40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c).
This part prescribes policies and procedures for the acquisition of supplies and services, including construction, research and development, and commercial items, the aggregate amount of which does not exceed the simplified acquisition threshold (see 2.101). Subpart 13.5 provides special authority for acquisitions of commercial items exceeding the simplified acquisition threshold but not exceeding $5 million ($10 million for acquisitions as described in 13.500(e)), including options. See part 12 for policies applicable to the acquisition of commercial items exceeding the micro-purchase threshold. See 36.602-5 for simplified procedures to be used when acquiring architect-engineer services.
As used in this part—
The purpose of this part is to prescribe simplified acquisition procedures in order to—
(a) Reduce administrative costs;
(b) Improve opportunities for small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business concerns to obtain a fair proportion of Government contracts;
(c) Promote efficiency and economy in contracting; and
(d) Avoid unnecessary burdens for agencies and contractors.
(a) Agencies shall use simplified acquisition procedures to the maximum extent practicable for all purchases of supplies or services not exceeding the simplified acquisition threshold (including purchases at or below the micro-purchase threshold). This policy does not apply if an agency can meet its requirement using—
(1) Required sources of supply under part 8 (e.g., Federal Prison Industries, Committee for Purchase from People Who are Blind or Severely Disabled, and Federal Supply Schedule contracts);
(2) Existing indefinite delivery/indefinite quantity contracts; or
(3) Other established contracts.
(b)(1) Each acquisition of supplies or services that has an anticipated dollar value exceeding $2,500 ($15,000 for acquisitions as described in 13.201(g)(1)) and not exceeding $100,000 ($250,000 for acquisitions described in paragraph (1) of the Simplified Acquisition Threshold definition at 2.101) is reserved exclusively for small business concerns and shall be set aside (
(2) The contracting officer may set aside for HUBZone small business concerns (
(3) Each written solicitation under a set-aside shall contain the appropriate provisions prescribed by part 19. If the solicitation is oral, however, information substantially identical to that in the provision shall be given to potential quoters.
(c)(1) The contracting officer shall not use simplified acquisition procedures to acquire supplies and services if the anticipated award will exceed—
(i) The simplified acquisition threshold; or
(ii) $5 million ($10 million for acquisitions as described in 13.500(e)), including options, for acquisitions of commercial items using Subpart 13.5.
(2) Do not break down requirements aggregating more than the simplified acquisition threshold (or for commercial items, the threshold in Subpart 13.5) or the micro-purchase threshold into several purchases that are less than the applicable threshold merely to—
(i) Permit use of simplified acquisition procedures; or
(ii) Avoid any requirement that applies to purchases exceeding the micro-purchase threshold.
(d) An agency that has specific statutory authority to acquire personal services (see 37.104) may use simplified
(e) Agencies shall use the Governmentwide commercial purchase card and electronic purchasing techniques to the maximum extent practicable in conducting simplified acquisitions.
(f) Agencies shall maximize the use of electronic commerce when practicable and cost-effective (see Subpart 4.5). Drawings and lengthy specifications can be provided off-line in hard copy or through other appropriate means.
(g) Authorized individuals shall make purchases in the simplified manner that is most suitable, efficient, and economical based on the circumstances of each acquisition. For acquisitions not expected to exceed—
(1) The simplified acquisition threshold for other than commercial items, use any appropriate combination of the procedures in parts 13, 14, 15, 35, or 36, including the use of Standard Form 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair), for construction contracts (see 36.701(a)); or
(2) $5 million ($10 million for acquisitions as described in 13.500(e)), for commercial items, use any appropriate combination of the procedures in Parts 12, 13, 14, and 15 (see paragraph (d) of this section).
(h) In addition to other considerations, contracting officers shall—
(1) Promote competition to the maximum extent practicable (see 13.104);
(2) Establish deadlines for the submission of responses to solicitations that afford suppliers a reasonable opportunity to respond (see 5.203);
(3) Consider all quotations or offers that are timely received. For evaluation of quotations or offers received electronically, see 13.106-2(b)(3); and
(4) Use innovative approaches, to the maximum extent practicable, in awarding contracts using simplified acquisition procedures.
(a) A quotation is not an offer and, consequently, cannot be accepted by the Government to form a binding contract. Therefore, issuance by the Government of an order in response to a supplier's quotation does not establish a contract. The order is an offer by the Government to the supplier to buy certain supplies or services upon specified terms and conditions. A contract is established when the supplier accepts the offer.
(b) When appropriate, the contracting officer may ask the supplier to indicate acceptance of an order by notification to the Government, preferably in writing, as defined at 2.101. In other circumstances, the supplier may indicate acceptance by furnishing the supplies or services ordered or by proceeding with the work to the point where substantial performance has occurred.
(c) If the Government issues an order resulting from a quotation, the Government may (by written notice to the supplier, at any time before acceptance occurs) withdraw, amend, or cancel its offer. (See 13.302-4 for procedures on termination or cancellation of purchase orders.)
(a) The following laws are inapplicable to all contracts and subcontracts (if otherwise applicable to subcontracts) at or below the simplified acquisition threshold:
(1) 41 U.S.C. 57 (a) and (b) (Anti-Kickback Act of 1986). (Only the requirement for the incorporation of the contractor procedures for the prevention and detection of violations, and the contractual requirement for contractor cooperation in investigations are inapplicable.).
(2) 40 U.S.C. 3131 (Miller Act). (Although the Miller Act does not apply to contracts at or below the simplified acquisition threshold, alternative forms of payment protection for suppliers of labor and material (see 28.102) are still required if the contract exceeds $25,000.).
(3) 40 U.S.C. 3701
(4) 41 U.S.C. 701(a)(1) (Section 5152 of the Drug-Free Workplace Act of 1988), except for individuals.
(5) 42 U.S.C. 6962 (Solid Waste Disposal Act). (The requirement to provide an estimate of recovered material utilized in contract performance does not apply unless the contract value exceeds $100,000.)
(6) 10 U.S.C. 2306(b) and 41 U.S.C. 254(a) (Contract Clause Regarding Contingent Fees).
(7) 10 U.S.C. 2313 and 41 U.S.C. 254(c) (Authority to Examine Books and Records of Contractors).
(8) 10 U.S.C. 2402 and 41 U.S.C. 253g (Prohibition on Limiting Subcontractor Direct Sales to the United States).
(9) 15 U.S.C. 631 note (HUBZone Act of 1997), except for 15 U.S.C. 657a(b)(2)(B), which is optional for the agencies subject to the requirements of the Act.
(10) 31 U.S.C. 1354(a) (Limitation on use of appropriated funds for contracts with entities not meeting veterans employment reporting requirements).
(b) When acquiring commercial items or supplies or services procured in accordance with 12.102(f)(1) and (f)(2), the contracting officer may use a combined synopsis and solicitation. The FAR Council may make exceptions when it determines in writing that it is in the best interest of the Government that the enactment should apply to contracts or subcontracts not greater than the simplified acquisition threshold.
(c) The provisions of paragraph (b) of this section do not apply to laws that—
(1) Provide for criminal or civil penalties; or
(2) Specifically state that notwithstanding the language of Section 4101, Public Law 103-355, the enactment will be applicable to contracts or subcontracts in amounts not greater than the simplified acquisition threshold.
(d) Any individual may petition the Administrator, Office of Federal Procurement Policy (OFPP), to include any applicable provision of law not included on the list set forth in paragraph (a) of this section unless the FAR Council has already determined in writing that the law is applicable. The Administrator, OFPP, will include the law on the list in paragraph (a) of this section unless the FAR Council makes a determination that it is applicable within 60 days of receiving the petition.
While certain statutes still apply, pursuant to Public Law 103-355, the following provisions and clauses are inapplicable to contracts and subcontracts at or below the simplified acquisition threshold:
(a) 52.203-5, Covenant Against Contingent Fees.
(b) 52.203-6, Restrictions on Subcontractor Sales to the
Government.
(c) 52.203-7, Anti-Kickback Procedures.
(d) 52.215-2, Audits and Records—Negotiation.
(e) 52.222-4, Contract Work Hours and Safety Standards Act—Overtime Compensation.
(f) 52.223-6, Drug-Free Workplace, except for individuals.
(g) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Products.
(a) In making purchases, contracting officers shall—
(1) Comply with the policy in 7.202 relating to economic purchase quantities, when practicable;
(2) Satisfy the procedures described in subpart 19.6 with respect to Certificates of Competency before rejecting a quotation, oral or written, from a small business concern determined to be nonresponsible (see subpart 9.1); and
(3) Provide for the inspection of supplies or services as prescribed in 46.404.
(b) In making purchases, contracting officers should—
(1) Include related items (such as small hardware items or spare parts for vehicles) in one solicitation and make award on an “all-or-none” or “multiple award” basis provided suppliers are so advised when quotations or offers are requested;
(2) Incorporate provisions and clauses by reference in solicitations and in awards under requests for quotations, provided the requirements in 52.102 are satisfied;
(3) Make maximum effort to obtain trade and prompt payment discounts (see 14.408-3). Prompt payment discounts shall not be considered in the evaluation of quotations; and
(4) Use bulk funding to the maximum extent practicable. Bulk funding is a system whereby the contracting officer receives authorization from a fiscal and accounting officer to obligate funds on purchase documents against a specified lump sum of funds reserved for the purpose for a specified period of time rather than obtaining individual obligational authority on each purchase document. Bulk funding is particularly appropriate if numerous purchases using the same type of funds are to be made during a given period.
(a) Contracting officers should use the Central Contractor Registration database (
(1) Small business.
(2) Small disadvantaged business.
(3) Women-owned small business.
(4) HUBZone small business.
(5) Service-disabled veteran-owned small business.
(6) Veteran-owned small business.
(b) The status information may be used as the basis to ensure that small business concerns are provided the maximum practicable opportunities to respond to solicitations issued using simplified acquisition procedures.
Authorized individuals do not have to obtain individual quotations for each purchase. Standing price quotations may be used if—
(a) The pricing information is current; and
(b) The Government obtains the benefit of maximum discounts before award.
The contracting officer must promote competition to the maximum extent practicable to obtain supplies and services from the source whose offer is the most advantageous to the Government, considering the administrative cost of the purchase.
(a) The contracting officer must not—
(1) Solicit quotations based on personal preference; or
(2) Restrict solicitation to suppliers of well-known and widely distributed makes or brands.
(b) If using simplified acquisition procedures and not using either FACNET or providing access to the notice of proposed contract action and solicitation information through the Governmentwide point of entry (GPE), maximum practicable competition ordinarily can be obtained by soliciting quotations or offers from sources within the local trade area. Unless the contract action requires synopsis pursuant to 5.101 and an exception under 5.202 is not applicable, consider solicitation of at least three sources to promote competition to the maximum extent practicable. Whenever practicable, request quotations or offers from two sources not included in the previous solicitation.
(a) The contracting officer must comply with the public display and synopsis requirements of 5.101 and 5.203 unless—
(1)(i) FACNET is used for an acquisition at or below the simplified acquisition threshold; or
(ii) The GPE is used at or below the simplified acquisition threshold for providing widespread public notice of acquisition opportunities and offerors are provided a means of responding to the solicitation electronically; or
(2) An exception in 5.202 applies.
(b) When acquiring commercial items or supplies or services produced in accordance with 12.102(f)(1), the contracting officer may use a combined synopsis and solicitation. In these cases, a separate solicitation is not required. The contracting officer must include enough information to permit suppliers to develop quotations or offers.
(a)
(1)(i) The nature of the article or service to be purchased and whether it is highly competitive and readily available in several makes or brands, or is relatively noncompetitive.
(ii) Information obtained in making recent purchases of the same or similar item.
(iii) The urgency of the proposed purchase.
(iv) The dollar value of the proposed purchase.
(v) Past experience concerning specific dealers' prices.
(2) When soliciting quotations or offers, the contracting officer shall notify potential quoters or offerors of the basis on which award will be made (price alone or price and other factors, e.g., past performance and quality). Contracting officers are encouraged to use best value. Solicitations are not required to state the relative importance assigned to each evaluation factor and subfactor, nor are they required to include subfactors.
(b)
(2) For sole source acquisitions of commercial items in excess of the simplified acquisition threshold conducted pursuant to subpart 13.5, the requirements at 13.501(a) apply.
(c)
(i) The acquisition does not exceed the simplified acquisition threshold;
(ii) Oral solicitation is more efficient than soliciting through available electronic commerce alternatives; and
(iii) Notice is not required under 5.101.
(2) However, an oral solicitation may not be practicable for contract actions exceeding $25,000 unless covered by an exception in 5.202.
(d)
(e)
(f)
(a)
(i) In an impartial manner; and
(ii) Inclusive of transportation charges from the shipping point of the supplier to the delivery destination.
(2) Quotations or offers shall be evaluated on the basis established in the solicitation.
(3) All quotations or offers shall be considered (see paragraph (b) of this subsection).
(b)
(2) If telecommuting is not prohibited, agencies shall not unfavorably evaluate an offer because it includes telecommuting unless the contracting officer executes a written determination in accordance with FAR 7.108(b).
(3) If using price and other factors, ensure that quotations or offers can be evaluated in an efficient and minimally burdensome fashion. Formal evaluation plans and establishing a competitive range, conducting discussions, and scoring quotations or offers are not required. Contracting offices may conduct comparative evaluations of offers. Evaluation of other factors, such as past performance—
(i) Does not require the creation or existence of a formal data base; and
(ii) May be based on information such as the contracting officer's knowledge of and previous experience with the supply or service being acquired, customer surveys, or other reasonable basis.
(4) For acquisitions conducted using FACNET or a method that permits electronic response to the solicitation, the contracting officer may—
(i) After preliminary consideration of all quotations or offers, identify from all quotations or offers received one that is suitable to the user, such as the lowest priced brand name product, and quickly screen all lower priced quotations or offers based on readily discernible value indicators, such as past performance, warranty conditions, and maintenance availability; or
(ii) Where an evaluation is based only on price and past performance, make an award based on whether the lowest priced of the quotations or offers having the highest past performance rating possible represents the best value when compared to any lower priced quotation or offer.
(a)
(1) Whenever possible, base price reasonableness on competitive quotations or offers.
(2) If only one response is received, include a statement of price reasonableness in the contract file. The contracting officer may base the statement on—
(i) Market research;
(ii) Comparison of the proposed price with prices found reasonable on previous purchases;
(iii) Current price lists, catalogs, or advertisements. However, inclusion of a price in a price list, catalog, or advertisement does not, in and of itself, establish fairness and reasonableness of the price;
(iv) A comparison with similar items in a related industry;
(v) The contracting officer's personal knowledge of the item being purchased;
(vi) Comparison to an independent Government estimate; or
(vii) Any other reasonable basis.
(3) Occasionally an item can be obtained only from a supplier that quotes a minimum order price or quantity that either unreasonably exceeds stated quantity requirements or results in
(b)
(1)
(2)
(3)
(i) Explaining the absence of competition if only one source is solicited and the acquisition does not exceed the simplified acquisition threshold (does not apply to an acquisition of utility services available from only one source); or
(ii) Supporting the award decision if other than price-related factors were considered in selecting the supplier.
(c)
(d)
(e)
(a) Agency heads are encouraged to delegate micro-purchase authority (see 1.603-3).
(b) The Governmentwide commercial purchase card shall be the preferred method to purchase and to pay for micro-purchases (see 2.101).
(c) Purchases at or below the micro-purchase threshold may be conducted using any of the methods described in subpart 13.3, provided the purchaser is authorized and trained, pursuant to agency procedures, to use those methods.
(d) Micro-purchases do not require provisions or clauses, except as provided at 4.1104 and 32.1110. This paragraph takes precedence over any other FAR requirement to the contrary, but does not prohibit the use of any clause.
(e) The requirements in part 8 apply to purchases at or below the micro-purchase threshold.
(f) The procurement requirements in the Resource Conservation and Recovery Act (42 U.S.C. 6962) and Executive Order 13101 of September 14, 1998, Greening the Government through
(g)(1) For acquisitions of supplies or services that, as determined by the head of the agency, are to be used to support a contingency operation or to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack, the micro-purchase threshold is _____.
(i) $15,000 in the case of any contract to be awarded and performed, or purchase to be made, inside the United States; and
(ii) $25,000 in the case of any contract to be awarded and performed, or purchase to be made, outside the United States.
(2) Purchases using this authority must have a clear and direct relationship to the support of a contingency operation or the defense against or recovery from nuclear, biological, chemical, or radiological attack.
(a)
(2) Micro-purchases may be awarded without soliciting competitive quotations if the contracting officer or individual appointed in accordance with 1.603-3(b) considers the price to be reasonable.
(3) The administrative cost of verifying the reasonableness of the price for purchases may more than offset potential savings from detecting instances of overpricing. Therefore, action to verify price reasonableness need only be taken if—
(i) The contracting officer or individual appointed in accordance with 1.603-3(b) suspects or has information to indicate that the price may not be reasonable (e.g., comparison to the previous price paid or personal knowledge of the supply or service); or
(ii) Purchasing a supply or service for which no comparable pricing information is readily available (e.g., a supply or service that is not the same as, or is not similar to, other supplies or services that have recently been purchased on a competitive basis).
(b)
(a) The Governmentwide commercial purchase card is authorized for use in making and/or paying for purchases of supplies, services, or construction. The Governmentwide commercial purchase card may be used by contracting officers and other individuals designated in accordance with 1.603-3. The card may be used only for purchases that are otherwise authorized by law or regulation.
(b) Agencies using the Governmentwide commercial purchase card shall establish procedures for use and control of the card that comply with the Treasury Financial Manual for Guidance of Departments and Agencies (TFM 4-4500) and that are consistent with the terms and conditions of the current GSA credit card contract. Agency procedures should not limit the use of the Governmentwide commercial purchase card to micro-purchases. Agency procedures should encourage use of the card in greater dollar amounts by contracting officers to place orders and to pay for purchases against contracts established under part 8 procedures, when authorized; and to place orders and/or make payment under other contractual instruments, when agreed to by the contractor. See 32.1110(d) for instructions for use of the appropriate clause when payment under a written contract will be made through use of the card.
(c) The Governmentwide commercial purchase card may be used to—
(1) Make micro-purchases;
(2) Place a task or delivery order (if authorized in the basic contract, basic ordering agreement, or blanket purchase agreement); or
(3) Make payments, when the contractor agrees to accept payment by the card.
(a) Except as provided under the unpriced purchase order method (see 13.302-2), purchase orders generally are issued on a fixed-price basis. See 12.207 for acquisition of commercial items.
(b) Purchase orders shall—
(1) Specify the quantity of supplies or scope of services ordered;
(2) Contain a determinable date by which delivery of the supplies or performance of the services is required;
(3) Provide for inspection as prescribed in part 46. Generally, inspection and acceptance should be at destination. Source inspection should be specified only if required by part 46. When inspection and acceptance will be performed at destination, advance copies of the purchase order or equivalent notice shall be furnished to the consignee(s) for material receipt purposes. Receiving reports shall be accomplished immediately upon receipt and acceptance of supplies;
(4) Specify f.o.b. destination for supplies to be delivered within the United States, except Alaska or Hawaii, unless there are valid reasons to the contrary; and
(5) Include any trade and prompt payment discounts that are offered, consistent with the applicable principles at 14.408-3.
(c) The contracting officer's signature on purchase orders shall be in accordance with 4.101 and the definitions at 2.101. Facsimile and electronic signature may be used in the production of purchase orders by automated methods.
(d) Limit the distribution of copies of purchase orders and related forms to the minimum deemed essential for administration and transmission of contractual information.
(e) In accordance with 31 U.S.C. 3332, electronic funds transfer (EFT) is required for payments except as provided in 32.1110. See Subpart 32.11 for instructions for use of the appropriate clause in purchase orders. When obtaining oral quotes, the contracting officer shall inform the quoter of the EFT clause that will be in any resulting purchase order.
(a) An unpriced purchase order is an order for supplies or services, the price of which is not established at the time of issuance of the order.
(b) An unpriced purchase order may be used only when—
(1) It is impractical to obtain pricing in advance of issuance of the purchase order; and
(2) The purchase is for—
(i) Repairs to equipment requiring disassembly to determine the nature and extent of repairs;
(ii) Material available from only one source and for which cost cannot readily be established; or
(iii) Supplies or services for which prices are known to be competitive, but exact prices are not known (e.g., miscellaneous repair parts, maintenance agreements).
(c) Unpriced purchase orders may be issued on paper or electronically. A realistic monetary limitation, either for each line item or for the total order, shall be placed on each unpriced purchase order. The monetary limitation shall be an obligation subject to adjustment when the firm price is established. The contracting office shall follow up on each order to ensure timely pricing. The contracting officer or the contracting officer's designated representative shall review the invoice price and, if reasonable (see 13.106-3(a)), process the invoice for payment.
(a) When it is desired to consummate a binding contract between the parties before the contractor undertakes performance, the contracting officer shall
(b) Each purchase order modification shall identify the order it modifies and shall contain an appropriate modification number.
(c) A contractor's written acceptance of a purchase order modification may be required only if—
(1) Determined by the contracting officer to be necessary to ensure the contractor's compliance with the purchase order as revised; or
(2) Required by agency regulations.
(a) If a purchase order that has been accepted in writing by the contractor is to be terminated, the contracting officer shall process the termination in accordance with—
(1) 12.403(d) and 52.212-4(l) for commercial items; or
(2) Part 49 or 52.213-4 for other than commercial items.
(b) If a purchase order that has not been accepted in writing by the contractor is to be canceled, the contracting officer shall notify the contractor in writing that the purchase order has been canceled, request the contractor's written acceptance of the cancellation, and proceed as follows:
(1) If the contractor accepts the cancellation and does not claim that costs were incurred as a result of beginning performance under the purchase order, no further action is required (
(2) If the contractor does not accept the cancellation or claims that costs were incurred as a result of beginning performance under the purchase order, the contracting officer shall process the termination action as prescribed in paragraph (a) of this subsection.
(a) Each purchase order (and each purchase order modification (see 13.302-3)) shall incorporate all clauses prescribed for the particular acquisition.
(b) The contracting officer shall insert the clause at 52.213-2, Invoices, in purchase orders that authorize advance payments (see 31 U.S.C. 3324(d)(2)) for subscriptions or other charges for newspapers, magazines, periodicals, or other publications (
(c) The contracting officer shall insert the clause at 52.213-3, Notice to Supplier, in unpriced purchase orders.
(d)(1) The contracting officer may use the clause at 52.213-4, Terms and Conditions—Simplified Acquisitions (Other Than Commercial Items), in simplified acquisitions exceeding the micro-purchase threshold that are for other than commercial items (see 12.301).
(2) The clause—
(i) Is a compilation of the most commonly used clauses that apply to simplified acquisitions; and
(ii) May be modified to fit the individual acquisition to add other needed clauses, or those clauses may be added separately. Modifications (
(3)(i) When an acquisition for supplies for use within the United States cannot be set aside for small business concerns and trade agreements apply (see Subpart 25.4), substitute the clause at FAR 52.225-3, Buy American Act—Free Trade Agreements—Israeli Trade Act, used with Alternate I or Alternate II, if appropriate, instead of the clause at FAR 52.225-1, Buy American Act—Supplies.
(ii) When acquiring supplies for use outside the United States, delete clause 52.225-1 from the clause list at 52.213-4(b).
(a) A blanket purchase agreement (BPA) is a simplified method of filling
(b) BPAs should be established for use by an organization responsible for providing supplies for its own operations or for other offices, installations, projects, or functions. Such organizations, for example, may be organized supply points, separate independent or detached field parties, or one-person posts or activities.
(c) The use of BPAs does not exempt an agency from the responsibility for keeping obligations and expenditures within available funds.
(a) The following are circumstances under which contracting officers may establish BPAs:
(1) There is a wide variety of items in a broad class of supplies or services that are generally purchased, but the exact items, quantities, and delivery requirements are not known in advance and may vary considerably.
(2) There is a need to provide commercial sources of supply for one or more offices or projects in a given area that do not have or need authority to purchase otherwise.
(3) The use of this procedure would avoid the writing of numerous purchase orders.
(4) There is no existing requirements contract for the same supply or service that the contracting activity is required to use.
(b) After determining a BPA would be advantageous, contracting officers shall—
(1) Establish the parameters to limit purchases to individual items or commodity groups or classes, or permit the supplier to furnish unlimited supplies or services; and
(2) Consider suppliers whose past performance has shown them to be dependable, who offer quality supplies or services at consistently lower prices, and who have provided numerous purchases at or below the simplified acquisition threshold.
(c) BPAs may be established with—
(1) More than one supplier for supplies or services of the same type to provide maximum practicable competition;
(2) A single firm from which numerous individual purchases at or below the simplified acquisition threshold will likely be made in a given period; or
(3) Federal Supply Schedule contractors, if not inconsistent with the terms of the applicable schedule contract.
(d) BPAs should be prepared without a purchase requisition and only after contacting suppliers to make the necessary arrangements for—
(1) Securing maximum discounts;
(2) Documenting individual purchase transactions;
(3) Periodic billings; and
(4) Incorporating other necessary details.
Prepare BPAs on the forms specified in 13.307. Do not cite accounting and appropriation data (see 13.303-5(e)(4)).
(a) The following terms and conditions are mandatory:
(1)
(2)
(3)
(4)
(5)
(i) Name of supplier.
(ii) BPA number.
(iii) Date of purchase.
(iv) Purchase number.
(v) Itemized list of supplies or services furnished.
(vi) Quantity, unit price, and extension of each item, less applicable discounts (unit prices and extensions need not be shown when incompatible with the use of automated systems, provided that the invoice is itemized to show this information).
(vii) Date of delivery or shipment.
(6)
(i) A summary invoice shall be submitted at least monthly or upon expiration of this BPA, whichever occurs first, for all deliveries made during a billing period, identifying the delivery tickets covered therein, stating their total dollar value, and supported by receipt copies of the delivery tickets.
(ii) An itemized invoice shall be submitted at least monthly or upon expiration of this BPA, whichever occurs first, for all deliveries made during a billing period and for which payment has not been received. These invoices need not be supported by copies of delivery tickets.
(iii) When billing procedures provide for an individual invoice for each delivery, these invoices shall be accumulated, provided that—
(A) A consolidated payment will be made for each specified period; and
(B) The period of any discounts will commence on the final date of the billing period or on the date of receipt of invoices for all deliveries accepted during the billing period, whichever is later.
(iv) An invoice for subscriptions or other charges for newspapers, magazines, or other periodicals shall show the starting and ending dates and shall state either that ordered subscriptions have been placed in effect or will be placed in effect upon receipt of payment.
(b) If the fast payment procedure is used, include the requirements stated in 13.403.
(a) The contracting officer shall insert in each BPA the clauses prescribed elsewhere in this part that are required for or applicable to the particular BPA.
(b) Unless a clause prescription specifies otherwise (e.g., see 22.305(a), 22.605(a)(5), or 22.1006), if the prescription includes a dollar threshold, the amount to be compared to that threshold is that of any particular order under the BPA.
(a) Use a BPA only for purchases that are otherwise authorized by law or regulation.
(b) Individual purchases shall not exceed the simplified acquisition threshold. However, agency regulations may establish a higher threshold consistent with the following:
(1) The simplified acquisition threshold and the $5,000,000 limitation for individual purchases ($10,000,000 for purchases entered into under the authority of 12.102(f)(1)) do not apply to BPAs established in accordance with 13.303-2(c)(3).
(2) The limitation for individual purchases for commercial item acquisitions conducted under Subpart 13.5 is $5 million ($10 million for acquisitions as described in 13.500(e)).
(c) The existence of a BPA does not justify purchasing from only one source or avoiding small business set-asides. The requirements of 13.003(b) and subpart 19.5 also apply to each order.
(d) If, for a particular purchase greater than the micro-purchase threshold, there is an insufficient number of BPAs to ensure maximum practicable competition, the contracting officer shall—
(1) Solicit quotations from other sources (see 13.105) and make the purchase as appropriate; and
(2) Establish additional BPAs to facilitate future purchases if—
(i) Recurring requirements for the same or similar supplies or services seem likely;
(ii) Qualified sources are willing to accept BPAs; and
(iii) It is otherwise practical to do so.
(e) Limit documentation of purchases to essential information and forms as follows:
(1) Purchases generally should be made electronically, or orally when it is not considered economical or practical to use electronic methods.
(2) A paper purchase document may be issued if necessary to ensure that the supplier and the purchaser agree concerning the transaction.
(3) Unless a paper document is issued, record essential elements (e.g., date, supplier, supplies or services, price, delivery date) on the purchase requisition, in an informal memorandum, or on a form developed locally for the purpose.
(4) Cite the pertinent purchase requisitions and the accounting and appropriation data.
(5) When delivery is made or the services are performed, the supplier's sales document, delivery document, or invoice may (if it reflects the essential elements) be used for the purpose of recording receipt and acceptance of the supplies or services. However, if the purchase is assigned to another activity for administration, the authorized Government representative shall document receipt and acceptance of supplies or services by signing and dating the agency specified form after verification and after notation of any exceptions.
(a) The contracting officer placing orders under a BPA, or the designated representative of the contracting officer, shall review a sufficient random sample of the BPA files at least annually to ensure that authorized procedures are being followed.
(b) The contracting officer that entered into the BPA shall—
(1) Ensure that each BPA is reviewed at least annually and, if necessary, updated at that time; and
(2) Maintain awareness of changes in market conditions, sources of supply, and other pertinent factors that may warrant making new arrangements with different suppliers or modifying existing arrangements.
(c) If an office other than the purchasing office that established a BPA is authorized to make purchases under that BPA, the agency that has jurisdiction over the office authorized to make the purchases shall ensure that the procedures in paragraph (a) of this subsection are being followed.
An individual BPA is considered complete when the purchases under it equal its total dollar limitation, if any, or when its stated time period expires.
The clause at 52.213-4, Terms and Conditions—Simplified Acquisitions (Other Than Commercial Items), may be used in BPAs established under this section.
Imprest funds and third party drafts may be used to acquire and to pay for supplies or services. Policies and regulations concerning the establishment of and accounting for imprest funds and third party drafts, including the responsibilities of designated cashiers and alternates, are contained in Part IV of the Treasury Financial Manual for Guidance of Departments and Agencies, Title 7 of the General Accounting Office Policy and Procedures Manual for Guidance of Federal Agencies, and the agency implementing regulations. Agencies also shall be guided by the Manual of Procedures and Instructions for Cashiers, issued by the Financial Management Service, Department of the Treasury.
Each agency using imprest funds and third party drafts shall—
(a) Periodically review and determine whether there is a continuing need for each fund or third party draft account established, and that amounts of those
(b) Take prompt action to have imprest funds or third party draft accounts adjusted to a level commensurate with demonstrated needs whenever circumstances warrant such action; and
(c) Develop and issue appropriate implementing regulations. These regulations shall include (but are not limited to) procedures covering—
(1) Designation of personnel authorized to make purchases using imprest funds or third party drafts; and
(2) Documentation of purchases using imprest funds or third party drafts, including documentation of—
(i) Receipt and acceptance of supplies and services by the Government;
(ii) Receipt of cash or third party draft payments by the suppliers; and
(iii) Cash advances and reimbursements.
Imprest funds or third party drafts may be used for purchases when—
(a) The imprest fund transaction does not exceed $500 or such other limits as have been approved by the agency head;
(b) The third party draft transaction does not exceed $2,500, unless authorized at a higher level in accordance with Treasury restrictions;
(c) The use of imprest funds or third party drafts is considered to be advantageous to the Government; and
(d) The use of imprest funds or third party drafts for the transaction otherwise complies with any additional conditions established by agencies and with the policies and regulations referenced in 13.305-1.
(a) Each purchase using imprest funds or third party drafts shall be based upon an authorized purchase requisition, contracting officer verification statement, or other agency approved method of ensuring that adequate funds are available for the purchase.
(b) Normally, purchases should be placed orally and without soliciting competition if prices are considered reasonable.
(c) Since there is, for all practical purposes, simultaneous placement of the order and delivery of the items, clauses are not required for purchases using imprest funds or third party drafts.
(d) Forms prescribed at 13.307(e) may be used if a written order is considered necessary (e.g., if required by the supplier for discount, tax exemption, or other reasons). If a purchase order is used, endorse it “Payment to be made from Imprest Fund” (or “Payment to be made from Third Party Draft,” as appropriate).
(e) The individual authorized to make purchases using imprest funds or third party drafts shall—
(1) Furnish to the imprest fund or third party draft cashier a copy of the document required under paragraph (a) of this subsection annotated to reflect—
(i) That an imprest fund or third party draft purchase has been made;
(ii) The unit prices and extensions; and
(iii) The supplier's name and address; and
(2) Require the supplier to include with delivery of the supplies an invoice, packing slip, or other sales instrument giving—
(i) The supplier's name and address;
(ii) List and quantity of items supplied;
(iii) Unit prices and extensions; and
(iv) Cash discount, if any.
The SF 44, Purchase Order—Invoice—Voucher, is a multipurpose pocket-size purchase order form designed primarily for on-the-spot, over-the-counter purchases of supplies and nonpersonal services while away from the purchasing office or at isolated activities. It also can be used as a receiving report, invoice, and public voucher.
(a) This form may be used if all of the following conditions are satisfied:
(1) The amount of the purchase is at or below the micro-purchase threshold, except for purchases made under unusual and compelling urgency or in support of contingency operations. Agencies may establish higher dollar
(2) The supplies or services are immediately available;
(3) One delivery and one payment will be made; and
(4) Its use is determined to be more economical and efficient than use of other simplified acquisition procedures.
(b) General procedural instructions governing the form's use are printed on the form and on the inside front cover of each book of forms.
(c) Since there is, for all practical purposes, simultaneous placement of the order and delivery of the items, clauses are not required for purchases using this form.
(d) Agencies shall provide adequate safeguards regarding the control of forms and accounting for purchases.
(a)
(b)
(1) Except when quotations are solicited via FACNET, electronically, or orally, the SF 1449; SF 18, Request for Quotations; or an agency form/automated format may be used. Each agency request for quotations form/automated format should conform with the SF 18 or SF 1449 to the maximum extent practicable.
(2) Both SF 1449 and OF 347, Order for Supplies or Services, are multipurpose forms used for negotiated purchases of supplies or services, delivery or task orders, inspection and receiving reports, and invoices. An agency form/automated format also may be used.
(c)
(1) OF 336, Continuation Sheet, or an agency form/automated format may be used when additional space is needed.
(2) OF 348, Order for Supplies or Services Schedule—Continuation, or an agency form/automated format may be used for negotiated purchases when additional space is needed. Agencies may print on these forms the clauses considered to be generally suitable for purchases.
(3) SF 30, Amendment of Solicitation/Modification of Contract, or a purchase order form may be used to modify a purchase order, unless an agency form/automated format is prescribed in agency regulations.
(d) SF 44, Purchase Order—Invoice—Voucher, is a multipurpose pocket-size purchase order form that may be used as outlined in 13.306.
(e) SF 1165, Receipt for Cash—Subvoucher, or an agency purchase order form may be used for purchases using imprest funds or third party drafts.
