[Congressional Record (Bound Edition), Volume 154 (2008), Part 16] [Extensions of Remarks] [Page 22867] [From the U.S. Government Publishing Office, www.gpo.gov]EARMARK DECLARATION ______ HON. ROBERT E. LATTA of ohio in the house of representatives Thursday, September 25, 2008 Mr. LATTA. Madam Speaker, pursuant to the Repubublican Leadership standards on earmarks, I am submitting the following information for publication in the Congressional Record regarding earmarks I received as part of H.R. 2638, The Consolidated Security, Disaster Assistance, and Continuing Appropriations Act, 2009. The following are the Department of Defense and Military Construction projects I have requested that have received funding approval: Project Name: N-STEP Enabled Manufacturing Cell for Future Combat Systems. Bill Number: H.R. 2638. Account: RDTE, A. Requesting Entity: Joint Systems Manufacturing Center/General Dynamics; 1161 Buckeye Road, Lima, Ohio 45804. Project Description and Amount: Joint Systems Manufacturing Center- Lima (JSMC) has developed, designed, installed and implemented an N- STEP Enabled Reconfigurable Manufacturing Cell and has completed performance demonstration phases using automatic processes. To make the core equipment production ready for FCS, specific weld process development using the Friction Appurtenance Welder, FAW, must be completed. This funding request will provide for the necessary technical resources required to develop the weld machine parameters/ specifications for support of vehicle production activities. $2,400,000. Project Name: Electronic Motion Actuation Systems. Bill Number: H.R. 2638. Account: RDTE, N. Requesting Entity: Moog: FloTork Facility, 1701 North Main Street, P.O. Box 68, Orrville, Ohio 44667. Project Description and Amount: The purpose of the project is to develop shipboard-qualified prototype electric actuators and demonstrate their satisfactory performance in shipboard applications. Successful completion of the technology will reduce shipboard personnel and reduce repair and maintenance costs. The Department of the Navy has repeatedly stated its desire for an all-electric ship. The target ship for this concept is the DDX which is due to hit the water in 2010. Environmental hazards associated with hydraulic systems will also be eliminated by moving to an electric actuator. $800,000. Project Name: Barracks, Camp Perry Training Site, Port Clinton, Ohio. Bill Number: H.R. 2638. Account: Department of Defense, Army National Guard. Military Facility Address: Ohio National Guard, Camp Perry Training Site, 1000 Lawrence Road, Port Clinton, Ohio 43452. Project Description and Amount: Provide $2 million in P-341, unspecified minor military construction, funds pursuant to Title 10 U.S. Code 2805, to construct a new 80-bed baracks at the Ohio National Guard's Camp Perry Training Site, Port Clinton, OH. The request will increase the readiness of our servicemen and women in the Ohio National Guard and help them better prepare for the challenges they face both at home and abroad. $2,000,000. ____________________