Sec. 10, 32 Stat. 390, as amended, sec. 6, 46 Stat. 368, sec. 5, 64 Stat. 40; 43 U.S.C. 373, 424e, 375f. Interpret or apply 41 Stat. 605, 46 Stat. 367, sec. 11, 53 Stat. 1197, 64 Stat. 39; 43 U.S.C. 375, 424 through 424d, 375a, 375b through 375f.
The regulations in this subpart apply to the sale of certain classes of lands that are subject to the reclamation laws and that may be sold under one of the following statutes:
(a) The Act of May 20, 1920 (41 Stat. 605; 43 U.S.C. 375);
(b) The Act of May 16, 1930 (46 Stat. 367; 43 U.S.C. 424 through 424e); or
(c) The Act of March 31, 1950 (64 Stat. 39; 43 U.S.C. Sup. 375b through 375f).
(a) Lands which may be sold under the Act of May 20, 1920 (41 Stat. 605; 43 U.S.C. 375) are lands, not otherwise reserved, which have been withdrawn in connection with a Federal irrigation project and improved at the expense of the reclamation fund for administration or other like purposes and which are no longer needed for project purposes. Not more than 160 acres of such lands may be sold to any one person. With one exception, such lands must be sold at public auction. If, however, a tract is appraised at not more than $300, it may be sold at private sale or at public auction and without regard to the provisions of the Act of May 20, 1920 respecting notice of publication and mode of sale.
(b) Lands which may be sold under the Act of May 16, 1930 (46 Stat. 367; 43 U.S.C. 424 through 424e) are tracts of temporarily or permanently unproductive land of insufficient size to support a family. A purchaser must be a resident farm owner or entryman on the Federal irrigation project where such lands are located and is permitted to purchase not more than 160 acres or an area which together with lands already owned or entered on such project, does not exceed 320 acres. A resident farm owner means a farm owner who is actually residing on the farm he owns, and a resident entryman means a homestead entryman who is actually residing on the land in his homestead entry. These lands may be sold either at public auction or at private sale.
(c) Lands which may be sold under the Act of March 31, 1950 (64 Stat. 39; 43 U.S.C. Sup., 375b through 375f) are tracts of land too small to be classed as farm units under the Federal reclamation laws. A purchaser must be a resident farm owner or entryman (as defined in paragraph (b) of this section) on the Federal irrigation project where such lands are located and is permitted to purchase not more than 160 acres or an area which, together with land already owned or entered on such project, does not exceed 160 irrigable acres. These lands may be sold either at public auction or at private sale.
The Commissioner of Reclamation may, in accordance with the regulations in this subpart, sell lands under each of the three statutes listed in § 402.1. An Assistant Commissioner or an official in charge of an office, region, division, district, or project of the Bureau of Reclamation, if authorized in writing by the Commissioner of Reclamation, may also sell lands under the statutes mentioned in accordance
Before patent may be issued to a purchaser under the regulations in this subpart, he must furnish satisfactory evidence that he is a citizen of the United States.
(a) Before offering any land for sale under any of the statutes listed in § 402.1, the Commissioner should determine that the sale will be in the best interest of the project in which the lands are located and, if the lands sold are to be irrigated, that there is a sufficient water supply for such irrigation.
(b) When a decision is made to offer lands for sale under any of the statutes listed in § 402.1: (1) The Commissioner should notify the State Supervisor of the Bureau of Land Management in whose State the lands are located, (2) a report showing the status of the lands should be obtained from the Manager of the appropriate office of the Bureau of Land Management, and (3) a report should be obtained from the Geological Survey with respect to the mineral resources of the lands. A copy of the report of the Geological Survey should be furnished to the Manager of the appropriate land office of the Bureau of Land Management for his use in preparing the final certificate.
The price of land sold under this subpart shall be not less than that fixed by independent appraisal approved by the Commissioner.
The sale of lands at public auction under this part shall be administered by the Commissioner. Notice of such sales shall be given by publication in a newspaper of general circulation in the vicinity of the lands to be sold for either not less than 30 days or once a week for five consecutive weeks prior to the date fixed for any such sale. Under the Act of May 20, 1920 (41 Stat. 605; 43 U.S.C. 375) notice of sales of lands appraised at more than $300 shall also be given by posting upon the land. In the case of all sales under this subpart notice may be given by such other means as the Commissioner may deem appropriate. Where lands are to be sold at private sale, no public notice shall be required.
(a) Under the Acts of May 16, 1930 (46 Stat. 367; 43 U.S.C. 424 through 424e) and March 31, 1950 (64 Stat. 39; 43 U.S.C. Sup., 375b through 375f) lands may be sold either for cash or upon deferred payments. A sale providing for deferred payments shall be upon terms to be established by the Commissioner, except that the Commissioner shall require the annual payment of interest at six percent per annum on the unpaid balance.
(b) Under the Act of May 20, 1920 (41 Stat. 605; 43 U.S.C. 375) lands may be sold either for cash or upon deferred payments. In connection with a sale providing for deferred payments the Commissioner shall require that not less than one-fifth the purchase price in cash be paid at the time of sale and that the remainder be payable in not more than four annual payments with interest at six percent per annum on the unpaid balance.
(c) All payments shall be made to the official of the Bureau of Reclamation specified in the contract of sale.
A contract in form approved by the Commissioner shall be signed by the purchaser at the time of sale and executed on behalf of the United States by the Commissioner. A copy of the contract shall be furnished to the appropriate land office of the Bureau of Land Management for entering in the tract books. The contract shall contain a description of the land to be sold, the price and terms of sale, a full statement by the purchaser respecting his qualifications, including citizenship, a description by the purchaser of his present holdings, and a statement by him of the irrigable acreage of those holdings. The contract shall also contain a statement by the purchaser with respect to his knowledge as to whether the land is mineral or non-mineral in
When a purchaser has complied fully with the provisions of his contract and with the applicable provisions of law, including the regulations in this subpart, the Commissioner shall issue to the purchaser a final receipt so stating. The receipt shall show any liens that, under the reclamation laws, must be indicated in the final certificate and patent and shall state the statutory authority for such liens. The receipt shall be submitted to the Manager of the appropriate land office of the Bureau of Land Management and the Manager shall prepare a final certificate for the issuance of patent to the purchaser. The Manager shall show in the final certificate the above-mentioned reclamation liens and any reservations that are required by law to be made on the patent.
Immediately upon the termination or cancellation of any contract for nonpayment or other appropriate reason the Commissioner shall notify the proper office of the Bureau of Land Management in order that the tract books located there may reflect the termination or cancellation of the contract.
Sec. 15, 53 Stat. 1198, sec. 7, 61 Stat. 630; 43 U.S.C. 485i, 613e. Interpret or apply secs. 3-4, 61 Stat. 629; 43 U.S.C. 613b through 613c.
The regulations in this subpart apply to the sale of small tracts of public and acquired lands on the Gila Project, Arizona, that are subject to the reclamation laws and that may be sold to actual settlers or farmers under the Act of July 30, 1947 (61 Stat. 628; 43 U. S. C. 613-613e).
The regulations in subpart A of this part relative to the sale of public lands under the Act of March 31, 1950 (64 Stat. 39; 43 U. S. C., Sup. 375b through 375f) shall be applicable to all sales proposed to be made under this subpart, except that the provisions of § 402.23(b) relative to deeds shall apply in lieu of the provisions of § 402.10 relative to patents; and excepting further that the residence requirements of § 402.2(b) shall not apply.
(a) After disposition of any lands under this subpart by contract of sale and during the time such contract shall remain in effect, said lands shall be (1) subject to the provisions of the laws of the State of Arizona relating to the organization, government, and regulation of irrigation, electrical power, and other similar districts, and (2) subject to legal assessment or taxation by any such district and by said State or political subdivisions thereof, and to liens for such assessments and taxes and to all proceedings for the enforcement thereof, in the same manner and to the same extent as privately-owned lands;
(b) When a purchaser has complied fully with the provisions of his contract and with the applicable provisions of law, including the regulations in this subpart, the Commissioner shall issue a deed to the purchaser. The deed shall recite the reservations described in the contract of sale.
Sec. 8, 57 Stat. 20; 16 U.S.C. 835c-4.
The provisions of this part shall govern the levy and enforcement of assessments by or on behalf of irrigation districts against lands owned by the United States within the Columbia Basin Project, pursuant to the provisions of subsection 5 (b) and section 8 of the Columbia Basin Project Act (57 Stat. 14; 16 U. S. C. 835c-1 and 835c-4) and in keeping with the provisions of section 14, Chapter 275, Laws of Washington, 1943. (Section 89.12.120, Revised Code of Washington).
As used in this part:
(a)
(b)
(c)
(d)
(e)
(a) Settlement lands, which the United States is not under contract to sell or exchange at the time a district makes its annual levy of assessments shall not be assessed, except as provided in paragraph (c) of this section. If the United States thereafter contracts to sell or exchange such lands before the end of the irrigation season following the date of the annual levy, the purchaser will be required to make appropriate payment to the district for the water service which will be available to the purchaser during that irrigation season or the remaining portion thereof.
(b) From the date the United States contracts to sell or exchange settlement lands until title thereto passes to the purchaser under such contract, or until the rights of the purchaser are terminated or reacquired by the United
(c) Settlement lands, which the United States is not under contract to sell or exchange at the time a district makes its levy may be assessed by a district to the extent of the construction charge obligation installment required to be levied for the following year on such lands on account of the district's construction cost obligation to the United States. No other levies shall be made by a district against settlement lands in this status.
(d) While settlement lands which the United States has leased for use as irrigated lands and which the United States has not contracted to sell or exchange may not be assessed by a district except as provided in paragraph (c) of this section, lessees shall pay the district the same amounts annually that would be required to be paid for water service if the lands were subject to assessment therefor, in addition to any assessment levied under paragraph (c) of this section.
(e) Assessments made by a district against settlement lands while the United States is under contract to sell or exchange such lands shall be subject to all interest and penalties for delinquency as provided by the laws of Washington, but interest and penalties shall cease to accumulate on the date such contract is terminated or the purchaser's interest therein reacquired by the United States.
(f) No action shall be taken by or for a district to enforce any lien created as permitted under the regulations in this part by assessment foreclosure or other means that would purport to transfer any right in or title to any land or interests therein while title thereto is vested in the United States. Although the United States does not assume any obligation for the payment of such liens, it will in any conveyance of settlement lands covered thereby convey subject to those liens.
(a) A district shall, as to other project act lands and rights of way the title to which passes to the United States on or after January 1 of any year and before the district has levied its assessments for that year, immediately remove the lands from its assessment rolls and shall not thereafter take any proceedings to complete or enforce the assessments. Any such removal from the rolls shall be effective as of January 1 of the year in which title passes to the United States Action so to remove shall be taken promptly after the giving of written notice by the Project Manager to the district as to the lands involved, and the district shall provide the United States with a certificate stating that the lands have not been and will not be assessed so long as title thereto remains in the United States.
(b) There is no authority in law for the assessment of rights of way owned by the United States. Accordingly, a district shall make no assessment thereof while title thereto remains in the United States.
(c) Other project act lands while title thereto remains in the United States shall not be assessed for any district charge so long as they are in the “other project act lands” category.
The Project Manager will furnish each district prior to its annual levy every year a list of all the settlement lands owned by the United States for which water is available and which are not under contract of sale or exchange and therefore are not to be assessed by the district, except for construction charge obligation installments under § 413.3(c) when such charges are required to be levied.
5 U.S.C. 553; 43 U.S.C. 391, 485 and 617; 373 U.S. 546; 376 U.S. 340.
(a)
(1) Permit State-authorized entities to store Colorado River water offstream;
(2) Permit State-authorized entities to develop intentionally created unused apportionment (ICUA);
(3) Permit State-authorized entities to make ICUA available to the Secretary for release for use in another Lower Division State. This release may only take place in accordance with the Secretary's obligations under Federal law and may occur in either the year of storage or in years subsequent to storage; and
(4) Allow only voluntary interstate water transactions. These water transactions can help to satisfy regional water demands by increasing the efficiency, flexibility, and certainty in Colorado River management in accordance with the Secretary's authority under Article II (B) (6) of the Decree entered March 9, 1964 (376 U.S. 340) in the case of
(b)
(1) Affect any Colorado River water entitlement holder's right to use its full water entitlement;
(2) Address or preclude independent actions by the Secretary regarding Tribal storage and water transfer activities;
(3) Change or expand existing authorities under the body of law known as the “Law of the River”;
(4) Change the apportionments made for use within individual States;
(5) Address intrastate storage or intrastate distribution of water;
(6) Preclude a Storing State from storing some of its unused apportionment in another Lower Division State if consistent with applicable State law; or
(7) Authorize any specific activities; the rule provides a framework only.
(1) An entity in a Storing State which is expressly authorized pursuant to the laws of that State to enter into Storage and Interstate Release Agreements and develop ICUA (“storing entity”); or
(2) An entity in a Consuming State which has authority under the laws of that State to enter into Storage and Interstate Release Agreements and acquire the right to use ICUA (“consuming entity”).
(1) Consumptive use from the mainstream within the Lower Division States includes water drawn from the mainstream by underground pumping.
(2) The Mexican treaty obligation is set forth in the February 3, 1944, Water Treaty between Mexico and the United States, including supplements and associated Minutes of the International Boundary and Water Commission.
(1) The Decree;
(2) A water delivery contract with the United States through the Secretary; or
(3) A reservation of water from the Secretary.
(1) Consistent with the laws of the Storing State;
(2) Solely as a result of, and would not exist except for, implementing a Storage and Interstate Release Agreement.
(1) Offstream storage of Colorado River water by a storing entity for future use within the Storing State;
(2) Subsequent development of ICUA by the storing entity, consistent with the laws of the Storing State;
(3) A request by the storing entity to the Secretary to release ICUA to the consuming entity;
(4) Release of ICUA by the Secretary to the consuming entity; and
(5) The inclusion of other entities that are determined by the Secretary and the storing entity and the consuming entity to be appropriate to the performance and enforcement of the agreement.
(a)
(1) The agreement must specify the quantity of Colorado River water to be stored, the Lower Division State in which it is to be stored, the entity(ies) that will store the water, and the facility(ies) in which it will be stored.
(2) The agreement must specify whether the water to be stored will be within the unused basic apportionment or unused surplus apportionment of the Storing State. For water from the Storing State's apportionment to qualify as unused apportionment available for storage under this part, the water must first be offered to all entitlement holders within the Storing State for purposes other than interstate transactions under proposed Storage and Interstate Release Agreements.
(3) The agreement must specify whether the water to be stored will be within the unused basic apportionment or unused surplus apportionment of the Consuming State. If the water to be stored will be unused apportionment of the Consuming State, the agreement must acknowledge that any unused apportionment of the Consuming State may be made available from the Consuming State by the Secretary to the Storing State only in accordance with Article II(B)(6) of the Decree. If unused apportionment from the Consuming State is to be stored under a Storage and Interstate Release Agreement, the Secretary will make the unused apportionment of the Consuming State available to the storing entity in accordance with the terms of a Storage and Interstate Release Agreement and will not make that water available to other entitlement holders.
(4) The agreement must specify the maximum quantity of ICUA that will be developed and made available for release to the consuming entity.
(5) The agreement must specify that ICUA may not be requested by the consuming entity in a quantity that exceeds the quantity of water that had been stored under a Storage and Interstate Release Agreement in the Storing State.
(6) The agreement must specify a procedure to verify and account for the quantity of water stored in the Storing State under a Storage and Interstate Release Agreement.
(7) The agreement must specify that, by a date certain, the consuming entity will:
(i) Notify the storing entity to develop a specific quantity of ICUA in the following calendar year;
(ii) Ask the Secretary to release that ICUA; and
(iii) Provide a copy of the notice or request to each Lower Division State.
(8) The agreement must specify that when the storing entity receives a request to develop a specific quantity of ICUA:
(i) It will ensure that the Storing State's consumptive use of Colorado River water will be decreased by a quantity sufficient to develop the requested quantity of ICUA; and
(ii) Any actions that the storing entity takes will be consistent with its State's laws.
(9) The agreement must include a description of:
(i) The actions the authorized entity will take to develop ICUA;
(ii) Potential actions to decrease the authorized entity's consumptive use of Colorado River water;
(iii) The means by which the development of the ICUA will be enforceable by the storing entity; and
(iv) The notice given to entitlement holders, including Indian tribes, of opportunities to participate in development of this ICUA.
(10) The agreement must specify that the storing entity will certify to the
(i) Identify the quantity, the means, and the entity by which ICUA has been or will be developed; and
(ii) Ask the Secretary to make the ICUA available to the consuming entity under Article II(B)(6) of the Decree and the Storage and Interstate Release Agreement.
(11) The agreement must specify a procedure for verifying development of the ICUA appropriate to the manner in which it is developed.
(12) The agreement must specify that the Secretary will release ICUA developed by the storing entity:
(i) In accordance with a request of the consuming entity;
(ii) In accordance with the terms of the Storage and Interstate Release Agreement;
(iii) Only for use by the consuming entity and not for use by other entitlement holders; and
(iv) In accordance with the terms of the Storage and Interstate Release Agreement, the BCPA, Article II(B)(6) of the Decree and all other applicable laws and executive orders.
(13) The agreement must specify that ICUA shall be released to the consuming entity only in the year and to the extent that ICUA is developed by the storing entity by reducing Colorado River water use within the Storing State.
(14) The agreement must specify that the Secretary will release ICUA only after the Secretary has determined that all necessary actions have been taken under this part.
(15) The agreement must specify that before releasing ICUA the Secretary must first determine that the storing entity:
(i) Stored water in accordance with the Storage and Interstate Release Agreement in quantities sufficient to support the development of the ICUA requested by the consuming entity; and
(ii) Certified to the satisfaction of the Secretary that the quantity of ICUA requested by the consuming entity has been developed in that year or will be developed in that year under § 414.3(f).
(16) The agreement must specify that the non-Federal parties to the Storage and Interstate Release Agreement will indemnify the United States, its employees, agents, subcontractors, successors, or assigns from loss or claim for damages and from liability to persons or property, direct or indirect, and loss or claim of any nature whatsoever arising by reason of the actions taken by the non-federal parties to the Storage and Interstate Release Agreement under this part.
(17) The agreement must specify the extent to which facilities constructed or financed by the United States will be used to store, convey, or distribute water associated with a Storage and Interstate Release Agreement.
(18) The agreement must include any other provisions that the parties deem appropriate.
(b)
(c)
(d)
(e)
(1) An authorized entity may satisfy the requirement of this section through a direct contract with the Secretary. An authorized entity also may satisfy the Section 5 requirement of the BCPA, for purposes of this part, through a valid subcontract with an entitlement holder that is authorized by the Secretary to subcontract for the delivery of all or a portion of its entitlement.
(2) For storing entities that do not otherwise hold a contract or valid subcontract for the delivery of the water to be stored, the Storage and Interstate Release Agreement will serve as the vehicle for satisfying the Section 5 requirement for the release or diversion of that water.
(3) For consuming entities that do not otherwise hold a contract or valid subcontract for the delivery of the water to be released by the Secretary as ICUA, the Storage and Interstate Release Agreement will serve as the vehicle for satisfying the Section 5 requirement for the release or diversion of that water.
(f)
(1) These anticipatory releases will only be made in the same year that the ICUA is developed.
(2) Before an anticipatory release, the Secretary must be satisfied that the storing entity will develop the necessary ICUA in the same year that the ICUA is to be released.
(g)
(a)
(1) The quantity of water diverted and stored during the prior year under all Storage and Interstate Release Agreements; and
(2) The total quantity of stored water available to support the development of ICUA under each Storage and Interstate Release Agreement to which the
(b)
(1) The Secretary will account for the water that is diverted and stored by a storing entity as a consumptive use in the Storing State for the year in which it is stored.
(2) The Secretary will account for the diversion and consumptive use of ICUA by a consuming entity as a consumptive use in the Consuming State of unused apportionment under Article II(B)(6) of the Decree in the year the water is released in the same manner as any other unused apportionment taken by that State.
(3) The Secretary will maintain individual balances of the quantities of water stored under a Storage and Interstate Release Agreement and available to support the development of ICUA. The appropriate balances will be reduced when ICUA is developed by the storing entity and released by the Secretary for use by a consuming entity.
(a)
(b)
(1) Comply with all applicable water pollution laws and regulations of the United States, the Storing State, and the Consuming State; and
(2) Obtain all applicable permits or licenses from the appropriate Federal, State, or local authorities regarding water quality and water pollution matters.
(a)
(b)
(c)
45 Stat. 1057, 1060; 43 U.S.C. 617; and Supreme Court Decree in “Arizona v. California,” 376 U.S. 340.
The procedures established in this part shall apply to every public or private organization (herein termed “Contractor”) in Arizona, California, or Nevada which, pursuant to the Boulder Canyon Project Act or to provisions of other Reclamation Laws, has a valid contract for the delivery of Colorado River water, and to Federal establishments other than Indian Reservations enumerated in Article II(D) of the March 9, 1964, Decree of the Supreme Court of the United States in the case of “Arizona v. California et al.”, 376 U.S. 340 (for purposes of this part each such Federal establishment is considered as a “Contractor”), except that (a) neither this part nor the term “Contractor” as used herein shall apply to any person or entity which has a contract for the delivery or use of Colorado River water made pursuant to the Warren Act of February 21, 1911 (36 Stat. 925) or the Miscellaneous Purposes Act of February 25, 1920 (41 Stat. 451), (b) Contractors and permittees for small quantities of water, as determined by the Regional Director, Bureau of Reclamation, Boulder City, Nev. (herein termed “Regional Director”), and Contractors for municipal and industrial water may be excluded from the application of these procedures at the discretion of the Regional Director, and (c) procedural methods for implementing Colorado River water conservation measures on Indian Reservations will be in accordance with § 417.5 of this part.
The Regional Director or his representative will, prior to the beginning of each calendar year, arrange for and conduct such consultations with each Contractor as the Regional Director may deem appropriate as to the making by the Regional Director of annual recommendations relating to water conservation measures and operating practices in the diversion, delivery, distribution and use of Colorado River water, and to the making by the Regional Director of annual determinations of each Contractor's estimated water requirements for the ensuing calendar year to the end that deliveries of Colorado River water to each Contractor will not exceed those reasonably required for beneficial use under the respective Boulder Canyon Project Act contract or other authorization for use of Colorado River water.
Following consultation with each Contractor and after consideration of all relevant comments and suggestions advanced by the Contractors in such consultations, the Regional Director will formulate his recommendations and determinations relating to the matters specified in § 417.2. The recommendations and determinations shall, with respect to each Contractor, be based upon but not necessarily limited to such factors as the area to be irrigated, climatic conditions, location, land classifications, the kinds of crops raised, cropping practices, the type of irrigation system in use, the condition of water carriage and distribution facilities, record of water orders, and rejections of ordered water, general operating practices, the operating efficiencies and methods of irrigation of the water users, amount and rate of return flows to the river, municipal water requirements and the pertinent provisions of the Contractor's Boulder Canyon Project Act water delivery contract. The Regional Director shall give each Contractor written notice by registered or certified mail, return receipt requested, of his recommendations and determinations. If the recommendations and determinations include a reduction in the amount of water to be delivered, as compared to the calendar year immediately preceding, the notice shall be delivered to the Contractor or timely sent by registered or certified mail, return receipt requested, so that it may reasonably be delivered at least 30 days prior to the first date water delivery would be affected thereby, and shall specify the basis for such reduction including any pertinent factual determinations. The recommendations
A Contractor may at any time apply in writing to the Regional Director for modification of recommendations or determinations deemed necessary because of changed conditions, emergency, or hardship. Upon receipt of such written application identifying the reason for such requested modification, the Regional Director shall arrange for consultation with the Contractor with the objective of making such modifications as he may deem appropriate under the then existing conditions. The Regional Director may initiate efforts for further consultation with any Contractor on his own motion with the objective of modifying previous recommendations and determinations, but in the event such modifications are made, the Contractor shall have the same opportunity to object and appeal as provided in § 417.3 of this part for the initial recommendations and determinations. The Regional Director shall afford the fullest practicable opportunity for consultation with a Contractor when acting under this section. Each modification under this section shall be transmitted to the Contractor by letter.
