[Federal Register Volume 82, Number 84 (Wednesday, May 3, 2017)] [Notices] [Page 20602] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2017-08736] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Certification Notice--245] Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of filing. ----------------------------------------------------------------------- SUMMARY: On March 20, 2017, PSEG Fossil, LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations. The FUA and regulations thereunder require DOE to publish a notice of filing of self- certification in the Federal Register. ADDRESSES: Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G- 024, Forrestal Building, 1000 Independence Avenue SW., Washington, DC 20585. FOR FURTHER INFORMATION CONTACT: Christopher Lawrence at (202) 586- 5260. SUPPLEMENTARY INFORMATION: On March 20, 2017, PSEG Fossil, LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to Sec. 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. The FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register. 42 U.S.C. 8311(d) and 10 CFR 501.61(c). Title II of FUA, as amended (42 U.S.C. 8301 et seq.), provides that no new base load electric powerplant may be constructed or operated without the capability to use coal or another alternate fuel as a primary energy source. Pursuant to the FUA, in order to meet the requirement of coal capability, the owner or operator of such a facility proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary of Energy (Secretary) prior to construction, or prior to operation as a base load electric powerplant, that such powerplant has the capability to use coal or another alternate fuel. Such certification establishes compliance with FUA section 201(a) as of the date it is filed with the Secretary. 42 U.S.C. 8311. The following owner of a proposed new baseload electric generating powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61: Owner: PSEG Fossil, LLC. Capacity: 755 megawatts (MW). Plant Location: Brandywine, MD 20613. In-Service Date: May 2018. Issued in Washington, DC, on April 11, 2017. Brian Mills, Senior Planning Advisor, Office of Electricity Delivery and Energy Reliability. [FR Doc. 2017-08736 Filed 5-2-17; 8:45 am] BILLING CODE 6450-01-P