49 U.S.C. 44502 and 47103.
The Air Force establishes and uses its airfields to support the scope and level of operations necessary to carry out missions worldwide. The Congress funds airfields in response to Air Force requirements, but also specifies that civil aviation access is a national priority to be accommodated when it does not jeopardize an installation's military utility. The Air Force engages in dialogue with the civil aviation community and the Federal Aviation Administration to ensure mutual understanding of long-term needs for the national air transportation system and programmed military force structure requirements. To implement the national policy and to respond to requests for access, the Air Force must have policies that balance such requests with military needs. Civil aircraft access to Air Force airfields on foreign territory requires host nation approval.
(a) The Air Force will manage two programs that are generally used to grant civil aircraft access to its airfields: civil aircraft landing permits and joint-use agreements. Other arrangements for access will be negotiated as required for specific purposes.
(1) Normally, landing permits will be issued only for civil aircraft operating in support of official Government business. Other types of use may be authorized if justified by exceptional circumstances. Access will be granted on an equitable basis.
(2) The Air Force will consider only proposals for joint use that do not compromise operations, security, readiness, safety, environment, and quality of life. Further, only proposals submitted by authorized local Government representatives eligible to sponsor a public airport will be given the comprehensive evaluation required to conclude a joint-use agreement.
(3) Any aircraft operator with an inflight emergency may land at any Air Force airfield without prior authorization. An inflight emergency is
(b) Air Force requirements will take precedence on Air Force airfields over all civil aircraft operations, whether they were previously authorized or not.
(c) Civil aircraft use of Air Force airfields in the United States will be subject to Federal laws and regulations. Civil aircraft use of Air Force airfields in foreign countries will be subject to US Federal laws and regulations that have extraterritorial effect and to applicable international agreements with the country in which the Air Force installation is located.
(a) As the program manager for joint use, the Civil Aviation Branch, Bases and Units Division, Directorate of Operations (HQ USAF/XOOBC), ensures that all impacts have been considered and addressed before forwarding a joint-use proposal or agreement to the Deputy Assistant Secretary for Installations (SAF/MII), who holds decision authority. All decisions are subject to the environmental impact analysis process as directed by the Environmental Planning Division, Directorate of Environment (HQ USAF/CEVP), and the Deputy Assistant Secretary for Environment, Safety, and Occupational Health (SAF/MIQ). The Air Force Real Estate Agency (AFREA/MI) handles the leases for Air Force-owned land or facilities that may be included in an agreement for joint use.
(b) HQ USAF/XOOBC determines the level of decision authority for landing permits. It delegates decision authority for certain types of use to major commands and installation commanders.
(c) HQ USAF/XOOBC makes the decisions on all requests for exceptions or waivers to this part and related Air Force instructions. The decision process includes consultation with other affected functional area managers when required. Potential impacts on current and future Air Force policies and operations strongly influence such decisions.
(d) Major commands, direct reporting units, and field operating agencies may issue supplements to establish command-unique procedures permitted by and consistent with this part.
This part applies to all regular United States Air Force (USAF), Air National Guard (ANG), and United States Air Force Reserve (USAFR) installations with airfields. This part also applies to civil aircraft use of Air Force ramps at civil airports hosting USAF, ANG, and USAFR units.
Air Force airfields are available for use by civil aircraft so far as such use does not interfere with military operations or jeopardize the military utility of the installation. Access will be granted on an equitable basis. Air Force requirements take precedence over authorized civil aircraft use. This part carries the force of US law, and exceptions are not authorized without prior approval from the Civil Aviation Branch, Bases and Units Division, Directorate of Operations, (HQ USAF/XOOBC), 1480 Air Force Pentagon, Washington DC 20330-1480. Proposed exceptions or waivers are evaluated as to current and future impact on Air Force policy and operations.
(a) The Air Force:
(1) Determines whether civil aircraft use of Air Force airfields is compatible with current and planned military activities.
(2) Normally authorizes civil aircraft use of Air Force airfields only in support of official Government business. If exceptional circumstances warrant, use for other purposes may be authorized.
(3) Acts as clearing authority for civil aircraft use of Air Force airfields, subject to the laws and regulations of the US, or to applicable international agreements (e.g., status of forces agreements) with the country in which the Air Force installation is located.
(4) Reserves the right to suspend any operation that is inconsistent with national defense interests or deemed not in the best interests of the Air Force.
(5) Will terminate authority to use an Air Force airfield if the:
(i) User's liability insurance is canceled.
(ii) User lands for other than the approved purpose of use or is otherwise in violation of this part or clearances and directives hereunder.
(6) Will not authorize use of Air Force airfields:
(i) In competition with civil airports by providing services or facilities that are already available in the private sector.
Use to conduct business with or for the US Government is not considered as competition with civil airports.
(ii) Solely for the convenience of passengers or aircraft operator.
(iii) Solely for transient aircraft servicing.
(iv) By civil aircraft that do not meet US Department of Transportation operating and airworthiness standards.
(v) That selectively promotes, benefits, or favors a specific commercial venture unless equitable consideration is available to all potential users in like circumstances.
(vi) For unsolicited proposals in procuring Government business or contracts.
(vii) Solely for customs-handling purposes.
(viii) When the air traffic control tower and base operations are closed or when a runway is restricted from use by all aircraft.
Requests for waiver of this provision must address liability responsibility, emergency response, and security.
(7) Will not authorize civil aircraft use of Air Force ramps located on civil airfields.
This section does not apply to use of aero club facilities located on Air Force land at civil airports, or civil aircraft chartered by US military departments and authorized use of terminal facilities and ground handling services on the Air Force ramp. Only the DD Form 2400, Civil Aircraft Certificate of Insurance, and DD Form 2402, Civil Aircraft Hold Harmless Agreement, are required for use of Air Force ramps on civil airfields.
(b) Civil aircraft operators must:
(1) Have an approved DD Form 2401, Civil Aircraft Landing Permit, before operating at Air Force airfields, except for emergency use and as indicated in paragraphs (d)(2) and (d)(2)(iii)(E) of this section, and , and § 855.13(b)(1)(ii).
(2) Ensure that pavement load-bearing capacity will support the aircraft to be operated at the Air Force airfield.
(3) Ensure that aircraft to be operated at Air Force airfields are equipped with an operating two-way radio capable of communicating with the air traffic control tower.
(4) Obtain final approval for landing from the installation commander or a designated representative (normally base operations) at least 24 hours prior to arrival.
(5) Not assume that the landing clearance granted by an air traffic control tower facility is a substitute for either the approved civil aircraft landing permit or approval from the installation commander or a designated representative (normally base operations).
(6) Obtain required diplomatic or overflight clearance before operating in foreign airspace.
(7) Pay applicable costs and fees.
(8) File a flight plan before departing the Air Force airfield.
(c) The installation commander or a designated representative:
(1) Exercises administrative and security control over both the aircraft and passengers while on the installation.
(2) May require civil users to delay, reschedule, or reroute aircraft arrivals or departures to preclude interference with military activities.
(3) Cooperates with customs, immigration, health, and other public authorities in connection with civil aircraft arrival and departure.
(d) Decision Authority: The authority to grant civil aircraft use of Air Force airfields is vested in:
(1) Directorate of Operations, Bases and Units Division, Civil Aviation Branch (HQ USAF/XOOBC). HQ USAF/XOOBC may act on any request for civil aircraft use of an Air Force airfield. Decision authority for the following will not be delegated below HQ USAF:
(i) Use of multiple Air Force airfields except as designated in paragraph (d)(2) of this section.
(ii) Those designated as 2 under Approval Authority in Table 1 to this part.
(iii) Any unusual or unique purpose of use not specifically addressed in this part.