(a) The fast payment procedure allows payment under limited conditions to a contractor prior to the Government's verification that supplies have been received and accepted. The procedure provides for payment for supplies based on the contractor's submission of an invoice that constitutes a certification that the contractor—
(1) Has delivered the supplies to a post office, common carrier, or point of first receipt by the Government; and
(2) Shall replace, repair, or correct supplies not received at destination, damaged in transit, or not conforming to purchase agreements.
(b) The contracting officer shall be primarily responsible for collecting debts resulting from failure of contractors to properly replace, repair, or correct supplies lost, damaged, or not conforming to purchase requirements (see 32.605(b) and 32.606).
If the conditions in paragraphs (a) through (f) of this section are present, the fast payment procedure may be used, provided that use of the procedure is consistent with the other conditions of the purchase. The conditions for use of the fast payment procedure are as follows:
(a) Individual purchasing instruments do not exceed $25,000, except that executive agencies may permit higher dollar limitations for specified activities or items on a case-by-case basis.
(b) Deliveries of supplies are to occur at locations where there is both a geographical separation and a lack of adequate communications facilities between Government receiving and disbursing activities that will make it impractical to make timely payment based on evidence of Government acceptance.
(c) Title to the supplies passes to the Government—
(1) Upon delivery to a post office or common carrier for mailing or shipment to destination; or
(2) Upon receipt by the Government if the shipment is by means other than Postal Service or common carrier.
(d) The supplier agrees to replace, repair, or correct supplies not received at destination, damaged in transit, or not conforming to purchase requirements.
(e) The purchasing instrument is a firm-fixed-price contract, a purchase order, or a delivery order for supplies.
(f) A system is in place to ensure—
(1) Documentation of evidence of contractor performance under fast payment purchases;
(2) Timely feedback to the contracting officer in case of contractor deficiencies; and
(3) Identification of suppliers that have a current history of abusing the fast payment procedure (also see subpart 9.1).
Priced or unpriced contracts, purchase orders, or BPAs using the fast payment procedure shall include the following:
(a) A requirement that the supplies be shipped transportation or postage prepaid.
(b) A requirement that invoices be submitted directly to the finance or other office designated in the order, or in the case of unpriced purchase orders, to the contracting officer (see 13.302-2(c)).
(c) The following statement on the consignee's copy:
The contracting officer shall insert the clause at 52.213-1, Fast Payment Procedure, in solicitations and contracts when the conditions in 13.402 are applicable and it is intended that the fast payment procedure be used in the contract (in the case of BPAs, the contracting officer may elect to insert the clause either in the BPA or in orders under the BPA).
(a) This subpart authorizes, as a test program, use of simplified procedures for the acquisition of supplies and services in amounts greater than the simplified acquisition threshold but not exceeding $5 million ($10 million for acquisitions as described in 13.500(e)), including options, if the contracting officer reasonably expects, based on the nature of the supplies or services sought, and on market research, that offers will include only commercial items. Under this test program, contracting officers may use any simplified acquisition procedure in this part, subject to any specific dollar limitation applicable to the particular procedure. The purpose of this test program is to vest contracting officers with additional procedural discretion and flexibility, so that commercial item acquisitions in this dollar range may be solicited, offered, evaluated, and awarded in a simplified manner that maximizes efficiency and economy and minimizes burden and administrative costs for both the Government and industry (10 U.S.C. 2304(g) and 2305 and 41 U.S.C. 253(g) and 253a and 253b).
(b) For the period of this test, contracting activities must employ the simplified procedures authorized by the test to the maximum extent practicable.
(c) When acquiring commercial items using the procedures in this part, the requirements of part 12 apply subject to the order of precedence provided at 12.102(c). This includes use of the provisions and clauses in subpart 12.3.
(d) The authority to issue solicitations under this subpart expires on January 1, 2008. Contracting officers may award contracts after the expiration of this authority for solicitations issued before the expiration of the authority.
(e) Under 41 U.S.C. 428a, the simplified acquisition procedures authorized by this test program may be used for acquisitions that do not exceed $10 million when—
(1) The acquisition is for commercial items that, as determined by the head of the agency, are to be used in support of a contingency operation or to facilitate the defense against or recovery from nuclear, biological, chemical, or radiological attack; or
(2) The acquisition will be treated as an acquisition of commercial items in accordance with 12.102(f)(1).
(a)
(i) Conduct sole source acquisitions, as defined in 2.101, under this subpart only if the need to do so is justified in writing and approved at the levels specified in paragraph (a)(2) of this section; and
(ii) Prepare sole source justifications using the format at 6.303-2, modified to reflect an acquisition under the authority of the test program for commercial items (section 4202 of the Clinger-Cohen Act of 1996) or the authority of the Services Acquisition Reform Act of 2003 (41 U.S.C. 428a).
(2) Justifications and approvals are required under this subpart only for sole source acquisitions.
(i) For a proposed contract exceeding $100,000, but not exceeding $500,000, the contracting officer's certification that the justification is accurate and complete to the best of the contracting officer's knowledge and belief will serve as approval, unless a higher approval level is established in accordance with agency procedures.
(ii) For a proposed contract exceeding $500,000 but not exceeding $10,000,000, the competition advocate for the procuring activity, designated pursuant to 6.501, or an official described in 6.304(a)(3) or (a)(4) must approve the justification and approval. This authority is not delegable.
(iii) For a proposed contract exceeding $10,000,000 but not exceeding $50,000,000 or, for DoD, NASA, and the Coast Guard, not exceeding $75,000,000, the head of the procuring activity or the official described in 6.304(a)(3) or (a)(4) must approve the justification and approval. This authority is not delegable.
(iv) For a proposed contract exceeding $50,000,000 or, for DoD, NASA, and the Coast Guard, $75,000,000, the official described in 6.304(a)(4) must approve the justification and approval. This authority is not delegable except as provided in 6.304(a)(4).
(b)
(1) A brief written description of the procedures used in awarding the contract, including the fact that the test procedures in FAR subpart 13.5 were used;
(2) The number of offers received;
(3) An explanation, tailored to the size and complexity of the acquisition, of the basis for the contract award decision; and
(4) Any justification approved under paragraph (a) of this section.
40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c).
This part prescribes (a) the basic requirements of contracting for supplies and services (including construction) by sealed bidding, (b) the information to be included in the solicitation (invitation for bids), (c) procedures concerning the submission of bids, (d) requirements for opening and evaluating bids and awarding contracts, and (e) procedures for two-step sealed bidding.
Sealed bidding is a method of contracting that employs competitive bids, public opening of bids, and awards. The following steps are involved:
(a)
(b)
(c)
(d)
(e)
(a) Sealed bidding shall be used whenever the conditions in 6.401(a) are met. This requirement applies to any proposed contract action under part 6.
(b) Sealed bidding may be used for classified acquisitions if its use does not violate agency security requirements.
(c) The policy for pricing modifications of sealed bid contracts appears in 15.403-4(a)(1)(iii).
No awards shall be made as a result of sealed bidding unless—
(a) Bids have been solicited as required by subpart 14.2;
(b) Bids have been submitted as required by subpart 14.3;
(c) The requirements of 1.602-1(b) and part 6 have been met; and
(d) An award is made to the responsible bidder (see 9.1) whose bid is responsive to the terms of the invitation for bids and is most advantageous to the Government, considering only price and the price-related factors included in the invitation, as provided in subpart 14.4.
Firm-fixed-price contracts shall be used when the method of contracting is sealed bidding, except that fixed-price contracts with economic price adjustment clauses may be used if authorized in accordance with 16.203 when some flexibility is necessary and feasible. Such clauses must afford all bidders an equal opportunity to bid.
See 15.201(e).
(a) Contracting officers shall prepare invitations for bids and contracts using the uniform contract format outlined in Table 14-1 to the maximum practicable extent. The use of the format facilitates preparation of the solicitation and contract as well as reference to, and use of, those documents by bidders and contractors. It need not be used for acquisition of the following:
(1) Construction (see part 36).
(2) Shipbuilding (including design, construction, and conversion), ship overhaul, and ship repair.
(3) Subsistence items.
(4) Supplies or services requiring special contract forms prescribed elsewhere in this regulation that are inconsistent with the uniform contract format.
(5) Firm-fixed-price or fixed-price with economic price adjustment acquisitions that use the simplified contract format (see 14.201-9).
(b) Information suitable for inclusion in invitations for bids under the uniform contract format shall also be included in invitations for bids not subject to that format if applicable.
(c) Solicitations to which the uniform contract format applies shall include Parts I, II, III, and IV. If any section of the uniform contract format does not apply, the contracting officer should so mark that section in the solicitation. Upon award, the contracting officer shall not physically include Part IV in the resulting contract, but shall retain it in the contract file. Award by acceptance of a bid on the award portion of Standard Form 33, Solicitation Offer and Award (SF 33), Standard Form 26, Award/Contract (SF 26), or Standard Form 1447, Solicitation/Contract (SF 1447), incorporates Section K, Representations, certifications, and other statements of bidders, in the resultant contract even though not physically attached.
The contracting officer shall prepare the Schedule as follows:
(a)
(2) When the SF 33 or SF 1447 is not used, include the following on the first page of the invitation for bids:
(i) Name, address, and location of issuing activity, including room and building where bids must be submitted.
(ii) Invitation for bids number.
(iii) Date of issuance.
(iv) Time specified for receipt of bids.
(v) Number of pages.
(vi) Requisition or other purchase authority.
(vii) Requirement for bidder to provide its name and complete address, including street, city, county, State, and ZIP code.
(viii) A statement that bidders should include in the bid the address to which payment should be mailed, if that address is different from that of the bidder.
(b)
(c)
(d)
(e)
(f)
(g)
(h)
The contracting officer shall prepare the representations and instructions as follows:
(a)
(b)
(c)
(a) The provisions prescribed in this subsection apply to preparation and submission of bids in general. See other FAR parts for provisions and clauses related to specific acquisition requirements.
(b) Insert in all invitations for bids the provisions at—
(1) 52.214-3, Amendments to Invitations for Bids; and
(2) 52.214-4, False Statements in Bids.
(c) Insert the following provisions in invitations for bids:
(1) 52.214-5, Submission of Bids.
(2) 52.214-6, Explanation to Prospective Bidders.
(3) 52.214-7, Late Submissions, Modifications, and Withdrawals of Bids.
(d) [Reserved]
(e) Insert in all invitations for bids, except those for construction, the provision at 52.214-10, Contract Award-Sealed Bidding.
(f) Insert in invitations for bids to which the uniform contract format applies, the provision at 52.214-12, Preparation of Bids.
(g)(1) Insert the provision at 52.214-13, Telegraphic Bids, in invitations for bids if the contracting officer decides to authorize telegraphic bids.
(2) Use the provision with its Alternate I in invitations for bids that are for perishable subsistence, and when the contracting officer considers that offerors will be unwilling to provide acceptance periods long enough to allow written confirmation.
(h) Insert the provision at 52.214-14, Place of Performance—Sealed Bidding, in invitations for bids except those in which the place of performance is specified by the Government.
(i) Insert the provision at 52.214-15, Period for Acceptance of Bids, in invitations for bids (IFB's) that are not issued on SF 33 or SF 1447 except IFB's (1) for construction work or (2) in which the Government specifies a minimum acceptance period.
(j) Insert the provision at 52.214-16, Minimum Bid Acceptance Period, in invitations for bids, except for construction, if the contracting officer determines that a minimum acceptance period must be specified.
(k) [Reserved]
(l) Insert the provision at 52.214-18, Preparation of Bids—Construction, in invitations for bids for construction work.
(m) Insert the provision at 52.214-19, Contract Award—Sealed Bidding—Construction, in all invitations for bids for construction work.
(n) [Reserved]
(o)(1) Insert the provision at 52.214-20, Bid Samples, in invitations for bids if bid samples are required.
(2) If it appears that the conditions in 14.202-4(e)(1) will apply and the contracting officer anticipates granting waivers and—
(i) If the nature of the required product does not necessitate limiting the grant of a waiver to a product produced at the same plant in which the product previously acquired or tested was produced, use the provision with its Alternate I; or
(ii) If the nature of the required product necessitates limiting the grant of a waiver to a product produced at the same plant in which the product previously acquired or tested was produced, use the provision with its Alternate II.
(3) See 14.202-4(e)(2) regarding waiving the requirement for all bidders.
(p)(1) Insert the provision at 52.214-21, Descriptive Literature, in invitations for bids if (i) descriptive literature is required to evaluate the technical acceptability of an offered product and (ii) the required information will not be readily available unless it is submitted by bidders.
(2) Use the basic clause with its Alternate I if the possibility exists that the contracting officer may waive the requirement for furnishing descriptive literature for a bidder offering a previously supplied product that meets specification requirements of the current solicitation.
(3) See 14.202-5(d)(2) regarding waiving the requirement for all bidders.
(q) Insert the provision at 52.214-22, Evaluation of Bids for Multiple Awards, in invitations for bids if the contracting officer determines that multiple awards might be made if doing so is economically advantageous to the Government.
(r) Insert the provision at 52.214-23, Late Submissions, Modifications, Revisions, and Withdrawals of Technical Proposals under Two-Step Sealed Bidding, in solicitations for technical proposals in step one of two-step sealed bidding.
(s) Insert the provision at 52.214-24, Multiple Technical Proposals, in solicitations for technical proposals in step one of two-step sealed bidding if the contracting officer permits the submission of multiple technical proposals.
(t) Insert the provision at 52.214-25, Step Two of Two-Step Sealed Bidding, in invitations for bids issued under step two of two-step sealed bidding.
(u)[Reserved]
(v) Insert the provision at 52.214-31, Facsimile Bids, in solicitations if facsimile bids are authorized (see 14.202-7).
(w) Insert the provision at 52.214-34, Submission of Offers in the English Language, in solicitations that include any of the clauses prescribed in 25.1101 or 25.1102. It may be included in other solicitations when the contracting officer decides that it is necessary.
(x) Insert the provision at 52.214-35, Submission of Offers in U.S. Currency, in solicitations that include any of the clauses prescribed in 25.1101 or 25.1102, unless the contracting officer includes the clause at 52.225-17, Evaluation of Foreign Currency Offers, as prescribed in 25.1103(d). It may be included in other solicitations when the contracting officer decides that it is necessary.
(a) When contracting by sealed bidding, the contracting officer shall insert the clause at 52.214-26, Audit and Records—Sealed Bidding, in solicitations and contracts if the contract amount is expected to exceed the threshold at 15.403-4(a)(1) for submission of cost or pricing data.
(b)(1) When contracting by sealed bidding, the contracting officer shall insert the clause at 52.214-27, Price Reduction for Defective Cost or Pricing Data—Modifications—Sealed Bidding, in solicitations and contracts if the contract amount is expected to exceed the threshold for submission of cost or pricing data at 15.403-4(a)(1).
(2) In exceptional cases, the head of the contracting activity may waive the requirement for inclusion of the clause in a contract with a foreign government or agency of that government. The authorizations for the waiver and the reasons for granting it shall be in writing.
(c)(1) When contracting by sealed bidding, the contracting officer shall insert the clause at 52.214-28, Subcontractor Cost or Pricing Data—Modifications—Sealed Bidding, in solicitations and contracts if the contract amount is expected to exceed the threshold for submission of cost or pricing data at 15.403-4(a)(1).
(2) In exceptional cases, the head of the contracting activity may waive the requirement for inclusion of the clause in a contract with a foreign government or agency of that government. The authorizations for the waiver and the reasons for granting it shall be in writing.
(d) When contracting by sealed bidding, the contracting officer shall insert the clause at 52.214-29, Order of Precedence—Sealed Bidding, in solicitations and contracts to which the uniform contract format applies.
The factors set forth in paragraphs (a) through (e) below may be applicable in evaluation of bids for award and shall be included in the solicitation when applicable. (See 14.201-5(c).)
(a) Foreseeable costs or delays to the Government resulting from such factors as differences in inspection, locations of supplies, and transportation. If bids are on an f.o.b. origin basis (see 47.303 and 47.305), transportation costs to the designated points shall be considered in determining the lowest cost to the Government.
(b) Changes made, or requested by the bidder, in any of the provisions of the invitation for bids, if the change does not constitute a ground for rejection under 14.404.
(c) Advantages or disadvantages to the Government that might result from making more than one award (see 14.201-6(q)). The contracting officer shall assume, for the purpose of making multiple awards, that $500 would be the administrative cost to the Government for issuing and administering each contract awarded under a solicitation. Individual awards shall be for the items or combinations of items that result in the lowest aggregate cost to the
(d) Federal, State, and local taxes (see part 29).
(e) Origin of supplies, and, if foreign, the application of the Buy American Act or any other prohibition on foreign purchases (see part 25).
(a)
(b)
(1) Contract line item number.
(2) Description of supplies or services, or data sufficient to identify the requirement.
(3) Quantity and unit of issue.
(4) Unit price and amount.
(5) Packaging and marking requirements.
(6) Inspection and acceptance, quality assurance, and reliability requirements.
(7) Place of delivery, performance and delivery dates, period of performance, and f.o.b. point.
(8) Other item-peculiar information as necessary (e.g., individual fund citations).
(c)
(d)
(e)
(2)
(3)
(4) Upon award, the contracting officer need not physically include the provisions in subparagraphs (e)(1), (2), and (3) of this subsection in the resulting contract, but shall retain them in the contract file. Award by acceptance of a bid on the award portion of SF 1447 incorporates the representations, certifications, and other statements of bidders in the resultant contract even though not physically attached.
(a)
(b)
(a) Telegraphic bids and mailgrams shall be authorized only when—
(1) The date for the opening of bids will not allow bidders sufficient time to submit bids in the prescribed format; or
(2) Prices are subject to frequent changes.
(b) If telegraphic bids are to be authorized, see 14.201-6(g). Unauthorized telegraphic bids shall not be considered (see 14.301(b)).
(a) Postage or envelopes bearing
(b) To provide for ready identification and proper handling of bids, Optional Form 17, Offer Label, may be furnished with each bid set. The form may be obtained from the General Services Administration (see 53.107).
(a)
(2) Bid samples will be used only to determine the responsiveness of the bid and will not be used to determine a bidder's ability to produce the required items.
(3) Bid samples may be examined for any required characteristic, whether or not such characteristic is adequately described in the specification, if listed in accordance with subdivision (e)(1)(ii) below.
(4) Bids will be rejected as nonresponsive if the sample fails to conform to each of the characteristics listed in the invitation.
(b)
(c)
(d)
(i) State the number and, if appropriate, the size of the samples to be submitted and otherwise fully describe the samples required; and
(ii) List all the characteristics for which the samples will be examined.
(2) If bid samples are required, see 14.201-6(o).
(e)
(2) Where samples required by a Federal, Military, or other formal specification are not considered necessary and a waiver of the sample requirements of the specification has been authorized, a statement shall be included in the invitation that notwithstanding the requirements of the specification, samples will not be required.
(f)
(g)
(2) Disposition instructions shall be requested from bidders and samples disposed of accordingly.
(3) Samples ordinarily will be returned collect to the address from which received if disposition instructions are not received within 30 days. Small items may be returned by mail, postage prepaid.
(4) Samples that are to be retained for inspection purposes in connection with deliveries shall be transmitted to the inspecting activity concerned, with instructions to retain the sample until completion of the contract or until disposition instructions are furnished.
(5) Where samples are consumed or their usefulness is impaired by tests, they will be disposed of as scrap unless the bidder requests their return.
(a)
(b)
(c)
(i) What descriptive literature the bidders must furnish;
(ii) The purpose for requiring the literature;
(iii) The extent of its consideration in the evaluation of bids; and
(iv) The rules that will apply if a bidder fails to furnish the literature before bid opening or if the literature provided does not comply with the requirements of the invitation.
(2) If bidders must furnish descriptive literature, see 14.201-6(p).
(d)
(i) The bidder states in the bid that the product being offered is the same as a product previously or currently being furnished to the contracting activity; and
(ii) The contracting officer determines that the product offered by the bidder complies with the specification requirements of the current invitation for bids. When the contracting officer waives the requirement, see 14.201-6(p)(2).
(2) When descriptive literature is not necessary and a waiver of literature requirements of a specification has been authorized, the contracting officer must include a statement in the invitation that, despite the requirements of the specifications, descriptive literature will not be required.
(3) If the solicitation provides for a waiver, a bidder may submit a bid on the basis of either the descriptive literature furnished with the bid or a previously furnished product. If the bid is submitted on one basis, the bidder may not have it considered on the other basis after bids are opened.
(e)
Each invitation for bids shall be thoroughly reviewed before issuance to detect and correct discrepancies or ambiguities that could limit competition or result in the receipt of nonresponsive bids. Contracting officers are responsible for the reviews.
(a) Unless prohibited or otherwise restricted by agency procedures, contracting officers may authorize facsimile bids (see 14.201-6(v)). In determining whether or not to authorize facsimile bids, the contracting officer shall consider factors such as—
(1) Anticipated bid size and volume;
(2) Urgency of the requirement;
(3) Frequency of price changes;
(4) Availability, reliability, speed, and capacity of the receiving facsimile equipment; and
(5) Adequacy of administrative procedures and controls for receiving, identifying, recording, and safeguarding facsimile bids, and ensuring their timely delivery to the bids opening location.
(b) If facsimile bids are authorized, contracting officers may, after the date set for bid opening, request the apparently successful offeror to provide the complete original signed bid.
In accordance with subpart 4.5, contracting officers may authorize use of electronic commerce for submission of bids. If electronic bids are authorized, the solicitation shall specify the electronic commerce method(s) that bidders may use.
Invitations for bids or presolicitation notices must be provided in accordance with 5.102. When a contracting office is located in the United States, any solicitation sent to a prospective bidder located outside the United States shall be sent by electronic data interchange or air mail if security classification permits.
(a) Procedures concerning display of invitations for bids in a public place, information releases to newspapers and trade journals, paid advertisements, and synopsizing through the Governmentwide point of entry (GPE) are set forth in 5.101 and Subpart 5.2.
(b) For procedures that apply to publicizing notices through the GPE to determine whether commercial sources are available, as prescribed by OMB Circular A-76, see 5.205(e) and 7.303(b).
The master solicitation is provided to potential sources who are requested to retain it for continued and repetitive use. Individual solicitations must reference the date of the current master solicitation and identify any changes. The contracting officer must—
(a) Make available copies of the master solicitation on request; and
(b) Provide the cognizant contract administration activity a current copy of the master solicitation.
(a) Each contracting office shall retain a record of each invitation that it issues and each abstract or record of bids. Contracting officers shall review and utilize the information available in connection with subsequent acquisitions of the same or similar items.
(b) The file for each invitation shall show the distribution that was made and the date the invitation was issued. The names and addresses of prospective bidders who requested the invitation and were not included on the original solicitation list shall be added to the list and made a part of the record.
In lieu of initially forwarding complete bid sets, the contracting officer may send presolicitation notices to concerns. The notice shall—
(a) Specify the final date for receipt of requests for a complete bid set;
(b) Briefly describe the requirement and furnish other essential information to enable concerns to determine whether they have an interest in the invitation; and
(c) Normally not include drawings, plans, and specifications. The return date of the notice must be sufficiently in advance of the mailing date of the invitation for bids to permit an accurate estimate of the number of bid sets required. Bid sets shall be sent to concerns that request them in response to the notice.
A pre-bid conference may be used, generally in a complex acquisition, as a means of briefing prospective bidders and explaining complicated specifications and requirements to them as early as possible after the invitation has been issued and before the bids are opened. It shall never be used as a substitute for amending a defective or ambiguous invitation. The conference shall be conducted in accordance with the procedure prescribed in 15.201.
(a) If it becomes necessary to make changes in quantity, specifications, delivery schedules, opening dates, etc., or to correct a defective or ambiguous invitation, such changes shall be accomplished by amendment of the invitation for bids using Standard Form 30, Amendment of Solicitation/Modification of Contract. The fact that a change was mentioned at a pre-bid conference does not relieve the necessity for issuing an amendment. Amendments shall be sent, before the time for bid opening, to everyone to whom invitations have been furnished and shall be displayed in the bid room.
(b) Before amending an invitation for bids, the period of time remaining until bid opening and the need to extend this period shall be considered. When only a short time remains before the time set for bid opening, consideration should be given to notifying bidders of an extension of time by telegrams or telephone. Such extension must be confirmed in the amendment.
(c) Any information given to a prospective bidder concerning an invitation for bids shall be furnished promptly to all other prospective bidders as an amendment to the invitation (1) if such information is necessary for bidders to submit bids or (2) if the lack of such information would be prejudicial to uninformed bidders. The information shall be furnished even though a pre-bid conference is held. No award shall be made on the invitation unless such amendment has been issued in sufficient time to permit all prospective bidders to consider such information in submitting or modifying their bids.
(a) The cancellation of an invitation for bids usually involves a loss of time, effort, and money spent by the Government and bidders. Invitations should not be cancelled unless cancellation is clearly in the public interest; e.g., (1) where there is no longer a requirement for the supplies or services or (2) where amendments to the invitation would be of such magnitude that a new invitation is desirable.
(b) When an invitation issued other than electronically is cancelled, bids that have been received shall be returned unopened to the bidders and notice of cancellation shall be sent to all prospective bidders to whom invitations were issued. When an invitation issued electronically is cancelled, a general notice of cancellation shall be posted electronically, the bids received shall not be viewed, and the bids shall be purged from primary and backup data storage systems.
(c) The notice of cancellation shall (1) identify the invitation for bids by number and short title or subject matter, (2) briefly explain the reason the invitation is being cancelled, and (3) where appropriate, assure prospective bidders that they will be given an opportunity to bid on any resolicitation of bids or any future requirements for the type of supplies or services involved. Cancellations shall be recorded in accordance with 14.403(d).
See subpart 9.2.
(a)
(b)
Contracting officers shall comply with the economic purchase quantity planning requirements for supplies in subpart 7.2. See 7.203 for instructions regarding use of the provision at 52.207-4, Economic Purchase Quantity—Supplies, and 7.204 for guidance on handling responses to that provision.
(a) To be considered for award, a bid must comply in all material respects with the invitation for bids. Such compliance enables bidders to stand on an equal footing and maintain the integrity of the sealed bidding system.
(b) Telegraphic bids shall not be considered unless permitted by the invitation. The term
(c) Facsimile bids shall not be considered unless permitted by the solicitation (see 14.202-7).
(d) Bids should be filled out, executed, and submitted in accordance with the instructions in the invitation. If a bidder uses its own bid form or a letter to submit a bid, the bid may be considered only if (1) the bidder accepts all the terms and conditions of the invitation and (2) award on the bid would result in a binding contract with terms and conditions that do not vary from the terms and conditions of the invitation.
(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.
(a) Bids shall be submitted so that they will be received in the office designated in the invitation for bids (referred to in paragraphs (b) and (c) below as the
(b) Except as specified in paragraph (c) below, if telegraphic bids are authorized, a telegraphic bid that is communicated by means of a telephone call
(1) Agency regulations authorize such consideration;
(2) The telephone call is made by the telegraph office that received the telegraphic bid;
(3) The telephone call is received by the designated office not later than the time set for the bid opening;
(4) The telegraph office that received the telegraphic bid sends the designated office the telegram that formed the basis for the telephone call;
(5) The telegram indicates on its face that it was received in the telegraph office before the telephone call was received by the designated office; and
(6) The bid in the telegram is identical in all essential respects to the bid received in the telephone call from the telegraph office.
(c) If the conditions in paragraph (b) above apply and the bid received by telephone is the apparent low bid, award may not be made until the telegram is received by the designated office; however, if the telegram is not received by the designated office within 5 days after the bid opening date, the bid shall be rejected.
(a) Bids may be modified or withdrawn by any method authorized by the solicitation, if notice is received in the office designated in the solicitation not later than the exact time set for opening of bids. Unless proscribed by agency regulations, a telegraphic modification or withdrawal of a bid received in such office by telephone from the receiving telegraph office shall be considered. However, the message shall be confirmed by the telegraph company by sending a copy of the written telegram that formed the basis for the telephone call. If the solicitation authorizes facsimile bids, bids may be modified or withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision prescribed in 14.201-6(v). Modifications received by telephone (including a record of those telephoned by the telegraph company) or facsimile shall be sealed in an envelope by a proper official. The official shall write on the envelope (1) the date and time of receipt and by whom, and (2) the number of the invitation for bids, and shall sign the envelope. No information contained in the envelope shall be disclosed before the time set for bid opening.
(b) A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for opening of bids, the identity of the persons requesting withdrawal is established and that person signs a receipt for the bid.
(c) Upon withdrawal of an electronically transmitted bid, the data received shall not be viewed and shall be purged from primary and backup data storage systems.
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bid (IFB) by the time specified in the IFB. They may use any transmission method authorized by the IFB (
(b)(1) Any bid, modification, or withdrawal of a bid received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late bid would not unduly delay the acquisition; and—
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for
(2) However, a late modification of an otherwise successful bid, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB, and urgent Government requirements preclude amendment of the bid opening date, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the IFB on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid. Upon withdrawal of an electronically transmitted bid, the data received must not be viewed and, where practicable, must be purged from primary and backup data storage systems.
(f) The contracting officer must promptly notify any bidder if its bid, modification, or withdrawal was received late, and must inform the bidder whether its bid will be considered, unless contract award is imminent and the notices prescribed in 14.409 would suffice.
(g) Late bids and modifications that are not considered must be held unopened, unless opened for identification, until after award and then retained with other unsuccessful bids. However, any bid bond or guarantee must be returned.
(h) If available, the following must be included in the contract files for each late bid, modification, or withdrawal:
(1) The date and hour of receipt.
(2) A statement, with supporting rationale, regarding whether the bid was considered for award.
(3) The envelope, wrapper, or other evidence of the date of receipt.
This subpart contains procedures for the receipt, handling, opening, and disposition of bids including mistakes in bids, and subsequent award of contracts.
(a) All bids (including modifications) received before the time set for the opening of bids shall be kept secure. Except as provided in paragraph (b) of this section, the bids shall not be opened or viewed, and shall remain in a locked bid box, a safe, or in a secured, restricted-access electronic bid box. If an invitation for bids is cancelled, bids shall be returned to the bidders. Necessary precautions shall be taken to ensure the security of the bid box or safe. Before bid opening, information concerning the identity and number of bids received shall be made available only to Government employees. Such disclosure shall be only on a
(b) Envelopes marked as bids but not identifying the bidder or the solicitation may be opened solely for the purpose of identification, and then only by an official designated for this purpose.
(a) The bid opening officer shall decide when the time set for opening bids has arrived and shall inform those present of that decision. The officer shall then (1) personally and publicly open all bids received before that time, (2) if practical, read the bids aloud to the persons present, and (3) have the bids recorded. The original of each bid shall be carefully safeguarded, particularly until the abstract of bids required by 14.403 has been made and its accuracy verified.
(b) Performance of the procedure in paragraph (a) above may be delegated to an assistant, but the bid opening officer remains fully responsible for the actions of the assistant.
(c) Examination of bids by interested persons shall be permitted if it does not interfere unduly with the conduct of Government business. Original bids shall not be allowed to pass out of the hands of a Government official unless a duplicate bid is not available for public inspection. The original bid may be examined by the public only under the immediate supervision of a Government official and under conditions that preclude possibility of a substitution, addition, deletion, or alteration in the bid.
The general public may not attend bid openings for classified acquisitions. A bidder or its representative may attend and record the results if the individual has the appropriate security clearance. The contracting officer also may make the bids available at a later time to properly cleared individuals who represent bidders. No public record shall be made of bids or bid prices received in response to classified invitations for bids.
(a) A bid opening may be postponed even after the time scheduled for bid opening (but otherwise in accordance with 14.208) and—
(1) The contracting officer has reason to believe that the bids of an important segment of bidders have been delayed in the mails, or in the communications system specified for transmission of bids, for causes beyond their control and without their fault or negligence (e.g., flood, fire, accident, weather conditions, strikes, or Government equipment blackout or malfunction when bids are due); or
(2) Emergency or unanticipated events interrupt normal governmental processes so that the conduct of bid openings as scheduled is impractical.
(b) At the time of a determination to postpone a bid opening under subparagraph (a)(1) above, an announcement of the determination shall be publicly posted. If practical before issuance of a formal amendment of the invitation, the determination shall be otherwise communicated to prospective bidders who are likely to attend the scheduled bid opening.
(c) In the case of paragraph (a)(2) of this section, and when urgent Government requirements preclude amendment of the solicitation as prescribed in 14.208, the time specified for opening of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume. In such cases, the time of actual bid opening shall be deemed to be the time set for bid opening for the purpose of determining “late bids” under 14.304. A note should be made on the abstract of bids or otherwise added to the file explaining the circumstances of the postponement.
(a) Standard Form 1409, Abstract of Offers, or Optional Form 1419, Abstract of Offers—Construction (or automated equivalent), shall be completed and certified as to its accuracy by the bid opening officer as soon after bid opening as practicable. Where bid items are too numerous to warrant complete recording of all bids, abstract entries for individual bids may be limited to item numbers and bid prices. In preparing these forms, the extra columns and SF 1410, Abstract of Offers—Continuation, and OF 1419A, Abstract of Offers—Construction, Continuation Sheet, may be used to label and record such information as the contracting activity deems necessary.
(b) Abstracts of offers for unclassified acquisitions shall be available for public inspection. Such abstracts shall not contain information regarding failure to meet minimum standards of responsibility, apparent collusion of bidders, or other notations properly exempt from disclosure to the public in accordance with agency regulations implementing subpart 24.2.
(c) The forms identified in paragraph (a) of this section need not be used by the Defense Energy Support Center for acquisitions of coal or petroleum products or by the Defense Supply Center Philadelphia for perishable subsistence items.
(d) If an invitation for bids is cancelled before the time set for bid opening, this fact shall be recorded together with a statement of the number of bids invited and the number of bids received.
(a)(1) Preservation of the integrity of the competitive bid system dictates that, after bids have been opened, award must be made to that responsible bidder who submitted the lowest responsive bid, unless there is a compelling reason to reject all bids and cancel the invitation.
(2) Every effort shall be made to anticipate changes in a requirement before the date of opening and to notify all prospective bidders of any resulting modification or cancellation. This will permit bidders to change their bids and prevent unnecessary exposure of bid prices.
(3) As a general rule, after the opening of bids, an invitation should not be cancelled and resolicited due solely to increased requirements for the items being acquired. Award should be made on the initial invitation for bids and the additional quantity should be treated as a new acquisition.
(b) When it is determined before award but after opening that the requirements of 11.201 (relating to the availability and identification of specifications) have not been met, the invitation shall be cancelled.
(c) Invitations may be cancelled and all bids rejected before award but after opening when, consistent with paragraph (a)(1) above, the agency head determines in writing that—
(1) Inadequate or ambiguous specifications were cited in the invitation;
(2) Specifications have been revised;
(3) The supplies or services being contracted for are no longer required;
(4) The invitation did not provide for consideration of all factors of cost to the Government, such as cost of transporting Government-furnished property to bidders' plants;
(5) Bids received indicate that the needs of the Government can be satisfied by a less expensive article differing from that for which the bids were invited;
(6) All otherwise acceptable bids received are at unreasonable prices, or only one bid is received and the contracting officer cannot determine the reasonableness of the bid price;
(7) The bids were not independently arrived at in open competition, were collusive, or were submitted in bad faith (see subpart 3.3 for reports to be made to the Department of Justice);
(8) No responsive bid has been received from a responsible bidder.
