[Federal Register Volume 83, Number 63 (Monday, April 2, 2018)]
[Rules and Regulations]
[Pages 13866-13867]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06536]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2018-0122]


Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating

[[Page 13867]]

schedule that governs the Tower Drawbridge across the Sacramento River, 
mile 59.0 at Sacramento, CA. The deviation is necessary to allow the 
local community to participate in the Sactown Run 10-mile and 5K races. 
This deviation allows the bridge to remain in the closed-to-navigation 
position during the deviation period.

DATES: This deviation is effective from 5 a.m. to 11:30 a.m. on April 
8, 2018.

ADDRESSES: The docket for this deviation, USCG-2018-0122, is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Carl T. Hausner, Chief, Bridge 
Section, Eleventh Coast Guard District; telephone 510-437-3516, email 
[email protected].

SUPPLEMENTARY INFORMATION: The California Department of Transportation 
has requested a temporary change to the operation of the Tower 
Drawbridge, mile 59.0, over the Sacramento River, at Sacramento, CA. 
The drawbridge navigation span provides a vertical clearance of 30 feet 
above Mean High Water in the closed-to-navigation position. The draw 
operates as required by 33 CFR 117.189(a). Navigation on the waterway 
is commercial and recreational.
    The drawspan will be secured in the closed-to-navigation position 5 
a.m. to 11:30 a.m. on April 8, 2018, to allow the community to 
participate in the Sactown Run 10 mile and 5K races. This temporary 
deviation has been coordinated with the waterway users. No objections 
to the proposed temporary deviation were raised.
    Vessels able to pass through the bridge in the closed position may 
do so at any time. The bridge will be able to open for emergencies and 
there is no immediate alternate route for vessels to pass. The Coast 
Guard will also inform the users of the waterway through our Local and 
Broadcast Notices to Mariners of the change in operating schedule for 
the bridge so that vessel operators can arrange their transits to 
minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: March 19, 2018.
Carl T. Hausner,
District Bridge Chief, Eleventh Coast Guard District.
[FR Doc. 2018-06536 Filed 3-30-18; 8:45 am]
 BILLING CODE 9110-04-P