[Federal Register Volume 82, Number 244 (Thursday, December 21, 2017)]
[Proposed Rules]
[Pages 60572-60576]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-27431]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R05-OAR-2016-0759; FRL-9972-35-Region 5]
Air Plan Approval; Ohio; Regional Haze Plan and Prong 4
(Visibility) for the 2012 and 2006 PM2.5, 2010 NO2, 2010 SO2, and 2008
Ozone NAAQS
AGENCY: Environmental Protection Agency (EPA).
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is proposing to take
action under the Clean Air Act (CAA) on an Ohio State Implementation
Plan (SIP) submittal addressing regional haze. This proposed action is
based on a final determination by EPA that a state's participation in
the Cross-State Air Pollution Rule (CSAPR) program continues to meet
the Regional Haze Rule (RHR)'s criteria to qualify as an alternative to
the application of Best Available Retrofit Technology (BART). EPA is
proposing the following five actions: Approve the portion of Ohio's
November 30, 2016 SIP submittal seeking to change reliance from the
Clean Air Interstate Rule (CAIR) to CSAPR for certain regional haze
requirements; convert EPA's limited approval/limited disapproval of
Ohio's March 11, 2011 regional haze SIP to a full approval; withdraw
the Federal Implementation Plan (FIP) provisions that address the
limited disapproval; approve the visibility prong of Ohio's
infrastructure SIP submittals for the 2012 annual and 2006 24-hour fine
particulate matter (PM2.5), 2010 nitrogen dioxide
(NO2), and 2010 sulfur dioxide (SO2) National
Ambient Air Quality Standards (NAAQS); and convert EPA's disapproval of
the visibility portion of Ohio's infrastructure SIP submittal for the
2008 ozone NAAQS to an approval.
DATES: Comments must be received on or before January 22, 2018.
ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R05-
OAR-2016-0759 at http://www.regulations.gov or via email to
[[Page 60573]]
[email protected]. For comments submitted at Regulations.gov,
follow the online instructions for submitting comments. Once submitted,
comments cannot be edited or removed from Regulations.gov. For either
manner of submission, EPA may publish any comment received to its
public docket. Do not submit electronically any information you
consider to be Confidential Business Information (CBI) or other
information whose disclosure is restricted by statute. Multimedia
submissions (audio, video, etc.) must be accompanied by a written
comment. The written comment is considered the official comment and
should include discussion of all points you wish to make. EPA will
generally not consider comments or comment contents located outside of
the primary submission (i.e., on the web, cloud, or other file sharing
system). For additional submission methods, please contact the person
identified in the FOR FURTHER INFORMATION CONTACT section. For the full
EPA public comment policy, information about CBI or multimedia
submissions, and general guidance on making effective comments, please
visit http://www2.epa.gov/dockets/commenting-epa-dockets.
FOR FURTHER INFORMATION CONTACT: Michelle Becker, Life Scientist,
Attainment Planning and Maintenance Section, Air Programs Branch (AR-
18J), Environmental Protection Agency, Region 5, 77 West Jackson
Boulevard, Chicago, Illinois 60604, (312) 886-3901,
[email protected].
SUPPLEMENTARY INFORMATION: Throughout this document whenever ``we,''
``us,'' or ``our'' is used, we mean EPA.
I. Background
A. Regional Haze SIPs and Their Relationship With CAIR and CSAPR
Section 169A(b)(2)(A) of the CAA requires states to submit regional
haze SIPs that contain such measures as may be necessary to make
reasonable progress towards the natural visibility goal, including a
requirement that certain categories of existing major stationary
sources built between 1962 and 1977 procure, install, and operate BART
as determined by the state. Under the RHR, states are directed to
conduct BART determinations for such ``BART-eligible'' sources that may
be anticipated to cause or contribute to any visibility impairment in a
Class I area. Rather than requiring source-specific BART controls,
states also have the flexibility to adopt an emissions trading program
or other alternative program as long as the alternative provides
greater reasonable progress towards improving visibility than BART. See
40 CFR 51.308(e)(2). EPA provided states with this flexibility in the
RHR, adopted in 1999, and further refined the criteria for assessing
whether an alternative program provides for greater reasonable progress
in two subsequent rulemakings. See 64 FR 35714 (July 1, 1999); 70 FR
39104 (July 6, 2005); 71 FR 60612 (October 13, 2006).