(9) A cost comparison as prescribed in OMB Circular A-76 and subpart 7.3 shows that performance by the Government is more economical; or
(10) For other reasons, cancellation is clearly in the public's interest.
(d) Should administrative difficulties be encountered after bid opening that may delay award beyond bidders' acceptance periods, the several lowest bidders whose bids have not expired (irrespective of the acceptance period specified in the bid) should be requested, before expiration of their bids, to extend in writing the bid acceptance period (with consent of sureties, if any) in order to avoid the need for resoliciting.
(e) Under some circumstances, completion of the acquisition after cancellation of the invitation for bids may be appropriate.
(1) If the invitation for bids has been cancelled for the reasons specified in subparagraphs (c) (6), (7), or (8) of this subsection, and the agency head has authorized, in the determination in paragraph (c) of this subsection, the completion of the acquisition through negotiation, the contracting officer shall proceed in accordance with paragraph (f) of this subsection.
(2) If the invitation for bids has been cancelled for the reasons specified in subparagraphs (c) (1), (2), (4), (5), or (10) of this subsection, or for the reasons in subparagraphs (c) (6), (7), or (8) of this subsection and completion through negotiation is not authorized under subparagraph (e)(1) of this subsection, the contracting officer shall proceed with a new acquisition.
(f) When the agency head has determined, in accordance with paragraph (e)(1) of this subsection, that an invitation for bids should be canceled and that use of negotiation is in the Government's interest, the contracting officer may negotiate (in accordance with part 15, as appropriate) and make award without issuing a new solicitation provided—
(1) Each responsible bidder in the sealed bid acquisition has been given notice that negotiations will be conducted and has been given an opportunity to participate in negotiations; and
(2) The award is made to the responsible bidder offering the lowest negotiated price.
(a) Any bid that fails to conform to the essential requirements of the invitation for bids shall be rejected.
(b) Any bid that does not conform to the applicable specifications shall be rejected unless the invitation authorized the submission of alternate bids and the supplies offered as alternates meet the requirements specified in the invitation.
(c) Any bid that fails to conform to the delivery schedule or permissible alternates stated in the invitation shall be rejected.
(d) A bid shall be rejected when the bidder imposes conditions that would modify requirements of the invitation or limit the bidder's liability to the Government, since to allow the bidder to impose such conditions would be prejudicial to other bidders. For example, bids shall be rejected in which the bidder—
(1) Protects against future changes in conditions, such as increased costs, if total possible costs to the Government cannot be determined;
(2) Fails to state a price and indicates that price shall be
(3) States a price but qualifies it as being subject to
(4) When not authorized by the invitation, conditions or qualifies a bid by stipulating that it is to be considered only if, before date of award, the bidder receives (or does not receive) award under a separate solicitation;
(5) Requires that the Government is to determine that the bidder's product meets applicable Government specifications; or
(6) Limits rights of the Government under any contract clause.
(e) A low bidder may be requested to delete objectionable conditions from a bid provided the conditions do not go to the substance, as distinguished from
(f) Any bid may be rejected if the contracting officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the bid, but the prices for individual line items as well.
(g) Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (see 15.404-1(g)).
(h) Bids received from any person or concern that is suspended, debarred, proposed for debarment, or declared ineligible as of the bid opening date shall be rejected unless a compelling reason determination is made (see subpart 9.4).
(i) Low bids received from concerns determined to be not responsible pursuant to subpart 9.1 shall be rejected (but if a bidder is a small business concern, see 19.6 with respect to certificates of competency).
(j) When a bid guarantee is required and a bidder fails to furnish the guarantee in accordance with the requirements of the invitation for bids, the bid shall be rejected, except as otherwise provided in 28.101-4.
(k) The originals of all rejected bids, and any written findings with respect to such rejections, shall be preserved with the papers relating to the acquisition.
(l) After submitting a bid, if all of a bidder's assets or that part related to the bid are transferred during the period between the bid opening and the award, the transferee may not be able to take over the bid. Accordingly, the contracting officer shall reject the bid unless the transfer is effected by merger, operation of law, or other means not barred by 41 U.S.C. 15 or 31 U.S.C. 3727.
When it is determined necessary to reject all bids, the contracting officer shall notify each bidder that all bids have been rejected and shall state the reason for such action.
When a bid is accompanied by descriptive literature (as defined in 2.101), and the bidder imposes a restriction that prevents the public disclosure of such literature, the restriction may render the bid nonresponsive. The restriction renders the bid nonresponsive if it prohibits the disclosure of sufficient information to permit competing bidders to know the essential nature and type of the products offered or those elements of the bid that relate to quantity, price, and delivery terms. The provisions of this paragraph do not apply to unsolicited descriptive literature submitted by a bidder if such literature does not qualify the bid (see 14.202-5(e)).
Unless the solicitation provides otherwise, a bid may be responsive notwithstanding that the bidder specifies that award will be accepted only on all, or a specified group, of the items. Bidders shall not be permitted to withdraw or modify
A minor informality or irregularity is one that is merely a matter of form and not of substance. It also pertains to some immaterial defect in a bid or variation of a bid from the exact requirements of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on price, quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the supplies or services being acquired. The
(a) Return the number of copies of signed bids required by the invitation;
(b) Furnish required information concerning the number of its employees;
(c) Sign its bid, but only if—
(1) The unsigned bid is accompanied by other material indicating the bidder's intention to be bound by the unsigned bid (such as the submission of a bid guarantee or a letter signed by the bidder, with the bid, referring to and clearly identifying the bid itself); or
(2) The firm submitting a bid has formally adopted or authorized, before the date set for opening of bids, the execution of documents by typewritten, printed, or stamped signature and submits evidence of such authorization and the bid carries such a signature;
(d) Acknowledge receipt of an amendment to an invitation for bids, but only if—
(1) The bid received clearly indicates that the bidder received the amendment, such as where the amendment added another item to the invitation and the bidder submitted a bid on the item; or
(2) The amendment involves only a matter of form or has either no effect or merely a negligible effect on price, quantity, quality, or delivery of the item bid upon; and
(e) Execute the representations with respect to Equal Opportunity and Affirmative Action Programs, as set forth in the clauses at 52.222-22, Previous Contracts and Compliance Reports, and 52.222-25, Affirmative Action Compliance.
If a bid received at the Government facility by electronic data interchange is unreadable to the degree that conformance to the essential requirements of the invitation for bids cannot be ascertained, the contracting officer immediately shall notify the bidder that the bid will be rejected unless the bidder provides clear and convincing evidence—
(a) Of the content of the bid as originally submitted; and
(b) That the unreadable condition of the bid was caused by Government software or hardware error, malfunction, or other Government mishandling.
After the opening of bids, contracting officers shall examine all bids for mistakes. In cases of apparent mistakes and in cases where the contracting officer has reason to believe that a mistake may have been made, the contracting officer shall request from the bidder a verification of the bid, calling attention to the suspected mistake. If the bidder alleges a mistake, the matter shall be processed in accordance with this section 14.407. Such actions shall be taken before award.
(a) Any clerical mistake, apparent on its face in the bid, may be corrected by the contracting officer before award. The contracting officer first shall obtain from the bidder a verification of the bid intended. Examples of apparent mistakes are—
(1) Obvious misplacement of a decimal point;
(2) Obviously incorrect discounts (for example, 1 percent 10 days, 2 percent 20 days, 5 percent 30 days);
(3) Obvious reversal of the price f.o.b. destination and price f.o.b. origin; and
(4) Obvious mistake in designation of unit.
(b) Correction of the bid shall be effected by attaching the verification to the original bid and a copy of the verification to the duplicate bid. Correction shall not be made on the face of the bid; however, it shall be reflected in the award document.
(c) Correction of bids submitted by electronic data interchange shall be effected by including in the electronic solicitation file the original bid, the verification request, and the bid verification.
In order to minimize delays in contract awards, administrative determinations may be made as described in this 14.407-3 in connection with mistakes in bids alleged after opening of bids and before award. The authority to permit correction of bids is limited to bids that, as submitted, are responsive to the invitation and may not be used to permit correction of bids to make them responsive. This authority is in addition to that in 14.407-2 or that may be otherwise available.
(a) If a bidder requests permission to correct a mistake and clear and convincing evidence establishes both the existence of the mistake and the bid actually intended, the agency head may make a determination permitting the bidder to correct the mistake;
(b) If (1) a bidder requests permission to withdraw a bid rather than correct it, (2) the evidence is clear and convincing both as to the existence of a mistake and as to the bid actually intended, and (3) the bid, both as uncorrected and as corrected, is the lowest received, the agency head may make a determination to correct the bid and not permit its withdrawal.
(c) If, under paragraph (a) or (b) of this subsection,
(1) The evidence of a mistake is clear and convincing only as to the mistake but not as to the intended bid, or
(2) The evidence reasonably supports the existence of a mistake but is not clear and convincing, an official above the contracting officer, unless otherwise provided by agency procedures, may make a determination permitting the bidder to withdraw the bid.
(d) If the evidence does not warrant a determination under paragraph (a), (b), or (c) above, the agency head may make a determination that the bid be neither withdrawn nor corrected.
(e) Heads of agencies may delegate their authority to make the determinations under paragraphs (a), (b), (c), and (d) of this 14.407-3 to a central authority, or a limited number of authorities as necessary, in their agencies, without power of redelegation.
(f) Each proposed determination shall have the concurrence of legal counsel within the agency concerned before issuance.
(g) Suspected or alleged mistakes in bids shall be processed as follows. A mere statement by the administrative officials that they are satisfied that an error was made is insufficient.
(1) The contracting officer shall immediately request the bidder to verify the bid. Action taken to verify bids must be sufficient to reasonably assure the contracting officer that the bid as confirmed is without error, or to elicit the allegation of a mistake by the bidder. To assure that the bidder will be put on notice of a mistake suspected by the contracting officer, the bidder should be advised as appropriate—
(i) That its bid is so much lower than the other bids or the Government's estimate as to indicate a possibility of error;
(ii) Of important or unusual characteristics of the specifications;
(iii) Of changes in requirements from previous purchases of a similar item; or
(iv) Of any other information, proper for disclosure, that leads the contracting officer to believe that there is a mistake in bid.
(2) If the bid is verified, the contracting officer shall consider the bid as originally submitted. If the time for acceptance of bids is likely to expire before a decision can be made, the contracting officer shall request all bidders whose bids may become eligible for award to extend the time for acceptance of their bids in accordance with 14.404-1(d). If the bidder whose bid is believed erroneous does not (or cannot) grant an extension of time, the bid
(3) When the bidder furnishes evidence supporting an alleged mistake, the contracting officer shall refer the case to the appropriate authority (see paragraph (e) above) together with the following data:
(i) A signed copy of the bid involved.
(ii) A copy of the invitation for bids and any specifications or drawings relevant to the alleged mistake.
(iii) An abstract or record of the bids received.
(iv) The written request by the bidder to withdraw or modify the bid, together with the bidder's written statement and supporting evidence.
(v) A written statement by the contracting officer setting forth—
(A) A description of the supplies or services involved;
(B) The expiration date of the bid in question and of the other bids submitted;
(C) Specific information as to how and when the mistake was alleged;
(D) A summary of the evidence submitted by the bidder;
(E) In the event only one bid was received, a quotation of the most recent contract price for the supplies or services involved or, in the absence of a recent comparable contract, the contracting officer's estimate of a fair price for the supplies or services;
(F) Any additional pertinent evidence; and
(G) A recommendation that either the bid be considered for award in the form submitted, or the bidder be authorized to withdraw or modify the bid.
(4) When time is of the essence because of the expiration of bids or otherwise, the contracting officer may refer the case by telegraph or telephone to the appropriate authority. Ordinarily, the contracting officer will not refer mistake in bid cases by telegraph or telephone to the appropriate authority when the determination set forth in paragraphs (a) or (b) above is applicable, since actual examination is generally necessary to determine whether the evidence presented is clear and convincing.
(5) Where the bidder fails or refuses to furnish evidence in support of a suspected or alleged mistake, the contracting officer shall consider the bid as submitted unless (i) the amount of the bid is so far out of line with the amounts of other bids received, or with the amount estimated by the agency or determined by the contracting officer to be reasonable, or (ii) there are other indications of error so clear, as to reasonably justify the conclusion that acceptance of the bid would be unfair to the bidder or to other bona fide bidders. Attempts made to obtain the information required and the action taken with respect to the bid shall be fully documented.
(h) Each agency shall maintain records of all determinations made in accordance with this subsection 14.407-3, the facts involved, and the action taken in each case. Copies of all such determinations shall be included in the file.
(i) Nothing contained in this subsection 14.407-3 prevents an agency from submitting doubtful cases to the Comptroller General for advance decision.
If a contractor's discovery and request for correction of a mistake in bid is not made until after the award, it shall be processed under the procedures of subpart 33.2 and the following:
(a) When a mistake in a contractor's bid is not discovered until after award, the mistake may be corrected by contract modification if correcting the
(b) In addition to the cases contemplated in paragraph (a) above or as otherwise authorized by law, agencies are authorized to make a determination—
(1) To rescind a contract;
(2) To reform a contract (i) to delete the items involved in the mistake or (ii) to increase the price if the contract price, as corrected, does not exceed that of the next lowest acceptable bid under the original invitation for bids; or
(3) That no change shall be made in the contract as awarded, if the evidence does not warrant a determination under subparagraphs (1) or (2) above.
(c) Determinations under subparagraphs (b)(1) and (2) above may be made only on the basis of clear and convincing evidence that a mistake in bid was made. In addition, it must be clear that the mistake was (1) mutual, or (2) if unilaterally made by the contractor, so apparent as to have charged the contracting officer with notice of the probability of the mistake.
(d) Each proposed determination shall be coordinated with legal counsel in accordance with agency procedures.
(e) Mistakes alleged or disclosed after award shall be processed as follows:
(1) The contracting officer shall request the contractor to support the alleged mistake by submission f written statements and pertinent evidence, such as (i) the contractor's file copy of the bid, (ii) the contractor's original worksheets and other data used in preparing the bid, (iii) subcontractors' and suppliers' quotations, if any, (iv) published price lists, and (v) any other evidence that will serve to establish the mistake, the manner in which the mistake occurred, and the bid actually intended.
(2) The case file concerning an alleged mistake shall contain the following:
(i) All evidence furnished by the contractor in support of the alleged mistake.
(ii) A signed statement by the contracting officer—
(A) Describing the supplies or services involved;
(B) Specifying how and when the mistake was alleged or disclosed;
(C) Summarizing the evidence submitted by the contractor and any additional evidence considered pertinent;
(D) Quoting, in cases where only one bid was received, the most recent contract price for the supplies or services involved, or in the absence of a recent comparable contract, the contracting officer's estimate of a fair price for the supplies or services and the basis for the estimate;
(E) Setting forth the contracting officer's opinion whether a bona fide mistake was made and whether the contracting officer was, or should have been, on constructive notice of the mistake before the award, together with the reasons for, or data in support of, such opinion;
(F) Setting forth the course of action with respect to the alleged mistake that the contracting officer considers proper on the basis of the evidence, and if other than a change in contract price is recommended, the manner by which the supplies or services will otherwise be acquired; and
(G) Disclosing the status of performance and payments under the contract, including contemplated performance and payments.
(iii) A signed copy of the bid involved.
(iv) A copy of the invitation for bids and any specifications or drawings relevant to the alleged mistake.
(v) An abstract of written record of the bids received.
(vi) A written request by the contractor to reform or rescind the contract, and copies of all other relevant correspondence between the contracting officer and the contractor concerning the alleged mistake.
(vii) A copy of the contract and any related change orders or supplemental agreements.
(f) Each agency shall include in the contract file a record of (1) all determinations made in accordance with
(a) The contracting officer shall make a contract award (1) by written or electronic notice, (2) within the time for acceptance specified in the bid or an extension (see 14.404-1(d)), and (3) to that responsible bidder whose bid, conforming to the invitation, will be most advantageous to the Government, considering only price and the price-related factors (see 14.201-8) included in the invitation. Award shall not be made until all required approvals have been obtained and the award otherwise conforms with 14.103-2.
(b) If less than three bids have been received, the contracting officer shall examine the situation to ascertain the reasons for the small number of responses. Award shall be made notwithstanding the limited number of bids. However, the contracting officer shall initiate, if appropriate, corrective action to increase competition in future solicitations for the same or similar items, and include a notation of such action in the records of the invitation for bids (see 14.204).
(c)(1) Award shall be made by mailing or otherwise furnishing a properly executed award document to the successful bidder.
(2) When a notice of award is issued, it shall be followed as soon as possible by the formal award.
(3) When more than one award results from any single invitation for bids, separate award documents shall be suitably numbered and executed.
(4) When an award is made to a bidder for less than all of the items that may be awarded to that bidder and additional items are being withheld for subsequent award, the award shall state that the Government may make subsequent awards on those additional items within the bid acceptance period.
(5) All provisions of the invitation for bids, including any acceptable additions or changes made by a bidder in the bid, shall be clearly and accurately set forth (either expressly or by reference) in the award document. The award is an acceptance of the bid, and the bid and the award constitute the contract.
(d)(1) Award is generally made by using the Award portion of Standard Form (SF) 33, Solicitation, Offer, and Award, or SF 1447, Solicitation/Contract (see 53.214). If an offer on an SF 33 leads to further changes, the resulting contract shall be prepared as a bilateral document on SF 26, Award/Contract.
(2) Use of the Award portion of SF 33, SF 26, or SF 1447, does not preclude the additional use of informal documents, including telegrams or electronic transmissions, as notices of awards.
(a) The contracting officer shall determine that a prospective contractor is responsible (see subpart 9.1) and that the prices offered are reasonable before awarding the contract. The price analysis techniques in 15.404-1(b) may be used as guidelines. In each case the determination shall be made in the light of all prevailing circumstances. Particular care must be taken in cases where only a single bid is received.
(b) The price analysis shall consider whether bids are materially unbalanced (see 15.404-1(g)).
(a) Prompt payment discounts shall not be considered in the evaluation of bids. However, any discount offered will form a part of the award, and will be taken by the payment center if payment is made within the discount period specified by the bidder. As an alternative to indicating a discount in conjunction with the offer, bidders may prefer to offer discounts on individual invoices.
(b) See 32.111(b)(1), which prescribes the contract clause at 52.232-8, Discounts for Prompt Payment.
(a)
(1) When a solicitation does not contain an economic price adjustment clause but a bidder proposes one with a ceiling that the price will not exceed, the bid shall be evaluated on the basis of the maximum possible economic price adjustment of the quoted base price.
(2) If the bid is eligible for award, the contracting officer shall request the bidder to agree to the inclusion in the award of an approved economic price adjustment clause (see 16.203) that is subject to the same ceiling. If the bidder will not agree to an approved clause, the award may be made on the basis of the bid as originally submitted.
(3) Bids that contain economic price adjustments with no ceiling shall be rejected unless a clear basis for evaluation exists.
(b)
(1) When an invitation contains an economic price adjustment clause and no bidder takes exception to the provisions, bids shall be evaluated on the basis of the quoted prices without the allowable economic price adjustment being added.
(2) When a bidder increases the maximum percentage of economic price adjustment stipulated in the invitation or limits the downward economic price adjustment provisions of the invitation, the bid shall be rejected as nonresponsive.
(3) When a bid indicates deletion of the economic price adjustment clause, the bid shall be rejected as nonresponsive since the downward economic price adjustment provisions are thereby limited.
(4) When a bidder decreases the maximum percentage of economic price adjustment stipulated in the invitation, the bid shall be evaluated at the base price on an equal basis with bids that do not reduce the stipulated ceiling. However, after evaluation, if the bidder offering the lower ceiling is in a position to receive the award, the award shall reflect the lower ceiling.
(a) Contracts shall be awarded in the following order of priority when two or more low bids are equal in all respects:
(1) Small business concerns that are also labor surplus area concerns.
(2) Other small business concerns.
(3) Other business concerns.
(b) If two or more bidders still remain equally eligible after application of paragraph (a) above, award shall be made by a drawing by lot limited to those bidders. If time permits, the bidders involved shall be given an opportunity to attend the drawing. The drawing shall be witnessed by at least three persons, and the contract file shall contain the names and addresses of the witnesses and the person supervising the drawing.
(c) When an award is to be made by using the priorities under this 14.408-6, the contracting officer shall include a written agreement in the contract that the contractor will perform, or cause to be performed, the contract in accordance with the circumstances justifying the priority used to break the tie or select bids for a drawing by lot.
(a) The contracting officer shall document compliance with 14.103-2 in the contract file.
(b) The documentation shall either state that the accepted bid was the lowest bid received, or list all lower bids with reasons for their rejection in sufficient detail to justify the award.
(c) When an award is made after receipt of equal low bids, the documentation shall describe how the tie was broken.
See subpart 33.1, Protests.
(a)(1) The contracting officer shall as a minimum (subject to any restrictions in Subpart 9.4)—
(i) Notify each unsuccessful bidder in writing or electronically within three days after contract award, that its bid was not accepted. “Day,” for purposes of the notification process, means calendar day, except that the period will run until a day which is not a Saturday, Sunday, or legal holiday;
(ii) Extend appreciation for the interest the unsuccessful bidder has shown in submitting a bid; and
(iii) When award is made to other than a low bidder, state the reason for rejection in the notice to each of the unsuccessful low bidders.
(2) For acquisitions covered by the World Trade Organization Government Procurement Agreement or a Free Trade Agreement (see 25.408(a)(5)), agencies must include in notices given unsuccessful bidders from World Trade Organization Government Procurement Agreement or Free Trade Agreement countries—
(i) The dollar amount of the successful bid; and
(ii) The name and address of the successful bidder.
(b) Information included in paragraph (a)(2) of this subsection shall be provided to any unsuccessful bidder upon request except when multiple awards have been made and furnishing information on the successful bids would require so much work as to interfere with normal operations of the contracting office. In such circumstances, only information concerning location of the abstract of offers need be given.
(c) When a request is received concerning an unclassified invitation from an inquirer who is neither a bidder nor a representative of a bidder, the contracting officer should make every effort to furnish the names of successful bidders and, if requested, the prices at which awards were made. However, when such requests require so much work as to interfere with the normal operations of the contracting office, the inquirer will be advised where a copy of the abstract of offers may be seen.
(d) Requests for records shall be governed by agency regulations implementing Subpart 24.2.
In addition to 14.409-1, if classified information was furnished or created in connection with the solicitation, the contracting officer shall advise the unsuccessful bidders, including any who did not bid, to take disposition action in accordance with agency procedures. The name of the successful bidder and the contract price will be furnished to unsuccessful bidders only upon request. Information regarding a classified award shall not be furnished by telephone.
Two-step sealed bidding is a combination of competitive procedures designed to obtain the benefits of sealed bidding when adequate specifications are not available. An objective is to permit the development of a sufficiently descriptive and not unduly restrictive statement of the Government's requirements, including an adequate technical data package, so that subsequent acquisitions may be made by conventional sealed bidding. This method is especially useful in acquisitions requiring technical proposals,
(a) Step one consists of the request for, submission, evaluation, and (if necessary) discussion of a technical proposal. No pricing is involved. The objective is to determine the acceptability of the supplies or services offered. As used in this context, the word
(b) Step two involves the submission of sealed priced bids by those who submitted acceptable technical proposals in step one. Bids submitted in step two are evaluated and the awards made in accordance with subparts 14.3 and 14.4.
(a) Unless other factors require the use of sealed bidding, two-step sealed bidding may be used in preference to negotiation when all of the following conditions are present:
(1) Available specifications or purchase descriptions are not definite or complete or may be too restrictive without technical evaluation, and any necessary discussion, of the technical aspects of the requirement to ensure mutual understanding between each source and the Government.
(2) Definite criteria exist for evaluating technical proposals.
(3) More than one technically qualified source is expected to be available.
(4) Sufficient time will be available for use of the two-step method.
(5) A firm-fixed-price contract or a fixed-price contract with economic price adjustment will be used.
(b) None of the following precludes the use of two-step sealed bidding:
(1) Multi-year contracting.
(2) Government-owned facilities or special tooling to be made available to the successful bidder.
(3) A total small business set-aside (see 19.502-2).
(4) The use of the price evaluation adjustment for small disadvantaged business concerns (see Subpart 19.11).
(5) The use of a set-aside or price evaluation preference for HUBZone small business concerns (see subpart 19.13).
(6) The use of a set-aside for service-disabled veteran-owned small business concerns (
(7) A first or subsequent production quantity is being acquired under a performance specification.
(a) Requests for technical proposals shall be synopsized in accordance with Part 5. The request must include, as a minimum, the following:
(1) A description of the supplies or services required.
(2) A statement of intent to use the two step method.
(3) The requirements of the technical proposal.
(4) The evaluation criteria, to include all factors and any significant subfactors.
(5) A statement that the technical proposals shall not include prices or pricing information.
(6) The date, or date and hour, by which the proposal must be received (see 14.201-6(r)).
(7) A statement that (i) in the second step, only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for awards and (ii) each bid in the second step must be based on the bidder's own technical proposals.
(8) A statement that (i) offerors should submit proposals that are acceptable without additional explanation or information, (ii) the Government may make a final determination regarding a proposal's acceptability solely on the basis of the proposal as submitted, and (iii) the Government
(9) A statement that a notice of unacceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination of unacceptability.
(10) A statement either that only one technical proposal may be submitted by each offeror or that multiple technical proposals may be submitted. When specifications permit different technical approaches, it is generally in the Government's interest to authorize multiple proposals. If multiple proposals are authorized, see 14.201-6(s).
(b) Information on delivery or performance requirements may be of assistance to bidders in determining whether or not to submit a proposal and may be included in the request. The request shall also indicate that the information is not binding on the Government and that the actual delivery or performance requirements will be contained in the invitation issued under step two.
(c) Upon receipt, the contracting officer shall—
(1) Safeguard proposals against disclosure to unauthorized persons;
(2) Accept and handle data marked in accordance with 15.609 as provided in that section; and
(3) Remove any reference to price or cost.
(d) The contracting officer shall establish a time period for evaluating technical proposals. The period may vary with the complexity and number of proposals involved. However, the evaluation should be completed quickly.
(e)(1) Evaluations shall be based on the criteria in the request for proposals but not consideration of responsibility as defined in 9.1. Proposals shall be categorized as—
(i) Acceptable;
(ii) Reasonably susceptible of being made acceptable; or
(iii) Unacceptable.
(2) Any proposal which modifies, or fails to conform to the essential requirements or specifications of, the request for technical proposals shall be considered nonresponsive and categorized as unacceptable.
(f)(1) The contracting officer may proceed directly with step two if there are sufficient acceptable proposals to ensure adequate price competition under step two, and if further time, effort and delay to make additional proposals acceptable and thereby increase competition would not be in Government's interest. If this is not the case, the contracting officer shall request bidders whose proposals may be made acceptable to submit additional clarifying or supplementing information. The contracting officer shall identify the nature of the deficiencies in the proposal or the nature of the additional information required. The contracting officer may also arrange discussions for this purpose. No proposal shall be discussed with any offeror other than the submitter.
(2) In initiating requests for additional information, the contracting officer shall fix an appropriate time for bidders to conclude discussions, if any, submit all additional information, and incorporate such additional information as part of their proposals submitted. Such time may be extended in the discretion of the contracting officer. If the additional information incorporated as part of a proposal within the final time fixed by the contracting officer establishes that the proposal is acceptable, it shall be so categorized. Otherwise, it shall be categorized as unacceptable.
(g) When a technical proposal is found unacceptable (either initially or after clarification), the contracting officer shall promptly notify the offeror of the basis of the determination and that a revision of the proposal will not be considered. Upon written request, the contracting officer shall debrief unsuccessful offerors (see 15.505 and 15.506).
(h) Late technical proposals are governed by 15.208 (b), (c), and (f).
(i) If it is necessary to discontinue two-step sealed bidding, the contracting officer shall include a statement of the facts and circumstances in
(a) Sealed bidding procedures shall be followed except that invitations for bids shall—
(1) Be issued only to those offerors submitting acceptable technical proposals in step one;
(2) Include the provision prescribed in 14.201-6(t);
(3) Prominently state that the bidder shall comply with the specifications and the bidder's technical proposal; and
(4) Not be synopsized through the Governmentwide point of entry (GPE) as an acquisition opportunity nor publicly posted (see 5.101(a)).
(b) The names of firms that submitted acceptable proposals in step one will be listed through the GPE for the benefit of prospective subcontractors (see 5.207).
40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c).
This part prescribes policies and procedures governing competitive and noncompetitive negotiated acquisitions. A contract awarded using other than sealed bidding procedures is a negotiated contract (see 14.101).
As used in this part—
(a)
(b)
This subpart describes some of the acquisition processes and techniques that may be used to design competitive acquisition strategies suitable for the specific circumstances of the acquisition.
An agency can obtain best value in negotiated acquisitions by using any one or a combination of source selection approaches. In different types of
(a) A tradeoff process is appropriate when it may be in the best interest of the Government to consider award to other than the lowest priced offeror or other than the highest technically rated offeror.
(b) When using a tradeoff process, the following apply:
(1) All evaluation factors and significant subfactors that will affect contract award and their relative importance shall be clearly stated in the solicitation; and
(2) The solicitation shall state whether all evaluation factors other than cost or price, when combined, are significantly more important than, approximately equal to, or significantly less important than cost or price.
(c) This process permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal. The perceived benefits of the higher priced proposal shall merit the additional cost, and the rationale for tradeoffs must be documented in the file in accordance with 15.406.
(a) The lowest price technically acceptable source selection process is appropriate when best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.
(b) When using the lowest price technically acceptable process, the following apply:
(1) The evaluation factors and significant subfactors that establish the requirements of acceptability shall be set forth in the solicitation. Solicitations shall specify that award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. If the contracting officer documents the file pursuant to 15.304(c)(3)(iv), past performance need not be an evaluation factor in lowest price technically acceptable source selections. If the contracting officer elects to consider past performance as an evaluation factor, it shall be evaluated in accordance with 15.305. However, the comparative assessment in 15.305(a)(2)(i) does not apply. If the contracting officer determines that a small business' past performance is not acceptable, the matter shall be referred to the Small Business Administration for a Certificate of Competency determination, in accordance with the procedures contained in subpart 19.6 and 15 U.S.C. 637(b)(7)).
(2) Tradeoffs are not permitted.
(3) Proposals are evaluated for acceptability but not ranked using the non-cost/price factors.
(4) Exchanges may occur (see 15.306).
(a) Oral presentations by offerors as requested by the Government may substitute for, or augment, written information. Use of oral presentations as a substitute for portions of a proposal can be effective in streamlining the source selection process. Oral presentations may occur at any time in the acquisition process, and are subject to the same restrictions as written information, regarding timing (see 15.208) and content (see 15.306). Oral presentations provide an opportunity for dialogue among the parties. Pre-recorded videotaped presentations that lack real-time interactive dialogue are not considered oral presentations for the purposes of this section, although they may be included in offeror submissions, when appropriate.
(b) The solicitation may require each offeror to submit part of its proposal through oral presentations. However, certifications, representations, and a signed offer sheet (including any exceptions to the Government's terms and
(c) Information pertaining to areas such as an offeror's capability, past performance, work plans or approaches, staffing resources, transition plans, or sample tasks (or other types of tests) may be suitable for oral presentations. In deciding what information to obtain through an oral presentation, consider the following:
(1) The Government's ability to adequately evaluate the information;
(2) The need to incorporate any information into the resultant contract;
(3) The impact on the efficiency of the acquisition; and
(4) The impact (including cost) on small businesses. In considering the costs of oral presentations, contracting officers should also consider alternatives to on-site oral presentations (e.g., teleconferencing, video teleconferencing).
(d) When oral presentations are required, the solicitation shall provide offerors with sufficient information to prepare them. Accordingly, the solicitation may describe—
(1) The types of information to be presented orally and the associated evaluation factors that will be used;
(2) The qualifications for personnel that will be required to provide the oral presentation(s);
(3) The requirements for, and any limitations and/or prohibitions on, the use of written material or other media to supplement the oral presentations;
(4) The location, date, and time for the oral presentations;
(5) The restrictions governing the time permitted for each oral presentation; and
(6) The scope and content of exchanges that may occur between the Government's participants and the offeror's representatives as part of the oral presentations, including whether or not discussions (see 15.306(d)) will be permitted during oral presentations.
(e) The contracting officer shall maintain a record of oral presentations to document what the Government relied upon in making the source selection decision. The method and level of detail of the record (e.g., videotaping, audio tape recording, written record, Government notes, copies of offeror briefing slides or presentation notes) shall be at the discretion of the source selection authority. A copy of the record placed in the file may be provided to the offeror.
(f) When an oral presentation includes information that the parties intend to include in the contract as material terms or conditions, the information shall be put in writing. Incorporation by reference of oral statements is not permitted.
(g) If, during an oral presentation, the Government conducts discussions (see 15.306(d)), the Government must comply with 15.306 and 15.307.
This subpart prescribes policies and procedures for—
(a) Exchanging information with industry prior to receipt of proposals;
(b) Preparing and issuing requests for proposals (RFPs) and requests for information (RFIs); and
(c) Receiving proposals and information.
(a) Exchanges of information among all interested parties, from the earliest identification of a requirement through receipt of proposals, are encouraged. Any exchange of information must be consistent with procurement integrity requirements (see 3.104). Interested parties include potential offerors, end users, Government acquisition and supporting personnel, and others involved in the conduct or outcome of the acquisition.
(b) The purpose of exchanging information is to improve the understanding of Government requirements and industry capabilities, thereby allowing potential offerors to judge whether or how they can satisfy the Government's requirements, and enhancing the Government's ability to obtain quality supplies and services, including construction, at reasonable prices, and increase efficiency in proposal preparation, proposal evaluation, negotiation, and contract award.
(c) Agencies are encouraged to promote early exchanges of information about future acquisitions. An early exchange of information among industry and the program manager, contracting officer, and other participants in the acquisition process can identify and resolve concerns regarding the acquisition strategy, including proposed contract type, terms and conditions, and acquisition planning schedules; the feasibility of the requirement, including performance requirements, statements of work, and data requirements; the suitability of the proposal instructions and evaluation criteria, including the approach for assessing past performance information; the availability of reference documents; and any other industry concerns or questions. Some techniques to promote early exchanges of information are—
(1) Industry or small business conferences;
(2) Public hearings;
(3) Market research, as described in part 10;
(4) One-on-one meetings with potential offerors (any that are substantially involved with potential contract terms and conditions should include the contracting officer; also see paragraph (f) of this section regarding restrictions on disclosure of information);
(5) Presolicitation notices;
(6) Draft RFPs;
(7) RFIs;
(8) Presolicitation or preproposal conferences; and
(9) Site visits.
(d) The special notices of procurement matters at 5.205(c), or electronic notices, may be used to publicize the Government's requirement or solicit information from industry.
(e) RFIs may be used when the Government does not presently intend to award a contract, but wants to obtain price, delivery, other market information, or capabilities for planning purposes. Responses to these notices are not offers and cannot be accepted by the Government to form a binding contract. There is no required format for RFIs.
