[House Report 111-559] [From the U.S. Government Publishing Office] 111th Congress Report HOUSE OF REPRESENTATIVES 2d Session 111-559 ====================================================================== MILITARY CONSTRUCTION, VETERANS AFFAIRS, AND RELATED AGENCIES APPROPRIATIONS BILL, 2011 _______ July 22, 2010.--Committed to the Committee of the Whole House on the State of the Union and ordered to be printed _______ Mr. Edwards of Texas, from the Committee on Appropriations, submitted the following R E P O R T together with ADDITIONAL VIEWS [To accompany H.R. 5822] The Committee on Appropriations submits the following report in explanation of the accompanying bill making appropriations for military construction, the Department of Veterans Affairs, and related agencies for the fiscal year ending September 30, 2011, and for other purposes. CONTENTS Page Purpose of the Bill.............................................. 2 Summary of Committee Recommendation.............................. 2 Comparative Statement of New Budget Authority.................... 4 Management and Oversight Initiatives............................. 13 Recovery Act Accomplishments..................................... 14 Items of Interest................................................ 15 Department of Defense: 16 Military Construction........................................ 16 NATO Security Investment Program............................. 30 Family Housing Construction and Operation and Maintenance.... 30 Chemical Demilitarization Construction, Defense-Wide......... 34 Department of Defense Base Closure Account 1990.............. 35 Department of Defense Base Closure Account 2005.............. 35 Administrative Provisions.................................... 36 Department of Veterans Affairs: 38 Overview....................................................... 38 Veterans Benefits Administration............................... 40 Veterans Health Administration................................. 44 National Cemetery Administration............................... 50 Departmental Administration.................................... 50 Administrative Provisions...................................... 55 Related Agencies: 59 American Battle Monuments Commission......................... 59 U.S. Court of Appeals for Veterans Claims.................... 60 Cemeterial Expenses, Army.................................... 60 Armed Forces Retirement Home................................. 61 Overseas Contingency Operations.................................. 62 General Provisions............................................... 64 Changes in Application of Existing Law........................... 65 Appropriations Not Authorized by Law............................. 69 Transfer of Funds................................................ 69 Constitutional Authority......................................... 71 Comparison With the Budget Resolution............................ 71 Five-Year Projection of Outlays.................................. 71 Assistance to State and Local Governments........................ 72 Statement of General Performance Goals and Objectives............ 72 Full Committee Votes............................................. 72 Disclosure of Earmarks and Congressionally Directed Spending Items.......................................................... 72 State Project List............................................... 73 Additional Views................................................. 128 Purpose of the Bill The purpose of the bill is to support our military and their families and provide the benefits and medical care that our veterans have earned for their service. This is accomplished through the programs funded in the bill, which provide the facilities and infrastructure needed to house, train, and equip our military personnel to defend this Nation, both in the United States and abroad; provide the housing and military community infrastructure that supports a good quality of life for them and their families; and allow the military to maintain an efficient and effective base structure. The bill also funds programs to ensure that all veterans receive the benefits and medical care that they have earned as a result of the sacrifices they have made in their service to our country. Finally, the bill funds four related agencies that provide support to our Nation's heroes; the American Battle Monuments Commission, Cemeterial Expenses, Army (including Arlington National Cemetery), the United States Court of Appeals for Veterans Claims, and the Armed Forces Retirement Home. Summary of Committee Recommendation The Committee recommends $141,104,146,000 in budget authority for the fiscal year 2011 programs and activities funded in the bill. In addition, advance appropriations of $50,610,985,000 are provided for fiscal year 2012 medical programs of the VA. The fiscal year 2011 recommendation is an increase of $6,536,846,000 above the fiscal year 2010 enacted level and the same as the President's request. Included in this amount is $63,849,146,000 in mandatory budget authority and $77,255,000,000 in discretionary budget authority, which includes $1,257,000,000 in emergency funding for Overseas Contingency Operations. The recommendation reflects the Committee's continued commitment to our servicemembers and veterans and to their families. The total funding level for military construction, including Overseas Contingency Operations, is $20,004,368,000, an 18.9 percent decrease below the fiscal year 2010 enacted level. A significant portion of this decrease is attributed to the reduction in BRAC 2005 program requirements. The overall level of funding supports the servicemen and women and their families who are making sacrifices during this time of war. The programs funded in the bill for the Department of Defense address the numerous challenges we have asked our military to accomplish simultaneously. These funds support an increase in troop strength for both the Army and Marine Corps, continue the cleanup of military