, Bridge
Administration Branch, Coast Guard; telephone 504-671-2128, email
[email protected].
SUPPLEMENTARY INFORMATION: The Burlington Northern Santa Fe Railway
Company requested a temporary deviation from the operating schedule of
the Galveston Causeway Railroad Vertical Lift Bridge across the GIWW,
mile 357.2 WHL, at Galveston, Galveston County, Texas. This deviation
was requested to allow the bridge owner to complete cable lubing and
scheduled semi-annual maintenance. This bridge is governed by 33 CFR
117.5.
This deviation allows the vertical lift bridge to remain in the
closed-to-navigation position from 7 a.m. to 11 a.m. and from 1 p.m. to
5 p.m., daily, beginning March 6 through March 10, 2017, with a
scheduled two-hour opening each day to facilitate passage of vessel
traffic from 11 a.m. to 1 p.m., and the bridge will revert to open on
demand status at 5 p.m. each day.
The bridge has a vertical clearance of 8.0 feet above mean high
water, elevation 3 feet of the North American Vertical Datum of 1988
(NAVD88), in the closed-to-navigation position and 73 feet above mean
high water in the open-to-navigation position. Navigation at the site
of the bridge consists mainly of tows with barges and some recreational
pleasure craft. The bridge can open in case of emergency. No alternate
routes are available. The Coast Guard will inform the users of the
waterways through our Local and Broadcast Notices to Mariners of the
change in operating schedule for the bridge.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: February 27, 2017.
Eric A. Washburn,
Bridge Administrator, Eighth Coast Guard District.
[FR Doc. 2017-04125 Filed 3-2-17; 8:45 am]
BILLING CODE 9110-04-P