(f) General information about agency mission needs and future requirements may be disclosed at any time. After release of the solicitation, the contracting officer must be the focal point of any exchange with potential offerors. When specific information about a proposed acquisition that would be necessary for the preparation of proposals is disclosed to one or more potential offerors, that information must be made available to the public as soon as practicable, but no later than the next general release of information, in order to avoid creating an unfair competitive advantage. Information provided to a potential offeror in response to its request must not be disclosed if doing so would reveal the potential offeror's confidential business strategy, and is protected under 3.104 or subpart 24.2. When conducting a presolicitation or preproposal conference, materials distributed at the conference should be made available to all potential offerors, upon request.
(a) The agency may publish a presolicitation notice (see 5.204) that provides a general description of the scope or purpose of the acquisition and invites potential offerors to submit information that allows the Government to advise the offerors about their potential to be viable competitors. The presolicitation notice should identify the information that must be submitted and the criteria that will be used in making the initial evaluation. Information sought may be limited to a statement of qualifications and other appropriate information (e.g., proposed technical concept, past performance, and limited pricing information). At a minimum, the notice shall contain sufficient information to permit a potential offeror to make an informed decision about whether to participate in the acquisition. This process should not be used for multi-step acquisitions where it would result in offerors being required to submit identical information in response to the notice and in response to the initial step of the acquisition.
(b) The agency shall evaluate all responses in accordance with the criteria stated in the notice, and shall advise each respondent in writing either that it will be invited to participate in the
(a) Requests for proposals (RFPs) are used in negotiated acquisitions to communicate Government requirements to prospective contractors and to solicit proposals. RFPs for competitive acquisitions shall, at a minimum, describe the—
(1) Government's requirement;
(2) Anticipated terms and conditions that will apply to the contract:
(i) The solicitation may authorize offerors to propose alternative terms and conditions, including the contract line item number (CLIN) structure; and
(ii) When alternative CLIN structures are permitted, the evaluation approach should consider the potential impact on other terms and conditions or the requirement (e.g., place of performance or payment and funding requirements) (see 15.206);
(3) Information required to be in the offeror's proposal; and
(4) Factors and significant subfactors that will be used to evaluate the proposal and their relative importance.
(b) An RFP may be issued for OMB Circular A-76 studies. See subpart 7.3 for additional information regarding cost comparisons between Government and contractor performance.
(c) Electronic commerce may be used to issue RFPs and to receive proposals, modifications, and revisions. In this case, the RFP shall specify the electronic commerce method(s) that offerors may use (see subpart 4.5).
(d) Contracting officers may issue RFPs and/or authorize receipt of proposals, modifications, or revisions by facsimile.
(1) In deciding whether or not to use facsimiles, the contracting officer should consider factors such as—
(i) Anticipated proposal size and volume;
(ii) Urgency of the requirement;
(iii) Availability and suitability of electronic commerce methods; and
(iv) Adequacy of administrative procedures and controls for receiving, identifying, recording, and safeguarding facsimile proposals, and ensuring their timely delivery to the designated proposal delivery location.
(2) If facsimile proposals are authorized, contracting officers may request offeror(s) to provide the complete, original signed proposal at a later date.
(e) Letter RFPs may be used in sole source acquisitions and other appropriate circumstances. Use of a letter RFP does not relieve the contracting officer from complying with other FAR requirements. Letter RFPs should be as complete as possible and, at a minimum, should contain the following:
(1) RFP number and date;
(2) Name, address (including electronic address and facsimile address, if appropriate), and telephone number of the contracting officer;
(3) Type of contract contemplated;
(4) Quantity, description, and required delivery dates for the item;
(5) Applicable certifications and representations;
(6) Anticipated contract terms and conditions;
(7) Instructions to offerors and evaluation criteria for other than sole source actions;
(8) Proposal due date and time; and
(9) Other relevant information; e.g., incentives, variations in delivery schedule, cost proposal support, and data requirements.
(f) Oral RFPs are authorized when processing a written solicitation would delay the acquisition of supplies or services to the detriment of the Government and a notice is not required under 5.202 (e.g., perishable items and support of contingency operations or other emergency situations). Use of an oral RFP does not relieve the contracting officer from complying with other FAR requirements.
(1) The contract files supporting oral solicitations should include—
(i) A description of the requirement;
(ii) Rationale for use of an oral solicitation;
(iii) Sources solicited, including the date, time, name of individuals contacted, and prices offered; and
(iv) The solicitation number provided to the prospective offerors.
(2) The information furnished to potential offerors under oral solicitations should include appropriate items from paragraph (e) of this section.
The use of a uniform contract format facilitates preparation of the solicitation and contract as well as reference to, and use of, those documents by offerors, contractors, and contract administrators. The uniform contract format need not be used for the following:
(a) Construction and architect-engineer contracts (see part 36).
(b) Subsistence contracts.
(c) Supplies or services contracts requiring special contract formats prescribed elsewhere in this part that are inconsistent with the uniform format.
(d) Letter requests for proposals (see 15.203(e)).
(e) Contracts exempted by the agency head or designee.
(a) Contracting officers shall prepare solicitations and resulting contracts using the uniform contract format outlined in Table 15-1 of this subsection.
(b) Solicitations using the uniform contract format shall include Parts I, II, III, and IV (see 15.204-2 through 15.204-5). Upon award, contracting officers shall not physically include Part IV in the resulting contract, but shall retain it in the contract file. Section K shall be incorporated by reference in the contract.
The contracting officer shall prepare the contract Schedule as follows:
(a)
(1) Optional Form (OF) 308, Solicitation and Offer-Negotiated Acquisition, or Standard Form (SF) 33, Solicitation, Offer and Award, may be used to prepare RFPs.
(2) When other than OF 308 or SF 33 is used, include the following information on the first page of the solicitation:
(i) Name, address, and location of issuing activity, including room and building where proposals or information must be submitted.
(ii) Solicitation number.
(iii) Date of issuance.
(iv) Closing date and time.
(v) Number of pages.
(vi) Requisition or other purchase authority.
(vii) Brief description of item or service.
(viii) Requirement for the offeror to provide its name and complete address, including street, city, county, state, and zip code, and electronic address (including facsimile address), if appropriate.
(ix) Offer expiration date.
(b)
(c)
(d)
(e)
(f)
(g)
(h)
The contracting officer shall prepare the representations and instructions as follows:
(a)
(b)
(1) Administrative;
(2) Management;
(3) Technical;
(4) Past performance; and
(5) Cost or pricing data (see Table 15-2 of 15.408) or information other than cost or pricing data.
(c)
(a) The contracting officer shall issue solicitations to potential sources in accordance with the policies and procedures in 5.102, 19.202-4, and part 6.
(b) A master solicitation, as described in 14.203-3, may also be used for negotiated acquisitions.
(a) When, either before or after receipt of proposals, the Government changes its requirements or terms and conditions, the contracting officer shall amend the solicitation.
(b) Amendments issued before the established time and date for receipt of
(c) Amendments issued after the established time and date for receipt of proposals shall be issued to all offerors that have not been eliminated from the competition.
(d) If a proposal of interest to the Government involves a departure from the stated requirements, the contracting officer shall amend the solicitation, provided this can be done without revealing to the other offerors the alternate solution proposed or any other information that is entitled to protection (see 15.207(b) and 15.306(e)).
(e) If, in the judgment of the contracting officer, based on market research or otherwise, an amendment proposed for issuance after offers have been received is so substantial as to exceed what prospective offerors reasonably could have anticipated, so that additional sources likely would have submitted offers had the substance of the amendment been known to them, the contracting officer shall cancel the original solicitation and issue a new one, regardless of the stage of the acquisition.
(f) Oral notices may be used when time is of the essence. The contracting officer shall document the contract file and formalize the notice with an amendment (see subpart 4.5, Electronic Commerce in Contracting).
(g) At a minimum, the following information should be included in each amendment:
(1) Name and address of issuing activity.
(2) Solicitation number and date.
(3) Amendment number and date.
(4) Number of pages.
(5) Description of the change being made.
(6) Government point of contact and phone number (and electronic or facsimile address, if appropriate).
(7) Revision to solicitation closing date, if applicable.
(a) Upon receipt at the location specified in the solicitation, proposals and information received in response to a request for information (RFI) shall be marked with the date and time of receipt and shall be transmitted to the designated officials.
(b) Proposals shall be safeguarded from unauthorized disclosure throughout the source selection process. (See 3.104 regarding the disclosure of source selection information (41 U.S.C. 423)). Information received in response to an RFI shall be safeguarded adequately from unauthorized disclosure.
(c) If any portion of a proposal received by the contracting officer electronically or by facsimile is unreadable, the contracting officer immediately shall notify the offeror and permit the offeror to resubmit the unreadable portion of the proposal. The method and time for resubmission shall be prescribed by the contracting officer after consultation with the offeror, and documented in the file. The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness under 15.208(a), provided the offeror complies with the time and format requirements for resubmission prescribed by the contracting officer.
(a) Offerors are responsible for submitting proposals, and any revisions, and modifications, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. Offerors may use any transmission method authorized by the solicitation (
(b)(1) Any proposal, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of proposals is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late proposal would not unduly delay the acquisition; and—
(i) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of proposals and was under the Government's control prior to the time set for receipt of proposals; or
(iii) It was the only proposal received.
(2) However, a late modification of an otherwise successful proposal, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the Government office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation closing date, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Proposals may be withdrawn by written notice at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. The contracting officer must document the contract file when oral withdrawals are made. One copy of withdrawn proposals should be retained in the contract file (see 4.803(a)(10)). Extra copies of the withdrawn proposals may be destroyed or returned to the offeror at the offerors request. Where practicable, electronically transmitted proposals that are withdrawn must be purged from primary and backup data storage systems after a copy is made for the file. Extremely bulky proposals must only be returned at the offeror's request and expense.
(f) The contracting officer must promptly notify any offeror if its proposal, modification, or revision was received late, and must inform the offeror whether its proposal will be considered, unless contract award is imminent and the notice prescribed in 15.503(b) would suffice.
(g) Late proposals and modifications that are not considered must be held unopened, unless opened for identification, until after award and then retained with other unsuccessful proposals.
(h) If available, the following must be included in the contracting office files for each late proposal, modification, revision, or withdrawal:
(1) The date and hour of receipt.
(2) A statement regarding whether the proposal was considered for award, with supporting rationale.
(3) The envelope, wrapper, or other evidence of date of receipt.
When contracting by negotiation—
(a) The contracting officer shall insert the provision at 52.215-1, Instructions to Offerors—Competitive Acquisition, in all competitive solicitations where the Government intends to award a contract without discussions.
(1) If the Government intends to make award after discussions with offerors within the competitive range, the contracting officer shall use the basic provision with its
(2) If the Government would be willing to accept alternate proposals, the contracting officer shall alter the basic clause to add a paragraph (c)(9) substantially the same as
(b)(1) The contracting officer shall insert the clause at 52.215-2, Audit and Records-Negotiation (10 U.S.C. 2313, 41 U.S.C. 254d, and OMB Circular No. A-133), in solicitations and contracts except those for—
(i) Acquisitions not exceeding the simplified acquisition threshold;
(ii) The acquisition of utility services at rates not exceeding those established to apply uniformly to the general public, plus any applicable reasonable connection charge; or
(iii) The acquisition of commercial items exempted under 15.403-1.
(2) For facilities acquisitions, the contracting officer shall use the clause with its
(3) For cost-reimbursement contracts with State and local Governments, educational institutions, and other nonprofit organizations, the contracting officer shall use the clause with its
(4) When the head of the agency has waived the examination of records by the Comptroller General in accordance with 25.1001, use the clause with its
(c) When issuing a solicitation for information or planning purposes, the contracting officer shall insert the provision at 52.215-3, Request for Information or Solicitation for Planning Purposes, and clearly mark on the face of the solicitation that it is for information or planning purposes.
(d) [Reserved]
(f) The contracting officer shall insert the provision at 52.215-6, Place of Performance, in solicitations unless the place of performance is specified by the Government.
(g) [Reserved]
(h) The contracting officer shall insert the clause at 52.215-8, Order of Precedence—Uniform Contract Format, in solicitations and contracts using the format at 15.204.
Prescribed forms are not required to prepare solicitations described in this part. The following forms may be used at the discretion of the contracting officer:
(a) Standard Form 33, Solicitation, Offer, and Award, and Optional Form 308, Solicitation and Offer—Negotiated Acquisition, may be used to issue RFPs and RFIs.
(b) Standard Form 30, Amendment of Solicitation/Modification of Contract, and Optional Form 309, Amendment of Solicitation, may be used to amend solicitations of negotiated contracts.
(c) Optional Form 17, Offer Label, may be furnished with each request for proposal.
This subpart prescribes policies and procedures for selection of a source or sources in competitive negotiated acquisitions.
The objective of source selection is to select the proposal that represents the best value.
(a) Agency heads are responsible for source selection. The contracting officer is designated as the source selection authority, unless the agency head appoints another individual for a particular acquisition or group of acquisitions.
(b) The source selection authority shall—
(1) Establish an evaluation team, tailored for the particular acquisition, that includes appropriate contracting, legal, logistics, technical, and other expertise to ensure a comprehensive evaluation of offers;
(2) Approve the source selection strategy or acquisition plan, if applicable, before solicitation release;
(3) Ensure consistency among the solicitation requirements, notices to offerors, proposal preparation instructions, evaluation factors and subfactors, solicitation provisions or contract clauses, and data requirements;
(4) Ensure that proposals are evaluated based solely on the factors and subfactors contained in the solicitation (10 U.S.C. 2305(b)(1) and 41 U.S.C. 253b(d)(3));
(5) Consider the recommendations of advisory boards or panels (if any); and
(6) Select the source or sources whose proposal is the best value to the Government (10 U.S.C. 2305(b)(4)(B) and 41 U.S.C. 253b(d)(3)).
(c) The contracting officer shall—
(1) After release of a solicitation, serve as the focal point for inquiries from actual or prospective offerors;
(2) After receipt of proposals, control exchanges with offerors in accordance with 15.306; and
(3) Award the contract(s).
(a) The award decision is based on evaluation factors and significant subfactors that are tailored to the acquisition.
(b) Evaluation factors and significant subfactors must—
(1) Represent the key areas of importance and emphasis to be considered in the source selection decision; and
(2) Support meaningful comparison and discrimination between and among competing proposals.
(c) The evaluation factors and significant subfactors that apply to an acquisition and their relative importance are within the broad discretion of agency acquisition officials, subject to the following requirements:
(1) Price or cost to the Government shall be evaluated in every source selection (10 U.S.C. 2305(a)(3)(A) (ii) and 41 U.S.C. 253a(c)(1)(B)) (also see part 36 for architect-engineer contracts);
(2) The quality of the product or service shall be addressed in every source selection through consideration of one or more non-cost evaluation factors such as past performance, compliance with solicitation requirements, technical excellence, management capability, personnel qualifications, and prior experience (10 U.S.C. 2305(a)(3) (A)(i) and 41 U.S.C. 253a(c)(1)(A)); and
(3)(i) Except as set forth in paragraph (c)(3)(iv) of this section, past performance shall be evaluated in all source selections for negotiated competitive acquisitions expected to exceed $1,000,000.
(ii) Except as set forth in paragraph (c)(3)(iv) of this section, past performance shall be evaluated in all source selections for negotiated competitive acquisitions issued on or after January 1, 1999, for acquisitions expected to exceed $100,000. Agencies should develop phase-in schedules that meet or exceed this schedule.
(iii) For solicitations involving bundling that offer a significant opportunity for subcontracting, the contracting officer must include a factor to evaluate past performance indicating the extent to which the offeror attained applicable goals for small business participation under contracts that required subcontracting plans (15 U.S.C. 637(d)(4)(G)(ii)).
(iv) Past performance need not be evaluated if the contracting officer documents the reason past performance is not an appropriate evaluation factor for the acquisition.
(4) The extent of participation of small disadvantaged business concerns in performance of the contract shall be evaluated in unrestricted acquisitions expected to exceed $500,000 ($1,000,000 for construction) subject to certain limitations (see 19.201 and 19.1202).
(5) For solicitations involving bundling that offer a significant opportunity for subcontracting, the contracting officer must include proposed small business subcontracting participation in the subcontracting plan as an evaluation factor (15 U.S.C. 637(d)(4)(G)(i)).
(6) If telecommuting is not prohibited, agencies shall not unfavorably evaluate an offer that includes telecommuting unless the contracting officer executes a written determination in accordance with FAR 7.108(b).
(d) All factors and significant subfactors that will affect contract award and their relative importance shall be stated clearly in the solicitation (10 U.S.C. 2305(a)(2)(A)(i) and 41 U.S.C. 253a(b)(1)(A)) (see 15.204-5(c)). The rating method need not be disclosed in the solicitation. The general approach for evaluating past performance information shall be described.
(e) The solicitation shall also state, at a minimum, whether all evaluation factors other than cost or price, when combined, are—
(1) Significantly more important than cost or price;
(2) Approximately equal to cost or price; or
(3) Significantly less important than cost or price (10 U.S.C. 2305(a)(3)(A)(iii) and 41 U.S.C. 253a(c)(1)(C)).
(a) Proposal evaluation is an assessment of the proposal and the offeror's ability to perform the prospective contract successfully. An agency shall evaluate competitive proposals and then assess their relative qualities solely on the factors and subfactors specified in the solicitation. Evaluations may be conducted using any rating method or combination of methods, including color or adjectival ratings, numerical weights, and ordinal rankings. The relative strengths, deficiencies, significant weaknesses, and risks supporting proposal evaluation shall be documented in the contract file.
(1)
(2)
(ii) The solicitation shall describe the approach for evaluating past performance, including evaluating offerors with no relevant performance history, and shall provide offerors an opportunity to identify past or current contracts (including Federal, State, and local government and private) for efforts similar to the Government requirement. The solicitation shall also authorize offerors to provide information on problems encountered on the identified contracts and the offeror corrective actions. The Government shall consider this information, as well as information obtained from any other sources, when evaluating the offeror past performance. The source selection authority shall determine the relevance of similar past performance information.
(iii) The evaluation should take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition.
(iv) In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.
(v) The evaluation should include the past performance of offerors in complying with subcontracting plan goals for small disadvantaged business (SDB) concerns (see Subpart 19.7), monetary targets for SDB participation (see 19.1202), and notifications submitted under 19.1202-4(b).
(3)
(i) An assessment of each offeror's ability to accomplish the technical requirements; and
(ii) A summary, matrix, or quantitative ranking, along with appropriate supporting narrative, of each technical proposal using the evaluation factors.
(4)
(5)
(b) The source selection authority may reject all proposals received in response to a solicitation, if doing so is in the best interest of the Government.
(c) For restrictions on the use of support contractor personnel in proposal evaluation, see 37.203(d).
(a)
(2) If award will be made without conducting discussions, offerors may be given the opportunity to clarify certain aspects of proposals (e.g., the relevance of an offeror's past performance information and adverse past performance information to which the offeror has not previously had an opportunity to respond) or to resolve minor or clerical errors.
(3) Award may be made without discussions if the solicitation states that the Government intends to evaluate proposals and make award without discussions. If the solicitation contains such a notice and the Government determines it is necessary to conduct discussions, the rationale for doing so shall be documented in the contract file (see the provision at 52.215-1) (10 U.S.C. 2305(b)(4)(A)(ii) and 41 U.S.C. 253b(d)(1)(B)).
(b)
(1) Shall be limited to the offerors described in paragraphs (b)(1)(i) and (b)(1)(ii) of this section and—
(i) Shall be held with offerors whose past performance information is the determining factor preventing them from being placed within the competitive range. Such communications shall address adverse past performance information to which an offeror has not had a prior opportunity to respond; and
(ii) May only be held with those offerors (other than offerors under paragraph (b)(1)(i) of this section) whose exclusion from, or inclusion in, the competitive range is uncertain;
(2) May be conducted to enhance Government understanding of proposals; allow reasonable interpretation of the proposal; or facilitate the Government's evaluation process. Such communications shall not be used to cure proposal deficiencies or material omissions, materially alter the technical or cost elements of the proposal, and/or otherwise revise the proposal. Such communications may be considered in rating proposals for the purpose of establishing the competitive range;
(3) Are for the purpose of addressing issues that must be explored to determine whether a proposal should be placed in the competitive range. Such communications shall not provide an opportunity for the offeror to revise its proposal, but may address—
(i) Ambiguities in the proposal or other concerns (e.g., perceived deficiencies, weaknesses, errors, omissions, or mistakes (see 14.407)); and
(ii) Information relating to relevant past performance; and
(4) Shall address adverse past performance information to which the offeror has not previously had an opportunity to comment.
(c)
(2) After evaluating all proposals in accordance with 15.305(a) and paragraph (c)(1) of this section, the contracting officer may determine that the number of most highly rated proposals that might otherwise be included in the competitive range exceeds the number at which an efficient competition can be conducted. Provided the solicitation notifies offerors that the competitive range can be limited for purposes of efficiency (see 52.215-1(f)(4)), the contracting officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals (10 U.S.C. 2305(b)(4) and 41 U.S.C. 253b(d)).
(3) If the contracting officer, after complying with paragraph (d)(3) of this section, decides that an offeror's proposal should no longer be included in the competitive range, the proposal shall be eliminated from consideration for award. Written notice of this decision shall be provided to unsuccessful offerors in accordance with 15.503.
(4) Offerors excluded or otherwise eliminated from the competitive range may request a debriefing (see 15.505 and 15.506).
(d)
(1) Discussions are tailored to each offeror's proposal, and must be conducted by the contracting officer with each offeror within the competitive range.
(2) The primary objective of discussions is to maximize the Government's ability to obtain best value, based on the requirement and the evaluation factors set forth in the solicitation.
(3) At a minimum, the contracting officer must, subject to paragraphs (d)(5) and (e) of this section and 15.307(a), indicate to, or discuss with, each offeror still being considered for award, deficiencies, significant weaknesses, and adverse past performance information to which the offeror has not yet had an opportunity to respond. The contracting officer also is encouraged to discuss other aspects of the offeror's proposal that could, in the opinion of the contracting officer, be altered or explained to enhance materially the proposal's potential for award. However, the contracting officer is not required to discuss every area where the proposal could be improved. The scope and extent of discussions are a matter of contracting officer judgment.
(4) In discussing other aspects of the proposal, the Government may, in situations where the solicitation stated that evaluation credit would be given for technical solutions exceeding any mandatory minimums, negotiate with offerors for increased performance beyond any mandatory minimums, and the Government may suggest to offerors that have exceeded any mandatory minimums (in ways that are not integral to the design), that their proposals would be more competitive if the excesses were removed and the offered price decreased.
(5) If, after discussions have begun, an offeror originally in the competitive range is no longer considered to be among the most highly rated offerors being considered for award, that offeror may be eliminated from the competitive range whether or not all material aspects of the proposal have been discussed, or whether or not the offeror has been afforded an opportunity to submit a proposal revision (see 15.307(a) and 15.503(a)(1)).
(e)
(1) Favors one offeror over another;
(2) Reveals an offeror's technical solution, including unique technology, innovative and unique uses of commercial items, or any information that
(3) Reveals an offerors price without that offeror's permission. However, the contracting officer may inform an offeror that its price is considered by the Government to be too high, or too low, and reveal the results of the analysis supporting that conclusion. It is also permissible, at the Government's discretion, to indicate to all offerors the cost or price that the Government's price analysis, market research, and other reviews have identified as reasonable (41 U.S.C. 423(h)(1)(2));
(4) Reveals the names of individuals providing reference information about an offeror's past performance; or
(5) Knowingly furnishes source selection information in violation of 3.104 and 41 U.S.C. 423(h)(1)(2).
(a) If an offerors proposal is eliminated or otherwise removed from the competitive range, no further revisions to that offeror's proposal shall be accepted or considered.
(b) The contracting officer may request or allow proposal revisions to clarify and document understandings reached during negotiations. At the conclusion of discussions, each offeror still in the competitive range shall be given an opportunity to submit a final proposal revision. The contracting officer is required to establish a common cut-off date only for receipt of final proposal revisions. Requests for final proposal revisions shall advise offerors that the final proposal revisions shall be in writing and that the Government intends to make award without obtaining further revisions.
The source selection authority's (SSA) decision shall be based on a comparative assessment of proposals against all source selection criteria in the solicitation. While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA's independent judgment. The source selection decision shall be documented, and the documentation shall include the rationale for any business judgments and tradeoffs made or relied on by the SSA, including benefits associated with additional costs. Although the rationale for the selection decision must be documented, that documentation need not quantify the tradeoffs that led to the decision.
This subpart prescribes the cost and price negotiation policies and procedures for pricing negotiated prime contracts (including subcontracts) and contract modifications, including modifications to contracts awarded by sealed bidding.
As used in this subpart—
Contracting officers must—
(a) Purchase supplies and services from responsible sources at fair and reasonable prices. In establishing the reasonableness of the offered prices, the contracting officer must not obtain more information than is necessary. To the extent that cost or pricing data are not required by 15.403-4, the contracting officer must generally use the following order of preference in determining the type of information required:
(1) No additional information from the offeror, if the price is based on adequate price competition, except as provided by 15.403-3(b).
(2) Information other than cost or pricing data:
(i) Information related to prices (e.g., established catalog or market prices or previous contract prices), relying first on information available within the
(ii) Cost information, that does not meet the definition of cost or pricing data at 2.101.
(3)
(b) Price each contract separately and independently and not—
(1) Use proposed price reductions under other contracts as an evaluation factor; or
(2) Consider losses or profits realized or anticipated under other contracts.
(c) Not include in a contract price any amount for a specified contingency to the extent that the contract provides for a price adjustment based upon the occurrence of that contingency.
(a) Cost or pricing data shall not be obtained for acquisitions at or below the simplified acquisition threshold.
(b)
(1) When the contracting officer determines that prices agreed upon are based on adequate price competition (see standards in paragraph (c)(1) of this subsection);
(2) When the contracting officer determines that prices agreed upon are based on prices set by law or regulation (see standards in paragraph (c)(2) of this subsection);
(3) When a commercial item is being acquired (see standards in paragraph (c)(3) of this subsection);
(4) When a waiver has been granted (see standards in paragraph (c)(4) of this subsection); or
(5) When modifying a contract or subcontract for commercial items (see standards in paragraph (c)(3) of this subsection).
(c)
(i) Two or more responsible offerors, competing independently, submit priced offers that satisfy the Government's expressed requirement and if—
(A) Award will be made to the offeror whose proposal represents the best value (see 2.101) where price is a substantial factor in source selection; and
(B) There is no finding that the price of the otherwise successful offeror is unreasonable. Any finding that the price is unreasonable must be supported by a statement of the facts and approved at a level above the contracting officer;
(ii) There was a reasonable expectation, based on market research or other assessment, that two or more responsible offerors, competing independently, would submit priced offers in response to the solicitation's expressed requirement, even though only one offer is received from a responsible offeror and if—
(A) Based on the offer received, the contracting officer can reasonably conclude that the offer was submitted with the expectation of competition, e.g., circumstances indicate that—
(
(
(B) The determination that the proposed price is based on adequate price competition, is reasonable, and is approved at a level above the contracting officer; or
(iii) Price analysis clearly demonstrates that the proposed price is reasonable in comparison with current or recent prices for the same or similar items, adjusted to reflect changes in market conditions, economic conditions, quantities, or terms and conditions under contracts that resulted from adequate price competition.
(2)
(3)
(ii) The following requirements apply to minor modifications defined in paragraph (3)(ii) of the definition of a commercial item at 2.101 that do not change the item from a commercial item to a noncommercial item:
(A) For acquisitions funded by any agency other than DoD, NASA, or Coast Guard, the modifications are exempt from the requirement for submission of cost or pricing data.
(B) For acquisitions funded by DoD, NASA, or Coast Guard, the modifications are exempt from the requirement for submission of cost or pricing data provided the total cost of the modifications do not exceed the greater of $500,000 or 5 percent of the total price of the contract.
(C) For acquisitions funded by DoD, NASA, or Coast Guard where the total cost of the modifications exceeds the greater of $500,000 or 5 percent of the total price of the contract and no other exception or waiver applies, the contracting officer must require submission of cost or pricing data.
(iii) Any acquisition for noncommercial supplies or services treated as commercial items at 12.102(f)(1), except sole source contracts greater than $15,000,000, is exempt from the requirements for cost or pricing data (41 U.S.C. 428a).
(4)
(i) An exception otherwise applies to the subcontract; or
(ii) The waiver specifically includes the subcontract and the rationale supporting the waiver for that subcontract.
(a) The exercise of an option at the price established at contract award or initial negotiation does not require submission of cost or pricing data.
(b) Cost or pricing data are not required for proposals used solely for overrun funding or interim billing price adjustments.
(a)
(2) The contractor's format for submitting the information should be used (see 15.403-5(b)(2)).
(3) The contracting officer must ensure that information used to support price negotiations is sufficiently current to permit negotiation of a fair and reasonable price. Requests for updated offeror information should be limited to information that affects the adequacy of the proposal for negotiations, such as changes in price lists.
(4) As specified in Section 808 of Public Law 105-261, an offeror who does not comply with a requirement to submit information for a contract or subcontract in accordance with paragraph (a)(1) of this subsection is ineligible for award unless the HCA determines that it is in the best interest of the Government to make the award to that offeror, based on consideration of the following:
(i) The effort made to obtain the data.
(ii) The need for the item or service.
(iii) Increased cost or significant harm to the Government if award is not made.
(b)
(c)
(2)
(ii) The contracting officer must, to the maximum extent practicable, limit the scope of the request for information relating to commercial items to include only information that is in the form regularly maintained by the offeror as part of its commercial operations.
(iii) The Government must not disclose outside the Government information obtained relating to commercial items that is exempt from disclosure under 24.202(a) or the Freedom of Information Act (5 U.S.C. 552(b)).
(a)(1) The contracting officer must obtain cost or pricing data only if the contracting officer concludes that none of the exceptions in 15.403-1(b) applies. However, if the contracting officer has sufficient information available to determine price reasonableness, then the contracting officer should consider requesting a waiver under the exception at 15.403-1(b)(4). The threshold for obtaining cost or pricing data is $550,000. Unless an exception applies, cost or pricing data are required before accomplishing any of the following actions expected to exceed the current threshold or, for existing contracts, the threshold specified in the contract:
(i) The award of any negotiated contract (except for undefinitized actions such as letter contracts).
(ii) The award of a subcontract at any tier, if the contractor and each higher-tier subcontractor were required to submit cost or pricing data (but see waivers at 15.403-1(c)(4)).
(iii) The modification of any sealed bid or negotiated contract (whether or not cost or pricing data were initially required) or any subcontract covered by paragraph (a)(1)(ii) of this subsection. Price adjustment amounts must consider both increases and decreases (
(A) The total final price agreement for such settlements or agreements exceeds the pertinent threshold set forth at paragraph (a)(1) of this subsection; or
(B) The partial termination settlement plus the estimate to complete the continued portion of the contract exceeds the pertinent threshold set forth at paragraph (a)(1) of this subsection (see 49.105(c)(15)).
(2) Unless prohibited because an exception at 15.403-1(b) applies, the head of the contracting activity, without power of delegation, may authorize the contracting officer to obtain cost or pricing data for pricing actions below the pertinent threshold in paragraph (a)(1) of this subsection, provided the action exceeds the simplified acquisition threshold. The head of the contracting activity shall justify the requirement for cost or pricing data. The documentation shall include a written finding that cost or pricing data are necessary to determine whether the price is fair and reasonable and the facts supporting that finding.
(b) When cost or pricing data are required, the contracting officer shall require the contractor or prospective contractor to submit to the contracting officer (and to have any subcontractor or prospective subcontractor submit to the prime contractor or appropriate subcontractor tier) the following in support of any proposal:
(1) The cost or pricing data.
(2) A certificate of current cost or pricing data, in the format specified in 15.406-2, certifying that to the best of its knowledge and belief, the cost or pricing data were accurate, complete, and current as of the date of agreement on price or, if applicable, an earlier date agreed upon between the parties that is as close as practicable to the date of agreement on price.
(c) If cost or pricing data are requested and submitted by an offeror, but an exception is later found to apply, the data must not be considered cost or pricing data as defined in 2.101 and must not be certified in accordance with 15.406-2.
(d) The requirements of this subsection also apply to contracts entered
(a) Taking into consideration the policy at 15.402, the contracting officer shall specify in the solicitation (see 15.408 (l) and (m))—
(1) Whether cost or pricing data are required;
(2) That, in lieu of submitting cost or pricing data, the offeror may submit a request for exception from the requirement to submit cost or pricing data;
(3) Any information other than cost or pricing data that is required; and
(4) Necessary preaward or postaward access to offeror's records.
(b)(1) Unless required to be submitted on one of the termination forms specified in Subpart 49.6, the contracting officer may require submission of cost or pricing data in the format indicated in Table 15-2 of 15.408, specify an alternative format, or permit submission in the contractor's format.
(2) Information other than cost or pricing data may be submitted in the offeror's own format unless the contracting officer decides that use of a specific format is essential and the format has been described in the solicitation.
(3) Data supporting forward pricing rate agreements or final indirect cost proposals shall be submitted in a form acceptable to the contracting officer.
(a)
(1) The contracting officer is responsible for evaluating the reasonableness of the offered prices. The analytical techniques and procedures described in this section may be used, singly or in combination with others, to ensure that the final price is fair and reasonable. The complexity and circumstances of each acquisition should determine the level of detail of the analysis required.
(2) Price analysis shall be used when cost or pricing data are not required (see paragraph (b) of this subsection and 15.404-3).
(3) Cost analysis shall be used to evaluate the reasonableness of individual cost elements when cost or pricing data are required. Price analysis should be used to verify that the overall price offered is fair and reasonable.
(4) Cost analysis may also be used to evaluate information other than cost or pricing data to determine cost reasonableness or cost realism.
(5) The contracting officer may request the advice and assistance of other experts to ensure that an appropriate analysis is performed.
(6) Recommendations or conclusions regarding the Government's review or analysis of an offeror's or contractor's proposal shall not be disclosed to the offeror or contractor without the concurrence of the contracting officer. Any discrepancy or mistake of fact (such as duplications, omissions, and errors in computation) contained in the cost or pricing data or information other than cost or pricing data submitted in support of a proposal shall be brought to the contracting officer's attention for appropriate action.
(7) The Air Force Institute of Technology (AFIT) and the Federal Acquisition Institute (FAI) jointly prepared a five-volume set of Contract Pricing Reference Guides to guide pricing and negotiation personnel. The five guides are: I Price Analysis, II Quantitative Techniques for Contract Pricing, III Cost Analysis, IV Advanced Issues in Contract Pricing, and V Federal Contract Negotiation Techniques. These references provide detailed discussion and examples applying pricing policies to pricing problems. They are to be used for instruction and professional guidance. However, they are not directive and should be considered informational only. They are available via the internet at
(b)
(2) The Government may use various price analysis techniques and procedures to ensure a fair and reasonable price. Examples of such techniques include, but are not limited to, the following:
(i) Comparison of proposed prices received in response to the solicitation. Normally, adequate price competition establishes price reasonableness (see 15.403-1(c)(1)).
