[Federal Register Volume 82, Number 189 (Monday, October 2, 2017)]
[Rules and Regulations]
[Page 45728]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-21067]



[[Page 45728]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0880]


Drawbridge Operation Regulation; Plum Island River, Newbury, MA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Plum Island Turnpike Bridge across 
Plum Island River, mile 3.3, between Newburyport and Plum Island, 
Massachusetts. This deviation is necessary to facilitate a planned 
water main repair project and allows the bridge to be closed for twenty 
nine days.

DATES: This deviation is effective from 5 a.m. on October 10, 2017 
through 5 p.m. on November 7, 2017.

ADDRESSES: The docket for this deviation, USCG-2017-0880, is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email James L. Rousseau, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
617-223-8619, email [email protected].

SUPPLEMENTARY INFORMATION: The owner of the bridge, the Massachusetts 
Department of Transportation, requested a temporary deviation in order 
to facilitate a planned water main repair next to the bridge. The 
project includes installing a temporary water main bypass on the 
bridge, preventing span operation.
    The Plum Island Turnpike Bridge across Plum Island River, mile 3.3, 
between Newburyport and Plum Island, Massachusetts is a bascule bridge 
with a vertical clearance of 13 feet at mean high water and 21 feet at 
mean low water in the closed position. The existing drawbridge 
operating regulations are listed at 33 CFR 117.615.
    This temporary deviation allows the Plum Island Turnpike Bridge to 
remain closed beginning 5 a.m. October 10, 2017 until 5 p.m. November 
7, 2017. Plum Island River is transited by small recreational vessels. 
Coordination with waterway users has indicated no objections to the 
closure of the draw and no requests for openings have occurred during 
this period for the last three years.
    Vessels that can pass under the bridge without an opening may do so 
at all times. The bridge will not be able to open for emergencies. The 
Atlantic Ocean can be used as an alternate route for vessels to pass. 
The Coast Guard will also inform the users of the waterways through our 
Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so vessel operators may arrange their transits 
to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: September 27, 2017.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-21067 Filed 9-29-17; 8:45 am]
 BILLING CODE 9110-04-P