In revisions to the regional haze program made in 2005, EPA
demonstrated that CAIR would achieve greater reasonable progress than
BART.\1\ See 70 FR 39104. In those revisions, EPA amended its
regulations to provide that states participating in the CAIR cap-and-
trade programs pursuant to an EPA-approved CAIR SIP, or states that
remain subject to a CAIR FIP need not require affected BART-eligible
electric generating units (EGUs) to install, operate, and maintain BART
for emissions of SO2 and nitrogen oxides (NOX).
---------------------------------------------------------------------------
\1\ CAIR created regional cap-and-trade programs to reduce
SO2 and NOX emissions in 27 eastern states
(and the District of Columbia), including Ohio, that contributed to
downwind nonattainment or interfered with maintenance of the 1997 8-
hour ozone NAAQS or the 1997 PM2.5 NAAQS.
---------------------------------------------------------------------------
As a result of EPA's determination that CAIR was ``better-than-
BART,'' a number of states in which CAIR applies, including Ohio,
relied on the CAIR cap-and-trade programs as an alternative to BART for
EGU emissions of SO2 and NOX in designing their
regional haze SIPs. These states also relied on CAIR as an element of a
long-term strategy (LTS) for achieving reasonable progress goals (RPGs)
for their regional haze programs. However, in 2008, the United States
Court of Appeals for the District of Columbia Circuit (D.C. Circuit)
remanded CAIR to EPA without vacatur (preserving the environmental
benefits provided by CAIR). North Carolina v. EPA, 550 F.3d 1176, 1178
(D.C. Cir. 2008). On August 8, 2011 (76 FR 48208), acting on the D.C.
Circuit's remand, EPA promulgated CSAPR to replace CAIR and issued FIPs
to implement the rule in CSAPR-subject states.\2\ Implementation of
CSAPR was scheduled to begin on January 1, 2012, when CSAPR would have
superseded the CAIR program.
---------------------------------------------------------------------------
\2\ CSAPR requires 28 eastern states to limit their statewide
emissions of SO2 and/or NOX in order to
mitigate transported air pollution unlawfully impacting other
states' ability to attain or maintain four NAAQS: The 1997 ozone
NAAQS, the 1997 annual PM2.5 NAAQS, the 2006 24-hour
PM2.5 NAAQS, and the 2008 8-hour ozone NAAQS. The CSAPR
emissions limitations are defined in terms of maximum statewide
``budgets'' for emissions of annual SO2, annual
NOX, and/or ozone-season NOX by each covered
state's large EGUs. The CSAPR state budgets are implemented in two
phases of generally increasing stringency, with the Phase 1 budgets
applying to emissions in 2015 and 2016 and the Phase 2 budgets
applying to emissions in 2017 and later years.
---------------------------------------------------------------------------
Due to the D.C. Circuit's 2008 ruling that CAIR was ``fatally
flawed,'' and its resulting status as a temporary measure following
that ruling, EPA could not fully approve regional haze SIPs to the
extent that they relied on CAIR to satisfy the BART requirement and the
requirement for a LTS sufficient to achieve the state-adopted RPGs. On
these grounds, EPA finalized a limited disapproval of Ohio's regional
haze SIP on June 7, 2012 (77 FR 33642), triggering the requirement for
EPA to promulgate a FIP unless Ohio submitted and EPA approved a SIP
revision that corrected the deficiency. EPA finalized a limited
approval of Ohio's regional haze SIP on July 2, 2012 (77 FR 39177), as
meeting the remaining applicable regional haze requirements set forth
in the CAA and the RHR.
In the June 7, 2012 limited disapproval action, EPA also amended
the RHR to provide that participation by a state's EGUs in a CSAPR
trading program for a given pollutant--either a CSAPR Federal trading
program implemented through a CSAPR FIP or an integrated CSAPR state
trading program implemented through an approved CSAPR SIP revision--
qualifies as a BART alternative for those EGUs for that pollutant.\3\
See 40 CFR 51.308(e)(4). Since EPA promulgated this amendment, numerous
states covered by CSAPR, including Ohio, have utilized the provision
through either SIPs or FIPs.\4\
---------------------------------------------------------------------------
\3\ Legal challenges to the CSAPR-Better-than-BART rule from
state, industry, and other petitioners are pending. Utility Air
Regulatory Group v. EPA, No. 12-1342 (D.C. Cir. filed August 6,
2012).