(2) Major Command, Field Operating Agency, Direct Reporting Unit, or Installation Commander. With the exception of those uses specifically delegated to another decision authority, major commands (MAJCOMs), field operating agencies (FOAs), direct reporting units (DRUs) and installation commanders or designated representatives have the authority to approve or disapprove civil aircraft landing permit applications (DD Forms 2400, Civil Aircraft Certificate of Insurance; 2401; Civil Aircraft Landing Permit, and 2402, Civil Aircraft Hold Harmless Agreement) at airfields for which they hold oversight responsibilities. Additionally, for expeditious handling of short notice requests, they may grant requests for one-time, official Government business flights that are in the best interest of the US Government and do not violate other provisions of this part. As a minimum, for one-time flights authorized under this section, the aircraft owner or operator must provide the decision authority with insurance verification and a completed DD Form 2402 before the aircraft operates into the Air Force airfield. Air Force authority to approve civil aircraft use of Air Force airfields on foreign soil may be limited. Commanders outside the US must be familiar with base rights agreements or other international agreements that may render inapplicable, in part or in whole, provisions of this part. Decision authority is delegated for specific purposes of use and or locations as follows:
(i) Commander, 611th Air Operations Group (AOG). The Commander, 611th AOG or a designated representative may approve commercial charters, on a case-by-case basis, at all Air Force airfields in Alaska, except Eielson and Elmendorf AFBs, if the purpose of the charter is to transport goods and or materials, such as an electric generator or construction materials for a community center, for the benefit of remote communities that do not have adequate civil airports.
(ii) Commander, Air Mobility Command (AMC). The Commander, AMC or a designated representative may approve permits that grant landing rights at Air Force airfields worldwide in support of AMC contracts.
(iii) US Defense Attache Office (USDAO). The USDAO, acting on behalf of HQ USAF/XOOBC, may grant a request for one-time landing rights at an Air Force airfield provided:
(A) The request is for official Government business of either the US or the country to which the USDAO is accredited.
(B) The Air Force airfield is located within the country to which the USDAO is accredited.
(C) Approval will not violate any agreement with the host country.
(D) The installation commander concurs.
(E) The USDAO has a properly completed DD Form 2402 on file and has verified that the insurance coverage meets the requirements of Table 2 to this part, before the aircraft operates into the Air Force airfield.
(a) Any aircraft owned by:
(1) Any other US Government agency.
(2) US Air Force aero clubs established as prescribed in AFI 34-117, Air Force Aero Club Program, and AFMAN 3-132, Air Force Aero Club Operations
This includes aircraft owned by individuals but leased by an Air Force aero club.
(3) Aero clubs of other US military services.
This includes aircraft owned by individuals but leased by Army or Navy aero clubs.
(4) A US State, County, Municipality, or other political subdivision, when operating to support official business at any level of Government.
(b) Any civil aircraft under:
(1) Lease or contractual agreement for exclusive US Government use on a long-term basis and operated on official business by or for a US Government agency; for example, the Federal
The Government must hold liability responsibility for all damages or injury associated with operation of the aircraft.
(2) Lease or contractual agreement to the Air Force for Air Force Civil Air Patrol (CAP) liaison purposes and operated by an Air Force CAP liaison officer on official Air Force business.
(3) CAP control for a specific mission directed by the Air Force.
(4) Coast Guard control for a specific mission directed by the Coast Guard.
For identification purposes, the aircraft will be marked with a sticker near the port side door identifying it as a Coast Guard Auxiliary aircraft. The pilot will always be in uniform and normally have a copy of a Coast Guard Auxiliary Patrol Order. If the aircraft is operating under “verbal orders of the commander,” the pilot can provide the telephone number of the cognizant Coast Guard commander.
(5) Contractual agreement to any US, State, or local Government agency in support of operations involving safety of life or property as a result of a disaster.
(6) Government furnished property or bailment contract for use by a contractor, provided the Federal, State, or local Government has retained liability responsibilities.
(7) Civil aircraft transporting critically ill or injured individuals or transplant organs to or from an Air Force installation.
(8) Historic aircraft being delivered for Air Force museum exhibits under the provisions of AFI 84-103, Museum System.
The Air Force authorizes use of its airfields for a specific purpose by a named individual or company. The authorization cannot be transferred to a second or third party and does not extend to use for other purposes. An approved landing permit does not obligate the Air Force to provide supplies, equipment, or facilities other than the landing, taxiing, and parking areas. The aircraft crew and passengers are only authorized activities at the installation directly related to the purpose for which use is granted. All users are expected to submit their application (DD Forms 2400, 2401, and 2402) at least 30 days before intended use and, except for use as a weather alternate, CRAF alternate, or emergency landing site, must contact the appropriate installation commander or a designated representative for final landing approval at least 24 hours before arrival. Failure to comply with either time limit may result in denied landing rights.
To allow time for processing, the application (DD Forms 2400, 2401, and 2402) and a self-addressed, stamped envelope should be submitted at least 30 days before the date of the first intended landing. The verification required for each purpose of use must be included with the application. The name of the user must be the same on all forms. Original, hand scribed signatures, not facsimile elements, are required on all forms. Landing Permit Application Instructions are at attachment 3 to this part. The user is responsible for reviewing this part and accurately completing the forms before submitting them to the approving authority.
When a landing permit expires, DD Forms 2401 and 2400 must be resubmitted for continued use of Air Force airfields.
Corporations must resubmit the DD Form 2402 every five years.
The purposes of use normally associated with civil aircraft operations at Air Force airfields are listed in Table 1. Requests for use for purposes other than those listed will be considered and may be approved if warranted by unique circumstances. A separate DD Form 2401 is required for each purpose of use. (Users can have multiple DD Forms 2401 that are covered by a single DD Form 2400 and DD Form 2402.)
Applicants must provide proof of third-party liability insurance on a DD Form 2400, with the amounts stated in
(a) Any insurance presented as a single limit of liability or a combination of primary and excess coverage will be an amount equal to or greater than the each accident minimums indicated in Table 2 to this part for bodily injury (individuals outside the aircraft), property damage, and passengers.
(b) The policy will specifically provide that:
(1) The insurer waives any right of subrogation it may have against the US by reason of any payment made under the policy for injury, death, or property damage that might arise, out of or in connection with the insured's use of any Air Force airfield.
(2) The insurance afforded by the policy applies to the liability assumed by the insured under DD Form 2402.
(3) If the insurer or the insured cancels or reduces the amount of insurance afforded under the listed policy before the expiration date indicated on DD Form 2400, the insurer will send written notice of policy cancellation or coverage reduction to the Air Force approving authority at least 30 days before the effective date of the cancellation or reduction. The policy must state that any cancellation or reduction will not be effective until at least 30 days after such notice is sent.
Upon receipt of an application (DD Forms 2400, 2401, and 2402) for use of an Air Force airfield, the decision authority:
(a) Determines the availability of the airfield and its capability to accommodate the purpose of use requested.
(b) Determines the validity of the request and ensures all entries on DD Forms 2400, 2401, and 2402 are in conformance with this part.
(c) Approves DD Form 2401 (with conditions or limitations noted) by completing all items in Section II—For Use by Approving Authority as follows:
(1) Period of Use (Block 7): The “From” date will be either the first day of approved use or the first day of insurance coverage. The “From” date cannot precede the first day of insurance coverage shown on the DD Form 2400. The “Thru” date is determined by the insurance expiration date and or the purpose of use. For example, the period of use for participants in an Air Force open house will be determined by both insurance coverage and open house dates. The permit would be issued only for the duration of the open house but must not precede or exceed the dates of insurance coverage. Many insurance policies terminate at noon on the expiration date. Therefore, if the insurance expiration is used to determine the permit expiration date, the landing permit will expire one day before the insurance expiration date shown on the DD Form 2400. If the insurance expiration date either exceeds 2 years or is indefinite (for example, “until canceled”), the landing permit will expire 2 years from the issue date or first day of coverage.
(2) Frequency of Use (Block 8) is normally “as required” but may be more specific, such as “one time.”
(3) Identification Number (Block 9): Installation commanders or a designated representative assign a permit number comprised of the last three letters of the installation's International
(4) DD Form 2400 (Dated and Filed) (Block 11a): This block should contain the date from block 1 (Date Issued) on the DD Form 2400 and the identification of the unit or base where the form was approved; i.e., 30 March 1995, HQ USAF/XOOBC.