(a) The Commissioner of Indian Affairs (herein termed “Commissioner”) will engage in consultations with various tribes and other water users on the Indian Reservations listed in Article II (D) of said Supreme Court Decree, similar to those engaged in by the Regional Director with regard to Contractors as provided in § 417.2 of this part. After consideration of all comments and suggestions advanced by said tribes and other water users on said Indian Reservations concerning water conservation measures and operating practices in the diversion, delivery, distribution and use of Colorado River water, the Commissioner shall, within the limits prescribed in said decree, make a determination as to the estimated amount of water to be diverted for use on each Indian Reservation covered by the above decree. Said determination shall be made prior to the beginning of each calendar year. That determination shall be based upon, but not necessarily limited to, such factors as: The area to be irrigated, climatic conditions, location, land classifications, the kinds of crops raised, cropping practices, the type of irrigation system in use, the condition of water carriage and distribution facilities, record of water orders, and rejections of ordered water, general operating practices, the operating efficiencies and methods of irrigation of the tribes and water users on each reservation, the amount and rate of return flows to the river, municipal water requirements, and other uses on the reservation. The Commissioner of Indian Affairs shall deliver to the Regional Director written notice of the amount of water to be diverted for use upon each Indian Reservation for each year 60 days prior to the beginning of each calendar year and the basis for said determination. The determination of the Commissioner shall be final and
(b) Modifications of said determinations due to changed conditions, emergency or hardship may be made by the Commissioner, subject, however, to the right of the Regional Director to appeal to the Secretary, as provided in the case of an initial determination by the Commissioner. During the pendency of such an appeal, water deliveries will be made on the basis of the initial determination.
In addition to the recommendations and determinations formulated according to the procedures set out above, the right is reserved to issue regulations of general applicability to the topics dealt with herein.
43 U.S.C. 391, et seq.; 43 U.S.C. 373; 43 U.S.C. 614, et seq.; 104 Stat. 3289, Pub. L. 101-618.
(1) Is classified as irrigable under Bureau land classification standards (Reclamation Instruction Series 510); or
(2) Has a paid out Project water right.
Project water may be delivered only to serve valid water rights used for:
(a) Maintenance of wetlands and fish and wildlife including endangered and threatened species;
(b) Recreation;
(c) Irrigation of eligible land; and
(d) Domestic and other uses of Project water as defined by the decrees.
This part governs water uses within existing rights. This part does not in any way change, amend, modify, abandon, diminish, or extend existing rights. Water rights transfers will be determined by the Nevada State Engineer under the provisions of the
The District must not deliver Project water or permit its use except as provided in this part. No Project water will be released in excess of the maximum allowable diversion or delivered to ineligible lands. Delivery of water to land in excess of established water duties is prohibited.
Violations of the terms and provisions of this part must be reported immediately to the Bureau. The District or individual water users will be responsible for any shortages to water users occasioned by waste or excess delivery or delivery of water to ineligible land as provided in this part.
Nothing in this part affects:
(a) The authority of the Fallon Paiute-Shoshone Tribe to use water on the Tribe's reservation which was delivered to the Reservation in accordance with this part; or
(b) The Secretary's trust responsibility with respect to the Fallon Paiute-Shoshone Tribe.
Project irrigation water deliveries may be made only to eligible land to be irrigated. The District must maintain records for each individual water right holder indicating the number of eligible acres irrigated and the amount of water ordered and delivered.
(a)
(b)
(c)
(a)
(2) As the adjustments are made, the District will provide updated information to the Bureau for review and approval. The District must adjust anticipated water allocations to individual water users accordingly. The allocations will at all times be based on a maximum annual entitlement of 3.5 acre-feet (AF) per acre of bottom land, 4.5 AF per acre of bench land, and 1.5 AF per acre of pasture land that is anticipated to be irrigated and not on the number of water-righted acres.
(3) The District will provide the individual water users with the approved data regarding the anticipated acreage to be irrigated and water allocations for each water user that year.
(i) Any adjustments based on changes in lands anticipated to be irrigated during the irrigation season must be reported by the individual water user to the District.
(ii) The District will, in turn, notify the Bureau of any changes in irrigated acreage which must be accounted for.
(iii) Each landowner's anticipated acreage must be less than or equal to the landowner's eligible acreage.
(4) Should a landowner believe that the number of acres of eligible land he or she is entitled to irrigate is different from the number of acres as approved by the Bureau, the landowner must notify the District and present appropriate documentation regarding the subject acreage. The District must record the information and present the claim to the Bureau for further consideration.
(i) If the Bureau determines there is sufficient support for the landowner's claim, then adjustments will be made to accommodate the changes requested by the landowner.
(ii) If the Bureau disallows the landowner's claim, the Bureau must notify the District in writing. The District will, in turn, inform the landowner of the disposition of the claim and the reasons therefore, and will further instruct the landowner that he or she may seek judicial review of the Bureau's determination under the decrees. If the dispute affects the current year, then the Bureau and the District will seek to expedite any court proceeding.
(b)
(a) Eligible land may receive no more than the amount of water in acre-feet per year established as maximum farm
(b) The annual water duty as assigned by the decrees is a maximum of 4.5 AF per acre for bench lands and a maximum of 3.5 AF per acre for bottom lands. The water duty for fields with a mixture of bench and bottom lands must be the water duty of the majority acreage. Bench and bottom land designations as finally approved by the United States District Court for the District of Nevada will be used in determining the maximum water duty for any parcel of eligible land. The annual water duty for pasture land established by contract is 1.5 AF per acre.
The valid water deliveries at the headgate are set by the product of eligible land actually irrigated multiplied by the appropriate water duty in accordance with §§ 418.8 and 418.10. The District will regularly monitor all water deliveries and report in accordance with § 418.9. No amount of water will be delivered in excess of the individual water user's headgate entitlement. In the event excess deliveries should occur, such amount will be automatically reflected in the efficiency deficit adjustment to the Lahontan storage. Water delivered in excess of entitlements must not be considered valid for purposes of computing project efficiency.
(a) The principal feature of this part is to obtain a reasonable level of efficiency in supplying water to the headgate by the District. The efficiency targets established by this part are the cornerstone of the enforcement and the incentive provisions and when implemented will aid other competing uses.
(b) The efficiency is readily calculable at the year's end, readily applicable to water appropriate to that year, able to be compared to other irrigation systems even though there may be many dissimilarities, appropriate for long term averaging, adjustable to any headgate delivery level including droughts or allocations, automatically adjusts to changes during the year and accurately accounts for misappropriated water. Efficiency also can be achieved through any number of measures from operations to changes in the facilities and can be measured as an end product without regard to the approach. Thus it is flexible enough to allow local decision making and yet is fact based to minimize disputes.
(c) Assuming the headgate deliveries are valid and enforceable, conveyance efficiency is the only remaining variable in determining the quantity of water needed to be supplied to the District. Conveyance efficiency is a measure of how much water is released into the irrigation system relative to actual headgate deliveries. Differences in efficiency, therefore, are directly convertible to acre-feet. The differences in efficiency, expressed as a quantity in acre-feet, may be added to or subtracted from the actual Lahontan Reservoir storage level before it is compared to the monthly storage objective. Thus, the diversions from the Truckee River, operation of other facilities (e.g., Stampede Reservoir) and decisions related to Lahontan Reservoir are made after the efficiency storage adjustments have been made. Operating decisions are made as if the adjusted storage reflected actual conditions.
(1)
(2)
(3)
(4)
(5) The measures in paragraph (c)(4) of this section are discretionary choices for the District. The range of measures available to the District provides a level of assurance that the target efficiency is reasonably achievable. The resultant efficiency targets were also compared to the range of efficiencies actually experienced by other irrigation systems that were considered comparable in order to provide a further check on “reasonable.” Most of the delivery losses are relatively constant regardless of the amount of deliveries. The efficiency will necessarily vary with the amount of headgate deliveries.
(6) The target efficiency for any annual valid headgate delivery can be derived from the table in Appendix A to this part.
(a)
(2) The MAD will be calculated annually to ensure an adequate water supply for all water right holders whose water use complies with their decreed entitlement and this part. The MAD is the maximum amount of water permitted to be diverted for irrigation use on the Project in that year. It is calculated to ensure full entitlements can be provided, but is expected to significantly exceed Project requirements. The MAD will be established by the Bureau at least 2 weeks before the start of each irrigation season. All releases of water from Lahontan Reservoir and diversions from the Truckee Canal (including any diversions from the Truckee Canal to Rock Dam Ditch) must be charged to the MAD except as provided in §§ 418.23 and 418.35 of this part.
(3) On the basis of the methodology adopted in this part (i.e., actual irrigated acres multiplied by appropriate water duties divided by established project efficiency) an example of the MAD calculated for the projected irrigated acreage as shown in the Newlands Project Water Budget table would be 308,319 acre-feet for the 1995 Example. The sample MAD corresponds
(4) The table Expected Project Distribution System Efficiency shows the target efficiencies which will be used over the range of irrigated acreage and percent use of entitlement expected in the future. At the beginning of the irrigation season, the target efficiencies from the Expected Project Distribution System Efficiency table used to calculate the MAD will be based on the expected irrigated acreage and expected percent use of entitlement. At the end of the irrigation season, the actual acreage irrigated and actual percent use of entitlement will be used to determine the required efficiency from the Expected Project Distribution System Efficiency. The target efficiencies are read directly from the table if the acreage and use of entitlement values are shown, otherwise the target efficiency must be extrapolated from the table or calculated using the Efficiency Equation. Appendix A of this part shows the calculations used to derive the Efficiency Equation and the efficiency targets.
(5) Adjustments in the MAD must be made by the Bureau each year based on changes in irrigated eligible land from the prior year and subsequent decisions concerning transfers of Project water rights, using the methodology established in this section.
(6) If the MAD for a given year will not meet the water delivery requirements for the eligible land to be irrigated due to weather conditions, canal breaks, or some other unusual or unforeseen condition, the District must ask the Bureau for additional water.
(i) The District's request must include a written statement containing a detailed explanation of the reasons for the request.
(ii) The Bureau must promptly review the request and after consultation with the Federal Water Master and other interested parties, will determine if the request or any portion of it should be approved. The Bureau will make reasonable adjustments for unforeseen causes or events but will not make adjustments to accommodate waste or Project inefficiency or other uses of water not in accordance with this part or with State and Federal law.
(iii) The Bureau will then notify the District of its determination. If the District does not agree with the Bureau's decision, it may seek judicial review. The Bureau and the District will seek to expedite the court proceeding in order to minimize any potential adverse effects.
(b)
(a) By the end of each month, the District must submit to the Bureau's Lahontan Area Office reports for the previous month which document monthly inflow and outflow in acre-feet from the Truckee and Carson divisions of the Project for that month. Reports must include any data the Bureau may reasonably require to monitor compliance with this part.
(b) Accounting for farm headgate deliveries must be based on the amount of water actually delivered to the water user. Project operations must provide for the amount of water ordered and the distribution system losses.
(c) The District must keep records of all domestic and other water uses showing the purpose and amount of water usage for each entity. The District must make the records available for review by the Bureau upon request. The Bureau may audit all records kept by the District.
(a) The Bureau will work with the District to monitor Project operations and will perform field inspections of water distribution during the irrigation season.
(1) Staff members of the Bureau's Lahontan Area Office and the District will meet as often as necessary during the irrigation season after each water distribution report has been prepared to examine the amounts of water used to that point in the season.
(2) On the basis of the information obtained from field observations, water use records, and consultations with District staff, the Bureau will determine at monthly intervals whether the rate of diversion is consistent with this part for that year.
(3) The District will be informed in writing of suggested adjustments that may be made in management of diversions and releases as necessary to achieve target efficiencies and stay within the MAD.
(b) Project operations will be monitored in part by measuring flows at key locations. Specifically, Project diversions (used in the calculations under § 418.18 below) will be determined by:
(1) Adding flows measured at:
(i) Truckee Canal near Wadsworth—U.S. Geological Survey (USGS) gauge number 10351300;
(ii) Carson River below Lahontan Dam—USGS gauge number 10312150;
(iii) Rock Dam Ditch near the end of the concrete lining; and
(2) Subtracting:
(i) Flows measured at the Truckee Canal near Hazen—USGS gauge number 10351400;
(ii) The Carson River at Tarzyn Road near Fallon (below Sagouspe Dam) for satisfying water rights outside of the Project boundaries as described in § 418.25, USGS gauge number 10312275;
(iii) Estimated losses in the Truckee Canal; and
(iv) Spills, precautionary drawdown, and incentive water released at Lahontan Dam under §§ 418.24 and 418.36.
All use of Project water for power generation must be incidental to releases charged against Project diversions, precautionary drawdown, incentive water (§ 418.35 ), or spills.
Project water must be managed to make maximum use of Carson River water and to minimize diversions of Truckee River water through the Truckee Canal. This will make available as much Truckee River water as possible for use in the lower Truckee River and Pyramid Lake.
(a) Diversions of Truckee River water at Derby Dam must be managed to maintain minimum terminal flow to Lahontan Reservoir or the Carson River except where this part specifically permits diversions.
(b) Diversions to the Truckee Canal must be managed to achieve an average terminal flow of 20 cfs or less during times when diversions to Lahontan Reservoir are not allowed (the flows must be averaged over the total time diversions are not allowed in that calendar year; i.e., if flows are not allowed in July and August and then are allowed in September then not allowed in October and November, the average flow will be averaged over the four months of July, August, October, and November).
(c) The Bureau will work cooperatively with the District on monitoring the flows at the USGS gage on the Truckee Canal near Hazen to determine if and when flows are in excess of those needed in accord with this part and bringing the flows back into compliance when excessive.
(d) Increases in canal diversions which would reduce Truckee River flows below Derby Dam by more than 20 percent in a 24-hour period will not be allowed when Truckee River flow, as measured by the gauge below Derby Dam, is less than or equal to 100 cfs.
(e) Diversions to the Truckee Canal will be coordinated with releases from Stampede Reservoir and other reservoirs, in cooperation with the Federal Water Master, to minimize fluctuations in the Truckee River below Derby Dam in order to meet annual flow regimes established by the United States Fish and Wildlife Service for listed species in the lower Truckee River.
Sufficient water, if available, will be diverted from the Truckee River through the Truckee Canal to meet the direct irrigation, domestic and other entitlements of the Truckee Division.
(a) Truckee River diversions through the Truckee Canal will be made to meet Lahontan Reservoir end-of-month storage objectives for the months of January through June. The current month storage objective will be based, in part, on the monthly Natural Resources Conservation Service (NRCS) April through July runoff forecast for the Carson River near Fort Churchill. The forecast will be used to determine the target storage for Lahontan Reservoir and anticipated diversion requirements for the Carson Division. The Bureau, in consultation with the District, Federal Water Master, Fish and Wildlife Service, the Pyramid Lake
(b) The January through June storage objective will be calculated using the following formula:
(c) The Lahontan Reservoir storage objective for each month is contained in the following table.
(d) Once the monthly Lahontan Reservoir storage objective has been determined, the monthly diversion to the Project from the Truckee River will be based upon water availability and Project demand as expressed in the following relationship:
(e) The following procedure is intended to ensure that monthly storage objectives are not exceeded. It may be implemented only if the following conditions are met:
(1) Diversions from the Truckee River are required to achieve the current month Lahontan Reservoir storage objective (LSOCM);
(2) Truckee River runoff above Derby Dam is available for diversion to Lahontan Reservoir;
(3) Sufficient Stampede Reservoir storage capacity is available.
(f) The Bureau, in consultation with the Federal Water Master, the District, Fish and Wildlife Service, the Bureau of Indian Affairs, and the Pyramid Lake Paiute Tribe will determine whether the calculated current month Truckee River diversion to Lahontan Reservoir (TRD-TDD-TCL) may be reduced during that month and the amount of reduction credit stored in Stampede Reservoir.
(1) Reductions in diversions may begin in November and continue until the end of June.
(2) Reductions in diversions to Lahontan Reservoir with credit storage in Stampede Reservoir may be implemented to the extent that:
(i) The reduction is in lieu of a scheduled release from Stampede Reservoir for the purpose of supplementing flows to Pyramid Lake; and/or
(ii) Water is captured in Stampede Reservoir that is scheduled to be passed through and diverted to the Truckee Canal.
(3) The Fish and Wildlife Service must approve any proposal to reduce diversions to Lahontan Reservoir for Newlands Project credit purposes without a comparable reduction in release from Stampede Reservoir or any conversion of Stampede Reservoir project water to Newlands Project credit water.
(4) The diversion to Lahontan Reservoir may be adjusted any time during the month as revised runoff forecasts become available. The accumulated credit will be added to current Lahontan Reservoir storage (ALRS) in calculating TRD. If the sum of accumulated credit and Lahontan Reservoir storage exceeds 295,000 acre-feet, credit will be reduced by the amount in excess of 295,000 acre-feet. Credit will also be reduced by the amount of precautionary drawdown or spills in that month. If the end-of-month storage in Lahontan Reservoir plus the accumulated credit in Stampede Reservoir at the end of June exceeds the end-of-month storage objective for Lahontan, the credit will be reduced by the amount exceeding the end-of-month storage objective.
(5) Following consultation with the District, the Federal Water Master, and other interested parties as appropriate, the Bureau will release credit water as needed for Project purposes from July 1 through the end of the irrigation season in which the credit accrues with timing priority given to meeting current year Project irrigation demands.
(6) Conveyance of credit water in the Truckee Canal must be in addition to regularly scheduled diversions for the Project and will be measured at the USGS gauge number 10351300 near Wadsworth.
(7) Newlands credit water in Stampede Reservoir storage will be subject to spill and will not carry over to subsequent years. Newlands credit water in Stampede can be exchanged to other reservoirs and retain its priority. The credit must be reduced to the extent that Lahontan Reservoir storage plus accumulated credit at the end of the previous month exceeds the storage objectives for that month. If Newlands credit water is spilled, it may be diverted to Lahontan Reservoir subject to applicable storage targets.
(i) The Bureau, in consultation with the District, the Federal Water Master, and other interested parties, may release Newlands Project credit water before July 1.
(ii) If any Newlands credit water remains in Stampede Reservoir storage after the end of the current irrigation season in which it accumulated, it will convert to water for cui-ui recovery and will no longer be available for Newlands credit water.
(iii) Newlands credit water stored in Stampede Reservoir will be available for use only on the Carson Division of the Newlands Project.
(g) Subject to the provisions of § 418.20 (b), LSOCM may be adjusted as frequently as necessary when new information indicates the need and diversions from the Truckee River to the Truckee Canal must be adjusted daily
Truckee River diversions through the Truckee Canal to Lahontan Reservoir from July through December must be made only in accordance with the Adjustments to Lahontan Reservoir Storage Targets table and § 418.22. Diversions shall be started to achieve the end-of-month storage targets listed in the table in § 418.22 and will be discontinued when storage is forecast to meet or exceed the end-of-month storage targets at the end of the month. Diversions may be adjusted any time during the month as conditions warrant (i.e., new forecasts, information from other forecasts becoming available, or any other new information that may impact stream forecasts).
(a) The Lahontan Reservoir storage targets must be adjusted to accommodate changes in water demand in the Carson Division. Using the information reported by the District by March 1 of each year on eligible land expected to be irrigated and end-of-year data on eligible land actually irrigated (§ 418.9(b)), the Bureau will determine if the Lahontan Reservoir storage targets need to be changed. If no change is needed, the storage targets currently in effect will remain in effect.
(1) Only the actual water demand reported for full water years (100 percent water supply) will be considered. Targets will not be changed based on water demand reported for less than full water years.
(2) All changes in storage targets must start on October 1 of any year. If information provided by March 1 and other available information indicates that the Lahontan Reservoir storage targets must be changed, the new set of storage targets must be applied starting October 1 of the same year and remain in effect until changed according to this section.
(b) All changes to storage targets will be made according to the table in this section. The table of storage targets has been developed to provide a consistent Project water supply over a range of demands.
(1) A storage target adjustment must be made in increments of thousands of acre-feet for the change as indicated in the column listing Carson Division Demand and the complete set of monthly targets must be applied.
(2) If the change in reported water demand is above or below the values in the table of storage targets, the adjustment to the storage targets can be calculated. The calculated adjustment is the number that would appear in the column Target Adjustment in the table. The calculated Target Adjustment is then added or subtracted to the base storage target for each month. Target Adjustments must be made in whole increments of 1,000 acre-feet and calculated values will be rounded to the nearest 1,000 acre-feet.
(i) For demands greater than those set forth on the table, the formula for the Target Adjustment is: Target Adjustment = 0.00208 (Demand in acre-feet—271,000 acre-feet). For example, if water demand increased to 292,635 acre-feet per year, the Target Adjustment calculation would be = 0.00208×(292,535−271,000). The result would be a Target Adjustment of 45 or 45,000 acre-feet. This would be added to the base monthly storage target values so, the January-May target would be 219,000 acre-feet, June would be 235,000 acre-feet, and so on.
(ii) For demands less than those set forth on the table, the formula for the Target Adjustment is: Target Adjustment = 0.00174 (Demand in acre-feet—271,000 acre-feet). For example, if water demand decreased to 248,011 acre-feet per year, the Target Adjustment calculation would be = 0.00174×(248,011−271,000). The result would be a Target Adjustment of −40 or −40,000 acre-feet. This would be subtracted from the base monthly storage target values so, the January-May target would be 134,000 acre-feet, June would be 150,000 acre-feet, and so on.
Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of Lahontan Reservoir. Such diversions will require the prior written approval of the Bureau and be used in calculating Project diversions.
(a) Even though flood control is not a specifically authorized purpose of the Project, at the request of the District
(1) The drawdown must be scheduled sufficiently in advance and at such a rate of flow in order to divert as much water as possible into the Project irrigation system for delivery to eligible land or storage in reregulating reservoirs for later use on eligible land.
(2) During periods of precautionary drawdown, or when water is spilled from Lahontan Reservoir, Project diversions will be determined by comparison with other years' data and normalized by comparison of differences in climatological data. The Bureau will estimate the normalization in consultation with the District and other interested parties.
(3) Spills from Lahontan Reservoir and precautionary drawdown of the reservoir to create space for storing flood waters from the Carson River Basin that are in excess of the normalized diversions will not be used in calculating Project diversions.
(4) Water captured in Project facilities as a result of a precautionary drawdown or spill will not be counted as storage in Lahontan Reservoir for the purpose of calculating Truckee River Diversions. Such water will not be counted as diversions to the Project unless such water is beneficially applied as described in (a)(5) of this section.
(5) Water from precautionary drawdowns or spills that is captured in Project facilities must be used to the maximum extent possible, and counted as deliveries to eligible lands in the year of the drawdown. If all the drawdown water captured in Project facilities cannot be used in the year of capture for delivery to eligible lands, then that water must be delivered to eligible lands in subsequent years to the maximum extent possible and counted against the water users' annual allocation.
(b) If a precautionary drawdown in one month results in a failure to meet the Lahontan Reservoir storage objective for that month, the storage objective in subsequent months will be reduced by one-half of the difference between that month's storage objective and actual end-of-month storage. The Bureau is not liable for any damage or water shortage resulting from a precautionary drawdown.
The District will release sufficient water to meet the vested water rights below Sagouspe Dam as specified in the
The District must maintain a financing and accounting system which produces revenue sufficient to repay its operation and maintenance costs and to discharge any debt to the United States. The District should give consideration to adopting a system which provides reasonable financial incentives for the economical and efficient use of water.