\4\ EPA has promulgated FIPs relying on CSAPR participation for
BART purposes for Georgia, Indiana, Iowa, Kentucky, Michigan,
Missouri, Ohio, Pennsylvania, South Carolina, Tennessee, Virginia,
and West Virginia, 77 FR at 33654, and Nebraska, 77 FR 40150, 40151
(July 6, 2012), and Texas 82 FR 48324 (October 17, 2017). EPA has
approved Minnesota's, Wisconsin's, and Alabama's SIPs relying on
CSAPR participation for BART purposes. See 77 FR 34801 (June 12,
2012) for Minnesota, 77 FR 46952 (August 7, 2012) for Wisconsin, and
82 FR 47393 (October 12, 2017) for Alabama.
---------------------------------------------------------------------------
Numerous parties filed petitions for review of CSAPR in the D.C.
Circuit, and on August 21, 2012, the court issued its ruling, vacating
and remanding CSAPR to EPA and ordering continued implementation of
CAIR. EME Homer City Generation, L.P. v. EPA, 696 F.3d 7, 38 (D.C. Cir.
2012). The D.C. Circuit's vacatur of CSAPR was reversed by the United
States Supreme Court on April 29, 2014, and the case was remanded to
the D.C. Circuit to resolve remaining issues in accordance
[[Page 60574]]
with the high court's ruling. EPA v. EME Homer City Generation, L.P.,
134 S. Ct. 1584 (2014). On remand, the D.C. Circuit affirmed CSAPR in
most respects, but invalidated without vacating some of the CSAPR
budgets as to a number of states. EME Homer City Generation, L.P. v.
EPA, 795 F.3d 118 (D.C. Cir. 2015).
The remanded budgets include the Phase 2 SO2 emissions
budgets for four states and the Phase 2 ozone-season NOX
budgets for Ohio, and 10 other states. This litigation ultimately
delayed implementation of CSAPR for three years, from January 1, 2012,
when CSAPR's cap-and-trade programs were originally scheduled to
replace the CAIR cap-and-trade programs, to January 1, 2015. Thus, the
rule's Phase 2 budgets that were originally scheduled to begin on
January 1, 2014, began on January 1, 2017.
On September 29, 2017 (82 FR 45481), EPA published a final rule
affirming the continued validity of the Agency's 2012 determination
that participation in CSAPR meets the RHR's criteria for an alternative
to the application of source specific BART. In the rulemaking, EPA
explained that the limited changes to the scope of CSAPR coverage did
not alter EPA's conclusion that CSAPR remains ``better-than-BART;''
that is, that participation in CSAPR remains available as an
alternative to BART for EGUs covered by the trading program.
Ohio's November 30, 2016 SIP submittal seeks to correct the
deficiencies identified in the June 7, 2012 limited disapproval of its
regional haze SIP by replacing reliance on CAIR with reliance on CSAPR.
Specifically, Ohio requests that EPA approve the State's regional haze
SIP revision that replaces reliance on CAIR with CSAPR to satisfy
SO2 and NOX BART requirements and SO2
reasonable progress requirements for EGUs formerly subject to CAIR,\5\
and as part of the LTS for Ohio in the first planning period of the
RHR.
---------------------------------------------------------------------------
\5\ In its regional haze SIP, Ohio concluded and EPA found
acceptable, that no additional controls beyond CAIR are reasonable
for SO2 for affected Ohio EGUs for the first
implementation period. See 77 FR 39177 (July 2, 2012).
