United States Government Publishing Office
publisher
pbl
distributor
dst
United States
National Archives and Records Administration
Office of the Federal Register
author
aut
Government Organization
text
government publication
eng
FR
Regulatory Information
1998_register
executive
2010-09-24
article
Electrical Standards for Construction; Information Collection Requirements
Notices
D09002ee1bdff581d
D09002ee1bdff589c
United States
Department of Labor
originator
org
United States Government Agency or Subagency
United States
Occupational Safety and Health Administration
originator
org
United States Government Agency or Subagency
The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a preclearance consultation program to provide the general public and Federal agencies with an opportunity to comment on proposed and/or continuing collections of information in accordance with the Paperwork Reduction Act of 1995 (PRA-95) (44 U.S.C. 3506(c)(2)(A)). This program helps to ensure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and impact of collection requirements on respondents can be properly assessed. Currently, the Occupational Safety and Health Administration (OSHA) is soliciting comments concerning the proposed extension of the information collection requirements contained in the Electrical Standards for Construction (29 CFR part 1926, Subpart K). The Agency is particularly interested in comments which: <bullet> Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the Agency, including whether the information will have practical utility; <bullet> Evaluate the accuracy of the Agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; <bullet> Enhance the quality, utility, and clarity of the information to be collected; and <bullet> Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submissions of responses.
63 FR 42067
https://www.govinfo.gov/app/details/FR-1998-08-06/98-20959
98-20959
fr06au98-91
4510-26-M
Docket No. ICR-98-31
https://www.govinfo.gov/app/details/FR-1998-08-06/98-20959
https://www.govinfo.gov/content/pkg/FR-1998-08-06/html/98-20959.htm
https://www.govinfo.gov/content/pkg/FR-1998-08-06/pdf/98-20959.pdf
2 p.
42067
42068
63 FR 42067
Electrical Standards for Construction; Information Collection Requirements; Federal Register Vol. 63, Issue
NOTICE
98-20959
DEPARTMENT OF LABOR
Occupational Safety and Health Administration
1998-10-05
Docket No. ICR-98-31
4510-26-M
98-20959
Notice; Opportunity for public comment.
The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a preclearance consultation program to provide the general public and Federal agencies with an opportunity to comment on proposed and/or continuing collections of information in accordance with the Paperwork Reduction Act of 1995 (PRA-95) (44 U.S.C. 3506(c)(2)(A)). This program helps to ensure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and impact of collection requirements on respondents can be properly assessed. Currently, the Occupational Safety and Health Administration (OSHA) is soliciting comments concerning the proposed extension of the information collection requirements contained in the Electrical Standards for Construction (29 CFR part 1926, Subpart K). The Agency is particularly interested in comments which: <bullet> Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the Agency, including whether the information will have practical utility; <bullet> Evaluate the accuracy of the Agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; <bullet> Enhance the quality, utility, and clarity of the information to be collected; and <bullet> Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submissions of responses.
Written comments must be submitted on or before October 5, 1998.
Theda Kenney, Directorate of Safety Standards Programs, Occupational Safety and Health Administration, U.S. Department of Labor, Room N-3605, 200 Constitution Avenue, NW, Washington, DC 20210, telephone (202) 219-8061. A copy of the referenced information collection request is available for inspection and copying in the Docket Office and will be mailed to persons who request copies by telephoning Theda Kenney at (202) 219-8061, extension 100, or Barbara Bielaski at (202) 219-8076, extension 142. For electronic copies of the Information Collection Request on the Electrical Standards for Construction (29 CFR part 1926, Subpart K), contact OSHA's WebPage on the Internet at http://www.osha.gov and click on ``Regulations and Compliance.''
Federal Register
Vol. 63, no. 151
Office of the Federal Register, National Archives and Records Administration
1998-08-06
continuing
daily
deposited
born digital
254 p.
Table of Contents:
AE 2.7:
GS 4.107:
AE 2.106:
KF70.A2
https://www.govinfo.gov/app/details/FR-1998-08-06
P0b002ee180a51989
0097-6326
0042-1219
0364-1406
769-004-00000-9
000582072
f:fr06au98
https://www.govinfo.gov/app/details/FR-1998-08-06
https://www.govinfo.gov/content/pkg/FR-1998-08-06/pdf/FR-1998-08-06.pdf
fdlp
41957
42199
DGPO
2010-09-24
2023-05-06
FR-1998-08-06
machine generated
eng
FR
FR-1998-08-06
63
151