bases closed during previous Base Realignment and Closure rounds, resource the military's global re-stationing plan, and ensure that our military personnel and their families' quality of life is preserved within these plans. The total funding level available for fiscal year 2011 for the Department of Veterans Affairs is $120,812,964,000, an increase of 10.2 percent over the fiscal year 2010 enacted level. The Committee recommendation supports the budget increases requested by the Department to improve access to care for all veterans, increase services for homeless veterans, and expand research programs. The recommendation provides funding increases for several veterans benefits programs, as authorized by current law, including additional education benefits which became effective late in fiscal year 2009. The recommendation provides funding to improve administration of these benefit programs, including an additional 4,048 permanent claims processors to address the growing veterans claims processing backlog, as well as the increase in average processing time for an initial claim. In addition to appropriations for fiscal year 2011, the Committee recommendation includes $50,610,985,000 in advance appropriations for fiscal year 2012 for the three medical accounts of the Department. The following table compares amounts recommended in the bill to the President's request and amounts appropriated in fiscal year 2010:Management and Oversight Initiatives The effective stewardship of taxpayer dollars is of the highest priority. In the interest of eliminating waste, fraud, and abuse in Federal programs, the Committee has and will continue to use public hearings, briefings and information requests, and reviews by the Government Accountability Office and the Inspectors General to promote strong financial and program management, oversight and leadership at the Department of Defense, the Department of Veterans Affairs, and other agencies under the jurisdiction of this bill. The fiscal year 2011 appropriations Act and the accompanying report address management challenges of the Federal agencies funded in, including directives to strengthen financial and program management, eliminate redundancy, and improve implementation and oversight of initiatives that support the mission of this bill. The Committee will use every means at its disposal to reduce mismanagement that results in waste, fraud, and abuse. Department of Defense (DOD).--In addition to the notification and reporting requirements for military construction programs contained in Title 10, United States Code, the Committee's recommendations include several provisions requiring the Department of Defense to report on various aspects of military construction programs, or to provide notification to the Committee when certain actions are taken. The Committee also retains prior approval authority for any reprogramming of funds exceeding a specific threshold. Finally, the Committee includes a provision under Military Construction, Army in Title IV (Overseas Contingency Operations) directing that $10,000,000 shall be made available by transfer to the Department of Defense Inspector General for the purpose of auditing military construction projects in Afghanistan. The Committee is concerned by data provided by the Defense Energy Support Center (DESC) showing an upward trend in the number of fuel spills at facilities owned by the Department of Defense. According to DESC, 57 percent of these spills between 1996 and 2009 were attributed to infrastructure or equipment failure. The Committee urges the Secretary of Defense and the Director of the Defense Logistics Agency to devote sufficient military construction resources to recapitalize at-risk fuel infrastructure to help reverse this upward trend in fuel spills. Department of Veterans Affairs (VA).--With the $120,812,964,000 provided for the VA in this bill and the 2.9 percent increase in the number of veterans seeking VA medical services, the Committee believes it is important to strengthen its tools to monitor spending as well as the skills and operating procedures of the VA workforce. The following initiatives demonstrate the Committee's oversight focus:
Strengthening contract oversight. The bill includes $23,584,000 to strengthen VA acquisitions management. While VA contract funding has grown substantially since 2001, the capacity of the acquisition workforce has not kept pace, leading to increased risk of higher costs and unsuccessful contract outcomes. This funding supports a five percent increase in acquisition personnel and invests in appropriate training and technology to make the workforce more effective in managing taxpayer dollars. Claims backlog reduction. The bill includes an increase of $460,000,000 for the Veterans Benefits Administration to add 4,048 permanent staff to address the unacceptably large and growing veterans disability claims backlog. The Department's annual claims receipts are expected to grow from 1,013,712 in 2009 to 1,318,753 in 2011, an increase of over 30 percent. In conjunction with efforts to develop automated solutions, the additional staff will help to resolve veterans' claims more accurately and in a more timely manner. While the Department anticipates an initial increase in the average time to process a claim (190 days) due to increases in the number of claims being filed, as the new personnel become more proficient and better trained, the Department expects to meet its strategic target of 125 days to process claims in the future. Claims processing review. In order to address the problems and delays the VA encounters in processing claims, the Committee directs the Government Accountability Office to review the process the Social Security Administration uses to administer its disability claims processing to determine whether t are efficiencies and best practices that the VA could adapt to improve disability claims processing. Redirecting IT funding. Given the large amounts of funding for information technology systems the VA projects will