WBI Energy Transmission Inc.; Notice of Schedule for
Environmental Review of the Valley Expansion Project
On April 26, 2017, WBI Energy Transmission Inc. (WBI Energy) filed
an application in Docket No. CP17-257-000 requesting a Certificate of
Public Convenience and Necessity pursuant to Section 7(c) of the
Natural Gas Act to construct and operate certain natural gas pipeline
facilities. The proposed project is known as the Valley Expansion
Project (Project), and would provide an additional 40 million cubic
feet per day of firm transportation on its system.
On May 9, 2017, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--September 20, 2017
90-day Federal Authorization Decision Deadline--December 19, 2017.
[[Page 36132]]
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
WBI Energy proposes to construct a new 2,600-horsepower electric-
driven compressor station in Cass County, North Dakota; 38 miles of new
16-inch-diameter pipeline between Mapleton, North Dakota and Felton,
Minnesota; and farm taps, valve settings, and ancillary facilities.
Additionally, WBI Energy proposes to replace two existing town border
station delivery points and construct one regulator station in
Burleigh, Stutsman, and Barnes Counties, North Dakota, respectively, to
increase the operating pressure of a portion of its Line Section 24.
Background
On November 23, 2016, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Planned Valley Expansion
Project and Request for Comments on Environmental Issues (NOI). The NOI
was issued during the pre-filing review of the Project in Docket No.
PF16-10 and was sent to affected landowners; federal, state, and local
government agencies; elected officials; Native American tribes; other
interested parties; and local libraries and newspapers. In response to
the NOI, commenters raised concerns regarding: watershed and waterbody
crossings; stormwater discharge; groundwater impacts; flood zone
impacts; reseeding and species review requirements; Section 106
consultation; cultural resources and land valuation impacts; route
variations; project impacts on the Fargo-Moorhead Area Diversion
Project; and fugitive dust emissions and noise impacts.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC Web site (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP17-257), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC Web site also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: July 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-16347 Filed 8-2-17; 8:45 am]
BILLING CODE 6717-01-P