(5) DD Form 2402 (Dated and Filed) (Block 11b): This block should contain the date from block 4 (Date Signed) on the DD Form 2402 and the identification of the unit or base where the form was approved; i.e., 30 March 1995, HQ USAF/XOOBC.
(6) SA-ALC/SFR, 1014 Andrews Road, Building 1621, Kelly AFB TX 78241-5603 publishes the list of companies authorized to purchase Air Force fuel on credit. Block 12 should be marked “yes” only if the permit holder's name appears on the SA-ALC list.
(7) Landing Fees, Block 13, should be marked as indicated in Table 1 to this part.
(8) Permit Amendments: New entries or revisions to an approved DD Form 2401 may be made only by or with the consent of the approving authority.
(d) Provides the applicant with written disapproval if:
(1) Use will interfere with operations, security, or safety.
(2) Adequate civil facilities are collocated.
(3) Purpose of use is not official Government business and adequate civil facilities are available in the proximity of the requested Air Force airfield.
(4) Use will constitute competition with civil airports or air carriers.
(5) Applicant has not fully complied with this part.
(e) Distributes the approved DD Form 2401 before the first intended landing, when possible, as follows:
(1) Retains original.
(2) Returns two copies to the user.
(3) Provides a copy to HQ USAF/XOOBC.
HQ USAF/XOOBC will provide a computer report of current landing permits to the MAJCOMs, FOAs, DRUs, and installations.
(a) Civil aircraft operators may be invited to a specified Air Force airfield for:
(1) A base open house to perform or provide a static display.
(2) A flying safety seminar.
(b) Civil fly-in procedures:
(1) The installation commander or a designated representative:
(i) Requests approval from the MAJCOM, FOA, or DRU with an information copy to HQ USAF/XOOBC/XOOO and SAF/PAC.
(ii) Ensures that DD Form 2402 is completed by each user.
DD Forms 2400 and 2401 are not required for fly-in participants if flying activity consists of a single landing and takeoff with no spectators other than flightline or other personnel required to support the aircraft operations.
(2) The MAJCOM, FOA, or DRU ensures HQ USAF/XOOBC/XOOO and SAF/PAC are advised of the approval or disapproval for the fly-in.
(3) Aerial performance by civil aircraft at an Air Force open house requires MAJCOM or FOA approval and an approved landing permit as specified in AFI 35-201, Community Relations
(a)
(1) Informs the operator of Subpart B procedures and the requirement for notifying the Federal Aviation Administration (FAA) as specified in section 6 of the FAA Airman's Information Manual.
(2) Notifies the Federal Aviation Flight Standards District Office (FSDO) by telephone or telefax, followed by written notification using FAA Form 8020-9, 8020-11, or 8020-17, as appropriate. A copy of the written notification must be provided to HQ USAF/XOOBC.
(3) Ensures the operator completes a DD Form 2402, and collects applicable charges. (In some instances, it may be necessary to arrange to bill the user for the appropriate charges.) DD Form 2402 need not be completed for commercial carriers if it is known that the form is already on file at HQ USAF/XOOBC.
(4) In a foreign country, notifies the local US Defense Attache Office (USDAO) by telephone or telefax and, where applicable, the appropriate USDAO in the country of aircraft registry, followed by written notification with an information copy to HQ USAF/XOOBC and the civil aviation authority of the country or countries concerned.
(b)
(1) The Air Force will use any method or means to clear an aircraft or wreckage from the runway to preclude interference with essential military operations after coordinating with the FSDO and National Transportation Safety Board. Removal efforts will minimize damage to the aircraft or wreckage; however, military or other operational factors may be overriding.
(2) An operator making an emergency landing:
(i) Is not charged a landing fee.
(ii) Pays all costs for labor, material, parts, use of equipment and tools, and so forth, to include, but not limited to:
(A) Spreading foam on the runway.
(B) Damage to runway, lighting, and navigation aids.
(C) Rescue, crash, and fire control services.
(D) Movement and storage of aircraft.
(E) Performance of minor maintenance.
(F) Fuel or oil (AFM 67-1, vol 1, part three, chapter 1, Air Force Stock Fund and DPSC Assigned Item Procedures
(c)
(i) Landed due to flight disorientation.
(ii) Mistook the Air Force airfield for a civil airport.
(2) Normal landing fees must be charged and an unauthorized landing fee may be assessed to compensate the Government for the added time, effort, and risk involved in the inadvertent landing. Only the unauthorized landing fee may be waived by the installation commander or a designated representative if, after interviewing the pilot-in-command and appropriate Government personnel, it is determined that flying safety was not significantly impaired. The pilot-in-command may appeal the imposition of an unauthorized landing fee for an inadvertent landing to the MAJCOM, FOA, or DRU whose decision will be final. A subsequent inadvertent landing will be processed as an intentional unauthorized landing.
(d)
(i) Landed without an approved DD Form 2401 on board the aircraft.
(ii) Landed for a purpose not approved on the DD Form 2401.
(iii) Operated an aircraft not of a model or registration number on the approved DD Form 2401.
(iv) Did not request or obtain the required final approval from the installation commander or a designated representative at least 24 hours before aircraft arrival.
(v) Did not obtain landing clearance from the air traffic control tower.
(vi) Landed with an expired DD Form 2401.
(vii) Obtained landing authorization through fraudulent methods, or
(viii) Landed after having been denied a request to land from any Air Force authority, including the control tower.
(2) Normal landing fees and an unauthorized landing fee must be charged. Intentional unauthorized landings increase reporting, processing, and staffing costs; therefore, the unauthorized landing fee for paragraph (d)(1)(i) through (d)(1)(vi) of this section will be increased by 100 percent. The unauthorized landing fee will be increased 200 percent for paragraph (d)(1)(vii) and (d)(1)(viii) of this section.
(3) Intentional unauthorized landings may be prosecuted as a criminal trespass, especially if a debarment letter has been issued. Repeated intentional unauthorized landings prejudice the user's FAA operating authority and jeopardize future use of Air Force airfields.
(a) An installation commander in the United States, its territories, or its possessions may choose to detain an aircraft for an intentional unauthorized landing until:
(1) The unauthorized landing has been reported to the FAA, HQ USAF/XOOBC, and the appropriate US Attorney.
(2) All applicable charges have been paid.
(b) If the installation commander wishes to release the aircraft before the investigation is completed, he or she must obtain bond, promissory note, or other security for payment of the highest charge that may be assessed.
(c) The pilot and passengers will not be detained longer than is necessary for identification, although they may be permitted to remain in a lounge or other waiting area on the base at their request for such period as the installation commander may determine (normally not to exceed close of business hours at the home office of the entity owning the aircraft, if the operator does not own the aircraft). No person, solely due to an intentional unauthorized landing, will be detained involuntarily after identification is complete without coordination from the appropriate US Attorney, the MAJCOM, FOA, or DRU, and HQ USAF/XOOBC.
The time that an aircraft spends on an installation is at the discretion of the installation commander or a designated representative but should be linked to the purpose of use authorized. Parking and storage may be permitted on a nonexclusive, temporary, or intermittent basis, when compatible with military requirements. At those locations where there are Air Force aero clubs, parking and storage privileges may be permitted in the area designated for aero club use without regard for the purpose of use authorized, if consistent with aero club policies. Any such permission may be revoked upon notice, based on military needs and the installation commander's discretion.
(a) Landing, parking, and storage fees (Tables 3 and 4 to this part) are determined by aircraft maximum gross takeoff weight (MGTOW). All fees are normally due and collectable at the time of use of the Air Force airfield. DD Form 1131, Cash Collection Voucher, is used to deposit the fees with the base accounting and finance officer. In some instances, it may be necessary to bill the user for charges incurred.
(b) Landing fees are not charged when the aircraft is operating in support of official Government business or for any purpose, the cost of which is subject to reimbursement by the US Government. Parking and Storage Fees (Table 4 to this part) are charged if an
When a user qualifies under the provisions of AFM 67-1, vol. 1, part three, chapter 1, Air Force Stock Fund and DPSC Assigned Item Procedures,
Supplies and services furnished to a user will be charged for as prescribed in AFM 67-1, volume 1, part one, chapter 10, section N, Basic Air Force Supply Procedures, and AFR 177-102, paragraph 28.24, Commercial Transactions at Base Level.