(ii) Comparison of previously proposed prices and previous Government and commercial contract prices with current proposed prices for the same or similar items, if both the validity of the comparison and the reasonableness of the previous price(s) can be established.
(iii) Use of parametric estimating methods/application of rough yardsticks (such as dollars per pound or per horsepower, or other units) to highlight significant inconsistencies that warrant additional pricing inquiry.
(iv) Comparison with competitive published price lists, published market prices of commodities, similar indexes, and discount or rebate arrangements.
(v) Comparison of proposed prices with independent Government cost estimates.
(vi) Comparison of proposed prices with prices obtained through market research for the same or similar items.
(vii) Analysis of pricing information provided by the offeror.
(3) The first two techniques at 15.404-1(b)(2) are the preferred techniques. However, if the contracting officer determines that information on competitive proposed prices or previous contract prices is not available or is insufficient to determine that the price is fair and reasonable, the contracting officer may use any of the remaining techniques as appropriate to the circumstances applicable to the acquisition.
(4) Value analysis can give insight into the relative worth of a product and the Government may use it in conjunction with the price analysis techniques listed in paragraph (b)(2) of this section.
(c)
(2) The Government may use various cost analysis techniques and procedures to ensure a fair and reasonable price, given the circumstances of the acquisition. Such techniques and procedures include the following:
(i) Verification of cost or pricing data and evaluation of cost elements, including—
(A) The necessity for, and reasonableness of, proposed costs, including allowances for contingencies;
(B) Projection of the offeror's cost trends, on the basis of current and historical cost or pricing data;
(C) Reasonableness of estimates generated by appropriately calibrated and validated parametric models or cost-estimating relationships; and
(D) The application of audited or negotiated indirect cost rates, labor rates, and cost of money or other factors.
(ii) Evaluating the effect of the offeror's current practices on future costs. In conducting this evaluation, the contracting officer shall ensure that the effects of inefficient or uneconomical past practices are not projected into the future. In pricing production of recently developed complex equipment, the contracting officer should perform a trend analysis of basic labor and materials, even in periods of relative price stability.
(iii) Comparison of costs proposed by the offeror for individual cost elements with—
(A) Actual costs previously incurred by the same offeror;
(B) Previous cost estimates from the offeror or from other offerors for the same or similar items;
(C) Other cost estimates received in response to the Government's request;
(D) Independent Government cost estimates by technical personnel; and
(E) Forecasts of planned expenditures.
(iv) Verification that the offeror's cost submissions are in accordance
(v) Review to determine whether any cost or pricing data necessary to make the contractor's proposal accurate, complete, and current have not been either submitted or identified in writing by the contractor. If there are such data, the contracting officer shall attempt to obtain them and negotiate, using them or making satisfactory allowance for the incomplete data.
(vi) Analysis of the results of any make-or-buy program reviews, in evaluating subcontract costs (see 15.407-2).
(d)
(2) Cost realism analyses shall be performed on cost-reimbursement contracts to determine the probable cost of performance for each offeror.
(i) The probable cost may differ from the proposed cost and should reflect the Government's best estimate of the cost of any contract that is most likely to result from the offeror's proposal. The probable cost shall be used for purposes of evaluation to determine the best value.
(ii) The probable cost is determined by adjusting each offeror's proposed cost, and fee when appropriate, to reflect any additions or reductions in cost elements to realistic levels based on the results of the cost realism analysis.
(3) Cost realism analyses may also be used on competitive fixed-price incentive contracts or, in exceptional cases, on other competitive fixed-price-type contracts when new requirements may not be fully understood by competing offerors, there are quality concerns, or past experience indicates that contractors proposed costs have resulted in quality or service shortfalls. Results of the analysis may be used in performance risk assessments and responsibility determinations. However, proposals shall be evaluated using the criteria in the solicitation, and the offered prices shall not be adjusted as a result of the analysis.
(e)
(2) At a minimum, the technical analysis should examine the types and quantities of material proposed and the need for the types and quantities of labor hours and the labor mix. Any other data that may be pertinent to an assessment of the offeror's ability to accomplish the technical requirements or to the cost or price analysis of the service or product being proposed should also be included in the analysis.
(f)
(2) Except for the acquisition of commercial items, contracting officers shall require that offerors identify in their proposals those items of supply that they will not manufacture or to which they will not contribute significant value, unless adequate price competition is expected (10 U.S.C. 2304 and 41 U.S.C. 254(d)(5)(A)(i)). Such information shall be used to determine whether the intrinsic value of an item has
(g)
(i) Startup work, mobilization, first articles, or first article testing are separate line items;
(ii) Base quantities and option quantities are separate line items; or
(iii) The evaluated price is the aggregate of estimated quantities to be ordered under separate line items of an indefinite-delivery contract.
(2) All offers with separately priced line items or subline items shall be analyzed to determine if the prices are unbalanced. If cost or price analysis techniques indicate that an offer is unbalanced, the contracting officer shall—
(i) Consider the risks to the Government associated with the unbalanced pricing in determining the competitive range and in making the source selection decision; and
(ii) Consider whether award of the contract will result in paying unreasonably high prices for contract performance.
(3) An offer may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.
(a)
(2) The contracting officer must tailor the type of information and level of detail requested in accordance with the specialized resources available at the buying activity and the magnitude and complexity of the required analysis. Field pricing assistance is generally available to provide—
(i) Technical, audit, and special reports associated with the cost elements of a proposal, including subcontracts;
(ii) Information on related pricing practices and history;
(iii) Information to help contracting officers determine commerciality and price reasonableness, including—
(A) Verifying sales history to source documents;
(B) Identifying special terms and conditions;
(C) Identifying customarily granted or offered discounts for the item;
(D) Verifying the item to an existing catalog or price list;
(E) Verifying historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item; and
(F) Identifying general market conditions affecting determinations of commerciality and price reasonableness.
(iv) Information relative to the business, technical, production, or other capabilities and practices of an offeror.
(3) When field pricing assistance is requested, contracting officers are encouraged to team with appropriate field experts throughout the acquisition process, including negotiations. Early communication with these experts will assist in determining the extent of assistance required, the specific areas for which assistance is needed, a realistic review schedule, and the information necessary to perform the review.
(4) When requesting field pricing assistance on a contractor's request for equitable adjustment, the contracting officer shall provide the information listed in 43.204(b)(5).
(5) Field pricing information and other reports may include proprietary or source selection information (see
(b)
(i) Whenever circumstances permit, the contracting officer and field pricing experts are encouraged to use telephonic and/or electronic means to request and transmit pricing information.
(ii) When it is necessary to have written technical and audit reports, the contracting officer shall request that the audit agency concurrently forward the audit report to the requesting contracting officer and the administrative contracting officer (ACO). The completed field pricing assistance results may reference audit information, but need not reconcile the audit recommendations and technical recommendations. A copy of the information submitted to the contracting officer by field pricing personnel shall be provided to the audit agency.
(2) Audit and field pricing information, whether written or reported telephonically or electronically, shall be made a part of the official contract file (see 4.807(f)).
(c)
(i) The auditor shall not reveal the audit conclusions or recommendations to the offeror/contractor without obtaining the concurrence of the contracting officer. However, the auditor may discuss statements of facts with the contractor.
(ii) The contracting officer should be notified immediately of any information disclosed to the auditor after submission of a report that may significantly affect the audit findings and, if necessary, a supplemental audit report shall be issued.
(2) The contracting officer shall not request a separate preaward audit of indirect costs unless the information already available from an existing audit, completed within the preceding 12 months, is considered inadequate for determining the reasonableness of the proposed indirect costs (41 U.S.C. 254d and 10 U.S.C. 2313).
(3) The auditor is responsible for the scope and depth of the audit. Copies of updated information that will significantly affect the audit should be provided to the auditor by the contracting officer.
(4) General access to the offeror's books and financial records is limited to the auditor. This limitation does not preclude the contracting officer or the ACO, or their representatives, from requesting that the offeror provide or make available any data or records necessary to analyze the offeror's proposal.
(d)
(a) The contracting officer is responsible for the determination of price
(b) The prime contractor or subcontractor shall—
(1) Conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices;
(2) Include the results of these analyses in the price proposal; and
(3) When required by paragraph (c) of this subsection, submit subcontractor cost or pricing data to the Government as part of its own cost or pricing data.
(c) Any contractor or subcontractor that is required to submit cost or pricing data also shall obtain and analyze cost or pricing data before awarding any subcontract, purchase order, or modification expected to exceed the cost or pricing data threshold, unless an exception in 15.403-1(b) applies to that action.
(1) The contractor shall submit, or cause to be submitted by the subcontractor(s), cost or pricing data to the Government for subcontracts that are the lower of either—
(i) $10,000,000 or more; or
(ii) Both more than the pertinent cost or pricing data threshold and more than 10 percent of the prime contractor's proposed price, unless the contracting officer believes such submission is unnecessary.
(2) The contracting officer may require the contractor or subcontractor to submit to the Government (or cause submission of) subcontractor cost or pricing data below the thresholds in paragraph (c)(1) of this subsection that the contracting officer considers necessary for adequately pricing the prime contract.
(3) Subcontractor cost or pricing data shall be submitted in the format provided in Table 15-2 of 15.408 or the alternate format specified in the solicitation.
(4) Subcontractor cost or pricing data shall be current, accurate, and complete as of the date of price agreement, or, if applicable, an earlier date agreed upon by the parties and specified on the contractor's Certificate of Current Cost or Pricing Data. The contractor shall update subcontractor's data, as appropriate, during source selection and negotiations.
(5) If there is more than one prospective subcontractor for any given work, the contractor need only submit to the Government cost or pricing data for the prospective subcontractor most likely to receive the award.
(a)
(1) Profit or fee prenegotiation objectives do not necessarily represent net income to contractors. Rather, they represent that element of the potential total remuneration that contractors may receive for contract performance over and above allowable costs. This potential remuneration element and the Government's estimate of allowable costs to be incurred in contract performance together equal the Government's total prenegotiation objective. Just as actual costs may vary from estimated costs, the contractor's actual realized profit or fee may vary from negotiated profit or fee, because of such factors as efficiency of performance, incurrence of costs the Government does not recognize as allowable, and the contract type.
(2) It is in the Government's interest to offer contractors opportunities for financial rewards sufficient to stimulate efficient contract performance, attract the best capabilities of qualified large and small business concerns to Government contracts, and maintain a viable industrial base.
(3) Both the Government and contractors should be concerned with profit as a motivator of efficient and effective contract performance. Negotiations aimed merely at reducing prices
(b)
(i) Shall use a structured approach for determining the profit or fee objective in those acquisitions that require cost analysis; and
(ii) May prescribe specific exemptions for situations in which mandatory use of a structured approach would be clearly inappropriate.
(2) Agencies may use another agency's structured approach.
(c)
(2) When the price negotiation is based on cost analysis, contracting officers in agencies that have a structured approach shall use it to analyze profit. When not using a structured approach, contracting officers shall comply with paragraph (d)(1) of this subsection in developing profit or fee prenegotiation objectives.
(3) Contracting officers shall use the Government prenegotiation cost objective amounts as the basis for calculating the profit or fee prenegotiation objective. Before applying profit or fee factors, the contracting officer shall exclude any facilities capital cost of money included in the cost objective amounts. If the prospective contractor fails to identify or propose facilities capital cost of money in a proposal for a contract that will be subject to the cost principles for contracts with commercial organizations (see subpart 31.2), facilities capital cost of money will not be an allowable cost in any resulting contract (see 15.408(i)).
(4)(i) The contracting officer shall not negotiate a price or fee that exceeds the following statutory limitations, imposed by 10 U.S.C. 2306(d) and 41 U.S.C. 254(b):
(A) For experimental, developmental, or research work performed under a cost-plus-fixed-fee contract, the fee shall not exceed 15 percent of the contract's estimated cost, excluding fee.
(B) For architect-engineer services for public works or utilities, the contract price or the estimated cost and fee for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent of the estimated cost of construction of the public work or utility, excluding fees.
(C) For other cost-plus-fixed-fee contracts, the fee shall not exceed 10 percent of the contract's estimated cost, excluding fee.
(ii) The contracting officer's signature on the price negotiation memorandum or other documentation supporting determination of fair and reasonable price documents the contracting officer's determination that the statutory price or fee limitations have not been exceeded.
(5) The contracting officer shall not require any prospective contractor to submit breakouts or supporting rationale for its profit or fee objective but may consider it, if it is submitted voluntarily.
(6) If a change or modification calls for essentially the same type and mix of work as the basic contract and is of relatively small dollar value compared to the total contract value, the contracting officer may use the basic contract's profit or fee rate as the prenegotiation objective for that change or modification.
(d)
(i)
(A)
(B)
(C)
(D)
(ii)
(B) The contractor assumes the greatest cost risk in a closely priced firm-fixed-price contract under which it agrees to perform a complex undertaking on time and at a predetermined price. Some firm-fixed-price contracts may entail substantially less cost risk than others because, for example, the contract task is less complex or many of the contractor's costs are known at the time of price agreement, in which case the risk factor should be reduced accordingly. The contractor assumes the least cost risk in a cost-plus-fixed-fee level-of-effort contract, under which it is reimbursed those costs determined to be allocable and allowable, plus the fixed fee.
(C) In evaluating assumption of cost risk, contracting officers shall, except in unusual circumstances, treat time-and-materials, labor-hour, and firm-fixed-price, level-of-effort term contracts as cost-plus-fixed-fee contracts.
(iii)
(iv)
(v)
(vi)
(2)
(a) The purpose of performing cost or price analysis is to develop a negotiation position that permits the contracting officer and the offeror an opportunity to reach agreement on a fair and reasonable price. A fair and reasonable price does not require that agreement be reached on every element of cost, nor is it mandatory that the agreed price be within the contracting officer's initial negotiation position. Taking into consideration the advisory recommendations, reports of contributing specialists, and the current status of the contractor's purchasing system, the contracting officer is responsible for exercising the requisite judgment needed to reach a negotiated settlement with the offeror and is solely responsible for the final price agreement. However, when significant audit or other specialist recommendations are not adopted, the contracting officer should provide rationale that supports the negotiation result in the price negotiation documentation.
(b) The contracting officer's primary concern is the overall price the Government will actually pay. The contracting officer's objective is to negotiate a contract of a type and with a price providing the contractor the greatest incentive for efficient and economical performance. The negotiation of a contract type and a price are related and should be considered together with the issues of risk and uncertainty to the contractor and the Government. Therefore, the contracting officer should not become preoccupied with any single element and should balance the contract type, cost, and profit or fee negotiated to achieve a total result—a price that is fair and reasonable to both the Government and the contractor.
(c) The Government's cost objective and proposed pricing arrangement directly affect the profit or fee objective. Because profit or fee is only one of several interrelated variables, the contracting officer shall not agree on profit or fee without concurrent agreement on cost and type of contract.
(d) If, however, the contractor insists on a price or demands a profit or fee that the contracting officer considers unreasonable, and the contracting officer has taken all authorized actions (including determining the feasibility of developing an alternative source) without success, the contracting officer shall refer the contract action to a level above the contracting officer. Disposition of the action should be documented.
(a) The prenegotiation objectives establish the Government's initial negotiation position. They assist in the contracting officer's determination of fair and reasonable price. They should be based on the results of the contracting officer's analysis of the offeror's proposal, taking into consideration all pertinent information including field pricing assistance, audit reports and technical analysis, fact-finding results, independent Government cost estimates and price histories.
(b) The contracting officer shall establish prenegotiation objectives before the negotiation of any pricing action. The scope and depth of the analysis supporting the objectives should be directly related to the dollar value, importance, and complexity of the pricing action. When cost analysis is required, the contracting officer shall document the pertinent issues to be negotiated, the cost objectives, and a profit or fee objective.
(a) When cost or pricing data are required, the contracting officer must require the contractor to execute a Certificate of Current Cost or Pricing Data, using the format in this paragraph, and must include the executed certificate in the contract file.
This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's representative in support of __* are accurate, complete, and current as of __**. This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between the offeror and the Government that are part of the proposal.
* Identify the proposal, request for price adjustment, or other submission involved, giving the appropriate identifying number (e.g., RFP No.).
** Insert the day, month, and year when price negotiations were concluded and price agreement was reached or, if applicable, an earlier date agreed upon between the parties that is as close as practicable to the date of agreement on price.
*** Insert the day, month, and year of signing, which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to.
(b) The certificate does not constitute a representation as to the accuracy of the contractor's judgment on the estimate f future costs or projections. It applies to the data upon which the judgment or estimate was based. This distinction between fact and judgment should be clearly understood. If the contractor had information reasonably available at the time of agreement showing that the negotiated price was not based on accurate, complete, and current data, the contractor's responsibility is not limited by any lack of personal knowledge of the information on the part of its negotiators.
(c) The contracting officer and contractor are encouraged to reach a prior agreement on criteria for establishing closing or cutoff dates when appropriate in order to minimize delays associated with proposal updates. Closing or cutoff dates should be included as part of the data submitted with the proposal and, before agreement on price, data should be updated by the contractor to the latest closing or cutoff dates for which the data are available. Use of cutoff dates coinciding with reports is acceptable, as certain data may not be reasonably available before normal periodic closing dates (e.g., actual indirect costs). Data within the contractor's or a subcontractor's organization on matters significant to contractor management and to the Government will be treated as reasonably available. What is significant depends upon the circumstances of each acquisition.
(d) Possession of a Certificate of Current Cost or Pricing Data is not a substitute for examining and analyzing the contractor's proposal.
(e) If cost or pricing data are requested by the Government and submitted by an offeror, but an exception is later found to apply, the data shall not be considered cost or pricing data and shall not be certified in accordance with this subsection.
(a) The contracting officer shall document in the contract file the principal elements of the negotiated agreement. The documentation (e.g., price negotiation memorandum (PNM)) shall include the following:
(1) The purpose of the negotiation.
(2) A description of the acquisition, including appropriate identifying numbers (e.g., RFP No.).
(3) The name, position, and organization of each person representing the contractor and the Government in the negotiation.
(4) The current status of any contractor systems (e.g., purchasing, estimating, accounting, and compensation) to the extent they affected and were considered in the negotiation.
(5) If cost or pricing data were not required in the case of any price negotiation exceeding the cost or pricing data threshold, the exception used and the basis for it.
(6) If cost or pricing data were required, the extent to which the contracting officer—
(i) Relied on the cost or pricing data submitted and used them in negotiating the price;
(ii) Recognized as inaccurate, incomplete, or noncurrent any cost or pricing data submitted; the action taken by the contracting officer and the contractor as a result; and the effect of the defective data on the price negotiated; or
(iii) Determined that an exception applied after the data were submitted and, therefore, considered not to be cost or pricing data.
(7) A summary of the contractor's proposal, any field pricing assistance recommendations, including the reasons for any pertinent variances from them, the Government's negotiation objective, and the negotiated position. Where the determination of price reasonableness is based on cost analysis, the summary shall address each major cost element. When determination of price reasonableness is based on price analysis, the summary shall include the source and type of data used to support the determination.
(8) The most significant facts or considerations controlling the establishment of the prenegotiation objectives and the negotiated agreement including an explanation of any significant differences between the two positions.
(9) To the extent such direction has a significant effect on the action, a discussion and quantification of the impact of direction given by Congress, other agencies, and higher-level officials (
(10) The basis for the profit or fee prenegotiation objective and the profit or fee negotiated.
(11) Documentation of fair and reasonable pricing.
(b) Whenever field pricing assistance has been obtained, the contracting officer shall forward a copy of the negotiation documentation to the office(s) providing assistance. When appropriate, information on how advisory field support can be made more effective should be provided separately.
(a) If, before agreement on price, the contracting officer learns that any cost or pricing data submitted are inaccurate, incomplete, or noncurrent, the contracting officer shall immediately bring the matter to the attention of the prospective contractor, whether the defective data increase or decrease the contract price. The contracting officer shall consider any new data submitted to correct the deficiency, or consider the inaccuracy, incompleteness, or noncurrency of the data when negotiating the contract price. The price negotiation memorandum shall
(b)(1) If, after award, cost or pricing data are found to be inaccurate, incomplete, or noncurrent as of the date of final agreement on price or an earlier date agreed upon by the parties given on the contractor's or subcontractor's Certificate of Current Cost or Pricing Data, the Government is entitled to a price adjustment, including profit or fee, of any significant amount by which the price was increased because of the defective data. This entitlement is ensured by including in the contract one of the clauses prescribed in 15.408 (b) and (c) and is set forth in the clauses at 52.215-10, Price Reduction for Defective Cost or Pricing Data, and 52.215-11, Price Reduction for Defective Cost or Pricing Data—Modifications. The clauses give the Government the right to a price adjustment for defects in cost or pricing data submitted by the contractor, a prospective subcontractor, or an actual subcontractor.
(2) In arriving at a price adjustment, the contracting officer shall consider the time by which the cost or pricing data became reasonably available to the contractor, and the extent to which the Government relied upon the defective data.
(3) The clauses referred to in paragraph (b)(1) of this subsection recognize that the Government's right to a price adjustment is not affected by any of the following circumstances:
(i) The contractor or subcontractor was a sole source supplier or otherwise was in a superior bargaining position;
(ii) The contracting officer should have known that the cost or pricing data in issue were defective even though the contractor or subcontractor took no affirmative action to bring the character of the data to the attention of the contracting officer;
(iii) The contract was based on an agreement about the total cost of the contract and there was no agreement about the cost of each item procured under such contract; or
(iv) Cost or pricing data were required; however, the contractor or subcontractor did not submit a Certificate of Current Cost or Pricing Data relating to the contract.
(4) Subject to paragraphs (b) (5) and (6) of this subsection, the contracting officer shall allow an offset for any understated cost or pricing data submitted in support of price negotiations, up to the amount of the Government's claim for overstated pricing data arising out of the same pricing action (e.g., the initial pricing of the same contract or the pricing of the same change order).
(5) An offset shall be allowed only in an amount supported by the facts and if the contractor—
(i) Certifies to the contracting officer that, to the best of the contractor's knowledge and belief, the contractor is entitled to the offset in the amount requested; and
(ii) Proves that the cost or pricing data were available before the “as of” date specified on the Certificate of Current Cost or Pricing Data but were not submitted. Such offsets need not be in the same cost groupings (e.g., material, direct labor, or indirect costs).
(6) An offset shall not be allowed if—
(i) The understated data were known by the contractor to be understated before the “as of” date specified on the Certificate of Current Cost or Pricing Data; or
(ii) The Government proves that the facts demonstrate that the price would not have increased in the amount to be offset even if the available data had been submitted before the “as of” date specified on the Certificate of Current Cost or Pricing Data.
(7)(i) In addition to the price adjustment, the Government is entitled to recovery of any overpayment plus interest on the overpayments. The Government is also entitled to penalty amounts on certain of these overpayments. Overpayment occurs only when payment is made for supplies or services accepted by the Government. Overpayments do not result from amounts paid for contract financing, as defined in 32.001.
(ii) In calculating the interest amount due, the contracting officer shall—
(A) Determine the defective pricing amounts that have been overpaid to the contractor;
(B) Consider the date of each overpayment (the date of overpayment for
(C) Apply the underpayment interest rate(s) in effect for each quarter from the time of overpayment to the time of repayment, utilizing rate(s) prescribed by the Secretary of the Treasury under 26 U.S.C. 6621(a)(2).
(iii) In arriving at the amount due for penalties on contracts where the submission of defective cost or pricing data was a knowing submission, the contracting officer shall obtain an amount equal to the amount of overpayment made. Before taking any contractual actions concerning penalties, the contracting officer shall obtain the advice of counsel.
(iv) In the demand letter, the contracting officer shall separately include—
(A) The repayment amount;
(B) The penalty amount (if any);
(C) The interest amount through a specified date; and
(D) A statement that interest will continue to accrue until repayment is made.
(c) If, after award, the contracting officer learns or suspects that the data furnished were not accurate, complete, and current, or were not adequately verified by the contractor as of the time of negotiation, the contracting officer shall request an audit to evaluate the accuracy, completeness, and currency of the data. The Government may evaluate the profit-cost relationships only if the audit reveals that the data certified by the contractor were defective. The contracting officer shall not reprice the contract solely because the profit was greater than forecast or because a contingency specified in the submission failed to materialize.
(d) For each advisory audit received based on a postaward review that indicates defective pricing, the contracting officer shall make a determination as to whether or not the data submitted were defective and relied upon. Before making such a determination, the contracting officer should give the contractor an opportunity to support the accuracy, completeness, and currency of the data in question. The contracting officer shall prepare a memorandum documenting both the determination and any corrective action taken as a result. The contracting officer shall send one copy of this memorandum to the auditor and, if the contract has been assigned for administration, one copy to the administrative contracting officer (ACO). A copy of the memorandum or other notice of the contracting officer's determination shall be provided to the contractor.
(e) If both the contractor and subcontractor submitted, and the contractor certified, or should have certified, cost or pricing data, the Government has the right, under the clauses at 52.215-10, Price Reduction for Defective Cost or Pricing Data, and 52.215-11, Price Reduction for Defective Cost or Pricing Data—Modifications, to reduce the prime contract price if it was significantly increased because a subcontractor submitted defective data. This right applies whether these data supported subcontract cost estimates or supported firm agreements between subcontractor and contractor.
(f) If Government audit discloses defective subcontractor cost or pricing data, the information necessary to support a reduction in prime contract and subcontract prices may be available only from the Government. To the extent necessary to secure a prime contract price reduction, the contracting officer should make this information available to the prime contractor or appropriate subcontractors, upon request. If release of the information would compromise Government security or disclose trade secrets or confidential business information, the contracting officer shall release it only under conditions that will protect it from improper disclosure. Information made available under this paragraph shall be limited to that used as the basis for the prime contract price reduction. In order to afford an opportunity for corrective action, the contracting officer should give the prime contractor reasonable advance notice
(1) When a prime contractor includes defective subcontract data in arriving at the price but later awards the subcontract to a lower priced subcontractor (or does not subcontract for the work), any adjustment in the prime contract price due to defective subcontract data is limited to the difference (plus applicable indirect cost and profit markups) between the subcontract price used for pricing the prime contract, and either the actual subcontract price or the actual cost to the contractor, if not subcontracted, provided the data on which the actual subcontract price is based are not themselves defective.
(2) Under cost-reimbursement contracts and under all fixed-price contracts except firm-fixed-price contracts and fixed-price contracts with economic price adjustment, payments to subcontractors that are higher than they would be had there been no defective subcontractor cost or pricing data shall be the basis for disallowance or nonrecognition of costs under the clauses prescribed in 15.408 (b) and (c). The Government has a continuing and direct financial interest in such payments that is unaffected by the initial agreement on prime contract price.
(a)
(b)
(c)
(2) Contracting officers may require prospective contractors to submit make-or-buy programs for negotiated acquisitions whose estimated value is under $10 million only if the contracting officer—
(i) Determines that the information is necessary; and
(ii) Documents the reasons in the contract file.
(d)
(1) A statement that the program and required supporting information must accompany the offer; and
(2) A description of factors to be used in evaluating the proposed program, such as capability, capacity, availability of small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business concerns for subcontracting, establishment of new facilities in or near labor surplus areas, delivery or performance schedules, control of technical and schedule interfaces, proprietary processes, technical superiority or exclusiveness, and technical risks involved.
(e)
(1)
(2) The offeror's program should include or be supported by the following information:
(i) A description of each major item or work effort.
(ii) Categorization of each major item or work effort as “must make,” “must buy, or “can either make or buy.”
(iii) For each item or work effort categorized as “can either make or buy,” a proposal either to “make” or to “buy.”
(iv) Reasons for categorizing items and work efforts as “must make” or “must buy,” and proposing to “make” or to “buy” those categorized as “can either make or buy.” The reasons must include the consideration given to the evaluation factors described in the solicitation and must be in sufficient detail to permit the contracting officer to evaluate the categorization or proposal.
(v) Designation of the plant or division proposed to make each item or perform each work effort, and a statement as to whether the existing or proposed new facility is in or near a labor surplus area.
(vi) Identification of proposed subcontractors, if known, and their location and size status (also see Subpart 19.7 for subcontracting plan requirements).
(vii) Any recommendations to defer make-or-buy decisions when categorization of some items or work efforts is impracticable at the time of submission.
(viii) Any other information the contracting officer requires in order to evaluate the program.
(f)
(1) When the program is to be incorporated in the contract and the design status of the product being acquired does not permit accurate precontract identification of major items or work efforts, the contracting officer shall notify the prospective contractor in writing that these items or efforts, when identifiable, shall be added under the clause at 52.215-9, Changes or Additions to Make-or-Buy Program.
(2) Contracting officers normally shall not agree to proposed “make items” when the products or services are not regularly manufactured or provided by the contractor and are available—quality, quantity, delivery, and other essential factors considered—from another firm at equal or lower prices, or when they are regularly manufactured or provided by the contractor, but are available—quality, quantity, delivery, and other essential factors considered—from another firm at lower prices. However, the contracting officer may agree to these as “make items” if an overall lower Governmentwide cost would result or it is otherwise in the best interest of the Government. If this situation occurs in any fixed-price incentive or cost-plus-incentive-fee contract, the contracting officer shall specify these items in the contract and state that they are subject to paragraph (d) of the clause at 52.215-9, Changes or Additions to Make-or-Buy Program (see 15.408(a)). If the contractor proposes to reverse the categorization of such items during contract performance, the contract price shall be subject to equitable reduction.
(g)
(1) Major systems (see part 34) or their subsystems or components, regardless of contract type; or
(2) Other supplies and services if—
(i) The contract is a cost-reimbursable contract, or a cost-sharing contract in which the contractor's share of the cost is less than 25 percent; and
(ii) The contracting officer determines that technical or cost risks justify Government review and approval of changes or additions to the make-or-buy program.
(a) When cost or pricing data are required, offerors are required to describe any forward pricing rate agreements (FPRA's) in each specific pricing proposal to which the rates apply and to identify the latest cost or pricing data already submitted in accordance with the agreement. All data submitted in connection with the agreement, updated as necessary, form a part of the total data that the offeror certifies to be accurate, complete, and current at the time of agreement on price for an initial contract or for a contract modification.
(b) Contracting officers will use FPRA rates as bases for pricing all contracts, modifications, and other contractual actions to be performed during the period covered by the agreement. Conditions that may affect the agreement's validity shall be reported promptly to the ACO. If the ACO determines that a changed condition invalidates the agreement, the ACO shall notify all interested parties of the extent of its effect and status of efforts to establish a revised FPRA.
(c) Contracting officers shall not require certification at the time of agreement for data supplied in support of FPRA's or other advance agreements. When a forward pricing rate agreement or other advance agreement is used to price a contract action that requires a certificate, the certificate supporting that contract action shall cover the data supplied to support the FPRA or other advance agreement, and all other data supporting the action.
(a)
(2) There are two types of should-cost reviews—program should-cost review (see paragraph (b) of this subsection) and overhead should-cost review (see paragraph (c) of this subsection). These should-cost reviews may be performed together or independently. The scope of a should-cost review can range from a large-scale review examining the contractor's entire operation (including plant-wide overhead and selected major subcontractors) to a small-scale tailored review examining specific portions of a contractor's operation.
(b)
(2) A program should-cost review should be considered, particularly in the case of a major system acquisition (see part 34), when—
(i) Some initial production has already taken place;
(ii) The contract will be awarded on a sole source basis;
(iii) There are future year production requirements for substantial quantities of like items;
(iv) The items being acquired have a history of increasing costs;
(v) The work is sufficiently defined to permit an effective analysis and major changes are unlikely;
(vi) Sufficient time is available to plan and adequately conduct the should-cost review; and
(vii) Personnel with the required skills are available or can be assigned for the duration of the should-cost review.
(3) The contracting officer should decide which elements of the contractor's operation have the greatest potential for cost savings and assign the available personnel resources accordingly. The expertise of on-site Government personnel should be used, when appropriate. While the particular elements to be analyzed are a function of the contract work task, elements such as manufacturing, pricing and accounting, management and organization, and subcontract and vendor management are normally reviewed in a should-cost review.
(4) In acquisitions for which a program should-cost review is conducted, a separate program should-cost review team report, prepared in accordance with agency procedures, is required. The contracting officer shall consider the findings and recommendations contained in the program should-cost review team report when negotiating the contract price. After completing the negotiation, the contracting officer shall provide the ACO a report of any identified uneconomical or inefficient practices, together with a report of correction or disposition agreements reached with the contractor. The contracting officer shall establish a follow-up plan to monitor the correction of the uneconomical or inefficient practices.
(5) When a program should-cost review is planned, the contracting officer should state this fact in the acquisition plan or acquisition plan updates (see subpart 7.1) and in the solicitation.
(c)
It is normally used to evaluate and negotiate an FPRA with the contractor. When an overhead should-cost review is conducted, a separate audit report is required.
(2) The following factors should be considered when selecting contractor sites for overhead should-cost reviews:
(i) Dollar amount of Government business.
(ii) Level of Government participation.
(iii) Level of noncompetitive Government contracts.
(iv) Volume of proposal activity.
(v) Major system or program.
(vi) Corporate reorganizations, mergers, acquisitions, or takeovers.
(vii) Other conditions (e.g., changes in accounting systems, management, or business activity).
(3) The objective of the overhead should-cost review is to evaluate significant indirect cost elements in-depth, and identify and recommend corrective actions regarding inefficient and uneconomical practices. If it is conducted in conjunction with a program should-cost review, a separate overhead should-cost review report is not required. However, the findings and recommendations of the overhead should-cost team, or any separate overhead should-cost review report, shall be provided to the ACO. The ACO should use this information to form the basis for the Government position in negotiating an FPRA with the contractor. The ACO shall establish a follow-up plan to monitor the correction of the uneconomical or inefficient practices.
(a) Using an acceptable estimating system for proposal preparation benefits both the Government and the contractor by increasing the accuracy and reliability of individual proposals. Cognizant audit activities, when it is appropriate to do so, shall establish and manage regular programs for reviewing selected contractors' estimating systems or methods, in order to reduce the scope of reviews to be performed on individual proposals, expedite the negotiation process, and increase the reliability of proposals. The results of estimating system reviews shall be documented in survey reports.
(b) The auditor shall send a copy of the estimating system survey report and a copy of the official notice of corrective action required to each contracting office and contract administration office having substantial business with that contractor. Significant deficiencies not corrected by the contractor shall be a consideration in subsequent proposal analyses and negotiations.
(a)
(1) Its
(2) Its
(b)
(c)
(d)
(e)
(f)
(i) Acquisitions at or below the simplified acquisition threshold;
(ii) Construction or architect-engineer services under part 36;
(iii) Utility services under part 41;
(iv) Service contracts where supplies are not required;
(v) Acquisitions of commercial items; and
(vi) Contracts for petroleum products.
(2) The contracting officer shall insert the clause with its
(g)
(h)
(i)
(j)
(k)
(l)
(1) Use the provision with its
(2) Use the provision with its
(3) Use the provision with its
(4) Replace the basic provision with its
(m)
(1) Use the clause with its
(2) Use the clause with its
(3) Use the clause with its
(4) Replace the basic clause with its
This document provides instructions for preparing a contract pricing proposal when cost or pricing data are required.
