[Federal Register Volume 83, Number 33 (Friday, February 16, 2018)] [Notices] [Pages 7029-7030] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2018-03247] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP17-441-000, CP17-441-001] Northwest Pipeline LLC; Notice of Availability of the Environmental Assessment for the Proposed North Seattle Lateral Upgrade Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the North Seattle Lateral Upgrade Project, proposed by Northwest Pipeline LLC (Northwest) in the above-referenced docket. Northwest requests authorization to replace approximately 5.9 miles of 8-inch-diameter natural gas pipeline with 20-inch-diameter pipeline in Snohomish County, Washington. According to Northwest, the North Seattle Lateral Upgrade Project would increase service reliability and enable Northwest to provide an incremental 159,299 dekatherms per day of firm capacity to serve Puget Sound Energy. The EA assesses the potential environmental effects of the construction and operation of the North Seattle Lateral Upgrade Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The proposed North Seattle Lateral Upgrade Project would consist of the following facilities:Replace 5.9-miles of 8-inch-diameter pipeline with 20- inch-diameter pipeline; rebuild the existing North Seattle/Everett meter station in order to accommodate the increased delivery capacity of the North Seattle Lateral; abandon and relocate approximately 0.1 mile of 16-inch- diameter pipeline; relocate an existing 8-inch pig launcher and a 20-inch pig receiver \1\ to project milepost 7.76; and --------------------------------------------------------------------------- \1\ A ``pig'' is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes. --------------------------------------------------------------------------- replace an existing 8-inch mainline valve with a 20-inch valve. The FERC staff mailed copies of the EA to federal, state, and local government representatives and agencies; elected officials; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. In addition, the EA is available for public viewing on the FERC's website (www.ferc.gov) using the eLibrary link. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street NE, Room 2A, Washington, DC 20426, (202) 502-8371. Any person wishing to comment on the EA may do so. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before March 13, 2018. For your convenience, there are three methods you can use to file your comments to the Commission. In all instances, please reference the project docket number (CP17-441-000 and [[Page 7030]] CP17-441-001) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502-8258 or [email protected]. (1) You can file your comments electronically using the eComment feature on the Commission's website (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; (2) You can also file your comments electronically using the eFiling feature on the Commission's website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ``eRegister.'' You must select the type of filing you are making. If you are filing a comment on a particular project, please select ``Comment on a Filing''; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission's Rules of Practice and Procedures (18 CFR 385.214).\2\ Only intervenors have the right to seek rehearing of the Commission's decision. The Commission grants affected landowners and others with environmental concerns intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. --------------------------------------------------------------------------- \2\ See the previous discussion on the methods for filing comments. --------------------------------------------------------------------------- Additional information about the project is available from the Commission's Office of External Affairs, at (866) 208-FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ``General Search,'' and enter the docket number excluding the last three digits in the Docket Number field (i.e., CP17- 441). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at [email protected] or toll free at (866) 208-3676, or for TTY, contact (202) 502-8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docs-filing/esubscription.asp. Dated: February 12, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018-03247 Filed 2-15-18; 8:45 am] BILLING CODE 6717-01-P