[Federal Register Volume 82, Number 75 (Thursday, April 20, 2017)]
[Notices]
[Pages 18632-18633]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-07994]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2790-069]


Boott Hydropower, Inc., and Eldred L. Field Hydroelectric 
Facility Trust; Notice of Application Accepted for Filing and 
Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:

    a. Application Type: Request to revise mitigation requirements.
    b. Project No: 2790-069.
    c. Date Filed: March 16, 2017.
    d. Applicant: Boott Hydropower, Inc., and Eldred L. Field 
Hydroelectric Facility Trust.
    e. Name of Project: Lowell Hydroelectric Project.
    f. Location: Merrimack River in the City of Lowell in Middlesex 
County, Massachusetts.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Kevin M. Webb, Hydro Licensing Manager Boott 
Hydropower, LLC, One Tech Drive, Suite 220, Andover, MA 01810, Phone: 
(978) 935-6039, Fax: (978) 681-7727, Email: [email protected].
    i. FERC Contact: Mr. M. Joseph Fayyad, (202) 502-8759, 
[email protected].
    j. Deadline for filing comments, motions to intervene and protests 
is 30 days from the issuance of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file motions 
to intervene, protests, comments, recommendations, preliminary terms 
and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at

[[Page 18633]]

http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-2790-069.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee for the 24.8-megawatt (MW) 
Lowell Hydroelectric Project, filed an amendment application to delete 
from one of its power stations, the Bridge Street Power Station, four 
generating units totaling 2.36 MW. The licensee says the proposal is in 
the public interest to enhance public safety and to support urban 
renewal.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214, respectively. In determining the appropriate action to take, 
the Commission will consider all protests or other comments filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: April 13, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-07994 Filed 4-19-17; 8:45 am]