There is a clear distinction between submitting cost or pricing data and merely making available books, records, and other documents without identification. The requirement for submission of cost or pricing data is met when all accurate cost or pricing data reasonably available to the offeror have been submitted, either actually or by specific identification, to the Contracting Officer or an authorized representative. As later information comes into your possession, it should be submitted promptly to the Contracting Officer in a manner that clearly shows how the information relates to the offeror's price proposal. The requirement for submission of cost or pricing data continues up to the time of agreement on price, or an earlier date agreed upon between the parties if applicable.
By submitting your proposal, you grant the Contracting Officer or an authorized representative the right to examine records that formed the basis for the pricing proposal. That examination can take place at any time before award. It may include those books, records, documents, and other types of factual information (regardless of form or whether the information is specifically referenced or included in the proposal as the basis for pricing) that will permit an adequate evaluation of the proposed price.
A. You must provide the following information on the first page of your pricing proposal:
(1) Solicitation, contract, and/or modification number;
(2) Name and address of offeror;
(3) Name and telephone number of point of contact;
(4) Name of contract administration office (if available);
(5) Type of contract action (that is, new contract, change order, price revision/redetermination, letter contract, unpriced order, or other);
(6) Proposed cost; profit or fee; and total;
(7) Whether you will require the use of Government property in the performance of the contract, and, if so, what property;
(8) Whether your organization is subject to cost accounting standards; whether your organization has submitted a CASB Disclosure Statement, and if it has been determined adequate; whether you have been notified that you are or may be in noncompliance with your Disclosure Statement or CAS (other than a noncompliance that the cognizant Federal agency official has determined to have an immaterial cost impact), and, if yes, an explanation; whether any aspect of this proposal is inconsistent with your disclosed practices or applicable CAS, and, if so, an explanation; and whether the proposal is consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles, and, if not, an explanation;
(9) The following statement: This proposal reflects our estimates and/or actual costs as of this date and conforms with the instructions in FAR 15.403-5(b)(1) and Table 15-2. By submitting this proposal, we grant the Contracting Officer and authorized representative(s) the right to examine, at any time before award, those records, which include books, documents, accounting procedures and practices, and other data, regardless of type and form or whether such supporting information is specifically referenced or included in the proposal as the basis for pricing, that will permit an adequate evaluation of the proposed price.
(10) Date of submission; and
(11) Name, title, and signature of authorized representative.
B. In submitting your proposal, you must include an index, appropriately referenced, of all the cost or pricing data and information accompanying or identified in the proposal. In addition, you must annotate any future additions and/or revisions, up to the date of agreement on price, or an earlier date agreed upon by the parties, on a supplemental index.
C. As part of the specific information required, you must submit, with your proposal, cost or pricing data (that is, data that are verifiable and factual and otherwise as defined at FAR 2.101). You must clearly identify on your cover sheet that cost or pricing data are included as part of the proposal. In addition, you must submit with your proposal any information reasonably required to explain your estimating process, including—
(1) The judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data; and
(2) The nature and amount of any contingencies included in the proposed price.
D. You must show the relationship between contract line item prices and the total contract price. You must attach cost-element breakdowns for each proposed line item, using the appropriate format prescribed in the “Formats for Submission of Line Item Summaries” section of this table. You must furnish supporting breakdowns for each cost element, consistent with your cost accounting system.
E. When more than one contract line item is proposed, you must also provide summary total amounts covering all line items for each element of cost.
F. Whenever you have incurred costs for work performed before submission of a proposal, you must identify those costs in your cost/price proposal.
G. If you have reached an agreement with Government representatives on use of forward pricing rates/factors, identify the agreement, include a copy, and describe its nature.
H. As soon as practicable after final agreement on price or an earlier date agreed to by the parties, but before the award resulting from the proposal, you must, under the conditions stated in FAR 15.406-2, submit a Certificate of Current Cost or Pricing Data.
Depending on your system, you must provide breakdowns for the following basic cost elements, as applicable:
A.
(1)
(2)
B.
C.
D.
E.
(1) Name and address of licensor.
(2) Date of license agreement.
(3) Patent numbers.
(4) Patent application serial numbers, or other basis on which the royalty is payable.
(5) Brief description (including any part or model numbers of each contract item or component on which the royalty is payable).
(6) Percentage or dollar rate of royalty per unit.
(7) Unit price of contract item.
(8) Number of units.
(9) Total dollar amount of royalties.
(10) If specifically requested by the Contracting Officer, a copy of the current license agreement and identification of applicable claims of specific patents (see FAR 27.204 and 31.205-37).
F.
(1) Enter appropriate cost elements.
(2) Enter those necessary and reasonable costs that, in your judgment, will properly be incurred in efficient contract performance. When any of the costs in this column have already been incurred (e.g., under a letter contract), describe them on an attached supporting page. When preproduction or startup costs are significant, or when specifically requested to do so by the Contracting
(3) Optional, unless required by the Contracting Officer.
(4) Identify the attachment in which the information supporting the specific cost element may be found. (Attach separate pages as necessary.)
(1) Enter appropriate cost elements.
(2) Include the current estimates of what the cost would have been to complete the deleted work not yet performed (not the original proposal estimates), and the cost of deleted work already performed.
(3) Include the incurred cost of deleted work already performed, using actuals incurred if possible, or, if actuals are not available, estimates from your accounting records. Attach a detailed inventory of work, materials, parts, components, and hardware already purchased, manufactured, or performed and deleted by the change, indicating the cost and proposed disposition of each line item. Also, if you desire to retain these items or any portion of them, indicate the amount offered for them.
(4) Enter the net cost to be deleted, which is the estimated cost of all deleted work less the cost of deleted work already performed. Column (2) minus Column (3) equals Column (4).
(5) Enter your estimate for cost of work added by the change. When nonrecurring costs are significant, or when specifically requested to do so by the Contracting Officer, provide a full identification and explanation of them. When any of the costs in this column have already been incurred, describe them on an attached supporting schedule.
(6) Enter the net cost of change, which is the cost of work added, less the net cost to be deleted. Column (5) minus Column (4) equals Column (6). When this result is negative, place the amount in parentheses.
(7) Identify the attachment in which the information supporting the specific cost element may be found. (Attach separate pages as necessary.)
(Use as applicable).
(1) Enter the cutoff date required by the contract, if applicable.
(2) Enter the number of units completed during the period for which experienced costs of production are being submitted.
(3) Enter the number of units remaining to be completed under the contract.
(4) Enter the cumulative contract amount.
(5) Enter your redetermination proposal amount.
(6) Enter the difference between the contract amount and the redetermination proposal amount. When this result is negative, place the amount in parentheses. Column (4) minus Column (5) equals Column (6).
(7) Enter appropriate cost elements. When residual inventory exists, the final costs established under fixed-price-incentive and fixed-price-redeterminable arrangements should be net of the fair market value of such inventory. In support of subcontract costs, submit a listing of all subcontracts subject to repricing action, annotated as to their status.
(8) Enter all costs incurred under the contract before starting production and other nonrecurring costs (usually referred to as startup costs) from your books and records
(9) Enter in Column (9) the production costs from your books and records (exclusive of preproduction costs reported in Column (8)) of the units completed as of the cutoff date.
(10) Enter in Column (10) the costs of work in process as determined from your records or inventories at the cutoff date. When the amounts for work in process are not available in your records but reliable estimates for them can be made, enter the estimated amounts in Column (10) and enter in Column (9) the differences between the total incurred costs (exclusive of preproduction costs) as of the cutoff date and these estimates. Explain the basis for the estimates, including identification of any provision for experienced or anticipated allowances, such as shrinkage, rework, design changes, etc. Furnish experienced unit or lot costs (or labor hours) from inception of contract to the cutoff date, improvement curves, and any other available production cost history pertaining to the item(s) to which your proposal relates.
(11) Enter total incurred costs (Total of Columns (8), (9), and (10)).
(12) Enter those necessary and reasonable costs that in your judgment will properly be incurred in completing the remaining work to be performed under the contract with respect to the item(s) to which your proposal relates.
(13) Enter total estimated cost (Total of Columns (11) and (12)).
(14) Identify the attachment in which the information supporting the specific cost element may be found. (Attach separate pages as necessary.)
This subpart applies to competitive proposals, as described in 6.102(b), and a combination of competitive procedures, as described in 6.102(c). The procedures in 15.504, 15.506, 15.507, 15.508, and 15.509, with reasonable modification, should be followed for sole source acquisitions and acquisitions described in 6.102(d)(1) and (2).
(a)
(2)
(A) When using a small business set-aside (see subpart 19.5);
(B) When a small disadvantaged business concern receives a benefit based on its disadvantaged status (see subpart 19.11 and 19.1202) and is the apparently successful offeror;
(C) When using the HUBZone procedures in 19.1305 or 19.1307; or
(D) When using the service-disabled veteran-owned small business procedures in 19.1405.
(ii) The notice shall state—
(A) The name and address of the apparently successful offeror;
(B) That the Government will not consider subsequent revisions of the offeror's proposal; and
(C) That no response is required unless a basis exists to challenge the small business size status, disadvantaged status, HUBZone status, or service-disabled veteran-owned status of the apparently successful offeror.
(iii) The notice is not required when the contracting officer determines in writing that the urgency of the requirement necessitates award without
(b)
(i) The number of offerors solicited;
(ii) The number of proposals received;
(iii) The name and address of each offeror receiving an award;
(iv) The items, quantities, and any stated unit prices of each award. If the number of items or other factors makes listing any stated unit prices impracticable at that time, only the total contract price need be furnished in the notice. However, the items, quantities, and any stated unit prices of each award shall be made publicly available, upon request; and
(v) In general terms, the reason(s) the offeror's proposal was not accepted, unless the price information in paragraph (b)(1)(iv) of this section readily reveals the reason. In no event shall an offeror's cost breakdown, profit, overhead rates, trade secrets, manufacturing processes and techniques, or other confidential business information be disclosed to any other offeror.
(2) Upon request, the contracting officer shall furnish the information described in paragraph (b)(1) of this section to unsuccessful offerors in solicitations using simplified acquisition procedures in part 13.
(3) Upon request, the contracting officer shall provide the information in paragraph (b)(1) of this section to unsuccessful offerors that received a preaward notice of exclusion from the competitive range.
The contracting officer shall award a contract to the successful offeror by furnishing the executed contract or other notice of the award to that offeror.
(a) If the award document includes information that is different than the latest signed proposal, as amended by the offeror's written correspondence, both the offeror and the contracting officer shall sign the contract award.
(b) When an award is made to an offeror for less than all of the items that may be awarded and additional items are being withheld for subsequent award, each notice shall state that the Government may make subsequent awards on those additional items within the proposal acceptance period.
(c) If the Optional Form (OF) 307, Contract Award, Standard Form (SF) 26, Award/Contract, or SF 33, Solicitation, Offer and Award, is not used to award the contract, the first page of the award document shall contain the Government's acceptance statement from Block 15 of that form, exclusive of the Item 3 reference language, and shall contain the contracting officer's name, signature, and date. In addition, if the award document includes information that is different than the signed proposal, as amended by the offeror's written correspondence, the first page shall include the contractor's agreement statement from Block 14 of the OF 307 and the signature of the contractor's authorized representative.
Offerors excluded from the competitive range or otherwise excluded from the competition before award may request a debriefing before award (10 U.S.C. 2305(b)(6)(A) and 41 U.S.C. 253b(f)-(h)).
(a)(1) The offeror may request a preaward debriefing by submitting a written request for debriefing to the contracting officer within 3 days after receipt of the notice of exclusion from the competition.
(2) At the offeror's request, this debriefing may be delayed until after award. If the debriefing is delayed until after award, it shall include all information normally provided in a postaward debriefing (see 15.506(d)). Debriefings delayed pursuant to this paragraph could affect the timeliness
(3) If the offeror does not submit a timely request, the offeror need not be given either a preaward or a postaward debriefing. Offerors are entitled to no more than one debriefing for each proposal.
(b) The contracting officer shall make every effort to debrief the unsuccessful offeror as soon as practicable, but may refuse the request for a debriefing if, for compelling reasons, it is not in the best interests of the Government to conduct a debriefing at that time. The rationale for delaying the debriefing shall be documented in the contract file. If the contracting officer delays the debriefing, it shall be provided no later than the time postaward debriefings are provided under 15.506. In that event, the contracting officer shall include the information at 15.506(d) in the debriefing.
(c) Debriefings may be done orally, in writing, or by any other method acceptable to the contracting officer.
(d) The contracting officer should normally chair any debriefing session held. Individuals who conducted the evaluations shall provide support.
(e) At a minimum, preaward debriefings shall include—
(1) The agency's evaluation of significant elements in the offeror's proposal;
(2) A summary of the rationale for eliminating the offeror from the competition; and
(3) Reasonable responses to relevant questions about whether source selection procedures contained in the solicitation, applicable regulations, and other applicable authorities were followed in the process of eliminating the offeror from the competition.
(f) Preaward debriefings shall not disclose—
(1) The number of offerors;
(2) The identity of other offerors;
(3) The content of other offerors proposals;
(4) The ranking of other offerors;
(5) The evaluation of other offerors; or
(6) Any of the information prohibited in 15.506(e).
(g) An official summary of the debriefing shall be included in the contract file.
(a)(1) An offeror, upon its written request received by the agency within 3 days after the date on which that offeror has received notification of contract award in accordance with 15.503(b), shall be debriefed and furnished the basis for the selection decision and contract award.
(2) To the maximum extent practicable, the debriefing should occur within 5 days after receipt of the written request. Offerors that requested a postaward debriefing in lieu of a preaward debriefing, or whose debriefing was delayed for compelling reasons beyond contract award, also should be debriefed within this time period.
(3) An offeror that was notified of exclusion from the competition (see 15.505(a)), but failed to submit a timely request, is not entitled to a debriefing.
(4)(i) Untimely debriefing requests may be accommodated.
(ii) Government accommodation of a request for delayed debriefing pursuant to 15.505(a)(2), or any untimely debriefing request, does not automatically extend the deadlines for filing protests. Debriefings delayed pursuant to 15.505(a)(2) could affect the timeliness of any protest filed subsequent to the debriefing.
(b) Debriefings of successful and unsuccessful offerors may be done orally, in writing, or by any other method acceptable to the contracting officer.
(c) The contracting officer should normally chair any debriefing session held. Individuals who conducted the evaluations shall provide support.
(d) At a minimum, the debriefing information shall include—
(1) The Government's evaluation of the significant weaknesses or deficiencies in the offeror's proposal, if applicable;
(2) The overall evaluated cost or price (including unit prices), and technical rating, if applicable, of the successful offeror and the debriefed offeror, and past performance information on the debriefed offeror;
(3) The overall ranking of all offerors, when any ranking was developed by the agency during the source selection;
(4) A summary of the rationale for award;
(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror; and
(6) Reasonable responses to relevant questions about whether source selection procedures contained in the solicitation, applicable regulations, and other applicable authorities were followed.
(e) The debriefing shall not include point-by-point comparisons of the debriefed offeror's proposal with those of other offerors. Moreover, the debriefing shall not reveal any information prohibited from disclosure by 24.202 or exempt from release under the Freedom of Information Act (5 U.S.C. 552) including—
(1) Trade secrets;
(2) Privileged or confidential manufacturing processes and techniques;
(3) Commercial and financial information that is privileged or confidential, including cost breakdowns, profit, indirect cost rates, and similar information; and
(4) The names of individuals providing reference information about an offeror's past performance.
(f) An official summary of the debriefing shall be included in the contract file.
(a) Protests against award in negotiated acquisitions shall be handled in accordance with part 33. Use of agency protest procedures that incorporate the alternative dispute resolution provisions of Executive Order 12979 is encouraged for both preaward and postaward protests.
(b) If a protest causes the agency, within 1 year of contract award, to—
(1) Issue a new solicitation on the protested contract award, the contracting officer shall provide the information in paragraph (c) of this section to all prospective offerors for the new solicitation; or
(2) Issue a new request for revised proposals on the protested contract award, the contracting officer shall provide the information in paragraph (c) of this section to offerors that were in the competitive range and are requested to submit revised proposals.
(c) The following information will be provided to appropriate parties:
(1) Information provided to unsuccessful offerors in any debriefings conducted on the original award regarding the successful offeror's proposal; and
(2) Other nonproprietary information that would have been provided to the original offerors.
Mistakes in a contractor's proposal that are disclosed after award shall be processed substantially in accordance with the procedures for mistakes in bids at 14.407-4.
Optional Form 307, Contract Award, Standard Form (SF) 26, Award/Contract, or SF 33, Solicitation, Offer and Award, may be used to award negotiated contracts in which the signature of both parties on a single document is appropriate. If these forms are not used, the award document shall incorporate the agreement and award language from the OF 307.
This subpart sets forth policies and procedures concerning the submission, receipt, evaluation, and acceptance or rejection of unsolicited proposals.
As used in this subpart—
It is the policy of the Government to encourage the submission of new and innovative ideas in response to Broad Agency Announcements, Small Business Innovation Research topics, Small Business Technology Transfer Research topics, Program Research and Development Announcements, or any other Government-initiated solicitation or program. When the new and innovative ideas do not fall under topic areas publicized under those programs or techniques, the ideas may be submitted as unsolicited proposals.
(a) Unsolicited proposals allow unique and innovative ideas or approaches that have been developed outside the Government to be made available to Government agencies for use in accomplishment of their missions. Unsolicited proposals are offered with the intent that the Government will enter into a contract with the offeror for research and development or other efforts supporting the Government mission, and often represent a substantial investment of time and effort by the offeror.
(b) Advertising material, commercial item offers, or contributions, as defined in 15.601, or routine correspondence on technical issues, are not unsolicited proposals.
(c) A valid unsolicited proposal must—
(1) Be innovative and unique;
(2) Be independently originated and developed by the offeror;
(3) Be prepared without Government supervision, endorsement, direction, or direct Government involvement;
(4) Include sufficient detail to permit a determination that Government support could be worthwhile and the proposed work could benefit the agency's research and development or other mission responsibilities;
(5) Not be an advance proposal for a known agency requirement that can be acquired by competitive methods; and
(6) Not address a previously published agency requirement.
(d) Unsolicited proposals in response to a publicized general statement of agency needs are considered to be independently originated.
(e) Agencies must evaluate unsolicited proposals for energy-savings performance contracts in accordance with the procedures in 10 CFR 436.33(b).
(a) Preliminary contact with agency technical or other appropriate personnel before preparing a detailed unsolicited proposal or submitting proprietary information to the Government may save considerable time and effort for both parties (see 15.201). Agencies must make available to potential offerors of unsolicited proposals at least the following information:
(1) Definition (see 2.101) and content (see 15.605) of an unsolicited proposal acceptable for formal evaluation.
(2) Requirements concerning responsible prospective contractors (see subpart 9.1), and organizational conflicts of interest (see subpart 9.5).
(3) Guidance on preferred methods for submitting ideas/concepts to the Government, such as any agency: upcoming solicitations; Broad Agency Announcements; Small Business Innovation Research programs; Small Business Technology Transfer Research programs; Program Research and Development Announcements; or grant programs.
(4) Agency points of contact for information regarding advertising, contributions, and other types of transactions similar to unsolicited proposals.
(5) Information sources on agency objectives and areas of potential interest.
(6) Procedures for submission and evaluation of unsolicited proposals.
(7) Instructions for identifying and marking proprietary information so that it is protected and restrictive legends conform to 15.609.
(b) Only the cognizant contracting officer has the authority to bind the
Unsolicited proposals should contain the following information to permit consideration in an objective and timely manner:
(a) Basic information including—
(1) Offeror's name and address and type of organization; e.g., profit, nonprofit, educational, small business;
(2) Names and telephone numbers of technical and business personnel to be contacted for evaluation or negotiation purposes;
(3) Identification of proprietary data to be used only for evaluation purposes;
(4) Names of other Federal, State, or local agencies or parties receiving the proposal or funding the proposed effort;
(5) Date of submission; and
(6) Signature of a person authorized to represent and contractually obligate the offeror.
(b) Technical information including—
(1) Concise title and abstract (approximately 200 words) of the proposed effort;
(2) A reasonably complete discussion stating the objectives of the effort or activity, the method of approach and extent of effort to be employed, the nature and extent of the anticipated results, and the manner in which the work will help to support accomplishment of the agency's mission;
(3) Names and biographical information on the offeror's key personnel who would be involved, including alternates; and
(4) Type of support needed from the agency; e.g., facilities, equipment, materials, or personnel resources.
(c) Supporting information including—
(1) Proposed price or total estimated cost for the effort in sufficient detail for meaningful evaluation;
(2) Period of time for which the proposal is valid (a 6-month minimum is suggested);
(3) Type of contract preferred;
(4) Proposed duration of effort;
(5) Brief description of the organization, previous experience, relevant past performance, and facilities to be used;
(6) Other statements, if applicable, about organizational conflicts of interest, security clearances, and environmental impacts; and
(7) The names and telephone numbers of agency technical or other agency points of contact already contacted regarding the proposal.
(a) Agencies shall establish procedures for controlling the receipt, evaluation, and timely disposition of unsolicited proposals consistent with the requirements of this subpart. The procedures shall include controls on the reproduction and disposition of proposal material, particularly data identified by the offeror as subject to duplication, use, or disclosure restrictions.
(b) Agencies shall establish agency points of contact (see 15.604) to coordinate the receipt and handling of unsolicited proposals.
(a) Before initiating a comprehensive evaluation, the agency contact point shall determine if the proposal—
(1) Is a valid unsolicited proposal, meeting the requirements of 15.603(c);
(2) Is suitable for submission in response to an existing agency requirement (see 15.602);
(3) Is related to the agency mission;
(4) Contains sufficient technical information and cost-related or price-related information for evaluation;
(5) Has overall scientific, technical, or socioeconomic merit;
(6) Has been approved by a responsible official or other representative authorized to obligate the offeror contractually; and
(7) Complies with the marking requirements of 15.609.
(b) If the proposal meets these requirements, the contact point shall promptly acknowledge receipt and process the proposal.
(c) If a proposal is rejected because the proposal does not meet the requirements of paragraph (a) of this subsection, the agency contact point shall promptly inform the offeror of the reasons for rejection in writing and of the
(a) Comprehensive evaluations shall be coordinated by the agency contact point, who shall attach or imprint on each unsolicited proposal, circulated for evaluation, the legend required by 15.609(d). When performing a comprehensive evaluation of an unsolicited proposal, evaluators shall consider the following factors, in addition to any others appropriate for the particular proposal:
(1) Unique, innovative and meritorious methods, approaches, or concepts demonstrated by the proposal;
(2) Overall scientific, technical, or socioeconomic merits of the proposal;
(3) Potential contribution of the effort to the agency's specific mission;
(4) The offeror's capabilities, related experience, facilities, techniques, or unique combinations of these that are integral factors for achieving the proposal objectives;
(5) The qualifications, capabilities, and experience of the proposed principal investigator, team leader, or key personnel critical to achieving the proposal objectives; and
(6) The realism of the proposed cost.
(b) The evaluators shall notify the agency point of contact of their recommendations when the evaluation is completed.
(a) A favorable comprehensive evaluation of an unsolicited proposal does not, in itself, justify awarding a contract without providing for full and open competition. The agency point of contact shall return an unsolicited proposal to the offeror, citing reasons, when its substance—
(1) Is available to the Government without restriction from another source;
(2) Closely resembles a pending competitive acquisition requirement;
(3) Does not relate to the activity's mission; or
(4) Does not demonstrate an innovative and unique method, approach, or concept, or is otherwise not deemed a meritorious proposal.
(b) The contracting officer may commence negotiations on a sole source basis only when—
(1) An unsolicited proposal has received a favorable comprehensive evaluation;
(2) A justification and approval has been obtained (see 6.302-1(a)(2)(i) for research proposals or other appropriate provisions of subpart 6.3, and 6.303-2(b));
(3) The agency technical office sponsoring the contract furnishes the necessary funds; and
(4) The contracting officer has complied with the synopsis requirements of subpart 5.2.
(a) Government personnel shall not use any data, concept, idea, or other part of an unsolicited proposal as the basis, or part of the basis, for a solicitation or in negotiations with any other firm unless the offeror is notified of and agrees to the intended use. However, this prohibition does not preclude using any data, concept, or idea in the proposal that also is available from another source without restriction.
(b) Government personnel shall not disclose restrictively marked information (see 3.104 and 15.609) included in an unsolicited proposal. The disclosure of such information concerning trade secrets, processes, operations, style of work, apparatus, and other matters, except as authorized by law, may result in criminal penalties under 18 U.S.C. 1905.
(a) An unsolicited proposal may include data that the offeror does not want disclosed to the public for any purpose or used by the Government except for evaluation purposes. If the offeror wishes to restrict the data, the title page must be marked with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. However, if a contract is awarded to this offeror as a result
(b) The offeror shall also mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(c) The agency point of contact shall return to the offeror any unsolicited proposal marked with a legend different from that provided in paragraph (a) of this section. The return letter will state that the proposal cannot be considered because it is impracticable for the Government to comply with the legend and that the agency will consider the proposal if it is resubmitted with the proper legend.
(d) The agency point of contact shall place a cover sheet on the proposal or clearly mark it as follows, unless the offeror clearly states in writing that no restrictions are imposed on the disclosure or use of the data contained in the proposal:
All Government personnel must exercise extreme care to ensure that the information in this proposal is not disclosed to an individual who has not been authorized access to such data in accordance with FAR 3.104, and is not duplicated, used, or disclosed in whole or in part for any purpose other than evaluation of the proposal, without the written permission of the offeror. If a contract is awarded on the basis of this proposal, the terms of the contract shall control disclosure and use. This notice does not limit the Government's right to use information contained in the proposal if it is obtainable from another source without restriction. This is a Government notice, and shall not by itself be construed to impose any liability upon the Government or Government personnel for disclosure or use of data contained in this proposal.
(e) Use the notice in paragraph (d) of this section solely as a manner of handling unsolicited proposals that will be compatible with this subpart. However, do not use this notice to justify withholding of a record, or to improperly deny the public access to a record, where an obligation is imposed by the Freedom of Information Act (5 U.S.C. 552). An offeror should identify trade secrets, commercial or financial information, and privileged or confidential information to the Government (see paragraph (a) of this section).
(f) When an agency receives an unsolicited proposal without any restrictive legend from an educational or nonprofit organization or institution, and an evaluation outside the Government is necessary, the agency point of contact shall—
(1) Attach a cover sheet clearly marked with the legend in paragraph (d) of this section;
(2) Change the beginning of this legend to read “All Government and non-Government personnel * * * ”; and
(3) Require any non-Government evaluator to agree in writing that data in the proposal will not be disclosed to others outside the Government.
(g) If the proposal is received with the restrictive legend (see paragraph (a) of this section), the modified cover sheet shall also be used and permission shall be obtained from the offeror before release of the proposal for evaluation by non-Government personnel.
(h) When an agency receives an unsolicited proposal with or without a restrictive legend from other than an educational or nonprofit organization or institution, and evaluation by Government personnel outside the agency or by experts outside of the Government is necessary, written permission must be obtained from the offeror before release of the proposal for evaluation. The agency point of contact shall—
(1) Clearly mark the cover sheet with the legend in paragraph (d) or as modified in paragraph (f) of this section; and
(2) Obtain a written agreement from any non-Government evaluator stating that data in the proposal will not be disclosed to persons outside the Government.
40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c).
This part describes types of contracts that may be used in acquisitions. It prescribes policies and procedures and provides guidance for selecting a contract type appropriate to the circumstances of the acquisition.
(a) A wide selection of contract types is available to the Government and contractors in order to provide needed flexibility in acquiring the large variety and volume of supplies and services required by agencies. Contract types vary according to (1) the degree and timing of the responsibility assumed by the contractor for the costs of performance and (2) the amount and nature of the profit incentive offered to the contractor for achieving or exceeding specified standards or goals.
(b) The contract types are grouped into two broad categories: fixed-price contracts (see subpart 16.2) and cost-reimbursement contracts (see subpart 16.3). The specific contract types range from firm-fixed-price, in which the contractor has full responsibility for the performance costs and resulting profit (or loss), to cost-plus-fixed-fee, in which the contractor has minimal responsibility for the performance costs and the negotiated fee (profit) is fixed. In between are the various incentive contracts (see subpart 16.4), in which the contractor's responsibility for the performance costs and the profit or fee incentives offered are tailored to the uncertainties involved in contract performance.
(a) Contracts resulting from sealed bidding shall be firm-fixed-price contracts or fixed-price contracts with economic price adjustment.
(b) Contracts negotiated under part 15 may be of any type or combination of types that will promote the Government's interest, except as restricted in this part (see 10 U.S.C. 2306(a) and 41 U.S.C. 254(a)). Contract types not described in this regulation shall not be used, except as a deviation under subpart 1.4.
(c) The cost-plus-a-percentage-of-cost system of contracting shall not be used (see 10 U.S.C. 2306(a) and 41 U.S.C. 254(b)). Prime contracts (including letter contracts) other than firm-fixed-price contracts shall, by an appropriate clause, prohibit cost- plus-a-percentage-of-cost subcontracts (see clauses prescribed in subpart 44.2 for cost-reimbursement contracts and subparts 16.2 and 16.4 for fixed-price contracts).
(d) No contract may be awarded before the execution of any determination and findings (D&F's) required by this part. Minimum requirements for the content of D&F's required by this part are specified in 1.704.
(a) Selecting the contract type is generally a matter for negotiation and requires the exercise of sound judgment. Negotiating the contract type and negotiating prices are closely related and should be considered together. The objective is to negotiate a contract type and price (or estimated cost and fee) that will result in reasonable contractor risk and provide the contractor with the greatest incentive for efficient and economical performance.
(b) A firm-fixed-price contract, which best utilizes the basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be predicted with an acceptable degree of certainty. However, when a reasonable basis for firm pricing does not exist, other contract types should be considered, and negotiations should be directed toward selecting a contract type (or combination of types) that will appropriately tie profit to contractor performance.
(c) In the course of an acquisition program, a series of contracts, or a single long-term contract, changing circumstances may make a different contract type appropriate in later periods than that used at the outset. In particular, contracting officers should avoid protracted use of a cost-reimbursement or time-and-materials contract after experience provides a basis for firmer pricing.
(d) Each contract file shall include documentation to show why the particular contract type was selected. Exceptions to this requirement are:
(1) Fixed-price acquisitions made under simplified acquisition procedures,
(2) Contracts on a firm fixed-price basis other than those for major systems or research and development, and
(3) Awards on the set-aside portion of sealed bid partial set-asides for small business.
There are many factors that the contracting officer should consider in selecting and negotiating the contract type. They include the following:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
The contracting officer shall complete and insert the provision at 52.216-1, Type of Contract, in a solicitation unless it is for—
(a) A fixed-price acquisition made under simplified acquisition procedures; or
(b) Information or planning purposes.
Fixed-price types of contracts provide for a firm price or, in appropriate cases, an adjustable price. Fixed-price contracts providing for an adjustable price may include a ceiling price, a target price (including target cost), or both. Unless otherwise specified in the contract, the ceiling price or target price is subject to adjustment only by operation of contract clauses providing for equitable adjustment or other revision of the contract price under stated circumstances. The contracting officer shall use firm-fixed-price or fixed-price with economic price adjustment contracts when acquiring commercial items.
A firm-fixed-price contract provides for a price that is not subject to any adjustment on the basis of the contractor's cost experience in performing the contract. This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss. It provides maximum incentive for the contractor to control costs and perform effectively and imposes a minimum administrative burden upon the contracting parties. The contracting officer may use a firm-fixed-price contract in conjunction with an award-fee incentive (see 16.404) and performance or delivery incentives (see 16.402-2 and 16.402-3) when the award fee or incentive is based solely on factors other than cost. The contract type remains firm-fixed-price when used with these incentives.
A firm-fixed-price contract is suitable for acquiring commercial items (see parts 2 and 12) or for acquiring other supplies or services on the basis of reasonably definite functional or detailed specifications (see part 11) when the contracting officer can establish fair and reasonable prices at the outset, such as when—
(a) There is adequate price competition;
(b) There are reasonable price comparisons with prior purchases of the same or similar supplies or services made on a competitive basis or supported by valid cost or pricing data;
(c) Available cost or pricing information permits realistic estimates of the probable costs of performance; or
(d) Performance uncertainties can be identified and reasonable estimates of their cost impact can be made, and the contractor is willing to accept a firm fixed price representing assumption of the risks involved.
(a) A fixed-price contract with economic price adjustment provides for upward and downward revision of the stated contract price upon the occurrence of specified contingencies. Economic price adjustments are of three general types:
(1)
(2)
(3)
(b) The contracting officer may use a fixed-price contract with economic price adjustment in conjunction with an award-fee incentive (see 16.404) and performance or delivery incentives (see 16.402-2 and 16.402-3) when the award
A fixed-price contract with economic price adjustment may be used when (i) there is serious doubt concerning the stability of market or labor conditions that will exist during an extended period of contract performance, and (ii) contingencies that would otherwise be included in the contract price can be identified and covered separately in the contract. Price adjustments based on established prices should normally be restricted to industry-wide contingencies. Price adjustments based on labor and material costs should be limited to contingencies beyond the contractor's control. For use of economic price adjustment in sealed bid contracts, see 14.408-4.
(a) In establishing the base level from which adjustment will be made, the contracting officer shall ensure that contingency allowances are not duplicated by inclusion in both the base price and the adjustment requested by the contractor under economic price adjustment clause.
(b) In contracts that do not require submission of cost or pricing data, the contracting officer shall obtain adequate information to establish the base level from which adjustment will be made and may require verification of data submitted.
A fixed-price contract with economic price adjustment shall not be used unless the contracting officer determines that it is necessary either to protect the contractor and the Government against significant fluctuations in labor or material costs or to provide for contract price adjustment in the event of changes in the contractor's established prices.
(a)
(i) A fixed-price contract is contemplated.
(ii) The requirement is for standard supplies that have an established catalog or market price.
(iii) The contracting officer has made the determination specified in 16.203-3.
(2) If all the conditions in subparagraph (a)(1) above apply and the contracting officer determines that the use of the clause at 52.216-2 is inappropriate, the contracting officer may use an agency-prescribed clause instead of the clause at 52.216-2.
(3) If the negotiated unit price reflects a net price after applying a trade discount from a catalog or list price, the contracting officer shall document in the contract file both the catalog or list price and the discount. (This does not apply to prompt payment or cash discounts.)
(b)
(i) A fixed price contract is contemplated.
(ii) The requirement is for semistandard supplies for which the prices can be reasonably related to the prices of nearly equivalent standard supplies that have an established catalog or market price.
(iii) The contracting officer has made the determination specified in 16.203-3.
(2) If all conditions in subparagraph (b)(1) above apply and the contracting officer determines that the use of the clause at 52.216-3 is inappropriate, the contracting officer may use an agency-
(3) If the negotiated unit price reflects a net price after applying a trade discount from a catalog or list price, the contracting officer shall document in the contract file both the catalog or list price and the discount. (This does not apply to prompt payment or cash discounts.)
(4) Before entering into the contract, the contracting officer and contractor must agree in writing on the identity of the standard supplies and the corresponding contract line items to which the clause applies.