(a) The District must permit only its authorized employees or agents to open and close individual turnouts and operate the distribution system facilities. After obtaining Bureau approval, the District may appoint agents to operate individual headgates on a specific lateral if it can be shown that the water introduced to the lateral by a District employee is completely scheduled and can be fully accounted for with a reasonable allowance for seepage and evaporation losses.
(b) If agents need to adjust the scheduled delivery of water to the lateral to accommodate variable field conditions, weather, etc., they must immediately notify the District so proper adjustments can be made in the distribution system. Each agent must keep an accurate record of start and stop times for each delivery and the flow during delivery. This record will be given to the District for proper accounting of water delivered.
(c) The program of using agents to operate individual headgates will be reviewed on a regular basis by the District and the Bureau. If it is found that problems such as higher than normal losses, water not accounted for, etc., have developed on an individual lateral, the program will be suspended and the system operated by District employees until the problems are resolved.
There are four basic elements for enforcement with all necessary quantities and review determined in accordance with the relevant sections of this part.
(a)
(1) The District will stop the illegal delivery immediately;
(2) The District will notify the Bureau of the particulars including the known or estimated location and amounts;
(3) The amount will not be included as a valid headgate delivery for purposes of computing the Project efficiency and resultant incentive credit or debit to Lahontan storage; and
(4) If the amount applies to a prior year, then the amount will be treated directly as a debit to Lahontan storage in the same manner as an efficiency debit.
(b)
(1) Greater efficiency—Credited to the District as storage in Lahontan or subtracted from any accumulated debit, or two-thirds as storage in Lahontan for their discretionary use in accordance with state law.
(2) Less efficient—Debited or added to Lahontan storage as an adjustment to the actual storage level.
(c)
(d)
In addition to the provisions of § 418.28, if the District is found to be operating Project facilities or any part thereof in substantial violation of this part, then, upon the determination by the Bureau, the Bureau may take over from the District the care, operation, maintenance, and management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of the transferred works by giving written notice to the District of the determination and its effective date. Following written notification from the Bureau, the care, operation, and maintenance of the works may be retransferred to the District.
The Bureau must provide in new, amended, or replacement contracts for the operation and maintenance of Project works, for the reservation by the Secretary of rights and options to enforce this part.
(a) Specific conservation actions will be needed for the District and its members to achieve a reasonable efficiency of operation as required by this part. The District is best able to determine the particular conservation measures that meet the needs of its water users. This ensures that the measures reflect the priorities and collective judgment of the water users; and will be practical, understandable and supported. The District also has the discretion to make changes in the measures they adopt as conditions or results dictate.
(b) The District will keep the Bureau informed of the measures they expect to utilize during each year. This will enable the Bureau to stay apprised of any helpful information that may, in turn, help the Bureau assist other irrigation districts. The Bureau will work cooperatively in support of the District's selection of measures and methods of implementation.
(a) The Bureau and the District will work cooperatively to develop a water management and conservation program to promote efficient management of water in the Project. The program will emphasize developing methods, including computerization and automation, to improve the District's operations and procedures for greater water delivery conservation.
(b) The Bureau will provide technical assistance to the District and cooperatively assist the District in their obligations and efforts to:
(1) Document and evaluate existing water delivery and measurement practices:
(2) Implement improvements to these practices; and
(3) Evaluate and, where practical, implement physical changes to Project facilities.
The intent of the implementation strategy for this part is to ensure that the District delivers water within entitlements at a reasonable level of efficiency as a long term average.
(a) The incentives and disincentives provided in this part are designed to encourage local officials with responsibilities for Project operations to select and implement through their discretionary actions, operating strategies which achieve the principles of this part.
(b) The specified efficiencies in the Expected Project Distribution System Efficiency table (§ 418.13 (a)(4)) were developed considering implementation of reasonable conservation measures, historic project operations, economics, and environmental effects.
(c) The efficiency target will be used as a performance standard to establish at the end of each year on the basis of actual operations, whether the District is entitled to a performance bonus in the form of incentive water or a reduction in storage for the amount borrowed ahead.
Project water may be delivered to headgates only as provided in §§ 418.8 and 418.10. Water delivered to lands that are not entitled to be irrigated or not in accord with decreed water duties is difficult to quantify at best because it is not typically measured. Since it is not likely to be a part of the total actual headgate deliveries, yet is a part of the total deliveries to the Project, it will manifest itself directly as a lower efficiency. Thus, it will either reduce the District's incentive credit or increase the storage debit by the amount improperly diverted. All other users outside the Project are thereby held harmless but the District incurs the consequence. This approach should eliminate any potential disputes between the District and the Bureau regarding the quantity of water misappropriated.
The established target efficiencies under this part are shown in the Expected Project Distribution System Efficiency table (§ 418.13 (a)(4)). The efficiency of the Project will vary with the amount of entitlement water actually delivered at the headgates. Since most of the distribution system losses such as evaporation and seepage do not change significantly with the amount of water delivered (i.e., these losses are principally a function of water surface area and the wetted perimeter of the canals), the Project efficiency requirement is higher as the percent of entitlement water actually delivered at the headgates increases. The actual efficiency is calculated each year after the close of the irrigation season based on actual measured amounts. The application of any adjustments to Lahontan Reservoir storage or Truckee River diversions resulting from the efficiency is always prospective.
(a) As an incentive for the District to increase the efficiency of the delivery system beyond the expected efficiency of 65.7 percent (66.9 percent with full delivery) as shown in the Newlands Project Water Budget table, 1995 Example, the District will be allowed to store and use the Carson River portion of the saved water at its discretion, in accordance with Nevada State Law and this part.
(1) If the District is able to exceed its expected efficiency, the District may store in Lahontan Reservoir two-thirds (2/3) of the additional water saved. (The remaining one-third (1/3) of the water saved will remain in the Truckee River through reduced diversions to Lahontan Reservoir). This water will be considered incentive water saved from the Carson River and will not be counted as storage in determining diversions from the Truckee River or computing the target storage levels for Lahontan Reservoir under this part.
(2) For purposes of this part, incentive water is no longer considered Project water. The District may use the water for any purpose (e.g., wetlands, storage for recreation, power generation, shortage reduction) that is consistent with Nevada State Law and Federal Law. The water will be managed under the District's discretion and may be stored in Lahontan Reservoir until needed subject to the limitations in (a)(3) of this section.
(3) The amount of incentive water stored in Lahontan Reservoir will be reduced under the following conditions:
(i) There is a deficit created and remaining in Lahontan Reservoir from operations penalties in a prior year;
(ii) The District releases the water from the reservoir for its designated use;
(iii) During a spill of the reservoir, the amount of incentive water must be reduced by the amount of spill; and
(iv) At the discretion of the District, incentive water may be used to offset the precautionary drawdown adjustment to the Lahontan storage objective.
(v) At the end of each year, the amount of incentive water will be reduced by the incremental amount of evaporation which occurs as a result of the increased surface area of the reservoir due to the additional storage. The evaporation rate used will be either the net evaporation measured or the net historical average after precipitation is taken into account. The method of calculation will be agreed to
(b) An example of this concept is:
(1) At the end of the 1996 irrigation season, the Bureau and the District audit the District's water records for 1996. The District's water delivery records show that 194,703 acre-feet of water were delivered to farm headgates. On the basis of their irrigated acreage that year (59,075) the farm headgate entitlement would have been 216,337 acre-feet. On the basis of 90 percent deliveries for 59,075 acres (194,203 divided by 216,337 = 0.90) the established Project efficiency requirement was 65.1 percent.
(2) On the basis of the established Project efficiency (66.1 percent), the Project diversion required to make the headgate deliveries would be expected to be 291,909 acre-feet (194,703 divided by 0.651 = 291,909). An examination of Project records reveals that the District only diverted 286,328 acre-feet which demonstrated actual Project efficiency was 68 percent and exceeded requirements of this part.
(3) The 5,581 acre-feet of savings (291,909-286,328 = 5,581) constitutes the savings achieved through efficiency improvements and the District would then be credited two-thirds (3,721 acre-feet=5,581×2/3) of this water (deemed to be Carson River water savings) as incentive water.
(4) This incentive water may be stored in Lahontan Reservoir or otherwise used by the District in its discretion consistent with State and Federal Law (e.g., power generation, recreation storage, wildlife, drought protection, etc.).
(a) If the District fails to meet the efficiencies established by this part, then, in effect, the District has borrowed from a subsequent year. The amount borrowed will be accounted for in the form of a deficit in Lahontan Reservoir storage. This deficit amount will be added to the actual Lahontan Reservoir storage quantity for the purpose of determining the Truckee River diversions to meet storage objectives as well as all other operating decisions.
(b) The amount of the deficit will be cumulative from year to year but will not be allowed to exceed 26,000 acre-feet (the expected variance between the MAD and actual water use). This limit is expected to avoid increasing the severity of drought and yet still allow for variations in efficiency over time due to weather and other factors. This approach should allow the District to plan its operation to correct for any deficiencies.
(c) The deficit can be reduced by crediting incentive water earned by the District or reducing the percentage of headgate entitlement delivered either through a natural drought or by the District and its water users administratively limiting deliveries while maintaining an efficiency greater than or equal to the target efficiency.
(d) If there is a natural drought and the shortage to the headgates is equal to or greater than the deficit, then the deficit is reduced to zero. If the shortage to headgates is less than the deficit then the deficit is reduced by an amount equal to the headgate shortage. During a natural drought, if the percentage of maximum headgate entitlement delivered is 75 percent or more then the District will be subject to the target efficiencies and resultant deficits or credits.
(e) If the District has a deficit in Lahontan Reservoir and earns incentive water, the incentive water must be used to eliminate the deficit before it can be used for any other purpose. The deficit must be credited on a 1 to 1 basis (i.e., actual efficiency savings rather than
(f) An example of the penalty concept is:
In 1996 the District delivers 90 percent of the maximum headgate entitlement or 194,703 acre-feet 216,337×.90) but actually diverts 308,000 acre-feet. The efficiency of the Project is 63.2 percent (194,703 divided by 308,000). Since the established efficiency of 65.1 percent would have required a diversion of only 299,083 acre-feet (194,703 divided by .651) the District has operated the system with 8,917 acre-feet of excess losses. Therefore, 8,917 acre-feet was borrowed and must be added to the actual storage quantities of Lahontan Reservoir for calculating target storage levels and Truckee River diversions.
(a) The MAD established in this part is based on the premise that the Project should be operated to ensure that it is capable of delivering to the headgate of each water right holder the full water entitlement for irrigable eligible acres and includes distribution
(b) Historically, actual deliveries at farm headgates have been approximately 90 percent of entitlements. This practice is expected to continue but the percentage is expected to change. This variance between headgate deliveries and headgate entitlements will be calculated annually under this part and is allowed to be diverted if needed and thereby provides an assurance that full headgate deliveries can be made. The expected diversion and associated efficiency target for the examples shown in the Newlands Project Water Budget table would be: 285,243 AF and 65.1 percent in 1996 and beyond. These are well below the MAD limits; however, the District may divert up to the MAD if it is needed to meet valid headgate entitlements.
32 Stat. 388 (43 U.S.C. 391
The provisions of this part establish regulations for off-road vehicle use on reclamation lands to protect the land resources, to promote the safety of all users, to minimize conflicts among the various uses, and to ensure that any permitted use will not result in significant adverse environmental impact or cause irreversible damage to existing ecological balances.
Reclamation lands are closed to off- road vehicle use, except for an area or trail specifically opened to use of off- road vehicles in accordance with § 420.21.
When administratively feasible, the regulation of off-road vehicle use on Reclamation lands will be compatible with such use as permitted by recreation-managing agencies on adjacent lands (both public and private).
The provisions of this part will be enforced to the extent of Bureau authority, including entering into cooperative agreements with Federal, State, county, or local law enforcement officials.
As used in this part, the term:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
Each off-road vehicle that is operated on Reclamation lands shall meet the following requirements:
(a) It shall conform to applicable State laws and vehicle registration requirements.
(b) It shall be equipped with a proper muffler and spark arrestor in good working order and in constant operation. The spark arrestor must conform to Forest Service Spark Arrestor Standard 5100-1a, and there shall be no muffler cutout, bypass, or similar device.
(c) It shall have adequate brakes and, for operation from dusk to dawn, working headlights and taillights.
(a) In addition to the regulation of part 420, operators shall comply with any applicable State laws pertaining to off-road vehicles; if State laws are lacking or less stringent than the regulations established in this part, then the regulations in part 420 are minimum standards and are controlling.
(b) Each operator of an off-road vehicle operated on Reclamation lands shall possess a valid motor vehicle operator's permit or license; or, if no permit or license is held, he/she shall be accompanied by or under the immediate supervision of a person holding a valid permit or license.
(c) During the operation of snowmobiles, trail bikes, and any other off road vehicle the operator shall wear safety equipment, generally accepted or prescribed by applicable State law or local ordinance for use of the particular activity in which he/she is participating.
(d) No person may operate an off-road vehicle:
(1) In a reckless, careless or negligent manner;
(2) In excess of established speed limits;
(3) While under the influence of alcohol or drugs;
(4) In a manner likely to cause irreparable damage or disturbance of the land, wildlife, vegetative resources, or archeological and historic values of resources; or
(5) In a manner likely to become an unreasonable nuisance to other users of Reclamation or adjacent lands.
The Regional Director shall, to the extent practicable, hold public hearings to obtain interested user groups, local populace, and affected Federal, State, and county agencies' opinions for opening or closing an area or trail in a manner that provides an opportunity for the public to express themselves and have their views taken into account. The Regional Director may act independently if he/she deems emergency action to open or close or restrict areas and trails is necessary to attain the objectives of the regulations of this part.
(a) Regional Directors shall designate and publicize those areas and trails which are open to off-road vehicle use in accordance with § 420.23.
(b) Before any area or trail is opened to off-road vehicle use, the Regional Director will establish specific regulations which are consistent with the criteria in these regulations.
(c) The Regional Director will inspect designated areas and trails periodically to determine conditions resulting from off-road vehicle use. If he determines that the use of off-road vehicles will cause or is causing considerable adverse effects on the soil, vegetation, wildlife, wildlife habitat, or cultural or historic resources of particular areas or trails of the public lands, he shall immediately close such areas or trails to the type of off-road vehicle causing such effects. No area or trail shall be reopened until the Regional Director determines that adverse effects have been eliminated and that measures have been implemented to prevent future recurrence. The public shall be notified of restrictions or closure in accordance with § 420.23.
(a) Areas and trails to be opened to off-road vehicle use shall be located:
(1) To minimize the potential hazards to public health and safety, other than the normal risks involved in off-road vehicle use.
(2) To minimize damage to soil watershed, vegetation, or other resources of the public lands.
(3) To minimize harassment of wildlife or significant disruption of wildlife habitats.
(4) To minimize conflicts between off-road vehicle use and other existing or proposed recreational uses of the same or neighboring public lands, and to ensure compatibility of uses with existing conditions in populated areas, taking into account noise and other factors.
(5) In furtherance of the purposes and policy of the National Environmental Policy Act of 1969 (Pub. L. 91-190, 83 Stat. 852).
(b) Areas and trails shall not be located in areas possessing unique natural, wildlife, historic, cultural, archeological, or recreational values unless the Commissioner determines that these unique values will not be adversely affected.
Areas and trails may be marked with appropriate signs to permit, control or prohibit off-road vehicle use on Reclamation lands. All notices concerning the regulation of off-road vehicles shall be posted in a manner that will reasonably bring them to the attention of the public. A copy of any notice shall be made available to the public in the regional office and field offices where appropriate. Such notice, and the reasons therefore, shall be published in the
Regional Directors may issue permits for the operation of off-road vehicles in organized races, rallies, meets, endurance contests, and other events on areas designed for each event. The application for such an event shall:
(a) Be received by the Regional Director at least 60 days before the event;
(b) Provide a plan for restoration and rehabilitation of trails and areas used, and demonstrate that the prospective permittee can be bonded for or deposit the amount that may be required to cover the cost;
(c) Demonstrate that special precautions will be taken to:
(1) Protect the health, safety, and welfare of the public; and
(2) Minimize damage to the land and related resources.
(d) Application fees (in amounts to be determined) as authorized by section 2 of the Land and Water Conservation Fund Act of 1965 (78 Stat. 897), as amended, shall accompany all applications.
(a) Off-road vehicle use will be administered in accordance with Executive Order 11644, by those Federal and non-Federal agencies which have assumed responsibility for management of Reclamation lands for recreation purposes.
Specifically:
(1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with regulations of those agencies.
(2) Reclamation lands managed by non-Federal entities will be administered in a manner consistent with both part 420 and applicable non-Federal laws and regulations.
(b) Public lands withdrawn, but not yet utilized for Reclamation purposes, will be administered by the Forest Service or by the Bureau of Land Management in accordance with regulations of those agencies, but consistent with Reclamation requirements for retaining the land.
16 U.S.C. 460l-31; 43 U.S.C. 373b, 373c
(a) This part implements Public Law No. 107-69, 115 Stat. 593 (November 12, 2001), an Act to Amend the Reclamation Recreation Management Act of 1992, by:
(1) Establishing eligibility criteria, such as fitness and training requirements, for Federal, State, local, and tribal law enforcement personnel to protect Bureau of Reclamation (Reclamation) facilities and lands; and
(2) Ensuring that Federal, State, local, and tribal law enforcement programs comply with applicable laws and regulations when they discharge the Secretary of the Interior's authority.
(b) This part does not apply to, or limit or restrict in any way, the investigative jurisdiction or exercise of law enforcement authority of any Federal law enforcement agency, under Federal law, within a Reclamation project or on Reclamation lands. The provisions of this part apply to non-Department of the Interior Federal law enforcement agents only where Reclamation has entered into a cooperative agreement or contract with a Federal law enforcement agency, pursuant to Public Law 107-69, for the services of specified individual Federal law enforcement agents.
(c) Nothing in this part shall be construed or applied to affect any existing right of a State or local government, or an Indian tribe, or their law enforcement officers, to exercise concurrent civil and criminal jurisdiction within a Reclamation project or on Reclamation lands.
(a)
(b)
(c)
(d)
(1) Direct the law enforcement program and units;
(2) Develop the policy, procedures, and standards for the law enforcement program within Reclamation; and
(3) Provide for inspection and oversight to control enforcement activity.
(e)
(f)
(1) A duly authorized Federal law enforcement officer, as that term is defined in Public Law 107-69, from any non-Department Federal agency who is authorized to act as a law enforcement officer on Reclamation projects and lands; or
(2) Law enforcement personnel of any State, local government, or tribal law enforcement agency.
The law enforcement policy of Reclamation is:
(a) To maintain an accountable, professional law enforcement program on Reclamation project facilities, and to protect Federal project lands and their occupants. Reclamation will meet its law enforcement responsibilities by establishing and promoting a law enforcement program which maintains law and order, and protects persons and property within Reclamation property and on Reclamation lands;
(b) To entrust law enforcement authority only to persons deemed to be qualified, competent law enforcement professionals;
(c) To maintain a continuing review and evaluation of Reclamation's law enforcement programs and operations to ensure compliance with applicable Federal laws, regulations, and policies of the Department;
(d) To ensure that approved standards are attained and maintained by each law enforcement unit undertaking a contract or cooperative agreement;
(e) To increase the effectiveness of law enforcement through the efficient handling and exchange of criminal and intelligence information with other Federal, State, local, and tribal agencies, as appropriate;
(f) To provide the public prompt access to information concerning its law enforcement program in accordance with the spirit and intent of the Freedom of Information Act, 5 U.S.C. 552; Department FOIA Regulations, 43 CFR 2; and 383 DM 15, Freedom of Information Act Handbook (
(g) To ensure that the use of force by agency personnel under contracts or cooperative agreements with Reclamation complies with the Constitution and the law of the United States; and
(h) To negotiate contracts and cooperative agreements under this part to ensure that:
(1) Reclamation retains flexibility to meet its law enforcement needs; and
(2) Entities entering into contracts and cooperative agreements are appropriately reimbursed.
(a) The Secretary of the Interior has designated the Commissioner of Reclamation to implement law enforcement authority at Reclamation facilities. The Commissioner is responsible for:
(1) Implementing the provisions of Public Law 107-69;
(2) Ensuring consistency with applicable Departmental and Reclamation requirements for law enforcement officers;
(3) Carrying out the specific responsibilities listed in paragraph (b) of this section; and
(4) Developing any additional policies necessary for the successful accomplishment of Reclamation's law enforcement responsibilities.
(b) The Commissioner's specific responsibilities include the following:
(1) Designating Reclamation's Law Enforcement Administrator (LEA), with authority to discharge the responsibilities assigned by these regulations;
(2) Overseeing the LEA's ability to ensure that all law enforcement officers under contract or cooperative agreement for law enforcement services to Reclamation are properly trained and receive necessary authorizations; and
(3) Overseeing the LEA's development of policy, procedures, and standards for directing the law enforcement units, and the installation of management controls for proper implementation of the law enforcement program.
(a) The Law Enforcement Administrator (LEA):
(1) Reports directly to the Commissioner;
(2) Oversees the law enforcement program; and
(3) Is responsible for promulgating mission-oriented policy, procedures, and standards to ensure the effective implementation of Reclamation's law enforcement authority.
(b) The chain of command for law enforcement will run from the Commissioner through the LEA to other positions designated as part of the Reclamation law enforcement managerial structure, which may include a Chief Law Enforcement Officer. The units will be staffed through cooperative agreements or contracts with law enforcement personnel from Department and non-Department Federal agencies or State, local, or tribal law enforcement organizations, with unit command being provided as part of the cooperative agreement or contract.
(c) Within the chain of command specified in paragraph (b) of this section, the LEA provides policy direction, inspection, and oversight for the law enforcement functions of Reclamation.
The Chief Law Enforcement Officer's (CLEO) responsibilities are to ensure that:
(a) Law enforcement officers working at Reclamation facilities and on Federal project lands are duly authorized under § 422.7;
(b) Law enforcement officers authorized under a contract or cooperative agreement meet training and fitness requirements established in this part and abide by standards of conduct and performance established in this part and in the contract or cooperative agreement;
(c) Law enforcement officers are under the immediate supervision of a commanding officer who is part of each law enforcement unit for which Reclamation enters into a contract or cooperative agreement; and
(d) Required reports are made to the LEA, or to another person designated by Reclamation, for purposes of carrying out the law enforcement functions for which Reclamation has a contract or cooperative agreement.
(a) The CLEO must issue written authorization to each officer who is authorized to perform Reclamation law enforcement duties.
(b) Before issuing an authorization under paragraph (a) of this section, the CLEO must ensure that the officer meets:
(1) All the requirements for officers authorized under the law enforcement contract or cooperative agreement with Reclamation; and
(2) All requirements in §§ 422.10, 422.11, and 422.12.
(c) The CLEO must terminate an officer's authorization under paragraph (a) of this section and must notify the issuing Reclamation official when the officer:
(1) Terminates employment as a full-time police officer for any reason;
(2) Is transferred to another area of jurisdiction, where the continued performance of Reclamation duties would be impractical;
(3) Is suspended for any offense that would impair his/her fitness to perform law enforcement duties; or
(4) Is under indictment or has been charged with a crime.
(d) The LEA can, upon showing just cause, revoke the authorization of an individual officer to perform law enforcement services under Reclamation's law enforcement authority after providing written notice to the CLEO.
The requirements in this section apply to Reclamation and to each law enforcement unit exercising Reclamation's law enforcement authority.
(a) The law enforcement program must provide for control, accountability, coordination, and clear lines of authority and communication. This organizational structure must apply both within the law enforcement units, and between the law enforcement units and the LEA or other personnel designated as responsible under the law enforcement contract or cooperative agreement.
(b) Only duly authorized law enforcement officers may discharge law enforcement duties.
(c) Each law enforcement contract or cooperative agreement must specifically name those individuals within
(d) Any uniform worn by law enforcement officers must display distinctive identification to ensure that the officer is:
(1) Distinguishable from non-law enforcement personnel; and
(2) Easily recognized by the public as a law enforcement officer.