An agreement between the Air Force and a local Government agency is required before a community can establish a public airport on an Air Force airfield.
(a) Joint use of an Air Force airfield will be considered only if there will be no cost to the Air Force and no compromise of mission capability, security, readiness, safety, or quality of life. Further, only proposals submitted by authorized representatives of local Government agencies eligible to sponsor a public airport will be given the comprehensive evaluation required to conclude a joint use agreement. All reviewing levels will consider and evaluate such requests on an individual basis.
(b) Generally, the Air Force is willing to consider joint use at an airfield if it does not have pilot training, nuclear storage, or a primary mission that requires a high level of security. Civil operations must begin within 5 years of the effective date of an agreement. Operational considerations will be based on the premise that military aircraft will receive priority handling (except in emergencies), if traffic must be adjusted or resequenced. The Air Force normally will not consider personnel increases solely to support civil operations but, if accommodated, all costs must be fully reimbursed by the joint-use sponsor. The Air Force will not provide personnel to install, operate, maintain, alter, or relocate navigation equipment or aircraft arresting systems for the sole use of civil aviation. Changes in equipment or systems to support the civil operations must be funded by the joint-use sponsor. The Air Force must approve siting, design, and construction of the civil facilities.
To initiate consideration for joint use of an Air Force airfield, a formal proposal must be submitted to the installation commander by a local Government agency eligible to sponsor a public airport. The proposal must include:
(a) Type of operation.
(b) Type and number of aircraft to be located on or operating at the airfield.
(c) An estimate of the number of annual operations for the first 5 years.
(a) Upon receipt of a joint-use proposal, the installation commander, without precommitment or comment, will send the documents to the Air Force Representative (AFREP) at the Federal Aviation Administration (FAA) Regional Office within the geographical area where the installation is located. AFI 13-201, Air Force Airspace Management,
(b) The AFREP provides comments to the installation commander on airspace, air traffic control, and other related areas, and informs local FAA personnel of the proposal for joint use.
(c) The installation, the numbered Air Force, and the major command (MAJCOM) will then evaluate the proposal. The MAJCOM will send the comments and recommendations from all reviewing officials to HQ USAF/XOOBC.
(d) Factors considered in evaluating joint use include, but are not limited to:
(1) Impact on current and programmed military activities at the installation.
(2) Compatibility of proposed civil aviation operations with present and planned military operations.
(3) Compatibility of communications systems.
(4) Instrument capability of crew and aircraft.
(5) Runway and taxiway configuration. (Installations with single runways normally will not be considered for joint use.)
(6) Security. The possibility for sabotage, terrorism, and vandalism increases with joint use; therefore, joint use will not be considered:
(i) If military and civil aircraft would be collocated in hangars or on ramps.
(ii) If access to the civil aviation facilities would require routine transit through the base.
(7) Fire, crash, and rescue requirements.
(8) Availability of public airports to accommodate the current and future air transportation needs of the community through construction or expansion.
(9) Availability of land for civil airport complex.
The majority of land required for a terminal and other support facilities must be located outside the installation perimeter or at a site that will allow maximum separation of military and civil activities. If the community does not already own the needed land, it must be acquired at no expense to the Air Force. The Air Force may make real property that is not presently needed, but not excess, available by lease under 10 U.S.C 2667. An application for lease of Air Force real property must be processed through the chain of command to the Air Force Real Estate Agency, 172 Luke Avenue, Suite 104, Building 5683, Bolling AFB DC 20332-5113, as prescribed in AFI 32-9003, Granting Temporary Use of Air Force Real Property
(10) Sponsor's resources to pay a proportionate share of costs for runway operation and maintenance and other jointly used facilities or otherwise provide compensation that is of direct benefit to the Government.
(e) When the Air Force determines that joint use may be compatible with its defense mission, the environmental impact analysis process must be completed before a final decision can be made. The Air Force will act as lead agency for the preparation of the environmental analysis (32 CFR part 989, Environmental Impact Analysis Process). The local Government agency representatives, working in coordination with Air Force personnel at the installation and other concerned local or Federal officials, must identify the proposed action, develop conceptual alternatives, and provide planning, socioeconomic, and environmental information as specified by the appropriate MAJCOM and HQ USAF/CEVP. The information must be complete and accurate in order to serve as a basis for the preparation of the Air Force environmental documents. All costs associated with the environmental studies required to complete the environmental impact analysis process must be paid by the joint use sponsor. Information on environmental analysis requirements is available from HQ USAF/CEVP, 1260 Air Force Pentagon, Washington DC 20330-1260.
(f) HQ USAF/XOOBC can begin negotiating a joint-use agreement after the environmental impact analysis process is completed. The agreement must be
(1) Joint-use agreements are tailored to accommodate the needs of the community and minimize the impact on the defense mission. Although each agreement is unique, attachment 4 to this part provides basic terms that are frequently included in such agreements.
(2) Agreements for joint use at Air Force airfields on foreign soil are subject to the requirements of AFI 51-701, Negotiating, Concluding, Reporting, and Maintaining International Agreements
(g) HQ USAF/XOOBC and SAF/MII approval is required to amend existing joint use agreements. The evaluation and decision processes followed in concluding an initial joint-use proposal must be used to amend existing joint-use agreements.
(a) Temporary use of Air Force runways occasionally is needed for extended periods when a local civil airport is unavailable or to accommodate special events or projects. Such use requires agreement between the Air Force and the local airport authority or other equivalent responsible entity.
(b) The local proponent and Air Force personnel should draft and submit an agreement to the MAJCOM Director for Operations, or equivalent level, for review and comment. The agreement must address all responsibilities for handling aircraft, cargo, and passengers, and hold the Air Force harmless of all liabilities. The agreement will not exceed 3 years. Although each agreement will be unique, attachment 5 of this part provides one example. The draft agreement, with all comments and recommendations, must be sent to HQ USAF/XOOBC for final approval.
* Formerly Shemya AFB.
A3.1. DD Form 2400, Civil Aircraft Certificate of Insurance: The insurance company or its authorized agent must complete and sign the DD Form 2400. Corrections to the form made using a different typewriter, pen, or whiteout must be initialed by the signatory. THE FORM CANNOT BE COMPLETED BY THE AIRCRAFT OWNER OR OPERATOR. Upon expiration, the DD Form 2400 must be resubmitted along with DD Form 2401 for continued use of Air Force airfields. The DD Form 2400 may be submitted to the decision authority by either the user or insurer. (Approved by the Office of Management and Budget under control number 0701-0050).
A3.1.1. Block 1, Date Issued. The date the DD Form 2400 is completed by the signatory.
A3.1.2. Block 2a and 2b, Insurer Name, Address. The name and address of the insurance company.
A3.1.3. Block 3a and 3b. Insured Name, Address. The name and address of the aircraft owner and or operator. (The name of the user must be the same on all the forms.)
A3.1.4. Block 4a, Policy Number(s). The policy number must be provided. Binder numbers or other assigned numbers will not be accepted in lieu of the policy number.
A3.1.5. Block 4b, Effective Date. The first day of current insurance coverage.
A3.1.6. Block 4c, Expiration Date. The last day of current insurance coverage. The DD Form 2400 is valid until one day before the insurance expiration date. A DD Form 2400 with the statement “until canceled,” in lieu of a specific expiration date, is valid for two years from the issue date.
A3.1.7. Block 5, Aircraft Liability Coverage. The amount of split limit coverage. All boxes in block 5 must be completed to specify the coverage for: each person (top line, left to right) outside the aircraft (bodily injury) and each passenger; and the total coverage per accident (second line, left to right) for: persons outside the aircraft (bodily injury), property damage, and passengers. IF BLOCK 5 IS USED, BLOCK 6 SHOULD NOT BE USED. All coverages must be stated in US dollars. ALL SEATS THAT CAN BE USED FOR PASSENGERS MUST BE INSURED. See Table 2 for required minimum coverage.