(5) If the supplies are standard, except for preservation, packaging, and packing requirements, the clause prescribed in 16.203-4(a), shall be used rather than this clause.
(c)
(i) A fixed-price contract is contemplated.
(ii) There is no major element of design engineering or development work involved.
(iii) One or more identifiable labor or material cost factors are subject to change.
(iv) The contracting officer has made the determination specified in 16.203-3.
(2) If all conditions in subparagraph (c)(1) above apply and the contracting officer determines that the use of the clause at 52.216-4 is inappropriate, the contracting officer may use an agency-prescribed clause instead of the clause at 52.216-4.
(3) The contracting officer shall describe in detail in the contract Schedule—
(i) The types of labor and materials subject to adjustment under the clause;
(ii) The labor rates, including fringe benefits (if any) and unit prices of materials that may be increased or decreased; and
(iii) The quantities of the specified labor and materials allocable to each unit to be delivered under the contract.
(4) In negotiating adjustments under the clause, the contracting officer shall—
(i) Consider work in process and materials on hand at the time of changes in labor rates, including fringe benefits (if any) or material prices;
(ii) Not include in adjustments any indirect cost (except fringe benefits as defined in 31.205-6(m)) or profit; and
(iii) Consider only those fringe benefits specified in the contract Schedule.
(d)
(1) A clause providing adjustment based on cost indexes of labor or materials may be appropriate when—
(i) The contract involves an extended period of performance with significant costs to be incurred beyond 1 year after performance begins;
(ii) The contract amount subject to adjustment is substantial; and
(iii) The economic variables for labor and materials are too unstable to permit a reasonable division of risk between the Government and the contractor, without this type of clause.
(2) Any clause using this method shall be prepared and approved under agency procedures. Because of the variations in circumstances and clause wording that may arise, no standard clause is prescribed.
A fixed-price incentive contract is a fixed-price contract that provides for adjusting profit and establishing the final contract price by a formula based on the relationship of final negotiated total cost to total target cost. Fixed-price incentive contracts are covered in subpart 16.4, Incentive Contracts. See 16.403 for more complete descriptions, application, and limitations for
A fixed-price contract with prospective price redetermination provides for (a) a firm fixed price for an initial period of contract deliveries or performance and (b) prospective redetermination, at a stated time or times during performance, of the price for subsequent periods of performance.
A fixed-price contract with prospective price redetermination may be used in acquisitions of quantity production or services for which it is possible to negotiate a fair and reasonable firm fixed price for an initial period, but not for subsequent periods of contract performance.
(a) The initial period should be the longest period for which it is possible to negotiate a fair and reasonable firm fixed price. Each subsequent pricing period should be at least 12 months.
(b) The contract may provide for a ceiling price based on evaluation of the uncertainties involved in performance and their possible cost impact. This ceiling price should provide for assumption of a reasonable proportion of the risk by the contractor and, once established, may be adjusted only by operation of contract clauses providing for equitable adjustment or other revision of the contract price under stated circumstances.
This contract type shall not be used unless—
(a) Negotiations have established that (1) the conditions for use of a firm-fixed-price contract are not present (see 16.202-2), and (2) a fixed-price incentive contract would not be more appropriate;
(b) The contractor's accounting system is adequate for price redetermination;
(c) The prospective pricing periods can be made to conform with operation of the contractor's accounting system; and
(d) There is reasonable assurance that price redetermination actions will take place promptly at the specified times.
The contracting officer shall, when contracting by negotiation, insert the clause at 52.216-5, Price Redetermination—Prospective, in solicitations and contracts when a fixed-price contract is contemplated and the conditions specified in 16.205-2 and 16.205-3(a) through (d) apply.
A fixed-ceiling-price contract with retroactive price redetermination provides for (a) a fixed ceiling price and (b) retroactive price redetermination within the ceiling after completion of the contract.
A fixed-ceiling-price contract with retroactive price redetermination is appropriate for research and development contracts estimated at $100,000 or less when it is established at the outset that a fair and reasonable firm fixed price cannot be negotiated and that the amount involved and short performance period make the use of any other fixed-price contract type impracticable.
(a) A ceiling price shall be negotiated for the contract at a level that reflects a reasonable sharing of risk by the contractor. The established ceiling price may be adjusted only if required by the operation of contract clauses providing for equitable adjustment or other revision of the contract price under stated circumstances.
(b) The contract should be awarded only after negotiation of a billing price that is as fair and reasonable as the circumstances permit.
(c) Since this contract type provides the contractor no cost control incentive except the ceiling price, the contracting officer should make clear to the contractor during discussion before award that the contractor's management effectiveness and ingenuity will be considered in retroactively redetermining the price.
This contract type shall not be used unless—
(a) The contract is for research and development and the estimated cost is $100,000 or less;
(b) The contractor's accounting system is adequate for price redetermination;
(c) There is reasonable assurance that the price redetermination will take place promptly at the specified time; and
(d) The head of the contracting activity (or a higher-level official, if required by agency procedures) approves its use in writing.
The contracting officer shall, when contracting by negotiation, insert the clause at 52.216-6, Price Redetermination—Retroactive, in solicitations and contracts when a fixed-price contract is contemplated and the conditions in 16.206-2 and 16.206-3(a) through (d) apply.
A firm-fixed-price, level-of-effort term contract requires (a) the contractor to provide a specified level of effort, over a stated period of time, on work that can be stated only in general terms and (b) the Government to pay the contractor a fixed dollar amount.
A firm-fixed-price, level-of-effort term contract is suitable for investigation or study in a specific research and development area. The product of the contract is usually a report showing the results achieved through application of the required level of effort. However, payment is based on the effort expended rather than on the results achieved.
This contract type may be used only when—
(a) The work required cannot otherwise be clearly defined;
(b) The required level of effort is identified and agreed upon in advance;
(c) There is reasonable assurance that the intended result cannot be achieved by expending less than the stipulated effort; and
(d) The contract price is $100,000 or less, unless approved by the chief of the contracting office.
Cost-reimbursement types of contracts provide for payment of allowable incurred costs, to the extent prescribed in the contract. These contracts establish an estimate of total cost for the purpose of obligating funds and establishing a ceiling that the contractor may not exceed (except at its own risk) without the approval of the contracting officer.
Cost-reimbursement contracts are suitable for use only when uncertainties involved in contract performance do not permit costs to be estimated with sufficient accuracy to use any type of fixed-price contract.
(a) A cost-reimbursement contract may be used only when—
(1) The contractor's accounting system is adequate for determining costs applicable to the contract; and
(2) Appropriate Government surveillance during performance will provide reasonable assurance that efficient methods and effective cost controls are used.
(b) The use of cost-reimbursement contracts is prohibited for the acquisition of commercial items (see parts 2 and 12).
(a)
(b)
(c)
(a)
(b)
(c)
A cost-plus-incentive-fee contract is a cost-reimbursement contract that provides for an initially negotiated fee to be adjusted later by a formula based on the relationship of total allowable costs to total target costs. Cost-plus-incentive-fee contracts are covered in subpart 16.4, Incentive Contracts. See 16.405-1 for a more complete description and discussion of application of these contracts. See 16.301-3 for limitations.
A cost-plus-award-fee contract is a cost-reimbursement contract that provides for a fee consisting of (a) a base amount (which may be zero) fixed at inception of the contract and (b) an award amount, based upon a judgmental evaluation by the Government, sufficient to provide motivation for excellence in contract performance. Cost-plus-award-fee contracts are covered in subpart 16.4, Incentive Contracts. See 16.405-2 for a more complete description and discussion of application of these contracts. See 16.301-3 and 16.405-2(c) for limitations.
(a)
(b)
(i) The contract is for the performance of research or preliminary exploration or study, and the level of effort required is unknown; or
(ii) The contract is for development and test, and using a cost-plus- incentive-fee contract is not practical.
(2) A cost-plus-fixed-fee contract normally should not be used in development of major systems (see part 34) once preliminary exploration, studies, and risk reduction have indicated a high degree of probability that the development is achievable and the Government has established reasonably firm performance objectives and schedules.
(c)
(d)
(1) The completion form describes the scope of work by stating a definite goal
(2) The term form describes the scope of work in general terms and obligates the contractor to devote a specified level of effort for a stated time period. Under this form, if the performance is considered satisfactory by the Government, the fixed fee is payable at the expiration of the agreed-upon period, upon contractor statement that the level of effort specified in the contract has been expended in performing the contract work. Renewal for further periods of performance is a new acquisition that involves new cost and fee arrangements.
(3) Because of the differences in obligation assumed by the contractor, the completion form is preferred over the term form whenever the work, or specific milestones for the work, can be defined well enough to permit development of estimates within which the contractor can be expected to complete the work.
(4) The term form shall not be used unless the contractor is obligated by the contract to provide a specific level of effort within a definite time period.
(a)(1) The contracting officer shall insert the clause at 52.216-7, Allowable Cost and Payment, in solicitations and contracts when a cost-reimbursement contract (other than a facilities contract) is contemplated. If the contract is with an educational institution, modify the clause by deleting from paragraph (a) the words “subpart 31.2” and substituting for them “subpart 31.3.” If the contract is with a State or local government, modify the clause by deleting from paragraph (a) the words “subpart 31.2” and substituting for them “subpart 31.6.” If the contract is with a nonprofit organization other than an educational institution, a State or local government, or a nonprofit organization exempted under OMB Circular No. A-122, modify the clause by deleting from paragraph (a) the words “subpart 31.2” and substituting for them “subpart 31.7.”
(2) If the contract is a construction contract and contains the clause at 52.232-27, Prompt Payment for Construction Contracts, the contracting officer shall use the clause at 52.216-7 with its
(b) The contracting officer shall insert the clause at 52.216-8, Fixed Fee, in solicitations and contracts when a cost-plus-fixed-fee contract (other than a facilities contract or a construction contract) is contemplated.
(c) The contracting officer shall insert the clause at 52.216-9, Fixed-Fee—Construction, in solicitations and contracts when a cost-plus-fixed-fee construction contract is contemplated.
(d) The contracting officer shall insert the clause at 52.216-10, Incentive Fee, in solicitations and contracts when a cost-plus-incentive-fee contract (other than a facilities contract) is contemplated.
(e)(1) The contracting officer shall insert the clause at 52.216-11, Cost Contract—No Fee, in solicitations and contracts when a cost-reimbursement contract is contemplated that provides no fee and is not a cost-sharing contract or a facilities contract.
(2) If a cost-reimbursement research and development contract with an educational institution or a nonprofit organization that provides no fee or other payment above cost and is not a cost-sharing contract is contemplated, and if the contracting officer determines that withholding of a portion of allowable costs is not required, the contracting officer shall use the clause with its
(f)(1) The contracting officer shall insert the clause at 52.216-12, Cost-Sharing Contract—No Fee, in solicitations and contracts when a cost-sharing contract (other than a facilities contract) is contemplated.
(2) If a cost-sharing research and development contract with an educational institution or a nonprofit organization is contemplated, and if the contracting officer determines that withholding of a portion of allowable costs is not required, the contracting officer shall use the clause with its
(g)(1) The contracting officer shall insert the clause at 52.216-13, Allowable Cost and Payment—Facilities, in solicitations and contracts when a cost-reimbursement consolidated facilities contract or a cost-reimbursement facilities acquisition contract (see 45.302-6) is contemplated.
(2) If a facilities acquisition contract is contemplated and, in the judgment of the contracting officer, it may be necessary to withhold payment of an amount to protect the Government's interest, the contracting officer shall use the clause with its
(h) The contracting officer shall insert the clause at 52.216-14, Allowable Cost and Payment—Facilities Use, in solicitations and contracts when a facilities use contract is contemplated.
(i) The contracting officer shall insert the clause at 52.216-15, Predetermined Indirect Cost Rates, in solicitations and contracts when a cost-reimbursement research and development contract with an educational institution (see 42.705-3(b)) is contemplated and predetermined indirect cost rates are to be used. If the contract is a facilities contract, modify paragraph (c) by deleting the words “Subpart 31.1” and substituting for them “section 31.106.”
(a) Incentive contracts as described in this subpart are appropriate when a firm-fixed-price contract is not appropriate and the required supplies or services can be acquired at lower costs and, in certain instances, with improved delivery or technical performance, by relating the amount of profit or fee payable under the contract to the contractor's performance. Incentive contracts are designed to obtain specific acquisition objectives by—
(1) Establishing reasonable and attainable targets that are clearly communicated to the contractor; and
(2) Including appropriate incentive arrangements designed to (i) motivate contractor efforts that might not otherwise be emphasized and (ii) discourage contractor inefficiency and waste.
(b) When predetermined, formula-type incentives on technical performance or delivery are included, increases in profit or fee are provided only for achievement that surpasses the targets, and decreases are provided for to the extent that such targets are not met. The incentive increases or decreases are applied to performance targets rather than minimum performance requirements.
(c) The two basic categories of incentive contracts are fixed-price incentive contracts (see 16.403 and 16.404) and cost-reimbursement incentive contracts (see 16.405). Since it is usually to the Government's advantage for the contractor to assume substantial cost responsibility and an appropriate share of the cost risk, fixed-price incentive contracts are preferred when contract costs and performance requirements are reasonably certain. Cost-reimbursement incentive contracts are subject to the overall limitations in 16.301 that apply to all cost-reimbursement contracts.
(d) Award-fee contracts are a type of incentive contract.
(a) Most incentive contracts include only cost incentives, which take the form of a profit or fee adjustment formula and are intended to motivate the contractor to effectively manage costs. No incentive contract may provide for other incentives without also providing a cost incentive (or constraint).
(b) Except for award-fee contracts (see 16.404 and 16.405-2), incentive contracts include a target cost, a target
(1) Actual cost that meets the target will result in the target profit or fee;
(2) Actual cost that exceeds the target will result in downward adjustment of target profit or fee; and
(3) Actual cost that is below the target will result in upward adjustment of target profit or fee.
(a) Performance incentives may be considered in connection with specific product characteristics (e.g., a missile range, an aircraft speed, an engine thrust, or a vehicle maneuverability) or other specific elements of the contractor's performance. These incentives should be designed to relate profit or fee to results achieved by the contractor, compared with specified targets.
(b) To the maximum extent practicable, positive and negative performance incentives shall be considered in connection with service contracts for performance of objectively measurable tasks when quality of performance is critical and incentives are likely to motivate the contractor.
(c) Technical performance incentives may be particularly appropriate in major systems contracts, both in development (when performance objectives are known and the fabrication of prototypes for test and evaluation is required) and in production (if improved performance is attainable and highly desirable to the Government).
(d) Technical performance incentives may involve a variety of specific characteristics that contribute to the overall performance of the end item. Accordingly, the incentives on individual technical characteristics must be balanced so that no one of them is exaggerated to the detriment of the overall performance of the end item.
(e) Performance tests and/or assessments of work performance are generally essential in order to determine the degree of attainment of performance targets. Therefore, the contract must be as specific as possible in establishing test criteria (such as testing conditions, instrumentation precision, and data interpretation) and performance standards (such as the quality levels of services to be provided).
(f) Because performance incentives present complex problems in contract administration, the contracting officer should negotiate them in full coordination with Government engineering and pricing specialists.
(g) It is essential that the Government and contractor agree explicitly on the effect that contract changes (e.g., pursuant to the Changes clause) will have on performance incentives.
(h) The contracting officer must exercise care, in establishing performance criteria, to recognize that the contractor should not be rewarded or penalized for attainments of Government-furnished components.
(a) Delivery incentives should be considered when improvement from a required delivery schedule is a significant Government objective. It is important to determine the Government's primary objectives in a given contract (e.g., earliest possible delivery or earliest quantity production).
(b) Incentive arrangements on delivery should specify the application of the reward-penalty structure in the event of Government-caused delays or other delays beyond the control, and without the fault or negligence, of the contractor or subcontractor.
A properly structured multiple-incentive arrangement should—
(a) Motivate the contractor to strive for outstanding results in all incentive areas; and
(b) Compel trade-off decisions among the incentive areas, consistent with the Government's overall objectives for the acquisition. Because of the interdependency of the Government's cost, the technical performance, and the delivery goals, a contract that emphasizes only one of the goals may jeopardize control over the others. Because
(a)
(b)
(1) A firm-fixed-price contract is not suitable;
(2) The nature of the supplies or services being acquired and other circumstances of the acquisition are such that the contractor's assumption of a degree of cost responsibility will provide a positive profit incentive for effective cost control and performance; and
(3) If the contract also includes incentives on technical performance and/or delivery, the performance requirements provide a reasonable opportunity for the incentives to have a meaningful impact on the contractor's management of the work.
(c)
(a)
(b)
(c)
(1) The contractor's accounting system is adequate for providing data to support negotiation of final cost and incentive price revision; and
(2) Adequate cost or pricing information for establishing reasonable firm targets is available at the time of initial contract negotiation.
(d)
(a)
(i) An initial target cost.
(ii) An initial target profit.
(iii) An initial profit adjustment formula to be used for establishing the firm target profit, including a ceiling and floor for the firm target profit. (This formula normally provides for a lesser degree of contractor cost responsibility than would a formula for establishing final profit and price.)
(iv) The production point at which the firm target cost and firm target profit will be negotiated (usually before delivery or shop completion of the first item).
(v) A ceiling price that is the maximum that may be paid to the contractor, except for any adjustment under other contract clauses providing for equitable adjustment or other revision of the contract price under stated circumstances.
(2) When the production point specified in the contract is reached, the parties negotiate the firm target cost, giving consideration to cost experience under the contract and other pertinent factors. The firm target profit is established by the formula. At this point, the parties have two alternatives, as follows:
(i) They may negotiate a firm fixed price, using the firm target cost plus the firm target profit as a guide.
(ii) If negotiation of a firm fixed price is inappropriate, they may negotiate a formula for establishing the final price using the firm target cost and firm target profit. The final cost is then negotiated at completion, and the final profit is established by formula, as under the fixed-price incentive (firm target) contract (see 16.403-1 above).
(b)
(1) Available cost or pricing information is not sufficient to permit the negotiation of a realistic firm target cost and profit before award;
(2) Sufficient information is available to permit negotiation of initial targets; and
(3) There is reasonable assurance that additional reliable information will be available at an early point in the contract performance so as to permit negotiation of either (i) a firm fixed price or (ii) firm targets and a formula for establishing final profit and price that will provide a fair and reasonable incentive. This additional information is not limited to experience under the contract, itself, but may be drawn from other contracts for the same or similar items.
(c)
(1) The contractor's accounting system is adequate for providing data for negotiating firm targets and a realistic profit adjustment formula, as well as later negotiation of final costs; and
(2) Cost or pricing information adequate for establishing a reasonable firm target cost is reasonably expected to be available at an early point in contract performance.
(d)
(a) Award-fee provisions may be used in fixed-price contracts when the Government wishes to motivate a contractor and other incentives cannot be used because contractor performance cannot be measured objectively. Such contracts shall—
(1) Establish a fixed price (including normal profit) for the effort. This price will be paid for satisfactory contract performance. Award fee earned (if any) will be paid in addition to that fixed price; and
(2) Provide for periodic evaluation of the contractor's performance against an award-fee plan.
(b) A solicitation contemplating award of a fixed-price contract with award fee shall not be issued unless the following conditions exist:
(1) The administrative costs of conducting award-fee evaluations are not
(2) Procedures have been established for conducting the award-fee evaluation;
(3) The award-fee board has been established; and
(4) An individual above the level of the contracting officer approved the fixed-price-award-fee incentive.
See 16.301 for requirements applicable to all cost-reimbursement contracts, for use in conjunction with the following subsections.
(a)
(b)
(i) A cost-reimbursement contract is necessary (see 16.301-2) and
(ii) A target cost and a fee adjustment formula can be negotiated that are likely to motivate the contractor to manage effectively.
(2) The contract may include technical performance incentives when it is highly probable that the required development of a major system is feasible and the Government has established its performance objectives, at least in general terms. This approach may also apply to other acquisitions, if the use of both cost and technical performance incentives is desirable and administratively practical.
(3) The fee adjustment formula should provide an incentive that will be effective over the full range of reasonably foreseeable variations from target cost. If a high maximum fee is negotiated, the contract shall also provide for a low minimum fee that may be a zero fee or, in rare cases, a negative fee.
(c)
(a)
(b)
(i) The work to be performed is such that it is neither feasible nor effective
(ii) The likelihood of meeting acquisition objectives will be enhanced by using a contract that effectively motivates the contractor toward exceptional performance and provides the Government with the flexibility to evaluate both actual performance and the conditions under which it was achieved; and
(iii) Any additional administrative effort and cost required to monitor and evaluate performance are justified by the expected benefits.
(2) The number of evaluation criteria and the requirements they represent will differ widely among contracts. The criteria and rating plan should motivate the contractor to improve performance in the areas rated, but not at the expense of at least minimum acceptable performance in all other areas.
(3) Cost-plus-award-fee contracts shall provide for evaluation at stated intervals during performance, so that the contractor will periodically be informed of the quality of its performance and the areas in which improvement is expected. Partial payment of fee shall generally correspond to the evaluation periods. This makes effective the incentive which the award fee can create by inducing the contractor to improve poor performance or to continue good performance.
(c)
(1) All of the limitations in 16.301-3 are complied with; and
(2) The contract amount, performance period, and expected benefits are sufficient to warrant the additional administrative effort and cost involved.
(a) Insert the clause at 52.216-16, Incentive Price Revision—Firm Target, in solicitations and contracts when a fixed-price incentive (firm target) contract is contemplated. If the contract calls for supplies or services to be ordered under a provisioning document or Government option and the prices are to be subject to the incentive price revision under the clause, the contracting officer shall use the clause with its
(b) Insert the clause at 52.216-17, Incentive Price Revision—Successive Targets, in solicitations and contracts when a fixed-price incentive (successive targets) contract is contemplated. If the contract calls for supplies or services to be ordered under a provisioning document or Government option and the prices are to be subject to incentive price revision under the clause, the contracting officer shall use the clause with its
(c) The clause at 52.216-7, Allowable Cost and Payment, is prescribed in 16.307(a) for insertion in solicitations and contracts when a cost-plus-incentive-fee contract or a cost-plus-award-fee contract is contemplated.
(d) The clause at 52.216-10, Incentive Fee, is prescribed in 16.307(d) for insertion in solicitations and contracts when a cost-plus-incentive-fee contract is contemplated.
(e) Insert an appropriate award-fee clause in solicitations and contracts when an award-fee contract is contemplated, provided that the clause—
(1) Is prescribed by or approved under agency acquisition regulations;
(2) Is compatible with the clause at 52.216-7, Allowable Cost and Payment; and
(3) Expressly provides that the award amount and the award-fee determination methodology are unilateral decisions made solely at the discretion of the Government.
(a) This subpart prescribes policies and procedures for making awards of indefinite-delivery contracts and establishes a preference for making multiple awards of indefinite-quantity contracts.
(b) This subpart does not limit the use of other than competitive procedures authorized by part 6.
(c) Nothing in this subpart restricts the authority of the General Services Administration (GSA) to enter into schedule, multiple award, or task or delivery order contracts under any other provision of law. Therefore, GSA regulations and the coverage for the Federal Supply Schedule program in subpart 8.4 and part 38 take precedence over this subpart.
(d) The statutory multiple award preference implemented by this subpart does not apply to architect-engineer contracts subject to the procedures in subpart 36.6. However, agencies are not precluded from making multiple awards for architect-engineer services using the procedures in this subpart, provided the selection of contractors and placement of orders are consistent with subpart 36.6.
As used in this subpart—
(a) There are three types of indefinite-delivery contracts: Definite-quantity contracts, requirements contracts, and indefinite-quantity contracts. The appropriate type of indefinite-delivery contract may be used to acquire supplies and/or services when the exact times and/or exact quantities of future deliveries are not known at the time of contract award. Pursuant to 10 U.S.C. 2304d and section 303K of the Federal Property and Administrative Services Act of 1949, requirements contracts and indefinite-quantity contracts are also known as delivery order contracts or task order contracts.
(b) The various types of indefinite-delivery contracts offer the following advantages:
(1) All three types permit (i) Government stocks to be maintained at minimum levels and (ii) direct shipment to users.
(2) Indefinite-quantity contracts and requirements contracts also permit (i) flexibility in both quantities and delivery scheduling and (ii) ordering of supplies or services after requirements materialize.
(3) Indefinite-quantity contracts limit the Government's obligation to the minimum quantity specified in the contract.
(4) Requirements contracts may permit faster deliveries when production lead time is involved, because contractors are usually willing to maintain limited stocks when the Government will obtain all of its actual purchase requirements from the contractor.
(c) Indefinite-delivery contracts may provide for any appropriate cost or pricing arrangement under part 16. Cost or pricing arrangements that provide for an estimated quantity of supplies or services (e.g., estimated number of labor hours) must comply with the appropriate procedures of this subpart.
(a)
(b)
(a)
(1) For the information of offerors and contractors, the contracting officer shall state a realistic estimated total quantity in the solicitation and resulting contract. This estimate is not a representation to an offeror or contractor that the estimated quantity will be required or ordered, or that conditions affecting requirements will be stable or normal. The contracting officer may obtain the estimate from records of previous requirements and consumption, or by other means, and should base the estimate on the most current information available.
(2) The contract shall state, if feasible, the maximum limit of the contractor's obligation to deliver and the Government's obligation to order. The contract may also specify maximum or minimum quantities that the Government may order under each individual order and the maximum that it may order during a specified period of time.
(b)
(c)
(d)
(2) The limitation in paragraph (d)(1) of this section is not applicable to an acquisition of supplies or services that includes the acquisition of advisory and assistance services, if the contracting officer or other official designated by the head of the agency determines that the advisory and assistance services are necessarily incident to, and not a significant component of, the contract.
(a)
(1) The contract must require the Government to order and the contractor to furnish at least a stated minimum quantity of supplies or services. In addition, if ordered, the contractor must furnish any additional quantities, not to exceed the stated maximum. The contracting officer should establish a reasonable maximum quantity based on market research, trends on recent contracts for similar supplies or services, survey of potential users, or any other rational basis.
(2) To ensure that the contract is binding, the minimum quantity must be more than a nominal quantity, but it should not exceed the amount that the Government is fairly certain to order.
(3) The contract may also specify maximum or minimum quantities that the Government may order under each
(4) A solicitation and contract for an indefinite quantity must—
(i) Specify the period of the contract, including the number of options and the period for which the Government may extend the contract under each option;
(ii) Specify the total minimum and maximum quantity of supplies or services the Government will acquire under the contract;
(iii) Include a statement of work, specifications, or other description, that reasonably describes the general scope, nature, complexity, and purpose of the supplies or services the Government will acquire under the contract in a manner that will enable a prospective offeror to decide whether to submit an offer;
(iv) State the procedures that the Government will use in issuing orders, including the ordering media, and, if multiple awards may be made, state the procedures and selection criteria that the Government will use to provide awardees a fair opportunity to be considered for each order (see 16.505(b)(1));
(v) Include the name, address, telephone number, facsimile number, and e-mail address of the agency task and delivery order ombudsman (see 16.505(b)(5)) if multiple awards may be made;
(vi) Include a description of the activities authorized to issue orders; and
(vii) Include authorization for placing oral orders, if appropriate, provided that the Government has established procedures for obligating funds and that oral orders are confirmed in writing.
(b)
(c)
(ii)(A) The contracting officer must determine whether multiple awards are appropriate as part of acquisition planning. The contracting officer must avoid situations in which awardees specialize exclusively in one or a few areas within the statement of work, thus creating the likelihood that orders in those areas will be awarded on a sole-source basis; however, each awardee need not be capable of performing every requirement as well as any other awardee under the contracts. The contracting officer should consider the following when determining the number of contracts to be awarded:
(
(
(
(
(B) The contracting officer must not use the multiple award approach if—
(
(
(
(
(
(
(C) The contracting officer must document the decision whether or not to use multiple awards in the acquisition plan or contract file. The contracting officer may determine that a class of acquisitions is not appropriate for multiple awards (see subpart 1.7).
(2)
(A) The contracting officer or other official designated by the head of the agency determines in writing, as part of acquisition planning, that multiple awards are not practicable. The contracting officer or other official must determine that only one contractor can reasonably perform the work because either the scope of work is unique or highly specialized or the tasks so integrally related;
(B) The contracting officer or other official designated by the head of the agency determines in writing, after the evaluation of offers, that only one offeror is capable of providing the services required at the level of quality required; or
(C) Only one offer is received.
(ii) The requirements of paragraph (c)(2)(i) of this section do not apply if the contracting officer or other official designated by the head of the agency determines that the advisory and assistance services are incidental and not a significant component of the contract.
(a)
(2) Individual orders shall clearly describe all services to be performed or supplies to be delivered so the full cost or price for the performance of the work can be established when the order is placed. Orders shall be within the scope, issued within the period of performance, and be within the maximum value of the contract.
(3) Performance-based work statements must be used to the maximum extent practicable, if the contract or order is for services (see 37.102(a)).
(4) When acquiring information technology and related services, consider the use of modular contracting to reduce program risk (see 39.103(a)).
(5) Orders may be placed by using any medium specified in the contract.
(6) Orders placed under indefinite-delivery contracts must contain the following information:
(i) Date of order.
(ii) Contract number and order number.
(iii) For supplies and services, contract item number and description, quantity, and unit price or estimated cost or fee.
(iv) Delivery or performance schedule.
(v) Place of delivery or performance (including consignee).
(vi) Any packaging, packing, and shipping instructions.
(vii) Accounting and appropriation data.
(viii) Method of payment and payment office, if not specified in the contract (see 32.1110(e)).
(7) Orders placed under a task-order contract or delivery-order contract awarded by another agency (
(i) Are not exempt from the development of acquisition plans (see subpart 7.1), and an information technology acquisition strategy (see part 39);
(ii) May not be used to circumvent conditions and limitations imposed on the use of funds (
(iii) Must comply with all FAR requirements for a bundled contract when the order meets the definition of “bundled contract” (
(8) In accordance with section 1427(b) of Public Law 108-136, orders placed under multi-agency contracts for services that substantially or to a dominant extent specify performance of architect-engineer services, as defined in 2.101, shall—
(i) Be awarded using the procedures at Subpart 36.6; and
(ii) Require the direct supervision of a professional architect or engineer licensed, registered or certified in the State, Federal District, or outlying area, in which the services are to be performed.
(9) No protest under subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a task-order contract or delivery-order contract, except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract (10 U.S.C. 2304c(d) and 41 U.S.C. 253j(d)).
(b)
(ii) The contracting officer may exercise broad discretion in developing appropriate order placement procedures. The contracting officer should keep submission requirements to a minimum. Contracting officers may use streamlined procedures, including oral presentations. In addition, the contracting officer need not contact each of the multiple awardees under the contract before selecting an order awardee if the contracting officer has information available to ensure that each awardee is provided a fair opportunity to be considered for each order. The competition requirements in part 6 and the policies in subpart 15.3 do not apply to the ordering process. However, the contracting officer must—
(A) Develop placement procedures that will provide each awardee a fair opportunity to be considered for each order and that reflect the requirement and other aspects of the contracting environment;
(B) Not use any method (such as allocation or designation of any preferred awardee) that would not result in fair consideration being given to all awardees prior to placing each order;
(C) Tailor the procedures to each acquisition;
(D) Include the procedures in the solicitation and the contract; and
(E) Consider price or cost under each order as one of the factors in the selection decision.
(iii) The contracting officer should consider the following when developing the procedures:
(A)(
(
(
(
(
(
(
(B) Formal evaluation plans or scoring of quotes or offers are not required.
(2)
(i) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.
(ii) Only one awardee is capable of providing the supplies or services required at the level of quality required
(iii) The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.
(iv) It is necessary to place an order to satisfy a minimum guarantee.
(3)
(4)
(5)
(c)
(2) The 5-year limitation does not apply when—
(i) A longer ordering period is specifically authorized by a statute; or
(ii) The contract is for an acquisition of supplies or services that includes the acquisition of advisory and assistance services and the contracting officer, or other official designated by the head of the agency, determines that the advisory and assistance services are incidental and not a significant component of the contract.
(3) The contracting officer may extend the contract on a sole-source basis only once for a period not to exceed 6 months if the contracting officer, or other official designated by the head of the agency, determines that—
(i) The award of a follow-on contract is delayed by circumstances that were not reasonably foreseeable at the time the initial contract was entered into; and
(ii) The extension is necessary to ensure continuity of services, pending the award of the follow-on contract.
(a) Insert the clause at 52.216-18, Ordering, in solicitations and contracts when a definite-quantity contract, a requirements contract, or an indefinite-quantity contract is contemplated.
(b) Insert a clause substantially the same as the clause at 52.216-19, Order Limitations, in solicitations and contracts when a definite-quantity contract, a requirements contract, or an indefinite-quantity contract is contemplated.
(c) Insert the clause at 52.216-20, Definite Quantity, in solicitations and contracts when a definite-quantity contract is contemplated.
(d)(1) Insert the clause at 52.216-21, Requirements, in solicitations and contracts when a requirements contract is contemplated.
(2) If the contract is for nonpersonal services and related supplies and covers estimated requirements that exceed a specific Government activity's internal capability to produce or perform, use the clause with its
(3) If the contract includes subsistence for both Government use and resale in the same Schedule, and similar products may be acquired on a brand-name basis, use the clause with its
(4) If the contract involves a partial small business set-aside, use the clause with its
(5) If the contract—
(i) Includes subsistence for Government use and resale in the same schedule and similar products may be acquired on a brand-name basis; and
(ii) Involves a partial small business set-aside, use the clause with its
(e) Insert the clause at 52.216-22, Indefinite Quantity, in solicitations and contracts when an indefinite-quantity contract is contemplated.
(f) Insert the provision at 52.216-27, Single or Multiple Awards, in solicitations for indefinite-quantity contracts that may result in multiple contract awards. Modify the provision to specify the estimated number of awards. Do not use this provision for advisory and assistance services contracts that exceed 3 years and $10 million (including all options).
(g) Insert the provision at 52.216-28, Multiple Awards for Advisory and Assistance Services, in solicitations for task-order contracts for advisory and assistance services that exceed 3 years and $10 million (including all options), unless a determination has been made under 16.504(c)(2)(i)(A). Modify the provision to specify the estimated number of awards.
(a)
(b)
(1)
(2)
(3)
(i) The total estimated contract price does not exceed $25,000 or the estimated price of material so charged does not exceed 20 percent of the estimated contract price;
(ii) The material to be so charged is identified in the contract;
(iii) No element of profit on material so charged is included as profit in the fixed hourly labor rates; and
(iv) The contract provides (A) that the price to be paid for such material shall be based on an established catalog or list price in effect when material is furnished, less all applicable discounts to the Government, and (B) that in no event shall the price exceed the contractor's sales price to its most-favored customer for the same item in like quantity, or the current market price, whichever is lower.
(c)
A letter contract is a written preliminary contractual instrument that authorizes the contractor to begin immediately manufacturing supplies or performing services.
(a) A letter contract may be used when (1) the Government's interests demand that the contractor be given a binding commitment so that work can start immediately and (2) negotiating a definitive contract is not possible in sufficient time to meet the requirement. However, a letter contract should be as complete and definite as feasible under the circumstances.
