Drawbridge Operation Regulation; Willamette River at Portland, OR
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Burnside Bridge across the
Willamette River, mile 12.4, at Portland, OR. The deviation is
necessary to accommodate bridge repairs and upgrades. This deviation
allows the double bascule bridge to operate one side only in single
leaf mode.
DATES: This deviation is effective from 7 a.m. on July 1, 2018 to 4
p.m. on October 13, 2018.
ADDRESSES: The docket for this deviation, USCG-2018-0300 is available
at http://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Steven Fischer, Bridge
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282,
email [email protected].
SUPPLEMENTARY INFORMATION: Multnomah County, Oregon owns the Burnside
Bridge, crossing the Willamette River, mile 12.4, at Portland, OR, and
has requested a temporary deviation from the operating schedule. The
requested deviation is to accommodate bridge repairs and upgrades. To
facilitate this maintenance, the draw of the subject bridge will be
authorized to operate in single leaf and open the east leaf of the span
only. The bridge is also authorized to maintain the west leaf in the
closed-to-navigation position to marine traffic, and reduce the
vertical clearance up to ten feet. This deviation period is from 7 a.m.
on July 1, 2018 to 4 p.m. on October 13, 2018.
The Burnside Bridge provides a vertical clearance of 41 feet in the
closed-to-navigation position referenced to Columbia River Datum 0.0,
and the west leaf will be reduced to 31 feet with scaffolding
installed. The horizontal clearance for an east leaf opening will be
100 feet. The normal operating schedule is in 33 CFR 117.897. Waterway
usage on this part of the Willamette River includes vessels ranging
from commercial tug and barge to small pleasure craft. The Coast Guard
contacted all known users of the Willamette River for comment, and we
received no objections for this deviation.
Vessels able to pass through the bridge in the closed-to-navigation
position may do so at any time. The bridge will be able to open the
east side of the span only for emergencies, and there is no immediate
alternate route for vessels to pass. The Coast Guard will inform the
users of the waterway, through our Local and Broadcast Notices to
Mariners, of the change in operating schedule for the bridges so that
vessels can arrange their transits to minimize any impact caused by the
temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedules immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: May 23, 2018.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.