A3.1.8. Block 6, Single Limit. The maximum amount of coverage per accident. IF BLOCK 6 IS USED, BLOCK 5 SHOULD NOT BE USED. The minimum coverage required for a combined single limit is determined by adding the minimums specified in the “each accident” line of Table 2. All coverages must be stated in US dollars. ALL SEATS THAT CAN BE USED FOR PASSENGERS MUST BE INSURED.
A3.1.9. Block 7, Excess Liability. The amount of coverage which exceeds primary coverage. All coverages must be stated in US dollars.
A3.1.10. Block 8, Provisions of Amendments or Endorsements of Listed Policy(ies). Any
A3.1.11. Block 9a, Typed Name of Insurer's Authorized Representative. Individual must be an employee of the insurance company, an agent of the insurance company, or an employee of an insurance broker.
A3.1.12. Block 9b, Signature. The form must be signed in blue ink so that hand scribed, original signatures are easy to identify. Signature stamps or any type of facsimile signature cannot be accepted.
A3.1.13. Block 9c, Title. Self-explanatory.
A3.1.14. Block 9d, Telephone Number. Self-explanatory.
A3.1.15. THE REVERSE OF THE FORM MAY BE USED IF ADDITIONAL SPACE IS REQUIRED.
A3.2. DD Form 2401, Civil Aircraft Landing Permit. A separate DD Form 2401 must be submitted for each purpose of use (Table 1). (Approved by the Office of Management and Budget under control number 0701-0050).
A3.2.1. Block 1a. The name of the owner or operator. (The name of the user must be the same on all the forms.)
A3.2.2. Block 1b. This block should only be completed if the applicant is a subsidiary, division, etc, of another company.
A3.2.3. Block 1c. Business or home address, whichever is applicable, of applicant.
A3.2.4. Block 2. List the airfields where the aircraft will be operating. The statement “Any US Air Force Installation Worldwide” is acceptable for users performing AMC and White House Press Corps charters. “All Air Force airfields in the CONUS” is acceptable, if warranted by official Government business, for all users.
A3.2.5. Block 3. Self-explanatory. (Users will not necessarily be denied landing rights if pilots are not instrument rated and current.)
A3.2.6. Block 4. Provide a brief explanation of purpose for use. The purposes normally associated with use of Air Force airfields are listed in Table 1. If use for other purposes is requested, it may be approved if warranted by unique circumstances. (The verification specified for each purpose of use must be included with the application.)
A3.2.7. Block 5. EXCEPT AS NOTED FOR BLOCK 5C, ALL ITEMS MUST BE COMPLETED.
A3.2.8. Block 5a and Block 5b. Self-explanatory.
A3.2.9. Block 5c. If the DD Form 2400, Certificate of Insurance, indicates coverage for “any aircraft of the listed model owned and or operated,” the same statement can be used in block 5c in lieu of specific registration numbers.
A3.2.10. Block 5d. The capacity provided must reflect only the number of crew required to operate the aircraft. The remaining seats are considered passenger seats.
A3.2.11. Block 5e. Self-explanatory.
A3.2.12. Block 5d. A two-way radio is required. Landing rights will not necessarily be denied for lack of strobe lights, a transponder, or IFR capabilities.
A3.2.13. Block 6a. Self-explanatory.
A3.2.14. Block 6b. If the applicant is an individual, this block should not be completed.
A3.2.15. Block 6c. This block should contain a daytime telephone number.
A3.2.16. Block 6d. The form must be signed in blue ink so that hand scribed, original signatures are easy to identify. Signature stamps or any type of facsimile signature cannot be accepted.
A3.2.17. Block 6e. Self-explanatory.
A3.2.18. THE REVERSE OF THE FORM MAY BE USED IF ADDITIONAL SPACE IS REQUIRED.
BLOCKS 7A THROUGH 14C ARE NOT COMPLETED BY THE APPLICANT.
A3.2.19. Blocks 7a and 7b. The expiration date of a permit is determined by the insurance expiration date or the purpose of use. For example, the dates of an air show will determine the expiration date of a permit approved for participation in the air show. If the insurance expiration is used to determine the permit expiration date, the landing permit will expire one day before the insurance expiration date shown on the DD Form 2400, or 2 years from the date the permit is issued when the insurance expiration date either exceeds 2 years or is indefinite (for example, “until canceled”).
A3.2.20. APPROVED PERMITS CANNOT BE CHANGED WITHOUT THE CONSENT OF THE APPROVING AUTHORITY.
A3.2.21. DD FORMS 2400 AND 2401 MUST BE RESUBMITTED TO RENEW A LANDING PERMIT. (Corporations must resubmit the DD Form 2402 every five years.)
A3.3. DD Form 2402, Civil Aircraft Hold Harmless Agreement. A form submitted and accepted by an approving authority for an individual remains valid and need not be resubmitted to the same approving authority, unless canceled for cause. Forms submitted by companies, organizations, associations, etc, must be resubmitted at least every five years. (Approved by the Office of Management and Budget under control number 0701-0050).
A3.3.1. Block 2a(1). This block should contain the user's name if the applicant is a company. If the hold harmless agreement is intended to cover other entities of a parent company, their names must also be included in this block.
A3.3.2. Block 2a(2). This block should contain the user's address if the applicant is a company.
A3.3.3. Block 2b(1). This block should contain the name of the individual applying for a landing permit or the name of a corporate officer that is authorized to legally bind the corporation from litigation against the Air Force.
A3.3.4. Block 2b(2). This block should contain the address of the individual applying for a landing permit. A company address is only required if it is different from the address in block 2a(2).
A3.3.5. Block 2b(3). The form must be signed in blue ink so that hand scribed, original signatures are easy to identify. Signature stamps or any type of facsimile signature cannot be accepted.
A3.3.6. Block 2b(4). This block should only be completed when the applicant is a company, organization, association, etc.
A3.3.7. Block 3a(1). If the applicant is a company, organization, association, etc, the form must be completed and signed by the corporate secretary or a second corporate officer (other than the officer executing DD Form 2402) to certify the signature of the first officer. As necessary, the US Air Force also may require that the form be authenticated by an appropriately designated third official.
A3.3.8. Block 3a(2). The form must be signed in blue ink so that hand scribed, original signatures are easy to identify. Signature stamps or any type of facsimile signature cannot be accepted.
A3.3.9. Block 3a(3). Self-explanatory.
A3.3.10. Block 4. Self-explanatory.
This Joint Use Agreement is made and entered into this ____ day of ____ 19__, by and between the Secretary of the Air Force, for and on behalf of the United States of America (“Air Force”) and an airport sponsor (“Sponsor”) a public body eligible to sponsor a public airport.
WHEREAS, the Air Force owns and operates the runways and associated flight facilities (collectively “flying facilities”) located at Warbucks Air Force Base, USA (“WAFB”); and
WHEREAS, Sponsor desires to use the flying facilities at WAFB to permit operations by general aviation aircraft and commercial air carriers (scheduled and nonscheduled) jointly with military aircraft; and
WHEREAS, the Air Force considers that this Agreement will be in the public interest, and is agreeable to joint use of the flying facilities at WAFB; and
WHEREAS, this Agreement neither addresses nor commits any Air Force real property or other facilities that may be required for exclusive use by Sponsor to support either present or future civil aviation operations and activities in connection with joint use; and
WHEREAS, the real property and other facilities needed to support civil aviation operations are either already available to or will be diligently pursued by Sponsor;
NOW, THEREFORE, it is agreed:
a. The Air Force hereby authorizes Sponsor to permit aircraft equipped with two-way radios capable of communicating with the WAFB Control Tower to use the flying facilities at WAFB, subject to the terms and conditions set forth in this Agreement and those Federal Aviation Regulations (FAR) applicable to civil aircraft operations. Civil aircraft operations are limited to 20,000 per calendar year. An operation is a landing or a takeoff. Civil aircraft using the flying facilities of WAFB on official Government business as provided in Air Force Instruction (AFI) 10-1001, Civil Aircraft Landing Permits, are not subject to this Agreement.
b. Aircraft using the flying facilities of WAFB under the authority granted to Sponsor by this Agreement shall be entitled to use those for landings, takeoffs, and movement of aircraft and will normally park only in the area made available to Sponsor and designated by them for that purpose.