(b) When a letter contract award is based on price competition, the contracting officer shall include an overall price ceiling in the letter contract.
(c) Each letter contract shall, as required by the clause at 52.216-25, Contract Definitization, contain a negotiated definitization schedule including (1) dates for submission of the contractor's price proposal, required cost or pricing data, and, if required, make-or-buy and subcontracting plans, (2) a date for the start of negotiations, and (3) a target date for definitization, which shall be the earliest practicable date for definitization. The schedule will provide for definitization of the contract within 180 days after the date of the letter contract or before completion of 40 percent of the work to be performed, whichever occurs first. However, the contracting officer may, in extreme cases and according to agency procedures, authorize an additional period. If, after exhausting all reasonable efforts, the contracting officer and the contractor cannot negotiate a definitive contract because of failure to reach agreement as to price or fee, the clause at 52.216-25 requires the contractor to proceed with the work and provides that the contracting officer may, with the approval of the head of the contracting activity, determine a reasonable price or fee in accordance with subpart 15.4 and part 31, subject to appeal as provided in the Disputes clause.
(d) The maximum liability of the Government inserted in the clause at 52.216-24, Limitation of Government Liability, shall be the estimated amount necessary to cover the contractor's requirements for funds before definitization. However, it shall not exceed 50 percent of the estimated cost of the definitive contract unless approved in advance by the official that authorized the letter contract.
(e) The contracting officer shall assign a priority rating to the letter contract if it is appropriate under 11.604.
A letter contract may be used only after the head of the contracting activity or a designee determines in writing that no other contract is suitable. Letter contracts shall not—
(a) Commit the Government to a definitive contract in excess of the funds available at the time the letter contract is executed;
(b) Be entered into without competition when competition is required by part 6; or
(c) Be amended to satisfy a new requirement unless that requirement is inseparable from the existing letter contract. Any such amendment is subject to the same requirements and limitations as a new letter contract.
(a) The contracting officer shall include in each letter contract the clauses required by this regulation for the type of definitive contract contemplated and any additional clauses known to be appropriate for it.
(b) In addition, the contracting officer shall insert the following clauses in solicitations and contracts when a letter contract is contemplated:
(1) The clause at 52.216-23, Execution and Commencement of Work, except that this clause may be omitted from letter contracts awarded on SF 26;
(2) The clause at 52.216-24, Limitation of Government Liability, with dollar amounts completed in a manner consistent with 16.603-2(d); and
(3) The clause at 52.216-25, Contract Definitization, with its paragraph (b) completed in a manner consistent with 16.603-2(c). If, at the time of entering into the letter contract, the contracting officer knows that the definitive contract will be based on adequate price competition or will otherwise meet the criteria of 15.403-1 for not requiring submission of cost or pricing data, the words “and cost or pricing data supporting its proposal” may be deleted from paragraph (a) of the clause. If the letter contract is being awarded on the basis of price competition, the contracting officer shall use the clause with its
(c) The contracting officer shall also insert the clause at 52.216-26, Payments of Allowable Costs Before Definitization, in solicitations and contracts if a cost-reimbursement definitive contract is contemplated, unless the acquisition involves conversion, alteration, or repair of ships.
This subpart prescribes policies and procedures for establishing and using basic agreements and basic ordering agreements. (See 13.303 for blanket purchase agreements (BPA's) and see 35.015(b) for additional coverage of basic agreements with educational institutions and nonprofit organizations.)
(a)
(b)
(1) Basic agreements shall contain (i) clauses required for negotiated contracts by statute, executive order, and this regulation and (ii) other clauses prescribed in this regulation or agency acquisition regulations that the parties agree to include in each contract as applicable.
(2) Each basic agreement shall provide for discontinuing its future applicablity upon 30 days' written notice by either party.
(3) Each basic agreement shall be reviewed annually before the anniversary of its effective date and revised as necessary to conform to the requirements of this regulation. Basic agreements may need to be revised before the annual review due to mandatory statutory requirements. A basic agreement may be changed only by modifying the agreement itself and not by a contract incorporating the agreement.
(4) Discontinuing or modifying a basic agreement shall not affect any prior contract incorporating the basic agreement.
(5) Contracting officers of one agency should obtain and use existing basic
(c)
(1) Cite appropriations or obligate funds;
(2) State or imply any agreement by the Government to place future contracts or orders with the contractor; or
(3) Be used in any manner to restrict competition.
(d)
(2) The contracting officer shall include clauses pertaining to subjects not covered by the basic agreement, but applicable to the contract being negotiated, in the same manner as if there were no basic agreement.
(3) If an existing contract is modified to effect new acquisition, the modification shall incorporate the most recent basic agreement, which shall apply only to work added by the modification, except that this action is not mandatory if the contract or modification includes all clauses required by statute, executive order, and this regulation as of the date of the modification. However, if it is in the Government's interest and the contractor agrees, the modification may incorporate the most recent basic agreement for application to the entire contract as of the date of the modification.
(a)
(b)
(c)
(1) Each basic ordering agreement shall—
(i) Describe the method for determining prices to be paid to the contractor for the supplies or services;
(ii) Include delivery terms and conditions or specify how they will be determined;
(iii) List one or more Government activities authorized to issue orders under the agreement;
(iv) Specify the point at which each order becomes a binding contract (e.g., issuance of the order, acceptance of the order in a specified manner, or failure to reject the order within a specified number of days);
(v) Provide that failure to reach agreement on price for any order issued before its price is established (see paragraph (d)(3) below) is a dispute under the Disputes clause included in the basic ordering agreement; and
(vi) If fast payment procedures will apply to orders, include the special data required by 13.403.
(2) Each basic ordering agreement shall be reviewed annually before the anniversary of its effective date and revised as necessary to conform to the requirements of this regulation. Basic ordering agreements may need to be revised before the annual review due to mandatory statutory requirements. A basic ordering agreement shall be
(d)
(1) Before issuing an order under a basic ordering agreement, the contracting officer shall—
(i) Obtain competition in accordance with part 6;
(ii) If the order is being placed after competition, ensure that use of the basic ordering agreement is not prejudicial to other offerors; and
(iii) Sign or obtain any applicable justifications and approvals, and any determination and findings, in accordance with 1.602-1(b), and comply with other requirements, as if the order were a contract awarded independently of a basic ordering agreement.
(2) Contracting officers shall—
(i) Issue orders under basic ordering agreements on Optional Form (OF) 347, Order for Supplies or Services, or on any other appropriate contractual instrument;
(ii) Incorporate by reference the provisions of the basic ordering agreement;
(iii) If applicable, cite the authority under 6.302 in each order; and
(iv) Comply with 5.203 when synopsis is required by 5.201.
(3) The contracting officer shall neither make any final commitment nor authorize the contractor to begin work on an order under a basic ordering agreement until prices have been established, unless the order establishes a ceiling price limiting the Government's obligation and either—
(i) The basic ordering agreement provides adequate procedures for timely pricing of the order early in its performance period; or
(ii) The need for the supplies or services is compelling and unusually urgent (i.e., when the Government would be seriously injured, financially or otherwise, if the requirement is not met sooner than would be possible if prices were established before the work began). The contracting officer shall proceed with pricing as soon as practical. In no event shall an entire order be priced retroactively.
40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c).
This part prescribes policies and procedures for the acquisition of supplies and services through special contracting methods, including—
(a) Multi-year contracting;
(b) Options; and
(c) Leader company contracting.
This subpart implements Section 304B of the Federal Property and Administrative Services Act of 1949 (41 U.S.C. 254c) and 10 U.S.C. 2306b and provides policy and procedures for the use of multiyear contracting.
For DoD, NASA, and the Coast Guard, the authorities cited in 17.101 do not apply to contracts for the purchase of supplies to which 40 U.S.C. 759 applies (information resource management supply contracts).
As used in this subpart—
(1) Notifies the contractor of nonavailability of funds for contract performance for any subsequent program year, or
(2) Fails to notify the contractor that funds are available for performance of the succeeding program year requirement.
(a) Multiyear contracting is a special contracting method to acquire known requirements in quantities and total cost not over planned requirements for up to 5 years unless otherwise authorized by statute, even though the total funds ultimately to be obligated may not be available at the time of contract award. This method may be used in sealed bidding or contracting by negotiation.
(b) Multiyear contracting is a flexible contract method applicable to a wide range of acquisitions. The extent to which cancellation terms are used in multiyear contracts will depend on the unique circumstances of each contract. Accordingly, for multiyear contracts, the agency head may authorize modification of the requirements of this subpart and the clause at 52.217-2, Cancellation Under Multiyear Contracts.
(c) Agency funding of multiyear contracts shall conform to the policies in OMB Circulars A-11 (Preparation and Submission of Budget Estimates) and A-34 (Instructions on Budget Execution) and other applicable guidance regarding the funding of multiyear contracts. As provided by that guidance, the funds obligated for multiyear contracts must be sufficient to cover any potential cancellation and/or termination costs; and multiyear contracts for the acquisition of fixed assets should be fully funded or funded in stages that are economically or programmatically viable.
(d) The termination for convenience procedure may apply to any Government contract, including multiyear contracts. As contrasted with cancellation, termination can be effected at any time during the life of the contract (cancellation is effected between fiscal years) and can be for the total quantity or partial quantity (where as cancellation must be for all subsequent fiscal years' quantities).
(a) Except for DoD, NASA, and the Coast Guard, the contracting officer may enter into a multiyear contract if the head of the contracting activity determines that—
(1) The need for the supplies or services is reasonably firm and continuing over the period of the contract; and
(2) A multiyear contract will serve the best interests of the United States by encouraging full and open competition or promoting economy in administration, performance, and operation of the agency's programs.
(b) For DoD, NASA, and the Coast Guard, the head of the agency may enter into a multiyear contract for supplies if—
(1) The use of such a contract will result in substantial savings of the total estimated costs of carrying out the program through annual contracts;
(2) The minimum need to be purchased is expected to remain substantially unchanged during the contemplated contract period in terms of production rate, procurement rate, and total quantities;
(3) There is a stable design for the supplies to be acquired, and the technical risks associated with such supplies are not excessive;
(4) There is a reasonable expectation that, throughout the contemplated contract period, the head of the agency will request funding for the contract at a level to avoid contract cancellation; and
(5) The estimates of both the cost of the contract and the cost avoidance through the use of a multiyear contract are realistic.
(c) The multiyear contracting method may be used for the acquisition of supplies or services.
(d) If funds are not appropriated to support the succeeding years' requirements, the agency must cancel the contract.
Use of multiyear contracting is encouraged to take advantage of one or more of the following:
(a) Lower costs.
(b) Enhancement of standardization.
(c) Reduction of administrative burden in the placement and administration of contracts.
(d) Substantial continuity of production or performance, thus avoiding annual startup costs, preproduction testing costs, make-ready expenses, and phaseout costs.
(e) Stabilization of contractor work forces.
(f) Avoidance of the need for establishing quality control techniques and procedures for a new contractor each year.
(g) Broadening the competitive base with opportunity for participation by firms not otherwise willing or able to
(h) Providing incentives to contractors to improve productivity through investment in capital facilities, equipment, and advanced technology.
(a)
(b)
(c)
(2) In determining cancellation ceilings, the contracting officer must estimate reasonable preproduction or startup, labor learning, and other nonrecurring costs to be incurred by an “average” prime contractor or subcontractor, which would be applicable to, and which normally would be amortized over, the items or services to be furnished under the multiyear requirements. Nonrecurring costs include such costs, where applicable, as plant or equipment relocation or rearrangement, special tooling and special test equipment, preproduction engineering, initial rework, initial spoilage, pilot runs, allocable portions of the costs of facilities to be acquired or established for the conduct of the work, costs incurred for the assembly, training, and transportation to and from the job site of a specialized work force, and unrealized labor learning. They shall not include any costs of labor or materials, or other expenses (except as indicated above), which might be incurred for performance of subsequent program year requirements. The total estimate of the above costs must then be compared with the best estimate of the contract cost to arrive at a reasonable percentage or dollar figure. To perform this calculation, the contracting officer should obtain in-house engineering cost estimates identifying the detailed recurring and nonrecurring costs, and the effect of labor learning.
(3) The contracting officer shall establish cancellation dates for each program year's requirements regarding production lead time and the date by which funding for these requirements can reasonably be established. The contracting officer shall include these dates in the schedule, as appropriate.
(d)
(e)
(f)
(g)
(h)
Solicitations for multiyear contracts shall reflect all the factors to be considered for evaluation, specifically including the following:
(a) The requirements, by item of supply or service, for the—
(1) First program year; and
(2) Multiyear contract including the requirements for each program year.
(b) Criteria for comparing the lowest evaluated submission on the first program year requirements to the lowest evaluated submission on the multiyear requirements.
(c) A provision that, if the Government determines before award that only the first program year requirements are needed, the Government's evaluation of the price or estimated cost and fee shall consider only the first year.
(d) A provision specifying a separate cancellation ceiling (on a percentage or dollar basis) and dates applicable to each program year subject to a cancellation (see 17.106-1 (c) and (d)).
(e) A statement that award will not be made on less than the first program year requirements.
(f) The Government's administrative costs of annual contracting may be used as a factor in the evaluation only if they can be reasonably established and are stated in the solicitation.
(g) The cancellation ceiling shall not be an evaluation factor.
(a)
(1) Multiyear contracting shall be used in such a manner as to seek, retain, and promote the use under such contracts of companies that are subcontractors, suppliers, and vendors; and
(2) Upon accrual of any payment or other benefit under such a multiyear contract to any subcontractor, supplier, or vendor company participating in such contract, such payment or benefit shall be delivered to such company in the most expeditious manner practicable.
(b)
(c)
(d) Contracts awarded under the multiyear procedure shall be firm-fixed-price, fixed-price with economic price adjustment, or fixed-price incentive.
(e)
(f)
(g)
Benefits may accrue by including options in a multiyear contract. In that event, contracting officers must follow the requirements of subpart 17.2. Options should not include charges for plant and equipment already amortized, or other nonrecurring charges which were included in the basic contract.
(a) Except for DoD, NASA, and the Coast Guard, a multiyear contract which includes a cancellation ceiling in excess of $10 million may not be awarded until the head of the agency gives written notification of the proposed contract and of the proposed cancellation ceiling for that contract to the committees on appropriations of the House of Representatives and Senate and the appropriate oversight committees of the House and Senate for the agency in question. Information on such committees may not be readily available to contracting officers. Accordingly, agencies should provide such information through its internal regulations. The contract may not be awarded until the thirty-first day after the date of notification.
(b) For DoD, NASA, and the Coast guard, a multiyear contract which includes a cancellation ceiling in excess of $100 million may not be awarded until the head of the agency gives written notification of the proposed contract and of the proposed cancellation ceiling for that contract to the committees on armed services and on appropriations of the House of Representative and Senate. The contract may not be awarded until the thirty-first day after the date of notification.
(a) The contracting officer shall insert the clause at 52.217-2, Cancellation Under Multiyear Contracts, in solicitations and contracts when a multiyear contract is contemplated.
(b)
(1) Shall add the clause at 52.222-43, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Multiple Year and Option Contracts), when the contract includes the clause at 52.222-41, Service Contract Act of 1965, as amended;
(2) May modify the clause at 52.222-43 in overseas contracts when laws, regulations, or international agreements require contractors to pay higher wage rates; or
(3) May use an economic price adjustment clause authorized by 16.203, when potential fluctuations require coverage and are not included in cost contingencies provided for by the clause at 52.222-43.
This subpart prescribes policies and procedures for the use of option solicitation provisions and contract clauses.
(a) Services involving the construction, alteration, or repair (including dredging, excavating, and painting) of buildings, bridges, roads, or other kinds of real property;
(b) Architect-engineer services; and
(c) Research and development services.
(a) Subject to the limitations of paragraphs (b) and (c) of this section, for both sealed bidding and contracting by negotiation, the contracting officer may include options in contracts when it is in the Government's interest. When using sealed bidding, the contracting officer shall make a written determination that there is a reasonable likelihood that the options will be exercised before including the provision at 52.217-5, Evaluation of Options, in the solicitation. (See 17.207(f) with regard to the exercise of options.)
(b) Inclusion of an option is normally not in the Government's interest when, in the judgment of the contracting officer—
(1) The foreseeable requirements involve—
(i) Minimum economic quantities (
(ii) Delivery requirements far enough into the future to permit competitive acquisition, production, and delivery.
(2) An indefinite quantity or requirements contract would be more appropriate than a contract with options. However, this does not preclude the use of an indefinite quantity contract or requirements contract with options.
(c) The contracting officer shall not employ options if—
(1) The contractor will incur undue risks; e.g., the price or availability of necessary materials or labor is not reasonably foreseeable;
(2) Market prices for the supplies or services involved are likely to change substantially; or
(3) The option represents known firm requirements for which funds are available unless (i) the basic quantity is a learning or testing quantity and (ii) competition for the option is impracticable once the initial contract is awarded.
(d) In recognition of (1) the Government's need in certain service contracts for continuity of operations and (2) the potential cost of disrupted support, options may be included in service contracts if there is an anticipated need for a similar service beyond the first contract period.
(a) Solicitations shall include appropriate option provisions and clauses when resulting contracts will provide for the exercise of options (see 17.208).
(b) Solicitations containing option provisions shall state the basis of evaluation, either exclusive or inclusive of the option and, when appropriate, shall inform offerors that it is anticipated that the Government may exercise the option at time of award.
(c) Solicitations normally should allow option quantities to be offered without limitation as to price, and there shall be no limitation as to price if the option quantity is to be considered in the evaluation for award (see 17.206).
(d) Solicitations that allow the offer of options at unit prices which differ from the unit prices for the basic requirement shall state that offerors may offer varying prices for options, depending on the quantities actually ordered and the dates when ordered.
(e) If it is anticipated that the Government may exercise an option at the time of award and if the condition specified in paragraph (d) above applies, solicitations shall specify the price at which the Government will evaluate the option (highest option price offered or option price for specified requirements).
(f) Solicitations may, in unusual circumstances, require that options be offered at prices no higher than those for the initial requirement; e.g., when (1) the option cannot be evaluated under 17.206, or (2) future competition for the option is impracticable.
(g) Solicitations that require the offering of an option at prices no higher than those for the initial requirement shall—
(1) Specify that the Government will accept an offer containing an option price higher than the base price only if the acceptance does not prejudice any other offeror; and
(2) Limit option quantities for additional supplies to not more than 50 percent of the initial quantity of the same contract line item. In unusual circumstances, an authorized person at a level above the contracting officer may approve a greater percentage of quantity.
(h) Include the value of options in determining if the acquisition will exceed the World Trade Organization Government Procurement Agreement or Free Trade Agreement thresholds.
(a) The contract shall specify limits on the purchase of additional supplies or services, or the overall duration of the term of the contract, including any extension.
(b) The contract shall state the period within which the option may be exercised.
(c) The period shall be set so as to provide the contractor adequate lead time to ensure continuous production.
(d) The period may extend beyond the contract completion date for service contracts. This is necessary for situations when exercise of the option would result in the obligation of funds that are not available in the fiscal year in which the contract would otherwise be completed.
(e) Unless otherwise approved in accordance with agency procedures, the total of the basic and option periods shall not exceed 5 years in the case of services, and the total of the basic and option quantities shall not exceed the requirement for 5 years in the case of supplies. These limitations do not apply to information technology contracts. However, statutes applicable to various classes of contracts, for example, the Service Contract Act (see 22.1002-1), may place additional restrictions on the length of contracts.
(f) Contracts may express options for increased quantities of supplies or services in terms of (1) percentage of specific line items, (2) increase in specific line items, or (3) additional numbered line items identified as the option.
(g) Contracts may express extensions of the term of the contract as an amended completion date or as additional time for performance; e.g., days, weeks, or months.
(a) The contracting officer shall justify in writing the quantities or the term under option, the notification period for exercising the option, and any limitation on option price under 17.203(g); and shall include the justification document in the contract file.
(b) Any justifications and approvals and any determination and findings required by part 6 shall specify both the basic requirement and the increase permitted by the option.
(a) In awarding the basic contract, the contracting officer shall, except as provided in paragraph (b) of this section, evaluate offers for any option quantities or periods contained in a solicitation when it has been determined prior to soliciting offers that the Government is likely to exercise the options. (See 17.208.)
(b) The contracting officer need not evaluate offers for any option quantities when it is determined that evaluation would not be in the best interests of the Government and this determination is approved at a level above
(a) When exercising an option, the contracting officer shall provide written notice to the contractor within the time period specified in the contract.
(b) When the contract provides for economic price adjustment and the contractor requests a revision of the price, the contracting officer shall determine the effect of the adjustment on prices under the option before the option is exercised.
(c) The contracting officer may exercise options only after determining that—
(1) Funds are available;
(2) The requirement covered by the option fulfills an existing Government need;
(3) The exercise of the option is the most advantageous method of fulfilling the Government's need, price and other factors (see paragraphs (d) and (e) below) considered; and
(4) The option was synopsized in accordance with part 5 unless exempted by 5.202(a)(10) or other appropriate exemptions in 5.202.
(d) The contracting officer, after considering price and other factors, shall make the determination on the basis of one of the following:
(1) A new solicitation fails to produce a better price or a more advantageous offer than that offered by the option. If it is anticipated that the best price available is the option price or that this is the more advantageous offer, the contracting officer should not use this method of testing the market.
(2) An informal analysis of prices or an examination of the market indicates that the option price is better than prices available in the market or that the option is the more advantageous offer.
(3) The time between the award of the contract containing the option and the exercise of the option is so short that it indicates the option price is the lowest price obtainable or the more advantageous offer. The contracting officer shall take into consideration such factors as market stability and comparison of the time since award with the usual duration of contracts for such supplies or services.
(e) The determination of other factors under (c)(3) of this section should take into account the Government's need for continuity of operations and potential costs of disrupting operations.
(f) Before exercising an option, the contracting officer shall make a written determination for the contract file that exercise is in accordance with the terms of the option, the requirements of this section, and part 6. To satisfy requirements of part 6 regarding full and open competition, the option must have been evaluated as part of the initial competition and be exercisable at an amount specified in or reasonably determinable from the terms of the basic contract, e.g.—
(1) A specific dollar amount;
(2) An amount to be determined by applying provisions (or a formula) provided in the basic contract, but not including renegotiation of the price for work in a fixed-price type contract;
(3) In the case of a cost-type contract, if—
(i) The option contains a fixed or maximum fee; or
(ii) The fixed or maximum fee amount is determinable by applying a formula contained in the basic contract (but see 16.102(c));
(4) A specific price that is subject to an economic price adjustment provision; or
(5) A specific price that is subject to change as the result of changes to prevailing labor rates provided by the Secretary of Labor.
(g) The contract modification or other written document which notifies the contractor of the exercise of the option shall cite the option clause as authority.
(a) Insert a provision substantially the same as the provision at 52.217-3, Evaluation Exclusive of Options, in solicitations when the solicitation includes an option clause and does not include one of the provisions prescribed in paragraph (b) or (c) below.
(b) Insert a provision substantially the same as the provision at 52.217-4, Evaluation of Options Exercised at Time of Contract Award, in solicitations when the solicitation includes an option clause, the contracting officer has determined that there is a reasonable likelihood that the option will be exercised, and the option may be exercised at the time of contract award.
(c) Insert a provision substantially the same as the provision at 52.217-5, Evaluation of Options, in solicitations when—
(1) The solicitation contains an option clause;
(2) An option is not to be exercised at the time of contract award;
(3) A firm-fixed-price contract, a fixed-price contract with economic price adjustment, or other type of contract approved under agency procedures is contemplated; and
(4) The contracting officer has determined that there is a reasonable likelihood that the option will be exercised. For sealed bids, the determination shall be in writing.
(d) Insert a clause substantially the same as the clause at 52.217-6, Option for Increased Quantity, in solicitations and contracts, other than those for services, when the inclusion of an option is appropriate (see 17.200 and 17.202) and the option quantity is expressed as a percentage of the basic contract quantity or as an additional quantity of a specific line item.
(e) Insert a clause substantially the same as the clause at 52.217-7, Option for Increased Quantity—Separately Priced Line Item, in solicitations and contracts, other than those for services, when the inclusion of an option is appropriate (see 17.200 and 17.202) and the option quantity is identified as a separately priced line item having the same nomenclature as a corresponding basic contract line item.
(f) Insert a clause substantially the same as the clause at 52.217-8, Options to Extend Services, in solicitations and contracts for services when the inclusion of an option is appropriate. (See 17.200, 17.202, and 37.111.)
(g) Insert a clause substantially the same as the clause at 52.217-9, Option to Extend the Term of the Contract, in solicitations and contracts when the inclusion of an option is appropriate (see 17.200 and 17.202) and it is necessary to include in the contract any or all of the following:
(1) A requirement that the Government must give the contractor a preliminary written notice of its intent to extend the contract.
(2) A statement that an extension of the contract includes an extension of the option.
(3) A specified limitation on the total duration of the contract.
Leader company contracting is an extraordinary acquisition technique that is limited to special circumstances and utilized only when its use is in accordance with agency procedures. A developer or sole producer of a product or system is designated under this acquisition technique to be the leader company, and to furnish assistance and know-how under an approved contract to one or more designated follower companies, so they can become a source of supply. The objectives of this technique are one or more of the following:
(a) Reduce delivery time.
(b) Achieve geographic dispersion of suppliers.
(c) Maximize the use of scarce tooling or special equipment.
(d) Achieve economies in production.
(e) Ensure uniformity and reliability in equipment, compatibility or standardization of components, and interchangeability of parts.
(f) Eliminate problems in the use of proprietary data that cannot be resolved by more satisfactory solutions.
(g) Facilitate the transition from development to production and to subsequent competitive acquisition of end items or major components.
(a) Leader company contracting is to be used only when—
(1) The leader company has the necessary production know-how and is able to furnish required assistance to the follower(s);
(2) No other source can meet the Government's requirements without the assistance of a leader company;
(3) The assistance required of the leader company is limited to that which is essential to enable the follower(s) to produce the items; and
(4) Its use is authorized in accordance with agency procedures.
(b) When leader company contracting is used, the Government shall reserve the right to approve subcontracts between the leader company and the follower(s).
(a) The contracting officer may award a prime contract to a—
(1) Leader company, obligating it to subcontract a designated portion of the required end items to a specified follower company and to assist it to produce the required end items;
(2) Leader company, for the required assistance to a follower company, and a prime contract to the follower for production of the items; or
(3) Follower company, obligating it to subcontract with a designated leader company for the required assistance.
(b) The contracting officer shall ensure that any contract awarded under this arrangement contains a firm agreement regarding disclosure, if any, of contractor trade secrets, technical designs or concepts, and specific data, or software, of a proprietary nature.
(a) This subpart prescribes policies and procedures applicable to interagency acquisitions under the Economy Act (31 U.S.C. 1535). The Economy Act also provides authority for placement of orders between major organizational units within an agency; procedures for such intra-agency transactions are addressed in agency regulations.
(b) The Economy Act applies when more specific statutory authority does not exist. Examples of interagency acquisitions to which the Economy Act does not apply include—
(1) Acquisitions from required or optional sources of supplies prescribed in Part 8, which have separate statutory authority (
(2) Acquisitions using Governmentwide acquisition contracts.
(a) The Economy Act authorizes agencies to enter into mutual agreements to obtain supplies or services by interagency acquisition.
(b) The Economy Act may not be used by an agency to circumvent conditions and limitations imposed on the use of funds.
(c) Acquisitions under the Economy Act are not exempt from the requirements of subpart 7.3, Contractor Versus Government Performance.
(d) The Economy Act may not be used to make acquisitions conflicting
(a) Each Economy Act order shall be supported by a Determination and Finding (D&F). The D&F shall state that—
(1) Use of an interagency acquisition is in the best interest of the Government; and
(2) The supplies or services cannot be obtained as conveniently or economically by contracting directly with a private source.
(b) If the Economy Act order requires contract action by the servicing agency, the D&F must also include a statement that at least one of the following circumstances applies:
(1) The acquisition will appropriately be made under an existing contract of the servicing agency, entered into before placement of the order, to meet the requirements of the servicing agency for the same or similar supplies or services;
(2) The servicing agency has capabilities or expertise to enter into a contract for such supplies or services which is not available within the requesting agency; or
(3) The servicing agency is specifically authorized by law or regulation to purchase such supplies or services on behalf of other agencies.
(c) The D&F shall be approved by a contracting officer of the requesting agency with authority to contract for the supplies or services to be ordered, or by another official designated by the agency head, except that, if the servicing agency is not covered by the Federal Acquisition Regulation, approval of the D&F may not be delegated below the senior procurement executive of the requesting agency.
(a) Before placing an Economy Act order for supplies or services with another Government agency, the requesting agency shall make the D&F required in 17.503. The servicing agency may require a copy of the D&F to be furnished with the order.
(b) The order may be placed on any form or document that is acceptable to both agencies. The order should include—
(1) A description of the supplies or services required;
(2) Delivery requirements;
(3) A funds citation;
(4) A payment provision (see 17.505); and
(5) Acquisition authority as may be appropriate (see 17.504(d)).
(c) The requesting and servicing agencies should agree to procedures for the resolution of disagreements that may arise under interagency acquisitions, including, in appropriate circumstances, the use of a third-party forum. If a third party is proposed, consent of the third party should be obtained in writing.
(d) When an interagency acquisition requires the servicing agency to award a contract, the following procedures also apply:
(1) If a justification and approval or a D&F (other than the requesting agency's D&F required in 17.503) is required by law or regulation, the servicing agency shall execute and issue the justification and approval or D&F. The requesting agency shall furnish the servicing agency any information needed to make the justification and approval or D&F.
(2) The requesting agency shall also be responsible for furnishing other assistance that may be necessary, such as providing information or special contract terms needed to comply with any condition or limitation applicable to the funds of the requesting agency.
(3) The servicing agency is responsible for compliance with all other legal or regulatory requirements applicable to the contract, including
(i) Having adequate statutory authority for the contractual action, and
(ii) Complying fully with the competition requirements of part 6 (see 6.002). However, if the servicing agency is not subject to the Federal Acquisition Regulation, the requesting agency shall verify that contracts utilized to meet its requirements contain provisions protecting the Government from
(e) Nonsponsoring Federal agencies may use a Federally Funded Research and Development Center (FFRDC) only if the terms of the FFRDC's sponsoring agreement permit work from other than a sponsoring agency. Work placed with the FFRDC is subject to the acceptance by the sponsor and must fall within the purpose, mission, general scope of effort, or special competency of the FFRDC. (See 35.017; see also 6.302 for procedures to follow where using other than full and open competition.) The nonsponsoring agency shall provide to the sponsoring agency necessary documentation that the requested work would not place the FFRDC in direct competition with domestic private industry.
(a) The servicing agency may ask the requesting agency, in writing, for advance payment for all or part of the estimated cost of furnishing the supplies or services. Adjustment on the basis of actual costs shall be made as agreed to by the agencies.
(b) If approved by the servicing agency, payment for actual costs may be made by the requesting agency after the supplies or services have been furnished.
(c) Bills rendered or requests for advance payment shall not be subject to audit or certification in advance of payment.
(d) If the Economy Act order requires use of a contract by the servicing agency, then in no event shall the servicing agency require, or the requiring agency pay, any fee or charge in excess of the actual cost (or estimated cost if the actual cost is not known) of entering into and administering the contract or other agreement under which the order is filled.
This subpart prescribes policies and procedures for management and operating contracts for the Department of Energy and any other agency having requisite statutory authority.
(a) Heads of agencies, with requisite statutory authority, may determine in writing to authorize contracting officers to enter into or renew any management and operating contract in accordance with the agency's statutory authority, or the Competition in Contracting Act of 1984, and the agency's regulations governing such contracts. This authority shall not be delegated. Every contract so authorized shall show its authorization upon its face.
(b) Agencies may authorize management and operating contracts only in a manner consistent with the guidance of this subpart and only if they are consistent with the situations described in 17.604.
(c) Within 2 years of the effective date of this regulation, agencies shall review their current contractual arrangements in the light of the guidance of this subpart, in order to (1) identify, modify as necessary, and authorize management and operating contracts and (2) modify as necessary or terminate contracts not so identified and authorized, except that any contract with less than 4 years remaining as of the effective date of this regulation need not be terminated, nor need it be identified, modified, or authorized unless it is renewed or its terms are substantially renegotiated.
(a) Management and operating contracts shall not be authorized for—
(1) Functions involving the direction, supervision, or control of Government
(2) Functions involving the exercise of police or regulatory powers in the name of the Government, other than guard or plant protection services;
(3) Functions of determining basic Government policies;
(4) Day-to-day staff or management functions of the agency or of any of its elements; or
(5) Functions that can more properly be accomplished in accordance with subpart 45.3, Providing Government Property to Contractors.
(b) Since issuance of an authorization under 17.602(a) is deemed sufficient proof of compliance with paragraph (a) immediately above, nothing in paragraph (a) immediately above shall affect the validity or legality of such an authorization.
(c) For use of project labor agreements, see 36.202(d).
A management and operating contract is characterized both by its purpose (see 17.601) and by the special relationship it creates between Government and contractor. The following criteria can generally be applied in identifying management and operating contracts:
(a) Government-owned or -controlled facilities must be utilized; for instance, (1) in the interest of national defense or mobilization readiness, (2) to perform the agency's mission adequately, or (3) because private enterprise is unable or unwilling to use its own facilities for the work.
(b) Because of the nature of the work, or because it is to be performed in Government facilities, the Government must maintain a special, close relationship with the contractor and the contractor's personnel in various important areas (e.g., safety, security, cost control, site conditions).
(c) The conduct of the work is wholly or at least substantially separate from the contractor's other business, if any.
(d) The work is closely related to the agency's mission and is of a long-term or continuing nature, and there is a need (1) to ensure its continuity and (2) for special protection covering the orderly transition of personnel and work in the event of a change in contractors.
(a) Effective work performance under management and operating contracts usually involves high levels of expertise and continuity of operations and personnel. Because of program requirements and the unusual (sometimes unique) nature of the work performed under management and operating contracts, the Government is often limited in its ability to effect competition or to replace a contractor. Therefore contracting officers should take extraordinary steps before award to assure themselves that the prospective contractor's technical and managerial capacity are sufficient, that organizational conflicts of interest are adequately covered, and that the contract will grant the Government broad and continuing rights to involve itself, if necessary, in technical and managerial decisionmaking concerning performance.
(b) The contracting officer shall review each management and operating contract, following agency procedures, at appropriate intervals and at least once every 5 years. The review should determine whether meaningful improvement in performance or cost might reasonably be achieved. Any extension or renewal of an operating and management contract must be authorized at a level within the agency no lower than the level at which the original contract was authorized in accordance with 17.602(a).
(c) Replacement of an incumbent contractor is usually based largely upon expectation of meaningful improvement in performance or cost. Therefore, when reviewing contractor performance, contracting officers should consider—
(1) The incumbent contractor's overall performance, including, specifically, technical, administrative, and cost performance;
(2) The potential impact of a change in contractors on program needs, including safety, national defense, and mobilization considerations; and
(3) Whether it is likely that qualified offerors will compete for the contract.