(e) Officers investigating a violation of Federal law under a law enforcement contract or cooperative agreement with Reclamation will notify applicable Federal law enforcement authorities, as appropriate, pursuant to 43 U.S.C. 373b(d)(4).
(f) The LEA must:
(1) Establish an incident reporting system for incidents that occur on Reclamation lands; and
(2) Include the reporting requirements for incidents as an element of each contract or cooperative agreement.
(a) The LEA, or a person that the LEA designates, may enter into contracts or cooperative agreements with Federal, State, local, or tribal law enforcement agencies to aid in enforcing or carrying out Federal laws and regulations on Reclamation facilities or Reclamation-managed property. Reclamation will rescind the contract or cooperative agreement if an elected governing body with jurisdiction over the local law enforcement agency adopts a resolution objecting to the use of that agency's personnel to enforce Federal laws.
(b) Each contract and cooperative agreement authorizing the exercise of Reclamation law enforcement authority:
(1) Must expire no later than 3 years from its effective date;
(2) May be revoked earlier by either party with written notice;
(3) May be revised or amended with the written consent of both parties;
(4) Must expressly include the requirements for exercise of Reclamation law enforcement authority listed in § 422.10;
(5) Must expressly state that the officer has completed the Federal Bureau of Investigation criminal history review as required by § 422.11; and
(6) Must expressly include the standards of conduct listed in section 422.12.
(a) The CLEO must ensure that each officer receiving an authorization under § 422.7(a):
(1) Is at least 21 years old;
(2) Is certified as a bona fide full-time peace officer under State Peace Officer Standards and Training (POST) requirements, or its functional equivalent or is certified as a Federal law enforcement officer;
(3) Has passed his/her agency's firearms qualifications (which must be consistent with Federal policy) within the 6-month period immediately preceding the granting of the authority;
(4) Re-qualifies to use firearms with all issued service weapons at least semi-annually;
(5) Has neither been convicted of a felony offense, nor convicted of a misdemeanor offense for domestic violence, preventing him/her from possessing a firearm in compliance with section 658 of Public Law 104-208 (the 1996 amendment of the Gun Control Act of 1968);
(6) Is not the subject of a court order preventing him/her from possessing a firearm;
(7) Has no physical impairments that will hinder performance as an active duty law enforcement officer; and
(8) Attends and successfully completes a mandatory orientation session developed by Reclamation to become familiar with Federal laws and procedures and with all pertinent provisions of statutes, ordinances, regulations, and Departmental and Reclamation rules and policies.
(b) Qualification standards for guards as provided in the Departmental Manual or other Department or Reclamation guidance may only be used for those persons hired exclusively to perform guard duties.
Each law enforcement contract or cooperative agreement must include a provision requiring the CLEO to certify that each officer who exercises authority under the Act has completed an FBI criminal history check and is satisfactorily cleared.
All law enforcement officers authorized to exercise Reclamation authority must adhere to the following standards of conduct:
(a) Be punctual in reporting for duty at the time and place designated by superior officers;
(b) Be mindful at all times and under all circumstances of their responsibility to be courteous, considerate, patient and not use harsh, violent, profane, or insolent language;
(c) Make required reports of appropriate incidents coming to their attention;
(d) When in uniform and requested to do so, provide their name and identification/badge number orally or in writing;
(e) Immediately report any personal injury or any loss, damage, or theft of Federal government property as required by § 422.13;
(f) Not be found guilty in any court of competent jurisdiction of an offense that has a tendency to bring discredit upon the Department or Reclamation;
(g) Not engage in any conduct that is prejudicial to the reputation and good order of the Department or Reclamation; and
(h) Obey all regulations or orders relating to the performance of the unit's duties under the Reclamation contract or cooperative agreement.
(a) An officer must immediately report orally and in writing to his/her supervisor any:
(1) Injury suffered while on duty; and
(2) Any loss, damage, or theft of government property.
(b) The written report must be in detail and must include names and addresses of all witnesses.
(c) When an officer's injuries prevent him/her from preparing a report at the time of injury, the officer's immediate supervisor must prepare the report.
(d) The supervisor must submit all reports made under this section to the Reclamation official designated to receive them, as soon as possible after the incident occurs.
Public Law 107-69 (November 12, 2001) (Law Enforcement Authority) (43 U.S.C. 373b and 373c); Public Law 102-575, Title XXVIII (October 30, 1992) (16 U.S.C. 460l-31 through 34); Public Law 89-72 (July 9, 1965) (16 U.S.C. 460l-12); Public Law 106-206 (May 26, 2000) (16 U.S.C. 460l-6d); Public Law 59-209 (June 8, 1906) (16 U.S.C. 431-433); Public Law 96-95 (October 31, 1979) (16 U.S.C. 470aa-mm).
The purpose of this part is to maintain law and order and protect persons and property within Reclamation projects and on Reclamation facilities, lands, and waterbodies.
(1) Fighting, or threatening or violent behavior;
(2) Language, utterance, gesture, or display or act that is obscene, physically threatening or menacing, or that is likely to inflict injury or incite an immediate breach of the peace;
(3) Unreasonable noise, considering the nature and purpose of the person's conduct, location, time of day or night,
(4) Creating or maintaining a hazardous or physically offensive condition; or
(5) Any other act or activity that may cause or create public alarm, nuisance, or bodily harm.
(1) Nonamphibious registered motorboats;
(2) Military, fire, emergency, or law enforcement vehicles when used for emergency purpose;
(3) Self-propelled lawnmowers, snowblowers, garden or lawn tractors, and golf carts while being used for their designed purpose;
(4) Agricultural, timbering, construction, exploratory, and development equipment and vehicles while being used exclusively as authorized by permit, lease, license, agreement, or contract with Reclamation;
(5) Any combat or combat support vehicle when used in times of national defense emergencies;
(6) “Official use” vehicles; and
(7) Wheel chairs and carts designed and used for transporting persons with disabilities.
(1) Are rooted in that community's history; and
(2) Are important in maintaining the continuing cultural identity of the community.
(1) Unauthorized possession or occupancy of Reclamation facilities, lands, or waterbodies;
(2) Personal entry, presence, or occupancy on or in any portion or area of Reclamation facilities, lands, or waterbodies that have been closed to public use pursuant to subpart B of this part 423;
(3) Unauthorized extraction or disturbance of natural or cultural resources located on Reclamation facilities, lands, or waterbodies;
(4) Unauthorized conduct of commercial activities on Reclamation facilities, lands, or waterbodies;
(5) Holding unauthorized public gatherings on Reclamation facilities, lands, or waterbodies; or
(6) Unauthorized dumping or abandonment of personal property on Reclamation facilities, lands, or waterbodies.
(a) This part and all applicable state and local laws apply to all persons on Reclamation facilities, lands, and waterbodies, with the following exceptions:
(1) Certain exceptions apply to Federal, state, local, and contract employees, as further addressed in paragraph (b) of this section.
(2) Certain exceptions apply to non-Federal entities, as further addressed in paragraph (c) of this section;
(3) Certain exceptions apply on Reclamation facilities, lands, and waterbodies administered by other Federal agencies, as further addressed in paragraph (d) of this section; and
(4) Certain exceptions apply on Reclamation facilities, lands, and waterbodies subject to treaties and Federal laws concerning tribes and Indians, as further addressed in paragraph (e) of this section.
(b) This part does not apply to:
(1) Federal, state, and local law enforcement, fire, and rescue personnel in the performance of their official duties on Reclamation facilities, lands, and waterbodies;
(2) An employee or agent of the Federal government when the employee or agent is carrying out official duties; or
(3) An employee or agent of an entity that has entered into a contract or agreement with Reclamation to administer, operate, maintain, patrol, or provide security for Reclamation facilities, lands, and waterbodies, when the employee or agent is working within the scope of the defined activities described in the contract or agreement.
(c) If a non-Federal entity has assumed responsibility for operating, maintaining, or managing Reclamation facilities, lands, or waterbodies through a contract or other written agreement, public conduct in and on those Reclamation facilities, lands, and waterbodies will be regulated by this part 423 as well as any regulations established by the entity, the terms of the entity's contract with Reclamation, and applicable Federal, state, and local law.
(d) Public conduct on Reclamation facilities, lands, and waterbodies administered by other Federal agencies under statute or other authority will be governed by the regulations of those agencies rather than this part 423. However, Reclamation retains the right to take necessary actions to safeguard the security and safety of the public and such Reclamation facilities, lands and waterbodies.
(e) This part applies on all Reclamation facilities, lands, and waterbodies that are subject to Treaties with, and
(f) This part 423 and other Federal laws will govern over any conflicting regulations of a non-Federal entity.
All Reclamation facilities, lands, and waterbodies are open to lawful use by the public unless they are closed to public use under this subpart B of this part 423, or as provided by 43 CFR part 420, Off-Road Vehicle Use.
The following Reclamation facilities, lands, and waterbodies, or portions thereof, are closed to public use:
(a) Those that were closed to public use as of April 17, 2006, as evidenced by fencing, gates, barriers, locked doors, road closures, signage, posting of notices, or other reasonably obvious means, as provided in § 423.14;
(b) Those that are closed after April 17, 2006 under § 423.12;
(c) Those that are closed periodically and regularly under § 423.13; and
(d) Those that are closed to off-road vehicle use pursuant to 43 CFR part 420.
(a)
(1) Protection and security of Reclamation facilities and of Reclamation's employees and agents;
(2) Protection of public health and safety, cultural resources, natural resources, scenic values, or scientific research activities;
(3) Safe and efficient operation and maintenance of Reclamation projects;
(4) Reduction or avoidance of conflicts among visitor use activities;
(5) National security; or
(6) Other reasons in the public interest.
(b)
Reclamation facilities, lands, or waterbodies that are closed periodically and regularly, regardless of the date of the initial closure, must be noticed as provided in § 423.12(a) only once, and at any time the schedule of closure is changed.
Before or at the time of closing all or portions of Reclamation facilities, lands, or waterbodies to public use, the responsible authorized official must indicate the closure by:
(a) Locked doors, fencing, gates, or other barriers;
(b) Posted signs and notices at conspicuous locations, such as at normal points of entry and at reasonable intervals along the boundary of the closed area; or
(c) Other reasonably obvious means including, but not limited to, onsite personal contact with a uniformed official.
(a) The authorized official must document the reason(s) for establishing any closure or reopening that occurs after April 17, 2006. The official must do
(b) Documentation of a closure must cite one or more of the conditions for closure described in § 423.12 of this part.
(c) Documentation of closures or reopenings will be available to the public upon request, except when the release of this documentation could result in a breach of national security or the security of Reclamation facilities.
(a) You may be exempted from a closure, subject to any terms and conditions established under paragraph (c) of this section, by written authorization from the authorized official who effected or who is responsible for the closure, if you are:
(1) A person with a license or concession agreement that requires you to have access to the closed Reclamation facilities, lands, or waterbodies;
(2) An owner or lessee of real property, resident, or business in the vicinity of closed Reclamation facilities, lands, or waterbodies who cannot reasonably gain access to your property, residence, or place of business without entering and crossing such closed Reclamation facilities, lands, or waterbodies; or
(3) A holder of a permit granting you an exemption from the closure issued under subpart D of this part 423 by the authorized official who effected or who is responsible for the closure.
(b) You may request exemption from a closure by writing to the authorized official who effected or who is responsible for the closure. You need not do so if you have such an exemption in effect on April 17, 2006.
(c) An authorized official may establish terms and conditions on any exemption from a closure, or terminate such exemption, for any of the reasons listed in § 423.12.
An authorized official may reopen to public use any Reclamation facilities, lands, and waterbodies, or portions thereof. The authorized official may do this at any time with advance or subsequent public notice, except as required by other statute or regulation, and must document the reopening as provided in § 423.15.
(a) You must obey all applicable Federal, state, and local laws whenever you are at or on any Reclamation facilities, lands, or waterbodies.
(b) You must comply with all provisions of this subpart C whenever you are at or on any Reclamation facilities, lands, or waterbodies, except as specifically provided by:
(1) A permit issued by an authorized official under subpart D of this part 423;
(2) A contract with Reclamation or agency managing Reclamation facilities, lands, and waterbodies;
(3) The rules established by an authorized official in a special use area under subpart E of this part 423; or
(4) A right-of-use issued under 43 CFR part 429.
(a) You are responsible for finding, being aware of, and obeying notices and postings of closed and special use areas established by an authorized official under subpart B and subpart E of this part 423.
(b) You are responsible for the use of any device, vehicle, vessel, or aircraft you own, lease, or operate on Reclamation facilities, lands, or waterbodies. You may be issued a citation for a violation of regulations applicable to the use of any device, vehicle, vessel, or aircraft as provided in this part as the owner, lessee, or operator.
(c) You are responsible for the use and treatment of Reclamation facilities, lands, and waterbodies, and the cultural resources, wildlife, and other natural resources located thereon, by you and those for whom you are legally responsible. This presumption is sufficient to issue a citation to you for violation of provisions of these regulations by you or by those for whom you are legally responsible.
(d) The regulations governing permits, other use authorizations, and fees on Reclamation lands that are found in subpart D of this part 423 apply to your use of Reclamation facilities, lands, and waterbodies.
(e) You must furnish identification information upon request by a law enforcement officer.
(a) You must not assault, threaten, disturb, resist, intimidate, impede, or interfere with any employee or agent of Federal, state, or local government engaged in an official duty.
(b) You must comply with any lawful order of an authorized government employee or agent for the purpose of maintaining order and controlling public access and movement during law enforcement actions and emergency or safety-related operations.
(c) You must not knowingly give a false report or other false information to an authorized government employee or agent.
(d) You must not interfere with, impede, or disrupt the authorized use of Reclamation facilities, lands, or waterbodies or impair the safety of any person.
(e) Disorderly conduct is prohibited.
(a) You must not abandon personal property of any kind in or on Reclamation facilities, lands, or waterbodies.
(b) You must not store or leave unattended personal property of any kind.
(1) Unattended personal property is presumed to be abandoned:
(i) After a period of 24 hours;
(ii) At any time after a posted closure takes effect under subpart B of this part 423; or
(iii) At any time for reasons of security, public safety, or resource protection.
(2) If personal property is presumed abandoned, an authorized official may impound it, store it, and assess a reasonable impoundment fee.
(3) The impoundment fee must be paid before the authorized official will return the impounded property to you.
(c) An authorized official may impound or destroy unattended personal property at any time if it:
(1) Interferes with safety, operation, or management of Reclamation facilities, lands, or waterbodies; or
(2) Presents a threat to persons or Reclamation project resources.
(d) An authorized official may dispose of abandoned personal property in accordance with the procedures contained in title 41 CFR and applicable Reclamation and Department of the Interior policy.
You must not trespass on Reclamation facilities, lands, and waterbodies.
(a) You must not tamper or attempt to tamper with, move, manipulate, operate, adjust, or set in motion property not under your lawful control or possession including, but not limited to, vehicles, equipment, controls, recreational facilities, and devices.
(b) You must not destroy, injure, deface, damage, or unlawfully remove property not under your lawful control or possession.
(c) You must not drop, place, throw, or roll rocks or other items inside, into, down, or from, dams, spillways, dikes, or other structures and facilities.
You must not conduct public assemblies, meetings, gatherings, demonstrations, parades, and other events without a permit issued pursuant to subpart D of this part 423. Public gatherings that involve the possession or occupancy of Reclamation facilities, lands, and waterbodies are governed by 43 CFR part 429.
You must not engage in advertising or solicitation on Reclamation facilities, lands, or waterbodies except as allowed under a valid contract with Reclamation, or as allowed by a permit issued pursuant to subpart D of this part 423.
You must not bury, deposit, or scatter human or animal remains, or place memorials, markers, vases, or plaques on Reclamation facilities, lands, or waterbodies. This section does not apply to the burial of parts of fish or wildlife taken in legal hunting, fishing, or trapping.
(a) You must not destroy, injure, deface, remove, search for, disturb, or alter natural resources or cultural resources, including abandoned buildings or structures, on or in Reclamation facilities, lands, or waterbodies except in accordance with § 423.29(g) and other applicable Federal, state, and local laws.
(b) You must not introduce wildlife, fish, or plants, including their reproductive bodies, into Reclamation lands and waterbodies without a permit issued pursuant to subpart D of this part 423.
(c) You must not drop, place, throw, or roll rocks or other items inside, into, at, or down, caves, caverns, valleys, canyons, mountainsides, thermal features, or other natural formations.
(d) You may bring firewood to or gather dead wood on Reclamation lands for fires as allowed under § 423.31. You must not damage or remove any live tree or part thereof except with proper authorization under 43 CFR part 429.
(e) You must not walk on, climb, enter, ascend, descend, or traverse cultural resources on Reclamation lands, including monuments or statues, except as specifically allowed in special use areas designated by an authorized official under subpart E of this part 423.
(f) You must not possess a metal detector or other geophysical discovery device, or use a metal detector or other geophysical discovery techniques to locate or recover subsurface objects or features on Reclamation lands, except:
(1) When transporting, but not using, a metal detector or other geophysical discovery device in a vehicle on a public road as allowed under applicable Federal, state, and local law; or
(2) As allowed by a permit issued pursuant to subpart D of this part 423.
(g) You may engage in renewable natural resource gathering activities such as picking berries and mushrooms, collecting antlers, and other similar activities as regulated by this part 423 and other applicable Federal, state, and local laws.
(a) You may possess firearms, ammunition, bows and arrows, crossbows, or other projectile firing devices on Reclamation lands and waterbodies, provided the firearm, ammunition, or other projectile firing device is stowed, transported, and/or carried in compliance with applicable Federal, state, and local law, with the following exceptions:
(1) You must not have a weapon in your possession when at or in a Reclamation facility.
(2) You must comply with any prohibitions or regulations applicable to weapons in a special use area established by an authorized official under subpart E of this part 423.
(b) You must not discharge or shoot a weapon unless you are:
(1) Using a firearm or other projectile firing device lawfully for hunting or fishing as allowed under § 423.32, or at an authorized shooting or archery range; and
(2) In compliance with applicable Federal, state, and local law.
(c) You must not use or possess explosives, or fireworks or pyrotechnics of any type, except as allowed by a permit issued pursuant to subpart D of this part 423, or in special use areas so designated by an authorized official under subpart E of this part 423.
(a) You must not leave a fire unattended, and it must be completely extinguished before your departure.
(b) You must not improperly dispose of lighted smoking materials, including cigarettes, cigars, pipes, matches, or other burning material.
(c) You must not burn materials that produce toxic fumes, including, but not limited to, tires, plastic, flotation materials, or treated wood products.
(d) You must not transport gasoline and other fuels in containers not designed for that purpose.
(e) You must comply with all applicable Federal, state, and local fire orders, restrictions, or permit requirements.
(a) You may hunt, fish, and trap in accordance with applicable Federal, state, and local laws, and subject to the restrictions of § 423.30, in areas where both of the following conditions are met:
(1) The area is not closed to public use under subpart B of this part 423; and
(2) The area has not been otherwise designated by an authorized official in a special use area under subpart E of this part 423.
(b) You must comply with any additional restrictions pertaining to hunting, fishing, and trapping established by an authorized official in a special use area under subpart E of this part 423.
(a) You may camp on Reclamation lands, except that you must comply with any restrictions, conditions, limitations, or prohibitions on camping established by an authorized official in a special use area under subpart E of this part 423.
(b) You must not camp on Reclamation lands at any single Reclamation project for more than 14 days during any period of 30 consecutive days, except as allowed by a permit issued under 43 CFR part 429;
(c) You must not attempt to reserve a campsite for future use by placing equipment or other items on the campsite, or by personal appearance, without camping on and paying the required fees for that campsite daily;
(d) You must not camp on or place any equipment at a campsite that is posted or otherwise marked as “reserved” or “closed” by an authorized official without a valid reservation for that campsite, except as allowed by a permit issued under subpart D of this part 423; and
(e) You must not dig in or level any ground, or erect any structure other than a tent, in a designated campground.
(a) You must not bring or improperly dispose of refuse on Reclamation facilities, lands, and waterbodies. Both the owner and the person bringing or disposing refuse may be issued a citation for violating this provision.
(b) Campers, picnickers, and all other persons using Reclamation lands must keep their sites free of trash and litter during the period of occupancy and must remove all personal equipment and clean their sites before departure.
(c) You must not construct a latrine within 200 yards of any Reclamation waterbody, or within 200 yards of the high water mark of any reservoir.
(a) You must not bring pets or other animals into public buildings, public transportation vehicles, or sanitary facilities. This provision does not apply to properly trained animals assisting persons with disabilities, such as seeing-eye dogs.
(b) You must not abandon any animal on Reclamation facilities, lands, or waterbodies, or harass, endanger, or attempt to collect any animal except game you are attempting to take in the course of authorized hunting, fishing, or trapping.
(c) Any unauthorized, unclaimed, or unattended animal on Reclamation lands may be:
(1) Removed in accordance with Federal law, and applicable state and local laws; and
(2) Confined at a location designated by an authorized official, who may assess a reasonable impoundment fee that must be paid before the impounded animal is released to its owner.
(d) The following animals are prohibited and are subject to removal in accordance with Federal law, and applicable state and local laws:
(1) Captive wild or exotic animals (including, but not limited to, cougars, lions, bears, bobcats, wolves, and snakes), except as allowed by a permit issued under subpart D of this part 423; and
(2) Any pets or animals displaying vicious or aggressive behavior or posing a threat to public safety or deemed a public nuisance.
(a) You may swim, wade, snorkel, scuba dive, raft, or tube at your own risk in Reclamation waters, except:
(1) Within 300 yards of dams, power plants, pumping plants, spillways, stilling basins, gates, intake structures, and outlet works;
(2) Within 100 yards of buoys or barriers marking public access limits;
(3) In canals, laterals, siphons, tunnels, and drainage works; or
(4) At public docks, launching sites, and designated mooring areas.
(b) You must display an international diver down, or inland diving flag in accordance with state and U.S. Coast Guard guidelines when engaging in any underwater activities.
(c) You must not dive, jump, or swing from dams, spillways, bridges, cables, towers, or other structures.
(a) You must not tow persons on skis, sleds, or other sliding devices with a motor vehicle or snowmobile, except that you may tow sleds designed to be towed behind snowmobiles if joined to the towing snowmobile with a rigid hitching mechanism, and you may tow disabled snowmobiles by any appropriate means.
(b) You must not ice skate, ice fish, or ice sail within 300 yards of dams, power plants, pumping plants, spillways, stilling basins, gates, intake structures, or outlet works.
(a) You must comply with Federal, state, and local laws applicable to the operation of a vessel or other watercraft on Reclamation waters, and with any restrictions established by an authorized official.
(b) You must not operate a vessel in an area closed to the public.
(c) You must observe restrictions established by signs, buoys, and other regulatory markers.
(d) You must not operate a vessel, or knowingly allow another person to operate a vessel, in a reckless or negligent manner, or in a manner that endangers or is likely to endanger a person, property, natural resource, or cultural resource.
(e) You must not operate a vessel when impaired or intoxicated under the standards established by applicable state and local law.
(f) You must not occupy a vessel overnight, except where otherwise designated under applicable Federal, state, or local law, or where otherwise designated by an authorized official in a special use area.
(g) You must not use a vessel as a place of habitation or residence.
(h) You must not place or operate a vessel on a Reclamation waterbody for a fee or profit, except as allowed by contract or permit issued pursuant to subpart D of this part 423.
(i) You must remove your vessels from Reclamation lands and waters when not in actual use for a period of more than 24 hours, unless they are securely moored or stored at special use areas so designated by an authorized official.
(j) You must not attach or anchor a vessel to structures such as locks, dams, regulatory or navigational buoys, or other structures not designed for such purpose.
(k) You must display an international diver down, or inland diving flag in accordance with state and U.S. Coast Guard guidelines when operating a vessel involved in any underwater activities.