c. Government aircraft taking off and landing at WAFB will have priority over all civil aircraft at all times.
d. All ground and air movements of civil aircraft using the flying facilities of WAFB under this Agreement, and movements of all other vehicles across Air Force taxiways, will be controlled by the WAFB Control Tower. Civil aircraft activity will coincide with the WAFB Control Tower hours of operation. Any additional hours of the WAFB Control Tower or other essential airfield management, or operational requirements beyond those needed by the Air Force, shall be arranged and funded (or reimbursed) by Sponsor. These charges, if any, shall be in addition to the annual charge in paragraph 2 and payable not less frequently than quarterly.
e. No civil aircraft may use the flying facilities for training.
f. Air Force-owned airfield pavements made available for use under this Agreement shall be for use on an “as is, where is” basis. The Air Force will be responsible for snow removal only as required for Government mission accomplishment.
g. Dust or any other erosion or nuisance that is created by, or arises out of, activities or operations by civil aircraft authorized use of the flying facilities under this Agreement will be corrected by Sponsor at no expense to the Air Force, using standard engineering methods and procedures.
h. All phases of planning and construction of new runways and primary taxiways on Sponsor property must be coordinated with the WAFB Base Civil Engineer. Those intended to be jointly used by Air Force aircraft will be designed to support the type of
i. Coordination with the WAFB Base Civil Engineer is required for planning and construction of new structures or exterior alteration of existing structures that are owned or leased by Sponsor.
j. Sponsor shall comply with the procedural and substantive requirements established by the Air Force, and Federal, State, interstate, and local laws, for the flying facilities of WAFB and any runway and flight facilities on Sponsor property with respect to the control of air and water pollution; noise; hazardous and solid waste management and disposal; and hazardous materials management.
k. Sponsor shall implement civil aircraft noise mitigation plans and controls at no expense to and as directed by the Air Force, pursuant to the requirements of the WAFB Air Installation Compatible Use Zone (AICUZ) study; the FAA Part 150 study; and environmental impact statements and environmental assessments, including supplements, applicable to aircraft operations at WAFB.
l. Sponsor shall comply, at no expense to the Air Force, with all applicable FAA security measures and procedures as described in the Airport Security Program for WAFB.
m. Sponsor shall not post any notices or erect any billboards or signs, nor authorize the posting of any notices or the erection of any billboards or signs at the airfield of any nature whatsoever, other than identification signs attached to buildings, without prior written approval from the WAFB Base Civil Engineer.
n. Sponsor shall neither transfer nor assign this Agreement without the prior written consent of the Air Force.
a. For the purpose of reimbursing the Air Force for Sponsor's share of the cost of maintaining and operating the flying facilities of WAFB as provided in this Agreement, Sponsor shall pay, with respect to civil aircraft authorized to use those facilities under this Agreement, the sum of (specify sum) annually. Payment shall be made quarterly, in equal installments.
b. All payments due pursuant to this Agreement shall be payable to the order of the Treasurer of the United States of America, and shall be made to the Accounting and Finance Officer, WAFB, within thirty (30) days after each quarter. Quarters are deemed to end on December 31, March 31, June 30, and September 30. Payment shall be made promptly when due, without any deduction or setoff. Interest at the rate prescribed by the Secretary of the Treasury of the United States shall be due and payable on any payment required to be made under this Agreement that is not paid within ten (10) days after the date on which such payment is due and end on the day payment is received by the Air Force.
Sponsor shall be responsible for providing services, maintenance, and emergency repairs for civil aircraft authorized to use the flying facilities of WAFB under this Agreement at no cost to the Air Force. If Air Force assistance is required to repair an aircraft, Sponsor shall reimburse the Air Force for all expenses of such services. Any required reimbursement shall be paid not less frequently than quarterly. These charges are in addition to the annual charge specified in paragraph 2.
a. The Air Force maintains the level of fire fighting, crash, and rescue capability required to support the military mission at WAFB. The Air Force agrees to respond to fire, crash, and rescue emergencies involving civil aircraft outside the hangars or other structures within the limits of its existing capabilities, equipment, and available personnel, only at the request of Sponsor, and subject to subparagraphs b, c, and d below. Air Force fire fighting, crash, and rescue equipment and personnel shall not be routinely located in the airfield movement area during nonemergency landings by civil aircraft.
b. Sponsor shall be responsible for installing, operating, and maintaining, at no cost to the Air Force, the equipment and safety devices required for all aspects of handling and support for aircraft on the ground as specified in the FARs and National Fire Protection Association procedures and standards.
c. Sponsor agrees to release, acquit, and forever discharge the Air Force, its officers, agents, and employees from all liability arising out of or connected with the use of or failure to supply in individual cases, Air Force fire fighting and or crash and rescue equipment or personnel for fire control and crash and rescue activities pursuant to this Agreement. Sponsor further agrees to indemnify, defend, and hold harmless the Air Force, its officers, agents, and employees against any and all claims, of whatever description, arising out of or connected with such use of, or failure to supply Air Force fire fighting and or crash and rescue equipment or personnel.
d. Sponsor will reimburse the Air Force for expenses incurred by the Air Force for fire fighting and or crash and rescue materials expended in connection with providing such service to civil aircraft. The Air Force may, at its option, with concurrence of the National Transportation Safety Board, remove crashed civil aircraft from Air Force-owned
e. Failure to comply with the above conditions upon reasonable notice to cure or termination of this Agreement under the provisions of paragraph 7 may result in termination of fire protection and crash and rescue response by the Air Force.
f. The Air Force commitment to assist Sponsor with fire protection shall continue only so long as a fire fighting and crash and rescue organization is authorized for military operations at WAFB. The Air Force shall have no obligation to maintain or provide a fire fighting, and crash and rescue organization or fire fighting and crash and rescue equipment; or to provide any increase in fire fighting and crash and rescue equipment or personnel; or to conduct training or inspections for purposes of assisting Sponsor with fire protection.
a. Sponsor will assume all risk of loss and or damage to property or injury to or death of persons by reason of civil aviation use of the flying facilities of WAFB under this Agreement, including, but not limited to, risks connected with the provision of services or goods by the Air Force to Sponsor or to any user under this Agreement. Sponsor further agrees to indemnify and hold harmless the Air Force against, and to defend at Sponsor expense, all claims for loss, damage, injury, or death sustained by any individual or corporation or other entity and arising out of the use of the flying facilities of WAFB and or the provision of services or goods by the Air Force to Sponsor or to any user, whether the claims be based in whole, or in part, on the negligence or fault of the Air Force or its contractors or any of their officers, agents, and employees, or based on any concept of strict or absolute liability, or otherwise.
b. Sponsor will carry a policy of liability and indemnity insurance satisfactory to the Air Force, naming the United States of America as an additional insured party, to protect the Government against any of the aforesaid losses and or liability, in the sum of not less than (specify sum) bodily injury and property damage combined for any one accident. Sponsor shall provide the Air Force with a certificate of insurance evidencing such coverage. A new certificate must be provided on the occasion of policy renewal or change in coverage. All policies shall provide that: (1) No cancellation, reduction in amount, or material change in coverage thereof shall be effective until at least thirty (30) days after receipt of notice of such cancellation, reduction, or change by the installation commander at WAFB, (2) any losses shall be payable notwithstanding any act or failure to act or negligence of Sponsor or the Air Force or any other person, and (3) the insurer shall have no right of subrogation against the United States.
This Agreement shall become effective immediately and shall remain in force and effect for a term of 25 years, unless otherwise renegotiated or terminated under the provisions of paragraph 7, but in no event shall the Agreement survive the termination or expiration of Sponsor's right to use, by license, lease, or transfer of ownership, of the land areas used in connection with joint use of the flying facilities of WAFB.