---------------------------------------------------------------------------
B. Infrastructure SIPs
The ``infrastructure SIP'' requirements are designed to ensure that
the structural components of each state's air quality management
program are adequate to meet the state's responsibilities under the
CAA. The requirement for states to make an infrastructure SIP
submission is under CAA section 110(a)(1). SIPs meeting the
requirements of sections 110(a)(1) and (2) of the CAA are required to
be submitted by states within three years (or less, if the
Administrator so prescribes) after promulgation of a new or revised
NAAQS to provide for the implementation, maintenance, and enforcement
of the new or revised NAAQS. EPA has historically referred to these SIP
submissions made for the purpose of satisfying the requirements of
sections 110(a)(1) and 110(a)(2) as ``infrastructure SIP'' submissions.
Sections 110(a)(1) and (2) require states to address basic SIP elements
such as for monitoring, basic program requirements, and legal authority
that are designed to assure attainment and maintenance of the newly
established or revised NAAQS. More specifically, section 110(a)(1)
provides the procedural and timing requirements for infrastructure
SIPs. Section 110(a)(2) lists specific elements that states must meet
for the infrastructure SIP requirements related to a newly established
or revised NAAQS. The contents of an infrastructure SIP submission may
vary depending upon the data and analytical tools available to the
state, as well as the provisions already contained in the state's
implementation plan at the time in which the state develops and submits
the submission for a new or revised NAAQS.
Section 110(a)(2)(D) has two components: 110(a)(2)(D)(i) and
110(a)(2)(D)(ii). Section 110(a)(2)(D)(i) includes four distinct
components, commonly referred to as ``prongs,'' that must be addressed
in infrastructure SIP submissions. The first two prongs, which are
codified in section 110(a)(2)(D)(i)(I), prohibit any source or other
type of emissions activity in one state from contributing significantly
to nonattainment of the NAAQS in another state (prong 1) and from
interfering with maintenance of the NAAQS in another state (prong 2).
The third and fourth prongs, which are codified in section
110(a)(2)(D)(i)(II), prohibit emissions activity in one state from
interfering with measures required to prevent significant deterioration
of air quality in another state (prong 3) or from interfering with
measures to protect visibility in another state (prong 4).
Prong 4 Requirements
Section 110(a)(2)(D)(i)(II) requires a state's implementation plan
to contain provisions prohibiting sources in that state from emitting
pollutants in amounts that interfere with any other state's efforts to
protect visibility under part C of the CAA (which includes sections
169A and 169B). The 2013 Guidance \6\ states that these prong 4
requirements can be satisfied by approved SIP provisions that EPA has
found to adequately address any contribution of that state's sources
that impact the visibility program requirements in other states. The
2013 Guidance also states that EPA interprets this prong to be
pollutant-specific, such that the infrastructure SIP submission need
only address the potential for interference with protection of
visibility caused by the pollutant (including precursors) to which the
new or revised NAAQS applies.
---------------------------------------------------------------------------
\6\ ``Guidance on Infrastructure State Implementation Plan (SIP)
Elements under Clean Air Act Sections 110(a)(1) and 110(a)(2),''
Memorandum from Stephen D. Page, September 13, 2013.
---------------------------------------------------------------------------
The 2013 Guidance lays out how a state's infrastructure SIP may
satisfy prong 4. One way is via confirmation that the state has an
approved regional haze SIP that fully meets the requirements of 40 CFR
51.308 or 51.309. The regulations at 40 CFR 51.308 and 51.309
specifically require that a state participating in a regional planning
process include all measures needed to achieve its apportionment of
emission reduction obligations agreed upon through that process. A
fully approved regional haze SIP will ensure that emissions from
sources under an air agency's jurisdiction are not interfering with
measures required to be included in other air agencies' plans to
protect visibility.
Alternatively, in the absence of a fully approved regional haze
SIP, a state may meet the requirements of prong 4 through a
demonstration in its infrastructure SIP submission that emissions
within its jurisdiction do not interfere with other air agencies' plans
to protect visibility. Such an infrastructure SIP submission would need
to include measures to limit visibility-impairing pollutants and ensure
that the reductions conform with any mutually agreed upon regional haze
RPGs for mandatory Class I areas in other states.