(l) You may engage in towing activities, including but not limited to waterskiing and tubing, only during daylight hours and subject to any applicable Federal, state, and local law.
(a) All vessels on Reclamation waters must:
(1) Be constructed and maintained in compliance with the standards and requirements established by, or promulgated under, Title 46 United States Code, and any applicable state and local laws and regulations;
(2) Have safety equipment, including personal flotation devices, on board in compliance with U.S. Coast Guard boating safety requirements and in
(3) If motorized, have and utilize a proper and effective exhaust muffler as defined by applicable state and local laws. Actions or devices which render exhaust mufflers ineffective are prohibited.
(b) Owners or operators of vessels not in compliance with this § 423.39 may be required to remove the vessel immediately from Reclamation waterbodies until items of non-compliance are corrected.
(a) When operating a vehicle on Reclamation lands and Reclamation projects, you must comply with applicable Federal, state, and local laws, and with posted restrictions and regulations. Operating any vehicle through, around, or beyond a restrictive sign, recognizable barricade, fence, or traffic control barricade, is prohibited.
(b) You must not park a vehicle in violation of posted restrictions and regulations, or in a manner that would obstruct or impede normal or emergency traffic movement or the parking of other vehicles, create a safety hazard, or endanger any person, property, or natural feature. Vehicles so parked are subject to removal and impoundment at the owner's expense.
(c) You must not operate any vehicle, or allow another person to operate a vehicle in your control, in a careless, negligent or reckless manner that would endanger any person, property, natural resource, or cultural resource.
(d) In addition to the regulations in this part, the regulations governing off-road-vehicle use in 43 CFR part 420 apply.
(a) You must not takeoff or land an aircraft on Reclamation lands or waterbodies except in special use areas so designated by an authorized official. This paragraph does not apply to pilots engaged in emergency rescue or in the official business of Federal, state, or local governments or law enforcement agencies, or who are forced to land due to circumstances beyond the pilot's control.
(b) You must not operate any aircraft while on or above Reclamation facilities, lands, and waterbodies in a careless, negligent, or reckless manner so as to endanger any person, property, or natural feature.
(c) This section does not provide authority to deviate from Federal or state regulations, or prescribed standards, including, but not limited to, regulations and standards concerning pilot certifications or ratings and airspace requirements.
(d) Except in extreme emergencies threatening human life or serious property loss, you must not use non-standard boarding and loading procedures to deliver or retrieve people, material, or equipment by parachute, balloon, helicopter, or other aircraft.
(e) Operation of aircraft on or over Reclamation lands and waterbodies is at the risk of the aircraft owner, pilot, and passenger(s).
(f) You must comply with all applicable U.S. Coast Guard rules and § 423.38 when operating a seaplane on Reclamation waterbodies.
(g) You must securely moor any seaplane remaining on Reclamation waterbodies in excess of 24 hours at mooring facilities and locations designated by an authorized official. Seaplanes may be moored for periods of less than 24 hours on Reclamation waterbodies, except in special use areas otherwise designated by an authorized official, provided:
(1) The mooring is safe, secure, and accomplished so as not to damage the rights of the Government or the safety of persons; and
(2) The operator remains in the vicinity of the seaplane and reasonably available to relocate the seaplane if necessary.
(h) Commercial operation of seaplanes from Reclamation waterbodies is prohibited.
(i) You must not operate a seaplane on Reclamation lands and waterbodies between sunset and sunrise.
(j) You must comply with any further restrictions on the operation of aircraft in the proximity of specific Reclamation facilities, lands, or waterbodies established by an authorized official.
(k) You must not operate model aircraft except as allowed in special use areas established by an authorized official under subpart E of this part 423.
Commercial gambling in any form, or the operation of gambling devices, is prohibited on Reclamation facilities, lands, and waterbodies unless authorized by applicable treaties or Federal, state, and local laws or regulations.
You must not possess or consume alcoholic beverages in violation of Federal, state, or local law, or the rules of a special use area established by an authorized official under subpart E of this part 423.
You must not possess, consume, deliver, or be under the influence of, controlled substances included in schedules I, II, III, IV, or V of part B of the Controlled Substance Act (21 U.S.C. 812) on Reclamation facilities, lands, or waterbodies, unless the controlled substance was legally obtained through a valid prescription or order.
(a) Authorized officials may issue permits to authorize activities on Reclamation facilities, lands, or waterbodies otherwise prohibited or restricted by §§ 423.16(a)(3), 423.26, 423.27, 423.29(b), 423.29(f), 423.30(c), 423.33(d), 423.35(d)(1), and 423.38(h), and may terminate or revoke such permits for non-use, non-compliance with the terms of the permit, violation of any applicable law, or to protect public health or safety or natural or cultural resources.
(b) You may apply for permission to engage in activities otherwise prohibited or restricted by the sections listed in paragraph (a) of this section. You may apply to the authorized official responsible for the area in which your activity is to take place, and this authorized official may grant, deny, or establish conditions or limitations on this permission.
(c) You must pay all required fees and properly display applicable permits, passes, or receipts.
(d) You must not violate the terms and conditions of a permit issued by an authorized official. Any such violation is prohibited and may result in suspension or revocation of the permit, or other penalties as provided in subpart F of this part 423, or both.
(e) You must, upon request by a law enforcement officer, security guard, or other government employee or agent acting within the scope of their official duties, display any permit authorizing your presence or activity on Reclamation facilities, lands, and waterbodies.
(a) After making a determination under paragraph (b) of this section, an authorized official may:
(1) Establish special use areas within Reclamation facilities, lands, or waterbodies for application of reasonable schedules of visiting hours; public use limits; and other conditions, restrictions, allowances, or prohibitions on particular uses or activities that vary from the provisions of subpart C of this part 423, except § 423.28; and
(2) From time to time revise the boundaries of a previously designated special use area and revise or terminate previously imposed schedules of visiting hours; public use limits; and other conditions, restrictions, allowances, or prohibitions on a use or activity.
(b) Before taking action under paragraph (a) of this section, an authorized official must make a determination that action is necessary for:
(1) The protection of public health and safety;
(2) The protection and preservation of cultural and natural resources;
(3) The protection of environmental and scenic values, scientific research, the security of Reclamation facilities, the avoidance of conflict among visitor use activities; or
(4) Other reasons in the public interest.
When establishing, revising, or terminating a special use area, Reclamation must notify the public as required by this section.
(a)
(1) The location of the special use area; and
(2) The public use limits, conditions, restrictions, allowances, or prohibitions on uses and activities that are to be applied to the area or that are to be revised or terminated.
(b)
(1) Signs posted at conspicuous locations, such as normal points of entry and reasonable intervals along the boundary of the special use area;
(2) Maps available in the local Reclamation office and other places convenient to the public;
(3) Publication in a newspaper of general circulation in the affected area; or
(4) Other appropriate methods, such as the use of electronic media, brochures, and handouts.
(c)
(1) Notice under this section may be delayed in an emergency where delaying designation, revision, or termination of a special use area would result in significant risk to:
(i) National security; or
(ii) The security of a Reclamation facility, Reclamation employees, or the public.
(2) If the exception in paragraph (c)(1) of this section applies, Reclamation must comply with paragraph (b) of this section within 30 days after the effective date of the designation.
(3) Failure to meet the
(d)
(1) The action will not result in a significant change in the public use of the area;
(2) The action will not adversely affect the area's natural, esthetic, scenic or cultural values;
(3) The action will not require a long-term or significant modification in the resource management objectives of the area; and
(4) The action is not highly controversial.
(a) The authorized official must document the reasons for designating a special use area and the restrictions, conditions, public use limits, or prohibitions that apply to that area. In the case of the termination of a previously established restriction, condition, public use limit, or prohibition, the authorized official must make a written determination as to why the restriction is no longer necessary.
(b) Documentation of the designation or termination of a special use area must occur before the action, except in the emergency situations described in § 423.61(c). In the latter case, the documentation is required within 30 days after the date of the designation.
(c) Reclamation will make documents produced under this section available to the public upon request except where such disclosure could compromise national or facility security, or human safety.
To implement a public use limit, an authorized official may establish a registration or reservation system.
Areas designated and formally documented for special uses, public use limits, or other restrictions, on April 17, 2006 will remain so designated without the need for compliance with §§ 423.60 through 423.63, except with respect to termination or modification of the special uses, public use limits, or other restrictions.
(a) When at, in, or on Reclamation facilities, lands, or waterbodies, you must obey and comply with:
(1) Any closure orders established under subpart B of this part 423;
(2) The regulations in subpart C of this part 423;
(3) The conditions established by any permit issued under subpart D of this part 423; and
(4) The regulations established by an authorized official in special use areas under subpart E of this part 423.
(b) Violating any use or activity prohibition, restriction, condition, schedule of visiting hours, or public use limit established by or under this part 423 is prohibited.
(c) Any continuous or ongoing violation of these regulations constitutes a separate violation for each calendar day in which it occurs.
Under section (1)(a) of Public Law 107-69, you are subject to a fine under chapter 227, subchapter C of title 18 United States Code (18 U.S.C. 3571), or can be imprisoned for not more than 6 months, or both, if you violate:
(a) The provisions of this part 423; or
(b) Any condition, limitation, or prohibition on uses or activities, or of public use limits, imposed under this part 423.
Pursuant to the provisions of Article 34 and 25 of repayment contract I1r-1534, dated September 20, 1948, between the United States and the Okanogan Irrigation District, it is ordered as follows:
The Okanogan Irrigation District shall require that all recipients of cabinsite and recreation resort leases on Federal lands situated on Conconully Lake (formerly Salmon Lake) and Conconully Reservoir, Okanogan County, Wash., comply with applicable Federal, state and local laws, rules and regulations pertaining to water quality standards and effluent limitations for the discharge of pollutants into said reservoirs, including county regulations governing subsurface waste disposal systems.
5 U.S.C. 301; 5 U.S.C. 553; 16 U.S.C. 590z-11; 31 U.S.C. 9701; and 32 Stat. 388 and all acts amendatory thereof or supplementary thereto including, but not limited to, 43 U.S.C. 390aa to 390zz-1, 43 U.S.C. 418, 43 U.S.C. 423 to 425b, 43 U.S.C. 431, 434, 440, 43 U.S.C. 451 to 451k, 43 U.S.C. 462, 43 U.S.C. 485 to 485k, 43 U.S.C. 491 to 505, 43 U.S.C. 511 to 513, and 43 U.S.C. 544.
These rules and regulations implement certain provisions of Federal reclamation law that address the ownership and leasing of land on Federal Reclamation irrigation projects and the pricing of Federal Reclamation project irrigation water, and establish terms and conditions for the delivery of Federal Reclamation project irrigation water.
As used in these rules:
(a)
(1) The district executes a new or renewed contract with Reclamation after October 12, 1982. The discretionary provisions apply as of the execution date of the new or renewed contract;
(2) The district amends its contract to conform to the discretionary provisions:
(i) A district may ask Reclamation to amend its contract to conform to the discretionary provisions;
(ii) The district's request to Reclamation must be accompanied by a duly adopted resolution dated and signed by the governing board of the district obligating the district to take, in a timely manner, actions required by applicable State law to amend its contract; and
(iii) If the requirements of paragraphs (a)(2)(i) and (ii) of this section are met, then Reclamation will amend the contract, and the district becomes subject to the discretionary provisions from the date the district's request was submitted to Reclamation;
(iv) If the district only wants to amend its contracts to become subject to the discretionary provisions, the amendments need only be to the extent required to conform to the discretionary provisions; or
(3) The district amends its contract after October 12, 1982, to provide the district with additional or supplemental benefits. The amendment must also include the district's conformance to the discretionary provisions:
(i) The discretionary provisions apply as of the date that Reclamation executes the contract amendment;
(ii) For purposes of application of the acreage limitation provisions Reclamation considers a contract amendment as providing additional or supplemental benefits if that amendment:
(A) Requires the United States to expend significant funds;
(B) Requires the United States to commit significant additional water supplies; or
(C) Substantially modifies contract payments due the United States; and
(iii) For purposes of application of the acreage limitation provisions Reclamation does not consider the following contract actions as providing additional or supplemental benefits:
(A) The construction of facilities for conveyance of irrigation water for which districts contracted on or before October 12, 1982;
(B) Minor drainage and construction work contracted under a prior repayment or water service contract;
(C) Operation and maintenance (O&M) amendments;
(D) The deferral of payments provided the deferral is for a period of 12 months or less;
(E) A temporary supply of irrigation water as set forth in § 426.16(d);
(F) The transfer of water on an annual basis from one district to another, provided that:
(
(
(
(
(
(
(G) Contract actions pursuant to the Reclamation Safety of Dams Act of 1978, as amended (43 U.S.C. 506); or
(H) Other contract actions that Reclamation determines do not provide additional or supplemental benefits.
(b)
(1) Enters into a new or renewed contract requiring it to conform to the discretionary provisions, as provided in paragraph (a)(1) of this section;
(2) Makes a contract action requiring conformance to the discretionary provisions, as provided in paragraphs (a)(2) or (3) of this section; or
(3) Becomes exempt, as provided in § 426.16.
(c)
The parties agree that the delivery of irrigation water or use of Federal facilities pursuant to this contract is subject to reclamation law, as amended and supplemented, including but not limited to the Reclamation Reform Act of 1982 (43 U.S.C. 390aa
(2) New or renewed contracts executed after the effective date of these rules, or contracts that are amended to conform to the discretionary provisions after the effective date of these rules must include the following clause:
The parties agree that the delivery of irrigation water or use of Federal facilities pursuant to this contract is subject to Federal reclamation law, including but not limited to the Reclamation Reform Act of 1982 (43 U.S.C. 390aa
(d)
(1) The discretionary provisions, then all subcontracting districts who are entitled to receive irrigation water must also conform to the discretionary provisions; or
(2) Prior law, then the subcontracting district can amend its subcontract to conform to the discretionary provisions without subjecting the master contractor or any other subcontractor of the master contractor to the discretionary provisions. If a subcontract that does not include the United States as a party is amended to conform to the discretionary provisions, or the subcontract is a new or renewed contract executed after October 12, 1982, then the amended, new, or renewed subcontract must include the United States as a party.
(e)
(1) Other than a nonresident alien or a legal entity that is not established under State or Federal law, and is:
(i) A direct landholder in that district, then the landholder becomes subject to the discretionary provisions and the associated acreage limitation status will apply in any district in which the landholder holds land; or
(ii) Only an indirect landholder in that and all other discretionary provisions districts, then the landholder's acreage limitation status is not affected. Such a landholder can receive irrigation water as a prior law recipient on indirectly held lands in districts that conform to the discretionary provisions.
(2) A nonresident alien, or legal entity not established under State or Federal law, and the landholder is:
(i) A direct landholder, then since such a landholder cannot become subject to, and has no eligibility under the discretionary provisions:
(A) All direct landholdings in districts that conform to the discretionary provisions become ineligible; and
(B) Directly held land that becomes ineligible as a result of the district's action to conform to the discretionary provisions may be placed under recordable contract as subject to the conditions specified in § 426.12; or
(ii) An indirect landholder, then such a landholder may receive irrigation water on land indirectly held in districts conforming to the discretionary provisions, with the entitlements for such landholder determined as specified in § 426.8.
(f)
(i) The elector's entire landholding in all districts shall be subject to the discretionary provisions;
(ii) The election shall be binding on the elector and his or her landholding, but will not be binding on subsequent landholders of that land;
(iii) An irrevocable election by a legal entity is binding only upon that entity and not on the part owners of that entity;
(iv) An irrevocable election by a part owner of a legal entity binds only the part owner making the election and not the entity or other part owners of the entity; and
(v) An irrevocable election by a lessor does not affect the status of a lessee, and vice versa. However, the eligibility and entitlement of neither a lessor nor a lessee may be enhanced through leasing.
(2) A landholder makes an irrevocable election by completing a Reclamation issued irrevocable election form:
(i) The elector's original irrevocable election form must be filed by the district with Reclamation and must be accompanied by a completed certification form, as specified in § 426.18;
(ii) The elector must file copies of the irrevocable election and certification forms concurrently with each district where the elector holds nonexempt land;
(iii) Reclamation will prepare a letter advising the recipient of the approval or disapproval of the election. Reclamation will base approval upon whether the election form and the accompanying certification form(s) indicate the elector's satisfaction of the various requirements of Federal reclamation law and these regulations;
(iv) If the election is approved, the letter of approval, with a copy of the irrevocable election form and the original certification form(s), will be sent by Reclamation to each district where the elector holds land;
(v) The district(s) shall retain the forms; and
(vi) If the irrevocable election is disapproved, the landholder and the district will be advised by letter along with the reasons for disapproval.
(3) A landholder that only holds land indirectly in a district that has conformed to the discretionary provisions, other than a nonresident alien or a legal entity not established under State or Federal law, may make an irrevocable election also by simply submitting certification forms to all districts where the landholder holds land subject to the acreage limitation provisions. An election made in this manner is binding in all districts in which such elector holds land.
(g)
(h)
(a)
(b)
(1) Direct landowners in proportion to the direct beneficial interest the landowners own in the land; and
(2) Indirect landowners in proportion to the indirect beneficial interest they own in the land.
(c)
(d)
(e)
(f)
(1) Undivided, then all of the indirect part owners must be eligible in order for the entity to be eligible; or
(2) Divided, in such a manner that specific parcels are attributable to each indirect landholder, then the entity may qualify for eligibility on those portions of the landholding not attributable to any part owner who is ineligible.
(a)
(b)
(c)
(d)
(i) An individual subject to prior law is entitled to receive irrigation water on a maximum of 160 acres of owned nonexempt land;
(ii) Married couples who hold equal interests are entitled to receive irrigation water on a maximum of 320 acres of jointly owned nonexempt land;
(iii) Surviving spouses until remarriage are entitled to receive irrigation
(iv) Children are each entitled to receive irrigation water on a maximum of 160 acres of owned nonexempt land, regardless of whether they are independent or dependent;
(v) Joint tenancies and tenancies-in-common subject to prior law are entitled to receive irrigation water on a maximum of 160 acres of owned nonexempt land per tenant, provided each tenant holds an equal interest in the tenancy;
(vi) Partnerships subject to prior law are entitled to receive irrigation water on a maximum of 160 acres of owned nonexempt land per partner if the partners have separable and equal interests in the partnership and the right to alienate that interest. Partnerships where each partner does not have a separable interest and the right to alienate that interest are entitled to receive irrigation water on a maximum of 160 acres of nonexempt land owned by the partnership; and
(vii) All corporations subject to prior law are entitled to receive irrigation water on a maximum of 160 acres of owned nonexempt land.
(2) Prior law recipient ownership entitlements specified in this section apply on a westwide basis unless the land was acquired by the current owner on or before December 6, 1979. For land acquired by the current owner on or before that date, prior law ownership entitlements apply on a district-by-district basis.
(3) For those entities where an equal interest held by the part owners would result in a 160-acre per part owner entitlement for the entity, if the part owners interests are not equal then the entitlement of the entity will be determined by the relative interest held in the entity by each part owner.
(a)
(1) The lease is in writing;
(2) The lease includes the effective date and term of the lease, the length of which must be:
(i) 10 years or less, including any exercisable options; however, for perennial crops with an average life longer than 10 years, the term may be equal to the average life of the crop as determined by Reclamation, and
(ii) In no case may the term of a lease exceed 25 years, including any exercisable options;
(3) The lease includes a legal description, that is at least as detailed as what is required on the standard certification and reporting forms, of the land subject to the lease;
(4) Signatures of all parties to the lease are included;
(5) The lease includes the date(s) or conditions when lease payments are due and the amounts or the method of computing the payments due;
(6) The lease is available for Reclamation's inspection and Reclamation reviews and approves all leases for terms longer than 10 years; and
(7) If either the lessor or the lessee is subject to the discretionary provisions, the lease provides for agreed upon payments that reflect the reasonable value of the irrigation water to the productivity of the land; except
(8) Leases in effect as of the effective date of these regulations do not need to meet the criteria specified under paragraphs (a) (3) and (4) of this section, unless and until such leases are renewed.
(b)
(2) The nonfull-cost entitlement for limited recipients that received irrigation water on or before October 1, 1981, is 320 acres or the Class 1 equivalent thereof. The nonfull-cost entitlement for limited recipients that did not receive irrigation water on or prior to October 1, 1981, is zero.
(3) The nonfull-cost entitlement for prior law recipients is equal to the recipient's maximum ownership entitlement as set forth in § 426.5(d). However, for the purpose of computing the acreage subject to full cost, all owned and leased irrigation land westwide must be included in the computation.
(c)
(2) If a landholding exceeds the landholder's nonfull-cost entitlement, the landholder must pay the appropriate full-cost rate for irrigation water delivered to acreage that equals the amount of leased land that exceeds that entitlement.
(3) In the case of limited recipients, a landholder does not have to lease land to exceed a nonfull-cost entitlement, since the nonfull-cost entitlement is less than the ownership entitlement. Therefore, limited recipients must pay the appropriate full-cost rate for irrigation water delivered to any acreage that exceeds their nonfull-cost entitlement.
(d)
(i) Involuntarily acquired land, as provided in §§ 426.12 and 426.14; and
(ii) Land that is leased for incidental grazing or similar purposes during periods when the land is not receiving irrigation water.
(2) Reclamation's process for determining if a nonfull-cost entitlement has been exceeded is as follows:
(i) All land counted toward a landholder's nonfull-cost entitlement will be counted on a cumulative basis during any 1-water year;
(ii) Once a landholder's nonfull-cost entitlement is met in a given water year, any additional eligible land may be irrigated only at the full-cost rate; and
(iii) Irrigation land will be counted towards nonfull-cost entitlements on a westwide basis, even for prior law recipients, regardless of the date of acquisition.
(e)
(i) Leased land;
(ii) Nonexcess owned land;
(iii) Land under recordable contract, unless that land is already subject to application of the full-cost rate under an extended recordable contract; or
(iv) A combination of all three.
(2) Once a landholder has received irrigation water on a given land parcel during a water year, the selection of that parcel as full cost or nonfull-cost is binding until the landholder has completed receiving irrigation water westwide for that water year.
(f)
(g)
(h)
(1) The full-cost charge does not recover interest retroactively before October 12, 1982. But, interest on the unpaid balance does accrue from October 12, 1982, where the unpaid balance equals the irrigation allocated construction costs for facilities in service plus cumulative federally funded O&M deficits, less payments.
(2) The full-cost charge will be determined:
(i) As of October 12, 1982, for contracts entered into before that date regardless of amendments to conform to the discretionary provisions; and
(ii) At the time of contract execution for new and renewed contracts entered into on or after October 12, 1982.
(3) For repayment contracts, the full-cost charge will fix equal annual payments over the amortization period. For water service contracts, the full-cost charge will fix equal payments per acre-foot of projected water deliveries over the amortization period.
(4) If there are additional construction expenditures, or if the cost allocated to irrigation changes, then a new full-cost charge will be determined.
(5) Reclamation will notify the respective districts of changes in the full-cost charge at the time the district is notified of other payments due the United States.