7. Renegotiation and Termination
a. If significant change in circumstances or conditions relevant to this Agreement should occur, the Air Force and Sponsor may enter into negotiations to revise the provisions of this Agreement, including financial and insurance provisions, upon sixty (60) days written notice to the other party. Any such revision or modification of this Agreement shall require the written mutual agreement and signatures of both parties. Unless such agreement is reached, the existing agreement shall continue in full force and effect, subject to termination or suspension under this section.
b. Notwithstanding any other provision of this Agreement, the Air Force may terminate this Agreement: (1) At any time by the Secretary of the Air Force, giving ninety (90) days written notice to Sponsor, provided that the Secretary of the Air Force determines, in writing, that paramount military necessity requires that joint use be terminated, or (2) at any time during any national emergency, present or future, declared by the President or the Congress of the United States, or (3) in the event that Sponsor ceases operation of the civil activities at WAFB for a period of one (1) year, or (4) in the event Sponsor violates any of the terms and conditions of this Agreement and continues and persists therein for thirty (30) days after written notification to cure such violation. In addition to the above rights, the Air Force may at any time suspend this agreement if violations of its terms and conditions by Sponsor create a significant danger to safety, public health, or the environment at WAFB.
c. The failure of either the Air Force or Sponsor to insist, in any one or more instances, upon the strict performance of any of the terms, conditions, or provisions of this Agreement shall not be construed as a waiver or relinquishment of the right to the future performance of any such terms, conditions, or provisions. No provision of this Agreement shall be deemed to have been waived by either party unless such waiver be in writing signed by such party.
a. No notice, order, direction, determination, requirement, consent, or approval under this Agreement shall be of any effect unless it is in writing and addressed as provided herein.
b. Written communication to Sponsor shall be delivered or mailed to Sponsor addressed: The Sponsor, 9000 Airport Blvd, USA.
c. Written communication to the Air Force shall be delivered or mailed to the Air Force addressed: Commander, WAFB, USA.
This Agreement does not affect the WAFB-Sponsor Fire Mutual Aid Agreement.
IN WITNESS WHEREOF, the respective duly authorized representatives of the parties hereto have executed this Agreement on the date set forth below opposite their respective signatures.
This letter of agreement establishes policies, responsibilities, and procedures for commercial air carrier operations at Warbucks AFB, USA, (WAFB) for the period (date)through(date) Military requirements will take precedence over civil aircraft operations. Should a conflict arise between air carrier and Air Force operational procedures, Air Force procedures will apply.
The following air carriers are authorized use, provided they have a civil aircraft landing permit approved at HQ USAF/XOOBC for such use:
The Bunker International Airport (BIA) manager or air carrier station managers will ensure that the WAFB Airfield Manager is provided current airline schedules during the approved period of use. Every effort will be made to avoid disruption of the air carriers’ schedules; however, it is understood that the installation commander will suspend or change flight plans when required to preclude interference with military activities or operations.
The BIA terminal will be used for passenger loading and unloading. Security checks will be performed at the terminal before loading passengers on buses. Luggage on arriving aircraft will be directly offloaded onto vehicles and delivered to the BIA terminal. Each arriving and departing bus or vehicle caravan will be accompanied by a credentialed representative of the airline or BIA to ensure its integrity enroute. Buses or vehicles transporting passengers to board an aircraft will not depart WAFB until the passengers are airborne. Unless an emergency exists, arriving passengers will not deplane until the buses are available for transportation to the BIA terminal. All checked luggage will be picked up at BIA and delivered directly to the departing aircraft. Buses will proceed directly to the aircraft at WAFB alert ramp. Luggage on arriving aircraft will be directly offloaded onto a vehicle parked on the WAFB alert ramp. WAFB will be notified, in advance, if a local funeral home requires access for pickup or delivery of deceased persons.
Air Force-owned fuel will not be provided. The air carriers will provide their own ground support equipment. Refueling equipment from BIA will be prepositioned at WAFB on the alert ramp. The Air Force shall not be responsible for any damage or loss to such equipment, and BIA expressly assumes all risks of any such loss or damage and agrees to indemnify and hold the United States harmless against any such damage or loss. No routine aircraft maintenance will be accomplished at WAFB. Emergency repairs and or maintenance are only authorized to avoid extended parking and storage of civil aircraft at WAFB.
The installation commander will exercise administrative and security control over both the aircraft and passengers on WAFB. Customs officials will be transported to and from the base by air carrier representatives. The installation commander will cooperate with customer, health, and other public officials to expedite arrival and departure of the aircraft. Air carrier representatives will notify the WAFB Airfield Manager, in advance, of armed security or law enforcement officers arriving or departing on a flight. BIA officials and air carrier representatives must provide the WAFB Airfield Manager a list of employees, contractors, and vehicles requiring flightline access. Temporary passes will
BIA will provide technical information and training for WAFB Fire Department personnel prior to(date). Fire, Crash, and Rescue Services will be provided in an emergency, but fire trucks will not routinely park on the flightline for aircraft arrivals and departures. BIA will reimburse WAFB for all such services.
The Air Force shall not be responsible for damages to property or injuries to persons which may arise from or be incident to the use of WAFB by BIA under this Agreement, or for damages to the property of BIA or injuries to the person of BIA's officers, agents, servants, employees, or invitees. BIA agrees to assume all risks of loss or damage to property and injury or death to persons by reason of or incident to the use of WAFB under this Agreement and expressly waives any and all claims against the United States for any such loss, damage, personal injury, or death caused by or occurring as a consequence of such use. BIA further agrees to indemnify, save, and hold the United States, its officers, agents, and employees harmless from and against all claims, demands, or actions, liabilities, judgments, costs, and attorneys fees, arising out of, claimed on account of, or in any manner predicated upon personal injury, death or property damage resulting from, related to, caused by, or arising out of the use of WAFB under this Agreement.
Landing and parking fees will be charged in accordance with to AFI 10-1001, Civil Aircraft Landing Permits. Charges will be made in accordance with the appropriate Air Force Instructions for any services or supplies required from WAFB. The WAFB Airfield Manager will be responsible for consolidating all charges which will be billed to BIA not later than(date)by the Accounting and Finance Office.
IN WITNESS WHEREOF, the respective duly authorized representatives of the parties hereto have executed this Agreement on the date set forth below opposite their respective signatures.
10 U.S.C. 8013; 10 U.S.C. 2640.
(a) Section 1204, Public Law 99-661; 10 U.S.C. 2640, Charter Air Transportation of Members of the Armed Forces.
(b) DOD Directive 4500.53, Commercial Passenger Airlift Management and Quality Control.
(c) AMCR 76-8, Contract Airlift Management, Civil Air Carriers.
(d) MTMCR 15-1, Procedure for Disqualifying and Placing Carriers in Nonuse.
Department of Defense Directive 4500.53, Commercial Passenger Airlift Management and Quality Control, charges the Commander, Air Mobility Command (AMC), with establishing safety standards and criteria for commercial passenger airlift service used by the Department of Defense. It also charges the Commander, AMC, jointly with the Commander, Military Traffic Management Command (MTMC), with establishing the Commercial Airlift Review Board and providing policy guidance and direction for its operation. This part establishes Department of Defense (DOD) quality and safety criteria for commercial air carriers providing or seeking to provide airlift services to the DOD. Included are the operating procedures of the Commercial Airlift Review Board (CARB). The CARB has the authority to suspend air carriers from DOD use or take other action when issues of air safety arise.
(a) DOD, as a customer of airlift services, expects an air carrier or operator soliciting for or doing business with the DOD to engage in quality programs and business practices that not only ensure good service but enhance the safety, operational, and maintenance standards established by the applicable Civil Aviation Agency Regulations (CARs). Accordingly, and as required by U.S. Public Law 99-661, the DOD has established a set of air carrier quality and safety requirements that reflect the type programs and practices the DOD seeks from air carriers or operators airlifting DOD resources.
(b) A DOD survey team will use the following requirements, the specifics of the applicable DOD contract or agreement, the CARs, and the experienced judgment of DOD personnel to evaluate an air carrier's capability to perform for the DOD. The survey will also include, with the carrier's coordination, observation of cockpit crew performance, as well as ramp inspections of selected company aircraft. A satisfactory on-site survey (audit) conducted by DOD personnel is prerequisite to participation in the DOD air transportation program. Surveys are conducted prior to an air carrier's acceptance into the program; thereafter, surveys will be completed on a biennial basis and when otherwise required to validate adherence to DOD quality and safety requirements. DOD personnel will also assess these quality and safety requirements when conducting periodic commercial air carrier table-top performance evaluations.
