DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Record of Decision for Final Supplement I to the Final
Environmental Statement, Mississippi River Between the Ohio and
Missouri Rivers (Regulating Works), Missouri and Illinois
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Record of Decision.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers (USACE), St. Louis District,
is issuing this notice to advise Federal, state, and local government
agencies, affected Tribes, and the public that USACE has signed a
Record of Decision (ROD) for Final Supplement I to the Final
Environmental Statement, Mississippi River between the Ohio and
Missouri Rivers (Regulating Works). The ROD was rendered to declare
that, after careful consideration of the purpose of and need for the
Regulating Works Project, the analysis contained in Final Supplement I,
input from the public, affected Tribes, state and Federal agencies, and
other interested parties, and based on the Regulating Works Project's
Congressional authority and continued benefit of remaining
construction, USACE has determined that the public interest will best
be served by implementing the Continue Construction Alternative
(hereafter, the Selected Plan).
DATES: The USACE Mississippi Valley Division Commander, Major General
Michael C. Wehr, signed the ROD on August 31, 2017.
ADDRESSES: U.S. Army Corps of Engineers, Regional Planning and
Environmental Division North, CEMVP-PD-P (Attn: Mr. Kip Runyon), 1222
Spruce St., St. Louis, MO 63103-2833.
FOR FURTHER INFORMATION CONTACT: Kip Runyon, Environmental Planner,
Regional Planning and Environmental Division North, at 314-331-8396 or
by email at [email protected].
SUPPLEMENTARY INFORMATION: USACE is charged with obtaining and
maintaining a navigation channel on the Middle Mississippi River (MMR)
that is nine feet deep and 300 feet wide with additional width in bends
as necessary (commonly called the Regulating Works Project). As
authorized by Congress, the Regulating Works Project is obtained by
construction of revetment, rock removal, and river training structures
to maintain bank stability and ensure adequate, reliable navigation
depth and width. The Regulating Works Project is maintained through
dredging and any needed maintenance to constructed features. The long-
term goal of the Regulating Works Project, as authorized by Congress,
is to obtain and maintain a navigation channel at the authorized
dimensions and to reduce federal expenditures by alleviating the amount
of annual maintenance dredging through the construction of river
training structures. The Selected Plan consists of continuing with
construction of new river training structures and revetment for
navigation purposes until such time as the costs of placing more
structures, including costs for any mitigation, are no longer justified
by the resultant reduction in repetitive dredging quantities and
associated costs. The Selected Plan also involves continuing to dredge
as necessary, completing known bankline stabilization work to reduce
the risk of a channel cutoff, placing additional revetment, and
continuing to maintain existing structures.
The remaining construction associated with the Selected Plan is
currently estimated from programmatic analysis to require approximately
4.4 million tons (2.9 million cubic yards) of rock. Dredge quantities
are expected to decrease from their current average annual quantity of
approximately 4 million cubic yards to approximately 2.4 million cubic
yards after construction of new river training
[[Page 45009]]
structures and any compensatory mitigation is complete. These estimates
are based on assumptions of Congressional funding levels, rock prices,
dredging costs, sediment loads, mitigation costs, etc. Because these
assumptions are uncertain, the estimated quantity of construction could
differ from actual implementation.
Environmental impacts of the work associated with the Selected Plan
will continue to be avoided and minimized to the extent practicable.
Placement of river training structures is expected to increase the
acreage of low-velocity habitat that is considered important habitat
for many MMR fish species. However, placement of river training
structures is also expected to reduce shallow to moderate-depth,
moderate-to high-velocity habitat that is important for some MMR fish
guilds. Analysis of the impacts of the Selected Plan to main channel
border habitat suggests that future construction of river training
structures will result in the consideration of compensatory mitigation
measures. The specific impacts of each work area and any necessary
compensatory mitigation measures will be covered in Tier II Site
Specific Environmental Assessments, as appropriate.
The ROD, Final Supplement I, and supporting documentation are
available at: http://www.mvs.usace.army.mil/Missions/Navigation/SEIS/Library.aspx.
Brian L. Johnson,
Chief, Environmental Compliance Branch, Regional Planning and
Environmental Division North.
[FR Doc. 2017-20672 Filed 9-26-17; 8:45 am]