(6) In determining full-cost charges, the following factors will be considered:
(i)
(A) For contracts entered into before October 12, 1982, the contract repayment period as of October 12, 1982;
(B) For contracts entered into on or after October 12, 1982, the contract repayment period;
(C) For water service contracts, the period from October 12, 1982, or the execution date of the contract, whichever is later, to the anticipated date of project repayment; and
(D) In cases where water services rates are designed to completely repay applicable Federal expenditures in a specific time period, that time period may be used as the amortization period for full-cost calculations related to these expenditures; but, in no case will the amortization period exceed the project payback period authorized by the Congress;
(ii)
(A) Planning;
(B) Design;
(C) Land;
(D) Rights-of-way;
(E) Water-rights acquisitions;
(F) Construction expenditures;
(G) Interest during construction; and
(H) When appropriate, transfer costs associated with services provided from other projects;
(iii)
(iv)
(v)
(A) Direct repayment contract revenues;
(B) Net water service contract income;
(C) Contributions;
(D) Ad valorem taxes; and
(E) Other miscellaneous revenues and credits excluding power and municipal and industrial (M&I) revenues;
(vi)
(A) For irrigation water delivered to qualified recipients, limited recipients receiving water on or before October 1, 1981, and extended recordable contract land owned by prior law recipients, the interest rate for expenditures made on or before October 12, 1982, will be the greater of 7.5 percent per annum or the weighted average yield of all interest-bearing marketable issues sold by the Treasury during the fiscal year when the expenditures were made by the United States. The interest rate for expenditures made after October 12, 1982, will be the arithmetic average of:
(
(
(B) For irrigation water delivered to limited recipients not receiving irrigation water on or before October 1, 1981, and prior law recipients, except for land owned subject to extended recordable contract, the interest rate will be determined as of the fiscal year preceding the fiscal year the expenditures are made, except that the interest rate for expenditures made before October 12, 1982, will be determined as of October 12, 1982. The interest rate will be based on the arithmetic average of:
(
(
(C) Landholders who were prior law recipients and become subject to the discretionary provisions after April 12, 1987, are eligible for the full-cost interest rate specified in paragraph (h)(6)(vi)(A) of this section, unless they are limited recipients that did not receive irrigation water on or before October 1, 1981, in that case they remain subject to the full-cost interest rate specified in paragraph (h)(6)(vi)(B) of this section.
(i)
(1) Assessments will be based on the actual amounts of water used in situations where measuring devices are in use, to the satisfaction of Reclamation, to reasonably determine the amounts of irrigation water being delivered to full-cost and nonfull-cost land; or
(2) In situations where, as determined by Reclamation, measuring devices are not a reliable method for determining the amounts of water being delivered to full-cost and nonfull-cost land, then water charges must be based on the assumption that equal amounts of water per acre are being delivered to both types of land during periods when both types of land are actually being irrigated.
(j)
(i) That portion of the full-cost rate that would have been collected if the land had not been subject to full cost will be credited to the annual payments due under the district's contractual obligation;
(ii) Any O&M revenues collected over and above those required under the district's contract will be credited to the project O&M account; and
(iii) The remaining full-cost revenues will be credited to the Reclamation fund unless otherwise provided by law, with any capital component of the full-cost rate credited to project repayment, if applicable.
(2)
(a)
(b)
(1) For land held in an
(i) The trust is in written form and approved by Reclamation; and
(ii) The beneficiaries of the trust and the beneficiaries' respective interests are identified within the trust document.
(2) For land held in a
(i) The trust meets the criteria specified in paragraph (b)(1) of this section;
(ii) The grantor(s) of all land held by the trust is (are) identified within the trust document;
(iii) The conditions under which the trust may be revoked or terminated are identified within the trust document; and
(iv) The recipient(s) of the trust land upon revocation or termination is (are) identified within the trust document.
(3) For land held in an
(i) If Reclamation cannot determine who will hold the land in trust upon termination or revocation of the trust, or who is the grantor(s) of the land held in trust, then irrigation water will not be made available to the land held in trust until the trust satisfies the additional criteria listed in paragraph (b)(2) of this section.
(ii) If the trust fails to meet the criteria listed in paragraph (b)(1) of this section, but does meet the additional criteria listed in paragraphs (b)(2) (ii) through (iv) of this section, then the land is attributed to the trustee.
(c)
(1) Attribution during any given water year will be provided only to
(2) If a trust includes a class of beneficiaries to which land subject to the acreage limitation provisions will be attributed, the trustee and each of the beneficiaries will be required to submit standard certification or reporting forms annually. The submittal of verification forms, as provided in § 426.18(l), will not be applicable to such trusts.
(d)
(1) Before April 20, 1988, Reclamation will not assess full-cost rates for the land held by the revised trust for the period before it was revised; or
(2) On or after April 20, 1988, Reclamation will charge the full-cost rate for irrigation water delivered to any land held by the trust that exceeds the grantor's nonfull-cost entitlement, commencing December 23, 1987, until the trust agreement is revised to make it an irrevocable trust or an otherwise revocable trust.
(a)
(b)
(c)
(d)
(i) Friendship, Commerce and Navigation Treaty;
(ii) Bilateral Investment Treaty;
(iii) North American Free Trade Agreement;
(iv) Canada-United States Free Trade Agreement; or
(v) Organization for Economic Cooperation and Development.
(2) Nonresident aliens and foreign entities that meet the criteria listed in paragraph (d)(1) of this section will be required to provide proof of citizenship or documentation certifying the country in which the entity in question was established. Districts will retain such documentation in the landholder's file.
(3) If a nonresident alien or foreign entity meets the criteria listed in paragraph (d)(1) of this section, and only holds eligible land subject to the acreage limitation provisions indirectly, then the nonresident alien may be treated as a United States citizen or the foreign entity may be treated as a domestic entity for purposes of application of the acreage limitation provisions for the land held indirectly.
(i) The nonresident alien or foreign entity may submit an irrevocable election to conform to the discretionary provisions as provided for in § 426.3(f). Conformance to the discretionary provisions through the submittal of a certification form will not be allowed as specified in § 426.3(f)(3).
(ii) Upon Reclamation's approval of the irrevocable election, a nonresident alien will be treated as having the ownership entitlement of a qualified recipient as described in § 426.5(b), for any land held indirectly. A foreign entity will be treated as a qualified recipient or a limited recipient as determined by the number of natural persons who are beneficiaries of the entity as specified by the definitions found in § 426.2, and the subsequent entitlement as provided in § 426.5(b) or (c), for any land held indirectly. The applicable nonfull-cost entitlements will be determined as described in § 426.6(b).
(iii) Reclamation will not approve irrevocable elections submitted by a nonresident alien or a foreign entity that holds any land directly in any prior law district.
(iv) Reclamation will not approve irrevocable elections submitted by a nonresident alien that is not a citizen of or foreign entity that has not been established in a country that has a treaty or international membership as specified in paragraph (d)(1) of this section.
(a)
(b)
(i) The organization's or subdivision's agricultural produce and proceeds from the sales of such produce are used only for charitable purposes;
(ii) The organization or subdivision, itself, operates the land; and
(iii) No part of the net earnings of the organization or subdivision accrues to the benefit of any private shareholder or individual.
(2) If Reclamation determines that a religious or charitable organization or any of its subdivisions does not meet the criteria listed in paragraph (b)(1) of this section, then:
(i) If the central organization has not met the criteria, Reclamation will treat the entire organization, including all subdivisions, as a single entity; or
(ii) If a subdivision has not met the criteria, only that subdivision and any subdivisions of it will be treated as a single entity and not the central organization or other subdivisions of the central organization; and
(iii) In order to ascertain the acreage limitation status, Reclamation determines the total number of members in both the organization that has not met the criteria and in any subdivisions that are under that organization. If Reclamation determines that total number equals:
(A) More than 25 members, then Reclamation treats that organization and every subdivision under that organization as a single legal entity with a limited recipient status; or
(B) 25 members or less, then Reclamation treats that organization and every subdivision under that organization as a single legal entity with a qualified recipient status.
(c)
(2) Reclamation will treat the entire organization, including all subdivisions, as a single prior law corporation, if the central organization or any subdivisions do not meet the criteria specified in paragraph (b)(1) of this section.
(d)
(a)
(b)
(c)
(a)
(1) Reclamation establishes equivalency factors by comparing the weighted average farm size required to produce a given level of income on each of the lower classes of land with the farm size required to produce that income level on Class 1 land.
(2) For equivalency purposes, Reclamation will classify all irrigable land as Class 1, 2, or 3; no other classifications are permissible for irrigable land. Class 4 and special-use land classes will be allocated to one of these three classes on a case-by-case basis.
(3) Once the Class 1 equivalency determinations have been made, individual landowners with land classified as 2 or 3 for equivalency purposes will have the right to adjust their actual landholding acreage to its Class 1 equivalent acreage.
(4) In a district subject to prior law, Class 1 equivalency can be applied only to landholders who are subject to the discretionary provisions.
(5) Requests for equivalency determinations will be scheduled by region, with the regional director of each Reclamation region having responsibility for such scheduling. Generally, requests will be honored on a first-come-first-served basis. However, if requests exceed the region's ability to fulfill them expeditiously, priority will be given on the basis of greatest immediate need.
(b)
(c)
(i) Most completely meets the various parameters and specifications established by Reclamation for irrigable land classes;
(ii) Has the relatively highest level of suitability for continuous, successful irrigation farming; and
(iii) Is estimated to have the highest relative productive potential measured in terms of net income per acre (reflecting both productivity and costs of production). The equivalency analysis will establish the acreage of each of the lower classes of land which is equal in productive potential (measured in terms of net farm income) to 1 acre of Class 1 land.
(2) All land that Reclamation has not classified, or for which Reclamation has not yet performed the necessary economic studies, will be considered
(d)
(1) Reclamation will take into account the influence of economic and physical factors upon the productive potential of the land lying within the district. These factors will include, but are not limited to the following and their effect on agricultural practices:
(i) The physical and chemical characteristics of the soil;
(ii) Topography;
(iii) Drainage status;
(iv) Costs of production;
(v) Land development costs;
(vi) Water quality and adequacy;
(vii) Elevation;
(viii) Crop adaptability; and
(ix) Length of growing season.
(2) Acceptable levels of detail for land classification studies to be utilized in making Class 1 equivalency determinations for a given district will be evaluated on the basis of the physical and agricultural economic characteristics of the area. For districts where the sole purpose of the land classification study is for a Class 1 equivalency determination, the level of detail of the land classification to be made will never be greater than that required to make a Class 1 equivalency determination.
(3) Reclamation will pay for at least a portion of the costs associated with the land classification study. The amount to be paid by Reclamation will be determined as follows:
(i) Reclamation has provided basic land classification data as part of the project development process since 1924. Accordingly, if Reclamation determines that acceptable land classification data are not available for making requested Class 1 equivalency determinations and if the project was authorized for construction since 1924, such data will be made available at Reclamation's expense; or
(ii) For each district located in projects authorized for construction prior to 1924, Reclamation will pay 50 percent of the costs and the district must pay 50 percent of the costs of new land classification studies required to make accurate Class 1 equivalency determinations.
(4) When basic land classification data are available for a district, but the district does not agree with the accuracy or asserts that the data have become outdated, the district may request, and Reclamation may perform, a reclassification under the authority contained in the Reclamation Project Act of 1939 (43 U.S.C. 485), with the following conditions:
(i) The requesting district will pay 50 percent of the costs of performing such reclassifications and 100 percent of the costs of all other studies involved in the equivalency process; and
(ii) The results of such reclassifications will be binding upon the requesting district and Reclamation.
(e)
(1) Net farm income will be determined by considering the disposable income accruing to the farm operator's labor, management, and equity from the sale of farm crops and livestock produced on irrigated land, after all fixed and variable costs of production, including costs of irrigation service, are accounted for.
(2) Net farm income will be the measure of productivity to establish equivalency factors reflecting the acreage of each of the lower classes of land which is equal in productive potential to 1 acre of Class 1 land.
(3) The cost of performing new or additional economic studies and computations inherent in the equivalency process will be the responsibility of the requesting district.
(f)
(1) For purposes of ownership entitlement, Class 1 equivalency will not be applied until a final determination has been made by Reclamation concerning the district's request for equivalency.
(i) Reclamation will protect excess landowners' property interests by ensuring that equivalency determinations are completed in advance of maturity dates on recordable contracts, provided the district requests an equivalency determination at least 6 months prior to the maturity of the recordable contract, the district fulfills its obligations under this section, and the district notifies Reclamation 6 months in advance of the maturity dates for the need for an expedited review.
(ii) Once the determination has been made, owners of land subject to recordable contracts may withdraw land from such recordable contracts in order to reach their ownership entitlement in Class 1 equivalent acreage.
(iii) The requirement that land under recordable contract be sold at a price approved by Reclamation does not apply to land which is withdrawn from a recordable contract and included as part of a landowner's nonexcess landholding as a result of an equivalency determination.
(iv) In cases of equivalency determination disputes, Reclamation will not undertake the sale of the reasonable increment of the excess land under a matured recordable contract which could be affected by a reclassification, provided the dispute is determined by Reclamation not to be an attempt to thwart the sale of excess land.
(2) For purposes of nonfull-cost entitlement, Class 1 equivalency will not be applied until a final determination has been made by Reclamation on a district's request for equivalency.
(i) During the time when such determinations are pending, the full-cost rate will be assessed based on a landholder's nonfull-cost entitlement as determined in the absence of Class 1 equivalency.
(ii) Following Reclamation's final determination, Reclamation will reimburse the district for any full-cost charges that would not have been assessed had Class 1 equivalency been in place from the date of the district's request. Districts will return such reimbursements to the appropriate landholders.
(3) A landholder with holdings in more than one district is entitled to equivalency only in those districts which have requested equivalency (or are already subject to equivalency). That part of the landholding in a district or districts not requesting equivalency will be counted as Class 1 land for purposes of overall entitlement.
(g)
(a)
(1) The landowner designates which land is excess and which is nonexcess in accordance with the instructions on the appropriate certification or reporting forms; or
(2) If a landowner fails to designate his or her land as excess or nonexcess on the appropriate certification or reporting forms:
(i) And all of the landowner's nonexempt land is in only one district:
(A) If the district's contract with Reclamation includes designation procedures, then the land is designated according to those procedures; or
(B) If the district's contract with Reclamation does not include designation procedures, then:
(
(
(
(ii) If the landowner owns nonexempt land in more than one district, then Reclamation will notify the landowner and the districts that the landowner has 60-calendar days from the date of notification to make the designation. If the landowner does not make the designation in the 60-calendar days, Reclamation will make the designation.
(b)
(i) The excess land becomes eligible to receive irrigation water because the landowner becomes subject to the discretionary provisions as provided in § 426.3;
(ii) A recordable contract is amended to remove excess land when the landowner's entitlement increases because the landowner becomes subject to the discretionary provisions as provided in paragraph (j)(5) of this section; or
(iii) The excess land becomes eligible to receive irrigation water as a result of Class 1 equivalency determinations, as provided in § 426.11.
(2) No other redesignation of excess land is allowable without the approval of Reclamation in accordance with established Reclamation procedures. Reclamation will not approve a redesignation request if:
(i) The purpose of the redesignation is for achieving, through repeated redesignation, an effective farm size in excess of that permitted by Federal reclamation law; or
(ii) The landowner sells some or all of his or her land that is currently classified as nonexcess.
(3) When a redesignation involves an exchange of nonexcess land for excess land, a landowner must make an equal exchange of acreage (or Class 1 equivalent acreage) through the redesignation.
(c)
(i) Becomes subject to the discretionary provisions and the landowner designates the excess land, up to his or her ownership entitlement, as nonexcess as provided for in paragraph (b)(1)(i) of this section;
(ii) Places such excess land under a recordable contract, provided the period for executing recordable contracts under the district's contract has not expired;
(iii) Sells or transfers such excess land to an eligible buyer at a price and on terms approved by Reclamation; or
(iv) Redesignates the land as nonexcess with Reclamation's approval as provided for in paragraph (b)(2) of this section.
(2) If the landowner owned irrigable land on the execution date of the district's first water service or repayment contract and the execution date is after October 12, 1982, the landowner's excess land is ineligible until the landowner:
(i) Places such excess land under a recordable contract, provided the period for executing recordable contracts under the district's contract has not expired;
(ii) Sells or transfers such excess land to an eligible buyer at a price and on terms approved by Reclamation; or
(iii) Redesignates the land as nonexcess with Reclamation's approval as provided for in paragraph (b)(2) of this section.
(d)
(i) Irrigation water was physically available when the landowner acquires such land, then the land is ineligible to receive such water until:
(A) The landowner becomes subject to the discretionary provisions and the landowner designates the excess land, up to his or her ownership entitlement, as nonexcess as provided for in paragraph (b)(1)(i) of this section;
(B) The landowner sells or transfers such land to an eligible buyer at a price and on terms approved by Reclamation;
(C) The sale from the previous landowner is canceled; or
(D) The landowner redesignates the land as nonexcess with Reclamation's approval as provided for in paragraph (b)(2) of this section; or
(ii) Irrigation water was not physically available when the landowner acquired the land, then the land is ineligible to receive water until:
(A) The landowner becomes subject to the discretionary provisions and the landowner designates the excess land, up to his or her ownership entitlement, as nonexcess as provided for in paragraph (b)(1)(i) of this section;
(B) The landowner sells or transfers the land to an eligible buyer at a price and on terms approved by Reclamation;
(C) The sale from the previous landowner is canceled;
(D) The landowner places the land under recordable contract when water becomes available; or
(E) The landowner redesignates the land as nonexcess with Reclamation's approval as provided for in paragraph (b)(2) of this section.
(2) If a landowner acquires land after the date the district first entered into a repayment or water service contract that was nonexcess to the previous owner and is excess to the acquiring landowner, the first repayment or water service contract was executed after October 12, 1982, and:
(i) Irrigation water was physically available when the landowner acquired such land, then the land is ineligible until:
(A) The landowner sells or transfers the land to an eligible buyer at a price and on terms approved by Reclamation;
(B) The sale from the previous landowner is canceled; or
(C) The landowner redesignates the land as nonexcess with Reclamation's approval as provided for in paragraph (b)(2) of this section; or
(ii) Irrigation water was not physically available when the landowner acquired such land, then the land is ineligible to receive water until:
(A) The landowner sells or transfers the land to an eligible buyer at a price and on terms approved by Reclamation;
(B) The sale from the previous landowner is canceled;
(C) The landowner redesignates the land as nonexcess with Reclamation's approval as provided for in paragraph (b)(2) of this section; or
(D) The landowner places the land under recordable contract when water becomes available.
(e)
(i) The landowner places such land under recordable contract. The recordable contract does not need to include the sales price approval clause and application of the deed covenant provision will not be required; or
(ii) The landowner sells or transfers such land to an eligible buyer. The sales price does not need Reclamation's approval.
(2) If the district had a contract with Reclamation on or before October 12, 1982, and the landowner was a nonresident alien or a legal entity not established under State or Federal law, who directly held eligible land and such land is no longer eligible to receive water, then such formerly eligible land is ineligible until:
(i) The landowner places such land under recordable contract. The recordable contract does not need to include the sales price approval clause and application of the deed covenant provision will not be required; or
(ii) The landowner sells or transfers such land to an eligible buyer. The
(3) If the district first entered a contract with Reclamation after October 12, 1982, and land would have been eligible before October 12, 1982, but is now ineligible because the landowner is a direct landholder and either a nonresident alien or a legal entity not established under State or Federal law, then such land that would have been eligible remains ineligible until:
(i) If the landowner acquired such land before the date of the district's contract:
(A) The landowner places such land under a recordable contract requiring Reclamation sales price approval; or
(B) Sells or transfers the land to an eligible buyer subject to Reclamation sales price approval; or
(ii) If the landowner acquired such land after the date of the district's contract, the landowner sells or transfers such land to an eligible buyer subject to Reclamation sales price approval.
(4) Eligible nonexcess land that is indirectly owned on or before December 18, 1996 by a nonresident alien or a legal entity not established under State or Federal law, and that becomes ineligible because of § 426.8 is ineligible until:
(i) The landowner places such land under recordable contract. The recordable contract does not need to include the sales price approval clause and application of the deed covenant provision will not be required; or
(ii) The landowner sells or transfers such land to an eligible buyer. The sales price does not need Reclamation's approval.
(f)
(1) The sales price is reformed to conform to the price approved by Reclamation and is eligible to receive irrigation water in the landowner's ownership entitlement; or
(2) Such landowner sells or transfers the land to an eligible buyer at a price approved by Reclamation.
(g)
(1) The landholder became or contracted to become a direct or indirect landholder of that land prior to December 18, 1996, and the land in question is otherwise eligible to receive irrigation water;
(2) Such land becomes exempt from the acreage limitations of Federal reclamation law;
(3) The landholder pays the full-cost rate for any irrigation water delivered to the landholder's formerly excess land that is otherwise eligible to receive irrigation water. If a landholder is a part owner of a legal entity that becomes the direct or indirect landholder of the land in question, then the full-cost rate will be applicable to the proportional share of irrigation water delivered to the land that reflects the part owner's interest in that legal entity; or
(4) The deed covenant associated with the sale has expired as provided for in paragraph (i) of this section.
(h)
(1) The appropriate compensation rate for irrigation water delivered; and
(2) any other applicable fees as specified in § 426.20.
(i)
This covenant is to satisfy the requirements in 209(f)(2) of Pub. L. 97-293 (43 U.S.C 390,
(i) The terms of this covenant requiring price approval shall not apply to this land if it is acquired into excess status pursuant to a bona fide involuntary foreclosure or similar involuntary process of law, conveyance in satisfaction of a debt (including, but not limited to, a mortgage, real estate contract, or deed of trust), inheritance, or devise (hereinafter Involuntary Conveyance). Thereafter, this land may be sold to a landholder at its fair market value without regard to any other provision of the Reclamation Reform Act of 1982 enacted on October 12, 1982, (43 U.S.C. 390aa
(ii) If the status of this land changes from nonexcess into excess after a mortgage or deed of trust in favor of a lender is recorded and the land is subsequently acquired by a bona fide Involuntary Conveyance by reason of a default under that loan, this land may thereupon or thereafter be sold to a landholder at its fair market value;
(iii) The terms of this covenant requiring price approval shall not apply to the sales price obtained at the time of the Involuntary Conveyances described in subparagraphs (i) and (ii), nor to any subsequent voluntary sales by a landholder of this land after the Involuntary Conveyances or any subsequent Involuntary Conveyance;
(iv) Upon the completion of an Involuntary Conveyance, Reclamation shall reconvey or otherwise terminate this covenant of record;
(v) However, the deed covenant shall not be reconveyed or otherwise terminated if the involuntarily acquiring landowner is the landowner who sold this land from excess status, unless that landowner is a financial institution as defined in § 426.14(a) of the Acreage Limitation Rules and Regulations (43 CFR Part 426); and
(vi) The party whose excess ownership originally required the placement of this covenant may not receive Federal reclamation project irrigation water on the land subject to this covenant as a direct or indirect landowner or lessee, unless an exception provided for in § 426.12(g) is met.
Clauses (v) and (vi) of this covenant shall only be required on those covenants placed in deeds transferring land after January 1, 1998.
The date that the covenant expires shall be 10 years from the date the land was first transferred from excess to nonexcess status.
(2) A landholder may purchase or otherwise voluntarily acquire into nonexcess status, land subject to a deed covenant, at a price approved by Reclamation if the land is within the landholder's ownership entitlement.
(3) Upon expiration of the terms of the deed covenant, a landowner may resell such land at fair market value. A landowner may not sell more of such land in his or her lifetime than an amount equal to his or her ownership entitlement. Once the landowner reaches this limit, any additional excess land or land subject to a deed covenant the landowner acquires is ineligible to receive irrigation water, until such land is sold to an eligible buyer at a price approved by Reclamation.
(4) If a landholder acquires land burdened by such a deed covenant through involuntary foreclosure or similar involuntary process of law, conveyance in satisfaction of a debt, including, but not limited to, a mortgage, real estate contract, or deed of trust, inheritance, or devise, and is not the party whose excess ownership originally required placement of the deed covenant, then Reclamation must terminate the deed covenant upon the landholder's request. The provisions in paragraph (i)(1)(v) of this section and § 426.14(e) address termination of deed covenants for landholders whose excess ownership originally required placement of the deed covenant.
(j)
(i) The district's contract with Reclamation;
(ii) Federal reclamation law; and
(iii) These regulations.
(2)
(i) A clause whereby the landowner agrees to dispose of the excess land to an eligible buyer, excluding mineral rights and easements, under terms and
(ii) A clause granting power of attorney to Reclamation to sell the land held under the recordable contract, if the landholder has not already sold the land by the recordable contract's maturation.