Through this action, EPA is proposing to approve the prong 4
portion of Ohio's infrastructure SIP submissions for the 2012
PM2.5, 2010 NO2, and 2010 SO2
standards, and to convert EPA's disapproval of the prong 4 portion of
Ohio's infrastructure SIP submission for the 2008 ozone NAAQS to an
approval, as discussed in section IV of this action. All other
applicable infrastructure SIP requirements for these SIP submissions
have been or will be addressed in separate rulemakings. A brief
background regarding the NAAQS
[[Page 60575]]
relevant to this proposal is provided below.
1. 2012 and 2006 PM2.5 NAAQS
On December 14, 2012, EPA revised the annual primary
PM2.5 NAAQS to 12 micrograms per cubic meter ([mu]g/m\3\).
See 78 FR 3086 (January 15, 2013). States were required to submit
infrastructure SIP submissions for the 2012 PM2.5 NAAQS to
EPA no later than December 14, 2015. Ohio submitted an infrastructure
SIP submission for the 2012 PM2.5 NAAQS on December 4, 2015.
This proposed action only addresses the prong 4 element of that
submission. The other portions of Ohio's December 4, 2015
PM2.5 infrastructure submission have been previously
addressed (81 FR 64072, September 19, 2016) or will be addressed in a
separate action.
On December 18, 2006, EPA revised the 24-hour average primary and
secondary PM2.5 NAAQS to 35 [mu]g/m\3\. See 71 FR 61144
(October 17, 2006). States were required to submit infrastructure SIP
submissions for the 2006 PM2.5 NAAQS to EPA no later than
September 21, 2009. Ohio submitted an infrastructure SIP submission for
the 2006 PM2.5 NAAQS on September 4, 2009, supplemented on
June 3, 2011, and July 5, 2011. This proposed action only addresses the
prong 4 element of that submission. The other portions of Ohio's
September 4, 2009 PM2.5 infrastructure submission have been
previously addressed (76 FR 48208, August 8, 2011, 77 FR 65478, October
29, 2012, and 79 FR 18999, April 7, 2014).
2. 2010 SO2 NAAQS
On June 2, 2010, EPA revised the primary SO2 NAAQS to an
hourly standard of 75 parts per billion (ppb) based on a 3-year average
of the annual 99th percentile of 1-hour daily maximum concentrations.
See 75 FR 35520 (June 22, 2010). States were required to submit
infrastructure SIP submissions for the 2010 SO2 NAAQS to EPA
no later than June 2, 2013. Ohio submitted an infrastructure SIP
submission for the 2010 1-hour SO2 NAAQS on June 7, 2013.
This proposed action only addresses the prong 4 element of that
submission. The other portions of Ohio's June 7, 2013 SO2
infrastructure submission have been addressed in a previous EPA action
(80 FR 48733, August 14, 2015).
3. 2010 NO2 NAAQS
On January 22, 2010, EPA promulgated a new 1-hour primary NAAQS for
NO2 at a level of 100 ppb, based on a 3-year average of the
98th percentile of the yearly distribution of 1-hour daily maximum
concentrations. See 75 FR 6474 (February 9, 2010). States were required
to submit infrastructure SIP submissions for the 2010 NO2
NAAQS to EPA no later than January 22, 2013. Ohio submitted
infrastructure SIP submissions for the 2010 NO2 NAAQS on
February 8, 2013, and February 25, 2013. This proposed action only
addresses the prong 4 element of those submissions. The other portions
of Ohio's February 8, 2013, and February 25, 2013 NO2
infrastructure submissions have been addressed in a previous EPA action
(79 FR 60075, October 6, 2014).
4. 2008 Ozone NAAQS
On March 12, 2008, EPA revised the ozone NAAQS to 0.075 parts per
million. See 73 FR 16436 (March 27, 2008). States were required to
submit infrastructure SIP submissions for the 2008 ozone NAAQS to EPA
no later than March 12, 2011. Ohio submitted an infrastructure SIP for
the 2008 ozone NAAQS on December 27, 2012. On August 12, 2016, EPA
disapproved the prong 4 element of Ohio's 2008 ozone infrastructure
submission. See 81 FR 53309. This proposed action addresses that
disapproval and proposes to convert it to a full approval for prong 4.
The other portions of Ohio's December 27, 2012 ozone infrastructure SIP
submission have been addressed in a previous EPA action (79 FR 62019,
October 16, 2014).