(c) The size of an air carrier, along with the type and scope of operations, will be considered during the on-site survey. For example, while an air taxi/FAA part 135 air carrier may not have a formal flight control function, such as a 24-hour dispatch organization, that same air taxi is expected to demonstrate some kind of effective flight following capability. On the other hand, a major carrier/FAA part 121 air carrier is expected to have a formal flight control or dispatch function. Both, however, will be evaluated based on the effectiveness and quality of whatever flight following function they do maintain.
(d) The air carrier requirements stated in this part provide the criteria against which would-be DOD air carrier contractors may be subjectively evaluated by the DOD. These requirements are neither all-inclusive nor are they inflexible in nature. They are not replacements for the certification criteria and other regulations established by civil aviation agencies; rather, these requirements are customer-developed and describe enhanced air carrier activities sought by the DOD.
The term “Civil Aviation Agency (CAA)” is used throughout this part since these requirements are applicable to U.S. and international air carriers doing business with DOD. CAA includes the United States Federal Aviation Administration.
(1)
(2)
(3)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(4)
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(5)
(6)
(a) This part establishes the procedures to be used by the United States Air Force Air Mobility Command (AMC) and the United States Army Military Traffic Management Command (MTMC) when, in accordance with references § 861.1 (a) through (d):
(1) A commercial air carrier is subject to review or other action by the DOD Commercial Airlift Review Board (hereinafter referred to as the CARB),
(2) A warning, suspension, temporary nonuse, or reinstatement action is taken against a carrier by the CARB, or
(3) Review or other CARB action is escalated to a higher authority.
These procedures apply to all commercial air carriers providing DOD passenger or cargo airlift through charter, individual ticket movements, contracts, or other transportation agreements. They also apply to carriers providing air transportation purchased by DOD individuals for which government reimbursement will be made in whole or in part.
(b) Safety or airworthiness issues, per reference § 861.1(b) must be referred to the CARB. AMC and MTMC may each take independent corrective action in accordance with their respective procedures on standards of service issues when safety and airworthiness issues are not involved. The DOD Air Carrier Survey and Analysis Directorate will be informed of all actions taken independently by AMC or MTMC.
(c) Except as otherwise provided herein, the rights and remedies of the government and commercial air carriers outlined in these procedures are not exclusive and are in addition to any other rights and remedies provided for by law, regulation, contract, or agreement.
(d)
(2) Temporary nonuse is the immediate exclusion of a carrier from any flight activities in the DOD airlift transportation program, pending a decision on suspension, taken under the conditions outlined in paragraph (h)(1) of this section. By mutual agreement of the CARB and the air carrier involved, a suspension hearing or decision may be delayed and the air carrier
(3) Suspension is the exclusion of an air carrier from participating in the DOD airlift transportation program. The period of suspension will normally:
(i) Remain in effect until the carrier furnishes satisfactory evidence that the conditions causing the suspension have been remedied or
(ii) Be for a fixed period of time as determined at the discretion of the CARB.
(4) The procedures for commercial airlift safety review include five possible levels with increasing authority:
(i) DOD Air Carrier Survey and Analysis Directorate.
(ii) DOD Commercial Airlift Review Committee.
(iii) DOD Commercial Airlift Review Board.
(iv) Commanders MTMC and AMC.
(v) DOD Commercial Airlift Review Authority.
These levels are described in reference § 861.1(b), with the exception of the DOD Commercial Airlift Review Committee, which is described in reference § 861.1(c). The Committee provides multifunctional review of the efforts of the DOD Air Carrier Survey and Analysis Directorate, including approval or disapproval of carriers initially seeking DOD business, and offers advice to the higher authorities when appropriate.
(e)
(i) Failing to comply with generally accepted standards of airmanship, training, and maintenance practices and procedures.
(ii) Failing to satisfy DOD quality and safety requirements as described in § 861.3.
(iii) Failing to comply with all provisions of applicable statutes, agreements, and contract terms, as such may affect flight safety, as well as with all applicable Federal Aviation Administration regulations, airworthiness directives, orders, rules, and standards promulgated under the Federal Aviation Act of 1958 as amended.
(iv) Involvement of one of the carrier's aircraft in a serious or fatal accident, incident, or operational occurrence (regardless of whether or not such aircraft is being used in the performance of government procured transportation).
(v) Any other condition which affects the safe operation of the carrier's flights hereunder.
(vi) Compliance with published standards does not, standing alone, constitute compliance with generally accepted standards or airmanship, training, or maintenance practices.
(f)
(g)
(2) The HQ AMC senior member will act as the CARB chairperson. A voting member who will not be present at any meeting of the CARB, may be represented by a knowledgeable alternate empowered with the voting responsibilities of the voting member. Three voting members (or their alternate) shall constitute a quorum. Decisions shall be by majority vote. In the case of a tie vote, the chairperson will have the deciding vote.
(3) The meeting date, time, and site of the CARB will be determined at the time of the decision to convene the CARB. Teleconferencing, if utilized, will be specified in the notice to the carrier.
(4) Minutes of CARB hearings may be recorded or summarized and will be maintained with all other records pertaining to the CARB proceeding.
(5) The CARB recorder shall ensure that the air carrier and appropriate
(h)
(ii) Such determination shall include consideration of the advice of the DOD Commercial Airlift Review Committee, if reasonably available, but will not await such advice.
(iii) The carrier shall be promptly notified of the temporary nonuse determination and the basis therefore.
(iv) Temporary nonuse status terminates automatically if suspension proceedings are not commenced, as set out in paragraph (h)(2)(ii) of this section, within 30 days of inception, unless otherwise agreed to per paragraph (d)(2) of this section.
(2)
(ii) If the CARB determines that suspension may be appropriate, it shall notify the carrier that suspension action is under consideration and of the basis for such consideration and offer the carrier a hearing thereon within 15 days of the date of the notice, or such other period as granted by the CARB, at which the carrier may be present and may offer evidence. The presiding member of the CARB shall establish procedures for such hearing as may be appropriate which shall be as informal as practicable, consistent with administrative due process.
(iii) Types of evidence which may be considered, if appropriate, shall include, but not be limited to, the following:
(A) Information and analysis provided by the DOD Air Carrier Survey and Analysis Directorate.
(B) Carrier's written/oral evidence.
(C) Corrective actions that may have been taken by the carrier to:
(
(
(D) Such other matters as the CARB deems relevant.
(E) The CARB's decisions on the reception or exclusion of evidence shall be final.
(iv) Carriers shall have the burden of proving their suitability to safely perform DOD airlift services by clear and convincing evidence.
(v) After the conclusion of such hearing, or if no hearing is requested and attended by the carrier within the time specified by the CARB, the CARB shall consider the matter and make a final decision whether or not to suspend the carrier or to impose such lesser sanction as is appropriate. The carrier shall be notified of the CARB's decision.
(3)
(ii) The carrier has the burden of proving by clear and convincing evidence that the reinstatement considerations in paragraph (f) of this section have been satisfied.
(iii) Carrier evidence in support of reinstatement will be provided in a timely manner to the CARB for its review. The CARB may independently corroborate the carrier-provided evidence and may, at its option, convene a hearing and request the participation of the carrier.
(i)
(j)
(2) An appeal will be in writing only and carriers shall not be entitled to a de novo hearing before the administrative appellate authorities.
(3) The following administrative appellate authorities will review and make decisions on appeals:
(i) When the decision being appealed was made by the CARB, the appellate authorities are Commander, AMC, and Commander, MTMC. They will jointly decide the appeal.
(ii) When Commander, AMC, and Commander, MTMC, are unable to jointly agree on an appeal, they shall refer the matter to the DOD Commercial Airlift Review Authority (CARA) for its decision.
(iii) When the decision being appealed was made by Commander, AMC, and Commander, MTMC, the appellate authority is the DOD CARA.