(3)
(4)
(i) If both the landowner and any lessee are prior law recipients, land placed under a recordable contract can receive irrigation water at a contract rate that does not cover full operation and maintenance (O&M) costs;
(ii) If either landowner or any lessee is subject to the discretionary provisions, the water rate applicable to the recordable contract must cover, at a minimum, all O&M costs; or
(iii) If a landholder leases land subject to a recordable contract and is in excess of his or her nonfull-cost entitlement, the lessee may select such land as the land on which the full-cost rate will be charged for the delivery of irrigation water, unless the land is already subject to the full-cost rate because of an extended recordable contract.
(5)
(A) The landowner has an increased ownership entitlement because of becoming subject to the discretionary provisions; or
(B) Land becomes eligible by implementation of Class 1 equivalency, if the landowner amends the recordable contract prior to performance of appraisal.
(ii) Landholders must receive Reclamation's approval to amend recordable contracts.
(A) The disposition period for any land remaining under a recordable contract will not change because of an amendment to remove some land.
(B) For land removed from a recordable contract based on paragraph (j)(5)(i) of this section, any requirement for application of a deed covenant will no longer be applicable.
(6)
(7)
(8)
(i) If Reclamation determines it to be necessary, a qualified surveyor will make a land survey. The United States will pay for the survey initially, but such costs will be added to the approved sales price for the land. The United States will be reimbursed for these costs from the sale of the land;
(ii) Reclamation will appraise the value of the excess land, in the manner prescribed by § 426.13, to determine the appropriate sales price. The United
(iii) Reclamation will advertise the sale of the property in farm journals and in newspapers within the county in which the land lies, and by other public notices as deemed advisable. The United States will pay for the advertisements and notices initially, but such costs will be added to the approved sales price for the land. The United States will be reimbursed for these costs from the sale of the land. The notices must state:
(A) The minimum acceptable sales price for the property (which equals the appraised value plus the cost of the appraisal, survey, and advertising);
(B) That Reclamation will sell the land by auction for cash, or on terms acceptable to the landowner, to the highest eligible bidder whose bid equals or exceeds the minimum acceptable sales price; and
(C) The date of the sale (which must not exceed 90 calendar days from the date of the advertisement and notices);
(iv) The proceeds from the sale of the land will be paid:
(A) First, to the landowner in the amount of the appraised value;
(B) Second, to the United States for costs of the survey, appraisal, advertising, etc.; and
(C) Third, any remaining proceeds will be credited to the Reclamation fund or other funds as prescribed by law; and
(v) Reclamation will close the sale of the excess land when parties complete all sales arrangements. Reclamation will execute a deed conveying the land to the purchaser. Reclamation will not require the purchaser to include a covenant in the deed, as specified in paragraph (i) of this section, that restricts any further resale of the land.
(a)
(b)
(1)
(2)
(c)
(i) Ground water pumping lift;
(ii) Surface water supply;
(iii) Water quality; and
(iv) Trends associated with paragraphs (c)(1) (i) through (iii) of this section, where appropriate.
(2) Reclamation will develop the nonproject water supply and trend information with the assistance of:
(i) The district in which the land is located, if the district desires to participate;
(ii) Landowners of excess land or land burdened by a deed covenant and prospective buyers who submit information either to the district or Reclamation; and
(iii) Public meetings and forums, at the discretion of Reclamation.
(3) Data submitted may include:
(i) Historic geologic data;
(ii) Changing crops and cropping patterns; and
(iii) Other factors associated with the nonproject water supply.
(4) If Reclamation and the district cannot reach agreement on the nonproject water supply information within 60-calendar days, Reclamation will review and update the trend information as it deems necessary and make all final determinations considering the data provided by Reclamation and the district. Reclamation will provide these data to the appraisers who must consider the data in the appraisal process, and clearly explain how they used the data in the valuation of the land.
(d)
(e)
(1) The land's first appraisal, the United States will initially pay the costs of appraising the value of the land, but such costs will be added to the approved sale price for the land. The United States will reimburse itself for these costs from the sale of the land;
(2) Not the land's first appraisal, the landowner requesting the appraisal must pay any costs associated with the reappraisal, unless the value set by the reappraisal differs by more than 10 percent, in which case the United States will pay for the reappraisal; or
(3) Associated with a sales price reformation as specified in § 426.12(f)(1), the landowner requesting the appraisal must pay any costs associated with the appraisal.
(f)
(g)
(h)
(1) Technical accuracy and compliance with these rules and regulations;
(2) Applicable portions of the “Uniform Appraisal Standards for Federal Land Acquisition-Interagency Land Acquisition Conference 1973,” as revised in 1992;
(3) Reclamation policy; and
(4) Any detailed instructions provided by Reclamation setting conditions applicable to an individual appraisal.
(a)
(b)
(1) The land becomes nonexcess in the new landowner's ownership; and
(2) The deed to the land contains the 10-year covenant requiring Reclamation sale price approval, and that deed
(3) If either of these conditions is not met, the land remains ineligible excess until sold to an eligible buyer at an approved price, and the seller places the 10-year covenant requiring Reclamation price approval, as specified in § 426.12(i), in the deed transferring title to the land to the buyer.
(c)
(1) Assumes the recordable contract; and
(2) Executes an assumption agreement provided by Reclamation.
(3) This land will remain eligible to receive irrigation water for the longer of 5 years from the date that the land was involuntarily acquired, or for the remainder of the recordable contract period. The sale of this land shall be under terms and conditions set forth in the recordable contract and must be satisfactory to and at a price approved by Reclamation.
(d)
(1) If the new landowner designates the land as excess in his or her holding, then:
(i) The land is eligible to receive irrigation water for a period of 5 years or until transferred to an eligible landowner, whichever occurs first;
(ii) During the 5-year period Reclamation will charge a rate for irrigation water equal to the rate paid by the former owner, unless the land becomes subject to full-cost pricing through leasing; and
(iii) The land is eligible for sale at its fair market value without a deed covenant restricting its future sales price; or
(2) If the new landowner is eligible to designate the land as nonexcess and he or she designates the land as nonexcess, the land will be treated in the same manner as any other nonexcess land and will be eligible for sale at its fair market value without a deed covenant restricting its future sales price.
(e)
(i) The acquiring landowner never previously held such land as ineligible excess land or under a recordable contract;
(ii) The acquiring landholder is a financial institution; or
(iii) The acquiring landowner previously held the land as ineligible excess or under a recordable contract and § 426.12(g)(1), (3), or (4) applies.
(2) The following will be applicable in situations that meet the criteria specified under paragraph (e)(1) of this section:
(i) Reclamation will charge a rate for irrigation water delivered to such land equal to the rate paid by the former owner, except Reclamation will charge the full-cost rate if:
(A) The land becomes subject to full-cost pricing through leasing; or
(B) If the involuntarily acquired land is eligible to receive irrigation water only because § 426.12(g)(3) applies and the deed covenant has not expired;
(ii) The new landowner may not place such land under a recordable contract;
(iii) The new landowner may request that Reclamation remove a deed covenant as provided in § 426.12(i)(4), and may sell such land at any time without price approval and without the deed covenant. However, the deed covenant will not be removed and the terms of the deed covenant will be fully applied if the new landowner is the landowner who sold the land in question from excess status, except for:
(A) Financial institutions; or
(B) Landowners for which § 426.12(g) (1) or (2) apply; and
(iv) Such land will become ineligible to receive irrigation water 5 years after it was acquired and will remain ineligible until sold to an eligible buyer or redesignated as provided for in paragraph (f) of this section.
(f)
(1) However, such redesignations will not be approved if the water rate specified in paragraphs (d)(1)(ii) or (e)(2)(i) of this section is less than what would have been charged for water deliveries to the land in question if the landholder that involuntarily acquired the land had originally designated the land as nonexcess.
(2) Such landholders may utilize the redesignation process, if they remit to Reclamation the difference between the rate paid and the rate that would have been paid, if the land had been designated as nonexcess when involuntarily acquired, for all irrigation water delivered to the land in question while the land was designated as excess.
(g)
(1) The land is located in a district that is subject to the discretionary provisions;
(2) The landholder in question will be the direct landowner of the land; and
(3) The landholder in question declares the land as nonexcess.
(h)
(a)
(b)
(c)
(1) If the facilities used for the commingling of irrigation water and nonproject water are constructed without funds made available pursuant to Federal reclamation law, the provisions of Federal reclamation law and these regulations will apply only to the landholders who receive irrigation water, provided:
(i) That the water requirements for eligible lands can be established; and
(ii) The quantity of irrigation water to be used is less than or equal to the quantity necessary to irrigate eligible lands.
(2) If the facilities used for commingling irrigation water and nonproject water are funded with monies made available pursuant to Federal reclamation law, landholders who receive nonproject water will be subject to Federal reclamation law and these regulations unless:
(i) The district collects and pays to the United States an incremental fee which reasonably reflects an appropriate share of the cost to the Federal Government, including interest, of storing or delivering the nonproject water; and
(ii) The fee will be established by Reclamation and will be in addition to the district's obligation to pay for capital, operation, maintenance, and replacement costs associated with the facilities required to provide the service.
(3) If paragraphs (c)(2) (i) and (ii) of this section are met, the provisions of Federal reclamation law and these regulations will be applicable to only those landholders who receive irrigation water. Accordingly, the provisions of Federal reclamation law and these regulations will not be applicable to landholders who receive nonproject water delivered through facilities funded with monies made available pursuant to Federal reclamation law if those paragraphs are met.
(d)
(a)
(i) Federal law explicitly designates, integrates, or incorporates that land into a Federal Reclamation project; or
(ii) Reclamation provides project works for the control or conveyance of the agricultural water supply from the Corps project to that land.
(2) Upon such determination, Reclamation will:
(i) Notify the district of its exemption status;
(ii) Require the district's agricultural water users to continue, under contracts made with Reclamation, to repay their share of construction, operation and maintenance, and contract administration costs of the Corps project allocated to conservation or irrigation storage; and
(iii) At the request of the district delete provisions of the district's repayment or water service contract that imposes acreage limitation for those lands served by Corps projects.
(b)
(1) Payments by periodic installments over the contract repayment term, as well as lump-sum and accelerated payments, if allowed by the district's contract with Reclamation, will qualify the district to become exempt.
(2) If a district has a contract with the United States providing for individual landowner repayment of construction charges allocated to land, and the landowner has repaid all obligated construction costs allocated for that landowner's land, that landowner will become exempt from the acreage limitation provisions.
(3) Upon payout Reclamation will:
(i) Notify the district, and individual landowner in cases of individual landowner payout, of the exemption from the acreage limitation provisions;
(ii) Notify the district or individual landowner that the exemption does not relieve the district or individual landowner of the obligation to continue to pay, on an annual basis, O&M costs applicable to the district or landowner;
(iii) Upon request by the owner of land for which repayment has occurred, provide a certificate from Reclamation acknowledging that the land is free of the acreage limitation provisions of Federal reclamation law;
(iv) Except as provided for in § 426.19(e), no longer apply the certification and reporting requirements to the district, if the entire district is exempt, or to exempt landowners as specified in paragraph (b)(2) of this section; and
(v) Consider on a case-by-case basis continuation of the exemption if additional construction funds for the project are requested.
(c)
(1) Considers the loan as a loan for maintenance, including replacements that cannot be financed currently;
(2) Does not consider the loan in determining whether the district has discharged its obligation to repay the construction cost of project facilities used to make irrigation water available for delivery to land in the district; and
(3) Will not allow such a loan to serve as the basis for reinstating acreage limitation provisions in a district that has completed payment of its construction obligation, nor serve as the basis for increasing the construction obligation of the district and thereby extending the period during which acreage limitation provisions will apply.
(d)
(1) The contract for the temporary supply of water will be for 1 year or less in accordance with prior policies and practices;
(2) The acreage limitation provisions will not be applicable to the temporary supply of water;
(3) An applicable price for the water, if any, will be established; and
(4) Such other conditions as Reclamation may include.
(e)
(1) Will exempt such land from the ownership limitations of Federal reclamation law; and
(2) Will assess the full-cost rate for any irrigation water delivered to the isolated tract that exceeds the landowner's nonfull-cost entitlement.
(f)
(2) Indian tribes and tribal entities operating on Indian trust or restricted lands are excluded from application of the water conservation provisions.
(a)
(2) If a district entered into an SRPA loan contract prior to October 12, 1982, and the district:
(i) Did not amend the loan contract to conform to the SRPA, as amended by Section 223 of the RRA, prior to October 27, 1986, then the acreage provisions of the contract continue in effect, unless the contract is amended to conform to the SRPA as amended by section 307 of Pub. L. 99-546.
(ii) Amended the loan contract to conform to the SRPA, as amended by Section 223 of the RRA, prior to October 27, 1986, the contract is subject to the increased acreage provisions provided in Section 223 of the RRA. Reclamation cannot alter, modify or amend any other provision of the SRPA loan contract without the consent of the non-Federal party.
(b)
(c)
(1) In determining whether the district has discharged its construction cost obligation for the project facilities;
(2) As a basis for reinstating acreage limitation provisions in a district that has completed payment of its construction cost obligation(s); or
(3) As a basis for increasing the construction obligation of the district and extending the period during which acreage limitation provisions will apply to that district.
(d)
(a)
(b)
(c)
(2) Landholders who make an irrevocable election must submit the standard certification forms with their irrevocable election in the year that they make the election.
(3) Landholders who are subject to prior law must annually submit standard reporting forms, except as provided in paragraph (l) of this section.
(4) Landholders who qualify under an exemption as specified in paragraph (g) of this section need not submit any forms.
(d)
(e)
(f)
(g)
(i) The landholder's district has Category 1 status, as specified in paragraph (h) of this section, and the landholder is a:
(A) Qualified recipient who holds a total of 240 acres westwide or less; or
(B) Limited recipient or a prior law recipient who holds a total of 40 acres westwide or less.
(ii) The landholder's district has Category 2 status, as specified in paragraph (h) of this section, and the landholder is a:
(A) Qualified recipient who holds a total of 80 acres westwide or less; or
(B) Limited recipient or a prior law recipient who holds a total of 40 acres westwide or less.
(2) A wholly owned subsidiary is exempted from submitting certification or reporting forms, if its ultimate parent legal entity has properly filed such forms disclosing the landholdings of each of its subsidiaries.
(3) In determining whether certification or reporting is required for purposes of this section:
(i) Class 1 equivalency factors as determined in § 426.11 shall not be used; and
(ii) Indirect landholders need not count involuntarily acquired acreage designated as excess by the direct landowner.
(h)
(i) The district has conformed by contract to the discretionary provisions; and
(ii) The district is current in its financial obligations to Reclamation.
(2) Reclamation considers a district current in its financial obligation if as of September 30, the district is current in its:
(i) Financial obligations specified in its contract(s) with Reclamation; and
(ii) Payment obligations established by the RRA, and these rules.
(i)
(j)
(k)
(1) During the irrigation season, the landholder must:
(i) Notify the district office, either verbally or in writing within 30-calendar days of the change; and
(ii) Submit new forms to all districts in which the landholder holds nonexempt land, within 60-calendar days of the change.
(2) Outside of the irrigation season, then the landholder must submit new standard certification or reporting forms to all districts in which nonexempt land is held prior to any irrigation water deliveries following such changes.
(l)
(m)
(i) The district must not deliver, and the landholder is not eligible to receive and must not accept delivery of, irrigation water in any water year prior to submission of the required certification or reporting form(s) for that water year; and
(ii) Eligibility will be regained only after all required certification or reporting forms are submitted by the landholder to the district.
(2) If one or more part owners of a legal entity do not submit certification or reporting forms as required:
(i) The entire entity will be ineligible to receive irrigation water until such forms are submitted; or
(ii) If the documents forming the entity provide for the part owners' interest to be separable and alienable, then only that portion of the land attributable to the noncomplying part owners will be ineligible to receive irrigation water.
(n)
Under the provisions of 18 U.S.C. 1001, it is a crime punishable by 5 years imprisonment or a fine of up to $10,000, or both, for any person knowingly and willfully to submit or cause to be submitted to any agency of the United States any false or fraudulent statement(s) as to any matter within the agency's jurisdiction. False statements by the landowner or lessee will also result in loss of eligibility. Eligibility can only be regained upon the approval of the Commissioner.
(o)
(p)
A district that delivers irrigation water to nonexempt land under a contract with the United States must:
(a) Provide information to landholders concerning the requirements of Federal reclamation law and these regulations;
(b) Provide Reclamation, as required by these regulations or upon request, and in a form suitable to Reclamation, records and information as Reclamation may deem reasonably necessary to implement the RRA and other provisions of Federal reclamation law;
(c) Be responsible for payments to Reclamation of all appropriate charges specified in these regulations. Districts must collect the appropriate charges from each landholder based on the landholder's acreage limitation status, landholdings, and entitlements, and must not average the costs over the entire district, unless the charges prove uncollectible from the responsible landholders;
(d) Distribute, collect, and review landholder certification and reporting forms;
(e) File and retain landholder certification and reporting forms. Districts must retain superseded landholder certification and reporting forms for 6 years; thereafter, districts may destroy such superseded forms, except:
(1) Districts must keep on file the last fully completed standard certification or reporting form, in addition to the current verification form; or
(2) If Reclamation specifically requests a district to retain superseded forms beyond 6 years.
(f) Comply with the requirements of the Privacy Act of 1974, with respect to landholder certification and reporting forms;
(g) Annually summarize information provided on landholder certification and reporting forms on separate summary forms provided by Reclamation and submit these forms to Reclamation on or before the date established by the appropriate regional director;
(h) Withhold deliveries of irrigation water to any landholder not eligible to receive irrigation water under the certification or reporting requirements or any other provision of Federal reclamation law and these regulations; and
(i) Return to Reclamation, for deposit as a general credit to the Reclamation fund, all revenues received
(a)
(1) Reclamation will apply the assessment on a yearly basis in each district for each landholder that received irrigation water in violation of § 426.18, or for each landholder that received irrigation water on ineligible land as specified above.
(2) In applying the assessment to legal entities, compliance by an entity will be treated independently from compliance by its part owners or beneficiaries.
(3) The assessment in paragraph (a) of this section will be applied independently of the assessment specified in paragraph (b) of this section.
(b)
(1) Reclamation will apply the assessment on a yearly basis in each district for each landholder that received irrigation water and for whom the district does not provide corrected forms within the applicable 60-calendar day time period.
(2) In applying the assessment to legal entities, compliance by an entity will be treated independently from compliance by its part owners or beneficiaries.
(3) The assessment in paragraph (b) of this section will be applied independently of the assessment specified in paragraph (a) of this section.
(c)
(d)
(e)
(a)
(b)
(c)
(a)
(1) Provide notice of proposed irrigation or amendatory irrigation contract actions 60-calendar days prior to contract execution by publishing announcements in general circulation newspapers in the affected area;
(2) Issue announcements in the form of news releases, legal notices, official letters, memoranda, or other forms of written material; and
(3) Directly notify individuals and entities who made a timely written request for such notice to the appropriate Reclamation regional or local office.
(b)
(1) Provide copies of revised proposed contracts to all parties who requested copies of the proposed contract in response to the initial notice; and
(2) Determine whether or not to republish the notice or to extend the comment period. The regional director must consider, among other factors:
(i) The significance of the impact(s) of the modification to possible affected parties; and
(ii) The interest expressed by the public over the course of contract negotiations.
(c)
(1) A brief description of the proposed contract terms and conditions being negotiated;
(2) Date, time, and place of meetings, workshops, or hearings;
(3) The address and telephone number to which inquiries and comments may be addressed to Reclamation; and
(4) The period of time during which Reclamation will accept comments.
(d)
(e)
(2) Reclamation or the district can invite the public to observe any contract proceedings.
(3) All public participation procedures will be coordinated with those involved with National Environmental Policy Act compliance, if Reclamation determines that the contract action may or will have “significant” environmental effects.
(f)
(g)
(2) Reclamation will make available to the public all written correspondence regarding proposed contracts under the terms and procedures of the Freedom of Information Act (5 U.S.C. 552), as amended.
(a)
(b)
(c)
(1) The district must pay all of the O&M costs that Reclamation allocates to irrigation;
(2) If in the year the amendment is executed, the district's contract rate was more than the O&M costs allocated to the district in that year then that positive difference at the time of the contract amendment must continue to be factored into the contract rate and annually paid to the United States. This would be in addition to any adjusted O&M cost that results from paragraph (c)(1) of this section. The positive difference would be factored into the contract rate for the remainder of the term of the contract; and
(3) The district will not be required to pay an increased amount toward the construction costs of a project as a condition of the district's agreeing to a contract amendment pursuant to paragraph (c) of this section.
(d)
(1) The district must pay all of the O&M costs that Reclamation allocates to irrigation;
(2) If in the year the amendment is executed, the district's contract rate was more than the O&M costs allocated to the district in that year then that positive difference at the time of the contract amendment must continue to be factored into the contract rate and annually paid to the United States. This would be in addition to any adjusted O&M cost that results from paragraph (d)(1) of this section. The positive difference would be factored into the contract rate for the remainder of the term of the contract; and
(3) The district must pay any increases in the amount paid annually toward the construction costs of a project that the United States requires the district to pay as a condition of agreeing to provide the district with supplemental and additional benefits.
(e)
(f)
(i) The amount of land in the district held by the irrevocable elector that received irrigation water to the total amount of land in the district that received irrigation water; or
(ii) The amount of irrigation water in the district received by the irrevocable elector to the total amount of irrigation water that the district delivered.
(2) The district(s) where the irrevocable elector's landholding is located must collect from the irrevocable elector an amount equal to the irrevocable elector's proportionate share of all O&M costs allocated by Reclamation to irrigation and the following apply:
(i) If in the year the election is executed, the district's contract rate was more than the O&M costs allocated to the district in that year, then that positive difference at the time of the contract amendment must continue to be factored into the contract rate. This would be in addition to any adjusted O&M cost that results from paragraph (f)(1) of this section. The positive difference would be factored into the contract rate for the remainder of the term of the contract; and
(ii) Such collections must be forwarded annually to the United States.
(g)
(a)
(2)
(3)
(b)
(2)
(i) The affected party submits a request to the Commissioner in a timely manner;
(ii) The request includes the reason why additional time is needed; and
(iii) The Commissioner determines the appellant has shown good cause for such an extension and the extension would not prejudice Reclamation.
(3)
(A) Submits a request for stay in writing to the Commissioner, with, or in advance of, the notice of appeal, and states the grounds upon which the party requests the stay; and
(B) Demonstrates that the harm that a district or landholder would suffer if the Commissioner does not grant the stay outweighs the interest of the United States in having the final determination take effect pending appeal.
(ii) A decision, or that portion of the decision, for which a stay is not granted will become effective immediately after the Commissioner denies or partially denies the petition for stay, or fails to act within 30 days after receiving the request.
(iii) A Commissioner's decision on a petition for a stay or any other Commissioner decision is appealable.
(c)
(2)
(d)
(e)
(f)
(2) Appeals to the Commissioner of final determinations made by a regional director and appeals to OHA, which are pending on appeal as of the effective date of these regulations will be processed and decided in accordance with the regulations in effect immediately prior to the effective date of these regulations.
(g)
(1) Commissioner, Bureau of Reclamation, Office of Policy, Attention: D-5200, P.O. Box 25007, Denver, Colorado 80225.
(2) Director, Office of Hearings and Appeals, Department of the Interior, 801 North Quincy Street, Arlington, Virginia 22203.
Reclamation will conduct reviews of a district's administration and enforcement of and landholder compliance with Federal reclamation law and these regulations. These reviews may include, but are not limited to:
(a) Water district reviews;
(b) In-depth reviews; and
(c) Audits.
If any provision of these regulations or the application of these rules to any person or circumstance is held invalid, then the sections of these rules or their applications which are not held invalid will not be affected.