II. What is EPA's analysis of how Ohio addressed regional haze and
prong 4?
Ohio submitted infrastructure SIPs for the following NAAQS: 2012
annual PM2.5 (December 4, 2015); 2010 NO2
(February 8 and 25, 2013); 2010 SO2 (June 7, 2013); and 2008
ozone (December 27, 2012) which relied on the State having a fully
approved regional haze SIP to satisfy its prong 4 requirements.
However, EPA had not previously fully approved Ohio's regional haze
SIP. The Agency issued a limited disapproval of the State's original
regional haze plan on June 7, 2012, due to its reliance on CAIR, which
also triggered the requirement for EPA to promulgate a FIP in Ohio
utilizing CSAPR. To correct the deficiencies in its regional haze SIP
and obtain approval of the aforementioned infrastructure SIPs that rely
on the regional haze SIP, the State submitted a SIP revision on
November 30, 2016, to replace reliance on CAIR with reliance on CSAPR.
As noted above, EPA determined that CSAPR remains ``better than
BART,'' given the changes to CSAPR's scope in response to the D.C.
Circuit's remand. Because the Agency has finalized the ``CSAPR remains
better-than-BART'' rulemaking EPA is proposing to approve the regional
haze portion of the State's November 30, 2016 SIP revision and convert
EPA's previous action on Ohio's regional haze SIP from a limited
approval/limited disapproval to a full approval. Specifically, EPA's
finds that this portion of Ohio's November 30, 2016 SIP revision
satisfies the SO2 and NOX BART requirements and
SO2 reasonable progress requirements for EGUs formerly
subject to CAIR. Because a state may satisfy prong 4 requirements
through a fully approved regional haze SIP, EPA is also proposing to
approve the prong 4 portion of Ohio's 2012 and 2006 PM2.5
submissions; 2010 NO2 submissions; 2010 SO2
submission; and to convert EPA's disapproval of the prong 4 portions of
Ohio's 2008 ozone infrastructure submission to an approval.
III. Proposed Action
EPA is proposing to take the following actions: (1) Approve the
portion of Ohio's November 30, 2016 SIP submittal seeking to change
from reliance on CAIR to reliance on CSAPR for certain regional haze
requirements; (2) convert EPA's limited approval/limited disapproval of
Ohio's March 11, 2011 regional haze SIP to a full approval; (3)
withdraw the FIP provisions that address the limited disapproval; (4)
approve the visibility prong of Ohio's infrastructure SIP submittals
for the 2012 and 2006 PM2.5, 2010 NO2, and 2010
SO2 NAAQS; and (5) convert EPA's disapproval of the
visibility portion of Ohio's infrastructure SIP submittal for the 2008
ozone NAAQS to an approval.
All other applicable infrastructure requirements for the
infrastructure SIP submissions have been or will be addressed in
separate rulemakings.
IV. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the CAA and applicable
Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, EPA's role is to approve state choices,
provided that they meet the criteria of the CAA. Accordingly, this
action merely approves state law as meeting Federal requirements and
does not impose additional requirements beyond those imposed by state
law. For that reason, this action:
Is not a significant regulatory action subject to review
by the Office of Management and Budget under
[[Page 60576]]
Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR
3821, January 21, 2011);
Is not an Executive Order 13771 (82 FR 9339, February 2,
2017) regulatory action because SIP approvals are exempted under
Executive Order 12866;
Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
Does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
Is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
Is not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA; and
Does not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
In addition, the SIP is not approved to apply on any Indian
reservation land or in any other area where EPA or an Indian tribe has
demonstrated that a tribe has jurisdiction. In those areas of Indian
country, the rule does not have tribal implications and will not impose
substantial direct costs on tribal governments or preempt tribal law as
specified by Executive Order 13175 (65 FR 67249, November 9, 2000).
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by
reference, Intergovernmental relations, Nitrogen dioxide, Particulate
matter, Reporting and recordkeeping requirements, Sulfur oxides,
Volatile organic compounds.
Dated: December 8, 2017.
Robert A. Kaplan,
Acting Regional Administrator, Region 5.
[FR Doc. 2017-27431 Filed 12-20-17; 8:45 am]
BILLING CODE 6560-50-P