remain unobligated at the end of both fiscal years 2010 and 2011, the Committee reduces funding in this account by $85,000,000 and applies the funding to other areas of high priority in the VA. Reserve fund controls. The Committee is concerned about the VA's use of a national reserve fund, which captures significant VA resources. In fiscal year 2009, the reserve fund exceeded $641,000,000. The Committee includes bill language requiring the VA to notify the Committee within thirty days of enactment of this Act of the planned allocation from each appropriation account to the reserve fund and any subsequent increases in these allocations of ten percent or more, as well as requiring fifteen day advance notification before obligation, and notification of the intended use, of the reserve funds. Bid savings control. The VA has considerable flexibility in allocating funding for major construction projects. Once funding is appropriated for a particular construction project, the Committee has received little or no useful information about the ongoing status of the project, including whether any bid savings have been realized by the VA when contracts are awarded. The Committee includes bill language requiring the VA to notify the Committee of all bid savings totaling $5,000,000 or more, or five percent, whichever is less, within 14 days of obligation. Additionally, the VA is required to notify the Committee prior to any change in the scope of major construction projects. Recovery Act Accomplishments Military Construction.--The Department of Defense (DOD) received $2,880,000,000 in military construction and family housing funds from the 2009 American Recovery and Reinvestment Act to provide additional quality of life facilities for service members and their families, invest in energy conservation and alternative energy production, and assist military homeowners adversely affected by the crisis in the housing market. Key DOD investments are: 25 new child development facilities to serve more than 4,500 military dependents. 2 new military hospitals at Camp Pendleton, California, and Fort Hood, Texas, two of DOD's key land force generating installations. 26 projects to construct or improve family housing, provide unaccompanied housing, or establish facilities for wounded warrior care. 58 projects to improve energy conservation on military installations, or increase energy production from renewable sources, such as wind, solar, and geothermal. Veterans Affairs.--The Department of Veterans Affairs (VA) has seized the opportunities provided by $1,400,000,000 from the 2009 American Recovery and Reinvestment Act to improve the quality of services provided to veterans, while creating over 4,100 jobs and stimulating the economy. Funds have been committed for: Over 1,000 non-recurring maintenance projects for medical facilities to provide renovations, renewable energy sources, energy conservation, disabled accessibility, and safety and security improvements. These efforts will make medical facilities safer, more energy efficient, and better suited to provide veterans with comprehensive care. Almost 400 improvement projects at national cemeteries maintained by the VA, including national shrine projects, initiatives to conserve energy and water, repairs to historic monuments, and repairs of roads, bridges, and other cemetery infrastructure. Hiring 2,300 surge claims processors to assist in expediting disability claims to increase production of claims and shorten the number of days taken to resolve claims. This workforce is urgently needed to help with the continued increase in applications and the coming wave of Agent Orange presumptive disability claims. Close to 50 new construction and renovation projects for State veterans homes, resulting in an estimated 1,100 new beds for residents and important infrastructure and security upgrades. VA staff to provide the one-time $250 economic recovery benefit to eligible veterans and their survivors to mitigate the effects of the economy. Items of Interest Advance Appropriations.--The Committee recommendation, for the second year, includes an advance appropriation for the Medical Services, Medical Support and Compliance, and Medical Facilities accounts. The goal of this advance appropriation is to provide the Veterans Health Administration (VHA) with reliable and timely funding to ensure that the delivery of medical care to America's veterans is not disrupted. The provision of an advance appropriation is only the first step in this process. The VHA is directed to plan and publish the distribution of this funding prior to the beginning of the fiscal year so that medical center directors are prepared to execute the funding on October 1st, the first day of the new fiscal year. The Committee directs the Department to include in its budget submission the budget plan for the advance appropriation provided in the previous year's bill, including the amount of funds that will be allocated in accordance with the Veterans Equitable Resource Allocation (VERA), and the Committee expects funding provided by advance appropriations to be made available to the Veterans Integrated Service Networks on October 1st. The Committee further directs the Department to include in its budget submission a current services estimate for the advance appropriation for the Medical Services, Medical Support and Compliance, and Medical Facilities accounts. Reductions.--In order to invest in the critical priorities identified in this bill, and in an effort to build an economy on a solid foundation for growth and put the Nation on a path toward prosperity, the Committee has proposed herein a number of program reductions from the fiscal year 2010 level totaling over $6,100,000,000. In addition, nearly $1,000,000,000 in other program reductions from the budget request are recommended. These adjustments, no matter their size, are important to setting the right priorities within the spending allocation, for getting the deficit under control, and creating a government that is as efficient as it is effective. TITLE I DEPARTMENT OF DEFENSE Military Construction Overview Fiscal year 2010 enacted level (including rescissions) $12,720,031,000 Fiscal year 2011 budget request....................... 