5 U.S.C. 301; 5 U.S.C. 553; 16 U.S.C. 590y
(a)
(b)
(c)
5 U.S.C. 301; 5 U.S.C. 553; 16 U.S.C. 590z-11; 31 U.S.C. 9701; 32 Stat. 388, as amended.
This part addresses Reclamation Reform Act of 1982 (RRA) forms requirements for certain farm operators and the eligibility of formerly excess land that is operated by a farm operator who was the landowner of that land when it was excess.
(a) This part applies to farm operators who provide services to:
(1) More than 960 acres held (directly or indirectly owned or leased) by one trust or legal entity; or
(2) The holdings of any combination of trusts and legal entities that exceed 960 acres.
(b) This part also applies to farm operators who provide services to formerly excess land held in trusts or by legal entities if the farm operator previously owned that land when the land was ineligible excess or under recordable contract.
(c) This part supplements the regulations in part 426 of this chapter.
(a) You must submit RRA forms to districts annually as specified in § 428.6 if:
(1) You provide services to more than 960 nonexempt acres westwide, held by a single trust or legal entity or any combination of trusts and legal entities; or
(2) You are the ultimate parent legal entity of a wholly owned subsidiary or of a series of wholly owned subsidiaries that provide services in total to more than 960 nonexempt acres westwide, held by a single trust or legal entity or any combination of trusts and legal entities.
(b) Anyone who is the indirect owner of a legal entity that is a farm operator meeting the criteria of paragraph (a) of this section must submit forms to us annually, if any of the land to which services are being provided by that legal entity is land that the part owner formerly owned as excess land and sold or transferred at an approved price.
(c) If you must submit RRA forms due to the requirements of this section, then you may not use a verification form for your annual submittal as provided for in § 426.18(l) of this chapter to meet the requirements of this section.
(d) If you must submit RRA forms solely due to the requirements of this section, then once you have met the requirement found in paragraph (a) of
(a) We will determine which forms you must use to submit the information required by this section.
(b) You must declare all nonexempt land to which you provide services westwide.
(c) You must give us other information about your compliance with Federal reclamation law, including but not limited to:
(1) Identifier information, such as your name, address, telephone number;
(2) If you are a legal entity, information concerning your organizational structure and part owners;
(3) Information about the land to which you provide services, such as a legal description, and the number of acres;
(4) Information about whether you formerly owned, as ineligible excess land or under recordable contract, the land to which you are providing services;
(5) Information about the services you provide, such as what they are, who decides when they are needed, and how much control you have over the daily operation of the land;
(6) If you provide different services to different land parcels, a list of services that you provide to each parcel;
(7) Whether you can use your agreement with a landholder as collateral in any loan;
(8) Whether you can sue or be sued in the name of the landholding; and
(9) Whether you are authorized to apply for any Federal assistance from the United States Department of Agriculture in the name of the landholding.
You must submit the appropriate completed RRA form(s) to each district westwide that is subject to the acreage limitation provisions and in which you provide services.
(a) If you do not submit required RRA form(s) in any water year, then:
(1) The district must not deliver irrigation water before you submit the required RRA form(s); and
(2) You, the trustee, or the landholder(s) who holds the land (including to whom the land held in trust is attributed) must not accept delivery of irrigation water before you submit the required RRA form(s).
(b) After you submit all required RRA forms to the district, we will restore eligibility.
(c) If a district delivers irrigation water to land that is ineligible because you did not submit RRA forms as required by this part, we will assess administrative costs against the district as specified in § 426.20(e) of this chapter. We will determine these costs in the same manner used to determine costs for landholders under §§ 426.20(a)(1) through (3) of this chapter.
If you make a false statement on the required RRA form(s), Reclamation can prosecute you under the following statement:
Under the provisions of 18 U.S.C. 1001, it is a crime punishable by 5 years imprisonment or a fine of up to $10,000, or both, for any person knowingly and willfully to submit or cause to be submitted to any agency of the United States any false or fraudulent statement(s) as to any matter within the agency's jurisdiction. False statements by the farm operator will also result in loss of eligibility. Eligibility can only be regained upon the approval of the Commissioner.
(a) Land held in trust or by a legal entity may not receive irrigation water if:
(1) You owned the land when the land was excess, whether or not under recordable contract;
(2) You sold or transferred the land at a price approved by Reclamation; and
(3) You are the direct or indirect farm operator of that land.
(b) This section does not apply if:
(1) The formerly excess land becomes exempt from the acreage limitations of Federal reclamation law; or
(2) The full-cost rate is paid for any irrigation water delivered to your formerly excess land that is otherwise eligible to receive irrigation water. If you are a part owner of a legal entity that is the direct or indirect farm operator of the land in question, then the full-cost rate will apply to the proportional share of the land that reflects your interest in that legal entity.
Districts must not make irrigation water available to formerly excess land that meets the criteria under § 428.9(a), unless an exception provided in § 428.9(b) applies.
(a) All provisions of this part apply on January 1, 2001, except:
(1) For those districts whose 2001 water year commences prior to January 1, 2001, the applicability date of §§ 428.1 through 428.8 is October 1, 2000.
(b) On January 1, 2001, this part applies to all farm operating arrangements between farm operators and trusts or legal entities that:
(1) Are then in effect; or
(2) Are initiated on, or after, January 1, 2001.
43 U.S.C. 373 (32 Stat. 390); 43 U.S.C. 387 (53 Stat. 1196), as amended by 64 Stat. 463, c. 752 (1950); Department of the Interior Manual Part 346, Chapters 1, 2, 3, and 4; 43 U.S.C. 501; Independent Offices Appropriation Act (31 U.S.C. 483a); and Budget Circular A-25, as amended by transmittal memorandums 1 and 2 of Oct. 22, 1963, and April 16, 1974.
The purpose of this part is to notify the public that any possession or occupancy of any portion of and the extraction or disturbance of any natural resources from Reclamation facilities, lands, or waterbodies are prohibited without written authorization from Reclamation, except for the legal harvest or collection of fish, wildlife, or plant material in conformance with applicable Federal, state, and local laws. Written authorizations must meet the requirements of the Independent Offices Appropriation Act (31 U.S.C. 483a) and Office of Management and Budget Circular A-25, as amended; both of which require that Reclamation recover both the fair market value of rights-of-use granted to applicants and the administrative costs associated with the issuing of rights-of-use on facilities, lands, and waterbodies administered by Reclamation. This part also refers to costs incurred by Reclamation when, at the request of other agencies and parties, Reclamation gives aid and assistance in rights-of-use matters.
As used in this part:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(1) Personnel costs.
(i) Direct labor.
(ii) Fringe benefits.
(iii) Additional benefits.
(2) Material costs, printing costs, and other costs related directly with a specific right-of-use.
(3) Exclusions.
(i) Management overhead.
(ii) Normal costs not directly associated with the specific right-of-use.
(l)
(m)
(n)
(a) The value of a right-of-use shall be determined by Reclamation. The appraised value of a right-of-use shall be established by a Reclamation staff or contract appraiser in accordance with Reclamation Instructions for
(b) If the applicant has been or is currently using the right-of-use area without authorization, and if it can be determined that the unauthorized use of Federal Lands was unintentional and not due to carelessness or neglect on the part of the applicant, then the value of a right-of-use shall not include the value of any prior unauthorized use
(c) If the applicant's prior unauthorized use can be determined to be intentional on his part or to be a result of his carelessness or neglect, then the value of such previous use shall be determined as assessed to the user in addition to the appraised value of the right-of-use.
Rights-of-use requested by nonprofit organizations or nonprofit corporations may be provided with no charge being made for the value of these rights-of-use when it is determined that the use will not interfere with the authorized current or planned use of the land by Reclamation. Rights-of-use requested by other Federal or other governmental agencies will be granted with fair market value reimbursement unless, a reasonable opportunity exists for the exchange of rights-of-use privileges, and there exists an interagency agreement providing for such exchange. Other agencies and nonprofit organizations will be required to reimburse Reclamation for all administrative costs which are deemed to be excessive to normal costs for granting similar rights-of-use request. All billings for administrative costs will be well documented (§ 429.2(k)). All requests will provide the information required in § 429.6(a), and (b).
The agency requesting assistance from Reclamation in acquiring a right-of-use shall be required to reimburse Reclamation for any administrative costs deemed to be in excess of the average normal for the specific service or assistance (§ 429.2(h)) and would not normally be foreseen and covered in the Reclamation regular appropriation requests. Any billing for these excessive costs shall be well documented (§ 429.2(k)).
The applicant for a right-of-use over land or estate in land, in the custody and control of Reclamation, must make application to the Regional Director of the region in which the land is located or to the affected field office. A right-of-use will not be granted when it is determined that the proposed right-of-use will interfere with the functions of Reclamation or its ability to maintain its facilities.
(a) The application does not have to be in any particular form but must be in writing. The application must contain at least the following items:
(1) A detailed description of the proposed use of Reclamation's lands.
(2) A legal description of either aliquot parts or metes and bounds, or as an absolute minimum, a description of the route or area of use desired on Reclamation's lands, and as accurate delineation of the use area on a map as it is possible to provide without making a survey.
(3) A map or drawing showing the approximate location of the requested right-of-use.
(b) An initial deposit fee of $200 must accompany the initial application. If, after a preliminary review of the application Reclamation determines the granting of a right-of-use is incompatible with present or future uses of the land and the right-of-use cannot be granted, $150 of the $200 fee will be returned. The remaining $50 of the $200 fee will be retained by Reclamation regardless of its disposition of the right-of-use request. No refund will be made for any deposits if the applicant refuses to accept the right-of-use after it is prepared and offered. Applicants will be required to pay any administrative costs which are in excess of the $200 deposit for the preparation of right-of-use as well as the value to the right granted. Any administrative costs less than $150 will result in an appropriate refund to the applicant or may be applied to the value of the right-of-use at the discretion of the applicant. This shall apply equally to requested rights-of-use which are offered by Reclamation and are rejected by the applicant, as to those which the applicant accepts. Any billing for administrative costs shall be well documented. (§ 429.2(k).) At the
(c) All fees and costs may be waived or reduced at the discretion of the Regional Director, when:
(1) It is determined that the applicant for the right-of-use will soon be, or is in the position of granting a right-of-use to the United States, and an opportunity for a reciprocal agreement exists, providing an agreement between Reclamation and the applicant is on file permitting such an exchange of uses.
(2) The initial deposit and the administrative costs would exceed the value of the interests and rights to be granted. The $50 minimum fee will usually be retained.
(3) The holder provides without charges, or at a reduced charge, a valuable service to the general public or to the programs of the Department of the Interior; or
(4) The right-of-use is a result of a service requested by the Federal Government or a governmental agency.
(d) The applicant also may, at the discretion of the Regional Director, be required to furnish, or agree to furnish, the following additional material before Reclamation grants a right-of-use:
(1) A legal land description and/or a map or plat of the requested right-of-use. The description map or plat should relate to Reclamation's land boundaries.
(2) Detailed construction details, construction specifications, engineering drawings, power flow diagrams, one-line diagrams, and any other plans and specifications which may be applicable.
(3) Statements, reports, or other documents already prepared or which normally will be prepared by the applicant which may be used by Reclamation to satisfy the requirements of the National Environmental Policy Act (42 U.S.C. 4321 through 4347) or other legal requirements of Reclamation in granting the applications right-of-use request.
(4) An agreement to complete or assist in completing Reclamation's requirements towards compliance with cultural resource policies.
(e) The applicant shall pay any excess administrative costs which Reclamation incurs which are in excess to the initial deposit of $200 required by paragraph (b) of this section prior to the issuance of the right-of-use. All billing for administrative costs shall be well documented by Reclamation.
(f) Prior to the issuance of the right-of-use instrument the applicant shall also pay Reclamation a fair market value of the right and privilege requested for the use of Reclamation's lands.
(g) Information Collection: The information collection requirements contained in § 429.6 have been approved by the Office of Management and Budget under 44 U.S.C. 3501
(a) The right-of-use granting document shall contain all special conditions or requirements which are determined by the Regional Director to be necessary to protect the interest of the United States.
(b) Any grant of a right-of-use for a term of 25 years or longer must have the consent of any involved water user organization pursuant to the legal requirements of 43 U.S.C. 387. Concurrence in and approval of uses for less than a 25-year period may be requested of the water users organization at the discretion of the responsible Regional Director. As a minimum, the water user's organization shall be notified of
(c) Reclamation's land-use stipulation appearing in § 429.8 shall be included in all perpetual right-of-way easements granted, excepting grants to other Federal agencies.
(d) Temporary rights-of-use instruments shall contain a termination clause in the event the applicants use becomes, or may become, an interference with the Reclamation's use of the land.
(e) Except for grants of rights-of-use to Federal agencies, the use instruments shall contain a hold harmless clause found in § 429.9.
(f) The applicant must show that any legally required permits to construct power transmission lines in excess of 100 kilovolt have been secured by the applicant from the appropriate power marketing authority prior to Reclamation's granting a right-of-way for such line.
There is reserved from the rights herein granted, the prior rights of the United States acting through the Bureau of Reclamation, Department of the Interior, to construct, operate, and maintain public works now or hereafter authorized by the Congress without liability for severance or other damage to the grantee's work; provided, however, that if such reserved rights are not identified in at least general terms in this grant and exercised for works authorized by the Congress within 10 years following the date of this grant, they will not be exercised unless the grantee, or grantee's successor in interest is notified of the need, and grants an extension or waiver. If no extension or waiver is granted, the Government will compensate, or institute mitigation measures for any resultant damages to works placed on said lands pursuant to the rights herein granted. Compensation shall be in the amount of the cost of reconstruction of grantee's works to accommodate the exercise of the Government's reserved rights. As alternatives to such compensation, the United States, at its option and at its own expense, may mitigate the damages by reconstructing the grantee's works to accommodate the Government facilities, or may provide other adequate mitigation measures for any damage to the grantee's property or right. The decision to compensate or mitigate is that of the appropriate Regional Director.
(a) The following clause shall be a part of every land-use document issued by Reclamation:
(b) To meet local and special conditions, the Regional Director, upon advice of the Solicitor, may modify this or any other provision of these rules with respect to the contents of the right-of-use instrument.
(a) The Regional Director, acting as designee of the Commissioner, shall make the determinations required under these rules and regulations. A party directly affected by such determinations may appeal in writing to the Commissioner, Bureau of Reclamation, within 30 days of receipt of the Regional Director's determinations. The affected party shall have an additional 30 days thereafter within which to submit a supporting brief memorandum to the Commissioner. The Regional Director's determinations will be held in abeyance until the Commissioner has reviewed the matter and rendered a decision.
(b) Any party to a case adversely affected by final decision of the Commissioner of the Bureau of Reclamation, under this part, shall have a right of appeal to the Director, Office of Hearing and Appeals, Office of the Secretary, in accordance with the procedures in title 43 CFR part 4, subpart G.
(a) This part 429 applies to any possession or occupancy of Reclamation facilities, lands, or waterbodies.
(b) This part 429 does not apply to the use of Reclamation lands for transitory activities such as hiking, camping, sightseeing, picnicking, hunting, swimming, boating, fishing, and other personal recreational pursuits. These activities are governed by 43 CFR part 423, Public Conduct on Bureau of Reclamation Facilities, Lands, and Waterbodies.
(c) This part does not apply to leasing Reclamation lands for grazing, agriculture, or any other purposes where a greater return will be realized by the United States through a competitive bidding process.
(d) This part does not apply to interests issued or granted for the replacement or relocation of facilities belonging to others under section 14 of the Reclamation Project Act of August 4, 1939, 43 U.S.C. 389.
(e) This part does not apply to archaeological resources or archaeological resources management activities that are governed by the Archaeological Resources Protection Act (Pub. L. 96-95), 43 CFR part 7, and 43 CFR part 423.
You must not possess or occupy, or extract or remove natural resources from Reclamation facilities, lands, or waterbodies unless you obtain a right-of-use in accordance with this part 429 or under other written agreement with Reclamation.
Title VII, Pub. L. 93-493, 88 Stat. 1494.
The procedures detailed in title 43 CFR part 4, subpart G, are made applicable to the concessioners at Lake Berryessa, Napa County, California, as the procedure to follow in appealing decisions of the contracting officer of the Bureau of Reclamation, Department of the Interior, or his authorized representatives on disputed questions concerning termination for default or unsatisfactory performance under the concession contracts.
Reclamation Act of 1902 (32 Stat. 388), Boulder Canyon Project Act of 1928 (43 U.S.C. 617
(a) The Secretary of the Interior (Secretary), acting through the Commissioner of Reclamation (Commissioner), is authorized and directed to operate, maintain, and replace the facilities at the Hoover Powerplant, and also to promulgate regulations as the Secretary finds necessary and appropriate in accordance with the authorities in the Reclamation Act of 1902, and all acts amendatory thereof and supplementary thereto.
(b) In accordance with the Boulder Canyon Project Act of 1928, as amended and supplemented (Project Act), the Boulder Canyon Project Adjustment
These General Regulations shall be effective on June 1, 1987, and shall apply to power generation, operation, maintenance, and replacement activities at the Boulder Canyon Project after May 31, 1987. “General Regulations for the Charges for the Sale of Power from the Boulder Canyon Project” are the subject of a separate rule, under 10 CFR part 904, by the Secretary of Energy, acting by and through the Administrator of Western. The “General Regulations for Generation and Sale of Power in Accordance with the Boulder Canyon Project Adjustment Act,” dated May 20, 1941, and the “General Regulations for Lease of Power,” dated April 25, 1930, terminate May 31, 1987.
As used in this part:
(a) Power generation, and the associated operation, maintenance, and making of replacements, however necessitated, of facilities and equipment at the Hoover Powerplant, are the responsibilities of Reclamation.
(b) Subject to the statutory requirement that Hoover Dam and Lake Mead shall be used: First, for river regulation, improvement of navigation and flood control; second, for irrigation and domestic uses and satisfaction of present perfected rights mentioned in section 6 of the Project Act; and third, for power, Reclamation shall release water, make available generating capacity, and generate energy, in such quantities, and at such times, as are necessary for the delivery of the capacity and energy to which Contractors are entitled.
(c) Reclamation reserves the right to reschedule, temporarily discontinue, reduce, or increase the delivery of water for the generation of electrical energy at any time for the purpose of maintenance, repairs, and/or replacements, and for investigations and inspections necessary thereto, or to allow for changing reservoir and river conditions, or for changes in kilowatthours generation per acre-foot, or by reason of compliance with the statutory requirement as referred to in paragraph (b) of this section;
(d) Should a Contractor have concerns regarding power generation and related matters and request a meeting in writing, including a description of areas of concern, Reclamation shall convene such meeting within 10 days of receipt of such request and shall notify all Contractors and Western of the date and location of the meeting, and the areas of concern to be discussed.
Reclamation shall submit annually on or before April 15 to Western and Contractors, cost data, including one year of actual costs for the last completed fiscal year and estimated costs for the next 5 fiscal years, for operation, maintenance, replacements, additions and betterments, non-Federal funds advanced for the uprating program by non-Federal purchasers, and interest on and amortization of the Federal investment. Such cost data shall identify major items. Upon 5 days prior written notice to Reclamation, any Contractor shall have the right, subject to applicable Federal laws and regulations, to review records used to prepare such cost data at Reclamation offices during regular business hours. Contractors shall have an opportunity to present written views within 30 days of the transmittal of the cost data. Reclamation responses to written views shall be provided within 60 days of transmittal of the cost data or 30 days after a meeting with Contractors convened pursuant to § 431.4(d), whichever is later.
Reclamation shall submit annually on or before April 15 to Western and Contractors, an estimated annual operation schedule for the Hoover Powerplant showing estimated power generation and estimated maintenance outages for review, and shall provide an opportunity to present written views within 30 days of the transmittal of the schedule. Reclamation responses to written views shall be provided within 60 days of the transmittal of the schedule or 30 days after a meeting with Contractors convened pursuant to § 431.4(d), whichever is later. The estimated annual operation schedule of Hoover Powerplant shall be subject to necessary modifications, in accordance with § 431.4(c). Upon 5 days prior written notice to Reclamation, any Contractor shall have the right, subject to applicable Federal laws and regulations, to review records used to prepare such power generation estimates at Reclamation offices during regular business hours.
Reclamation is responsible for the repayment of the Project and the administration of the Colorado River Dam Fund and the Lower Colorado River Basin Development Fund.
(a) All receipts to the Project shall be deposited in the Fund along with electric service revenues deposited by Western and shall be available without further appropriation for:
(1) Defraying the costs of operation (including purchase of supplemental energy to meet temporary deficiencies in firm energy which the Secretary of Energy is obligated by contract to supply), maintenance, and replacements of
(2) Payment of annual interest on the unpaid investments in accordance with appropriate statutory authorities;
(3) Repayment of capital investments including amounts readvanced from the Treasury;
(4) Payments to the States of Arizona and Nevada as provided in section 2(c) of the Adjustment Act and section 403(c)(2) of the Colorado River Basin Project Act;
(5) Transfers to the Lower Colorado River Basin Development Fund and subsequent transfers to the Upper Colorado River Basin Fund, as provided in section 403(c)(2) of the Colorado River Basin Project Act and section 102(c) of the Hoover Power Plant Act, as reimbursement for the monies expended heretofore from the Upper Colorado River Basin Fund to meet deficiencies in generation at Hoover Dam during the filling period of storage units of the Colorado River Storage Project in accordance with the provisions of sections 403(g) and 502 of the Colorado River Basin Project Act, such transfers, totalling $27,591,621.25, to be effected by 17 annual payments of $1,532,868.00 beginning in 1988 and a final payment of $1,532,865.25 in 2005; and
(6) Any other purposes authorized by existing and future Federal law.
(b) Appropriations for the visitor facilities program and any other purposes authorized by existing and future Federal law advanced or readvanced to the Fund shall be disbursed from the Fund for those purposes.
(c) All funds advanced by non-Federal Contractors for the Uprating Program shall be deposited in the Fund, shall be available without further appropriation, and shall be disbursed from the Fund to accomplish the Uprating Program.
(d) The Fund shall be administered and managed in accordance with applicable Federal laws and regulations, by the Secretary acting through the Commissioner.
(a) All actions by Reclamation or the Secretary shall be binding unless and until reversed or modified in accordance with the provisions herein.
(b) Any disputes or disagreements as to interpretation or performance of the provisions of these General Regulations under the responsibility of the Secretary shall first be presented to and decided by the Commissioner. The Commissioner shall be deemed to have denied the Contractor's contention or claim if it is not acted upon within 60 days of its having been presented. The decision of the Commissioner shall be subject to appeal to the Secretary by a notice of appeal accompanied by a statement of reasons filed with the Secretary within 30 days after such decision. The Secretary shall be deemed to have denied the appeal if it is not acted upon within 60 days of its having been presented.
(c) The decision of the Secretary shall be final unless, within 30 days from the date of such decision, a written request for arbitration is received by the Secretary. The Secretary shall have 90 days from the date of receipt of a request for arbitration either to concur in or deny in writing the request for such arbitration. Failure by the Secretary to take any action within the 90 day period shall be deemed a denial of the request for arbitration. In the event of a denial of a request for arbitration, the decision of the Secretary shall become final. Upon a decision becoming final, the disputing Contractor's remedy lies with the appropriate Federal court. Any claim that a final decision of the Secretary violates any right accorded the Contractor under the Project Act, the Adjustment Act, or title I of the Hoover Power Plant Act is barred unless suit asserting such claim is filed in a Federal court of competent jurisdiction within one year after final refusal by the Secretary to correct the action complained of, in accordance with section 105(h) of the Hoover Power Plant Act.
(d) When a timely request for arbitration is received by the Secretary and the Secretary concurs in the request, the disputing Contractor and the Secretary shall, within 30 days of receipt of such notice of concurrence, each
(a) Reclamation may from time to time promulgate additional or amendatory regulations deemed necessary for the administration of the Project, in accordance with applicable law;
(b) Any modification, extension, or waiver of any provision of these General Regulations granted for the benefit of any one or more Contractors shall not be denied to any other Contractor.