Drawbridge Operation Regulation; Hutchinson River, Mount Vernon,
NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the South Fulton Avenue Bridge across
the Hutchinson River, mile 2.9, at Mount Vernon, New York. This
deviation is necessary to facilitate bridge rehabilitation allowing the
owner to temporarily close the draw for ten days.
DATES: This deviation is effective from 12:01 a.m. on November 13, 2017
until 11:59 p.m. on November 22, 2017.
ADDRESSES: The docket for this deviation, USCG-2017-0983, is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Judy K. Leung-Yee, Bridge Management
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone
212-514-4336, email [email protected].
SUPPLEMENTARY INFORMATION: The owner of the bridge, the Westchester
County Department of Public Works and Transportation, requested a
temporary deviation in order to facilitate bridge rehabilitation
including placement of the concrete deck for the counterweight spans,
installation of concrete on the movable spans, installation of sidewalk
deck panels, control/mechanical equipment wiring and testing, and
bridge testing.
The South Fulton Avenue Bridge across the Hutchinson River, mile
2.9, at Mount Vernon, New York is a bascule bridge with a vertical
clearance of 6 feet at mean high water and 13 feet at mean low water in
the closed position. The existing drawbridge operating regulations are
listed at 33 CFR 117.793(c).
This temporary deviation will allow the South Fulton Avenue Bridge
to remain in the closed position from 12:01 a.m. on November 13, 2017
to 11:59 p.m. on November 22, 2017. The waterway is transited by
recreational vessels and commercial vessels. There is only one facility
upstream of this bridge. Coordination with waterway user has indicated
no objection to the proposed closure of the draw. Vessels that can pass
under the bridge without an opening may do so at all times. The bridge
will not be able to open for emergencies. There is no alternate route
for vessels to pass.
The Coast Guard will also inform the users of the waterways through
our Local and Broadcast Notices to Mariners of the change in operating
schedule for the bridge so vessel operators may arrange their transits
to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.