13,825,563,000 Committee recommendation in the bill.................. 13,725,563,000 Comparison with: Fiscal year 2010 enacted level.................... 1,005,532,000 Fiscal year 2011 budget request................... (100,000,000) Military construction accounts provide funds for new construction, construction improvements, planning and design, and host nation support. Projects funded by these accounts include facilities for operations, training, maintenance, research and development, supply, medical care, and force protection, as well as unaccompanied housing, utilities infrastructure, and land acquisition. The Committee recommends a total appropriation of $13,725,563,000 for Military Construction, an increase of $1,005,532,000 above the fiscal year 2010 enacted level and a decrease of $100,000,000 below the budget request. Role of military construction in supporting job growth and the economy.--The Committee notes that, according to Department of Defense (DOD) ``Green Book'' data, the combined amount of military construction funding recommended in this bill and appropriated during the three preceding fiscal years is greater, in constant dollars, than the total for any four-year period extending back to fiscal year 1948. Military construction and family housing projects are requested by the Administration and approved by Congress first and foremost to meet military operational needs and improve the quality of life for service members and their families. At the same time, such funding has helped to support construction industry employment during a period when the construction sector suffered a net loss of nearly 2 million jobs. The Associated General Contractors of America estimates that each $1,000,000,000 in non-residential construction funding creates or sustains 28,500 jobs. Quadrennial Defense Review/Nuclear Posture Review.--The Committee notes that the reports of the 2010 Quadrennial Defense Review (QDR) and the Nuclear Posture Review (NPR) contain a number of new programs and initiatives with potential impact on military construction requirements. Among these programs and initiatives are: --The creation of a new U.S. Cyber Command, a sub- unified command under U.S. Strategic Command; --Increasing the ``resiliency'' of forward posture and overseas base infrastructure, including the ``hardening'' of key facilities; --The full ``normalization'' of tours for U.S. Forces Korea, requiring infrastructure to accommodate as many as 14,000 military families, compared to less than 2,000 prior to adoption of this policy; --The implementation of a new phased, adaptive approach to ballistic missile defense; --The retention of four Army brigade combat teams and a corps headquarters in the European Command area of responsibility, pending adoption of a new NATO Strategic Concept and a review of the U.S. posture network in Europe; --The stand-up of two new Army combat aviation brigades, and the conversion of one heavy brigade combat team to a Stryker brigade combat team by 2013; --The exploration of potential new modes to base the Minuteman III Intercontinental Ballistic Missile force; and --The creation of National Guard Homeland Response Forces in each of the ten Federal Emergency Management Agency regions. The Committee believes it is essential to ensure that the initiatives called for by the QDR/NPR are matched by the necessary resources in DOD budget plans, and therefore directs the Secretary of Defense to include a report along with the fiscal year 2012 military construction budget request describing how proposed QDR/NPR programs and initiatives are funded in the accompanying Future Years Defense Program (FYDP) for military construction, including dollar amounts associated with specific projects. The report shall also include a description of any ongoing studies or reviews specifically bearing on military construction that follow directly from QDR/ NPR decisions or proposals, including estimated completion dates. This report shall be submitted to the Congressional defense committees no later than 14 days following submission of the Administration's budget request for fiscal year 2012. Report on youth programs and youth centers.--At an April 14, 2010 hearing on the quality of life for military personnel and their families, the Committee heard testimony from the senior non-commissioned officers of all four service branches, as well as representatives from the National Military Family Association and the Military Child Education Coalition. Testimony received during this hearing indicated that the children of military families are under tremendous stress due to the frequency and duration of overseas deployments since 2001, and that older children experience greater problems. It is questionable whether DOD's existing goal of meeting 35 percent of youth program demand is adequate to ensuring that older school-age military dependents are well supported in the absence of one or more caregivers. The Committee therefore directs the Secretary of Defense to submit a report on youth programs and youth centers to the Committees on Appropriations of both Houses of Congress. This report shall encompass, at minimum: (1) how the Department of Defense determines youth center demand and capacity; (2) the means by which capacity is increased, including specific reference to facilities; (3) the extent to which non-appropriated fund programs provide for youth center facilities; and (4) existing unfunded requirements for youth center construction. This report shall be submitted no later than March 1, 2011. Guard and Reserve Initiative.--The Committee recommends $200,000,000 for a Guard and Reserve initiative to address urgent unfunded requirements for the Army National Guard, Air National Guard, Army Reserve, Navy Reserve, Marine Corps Reserve, and Air Force Reserve. The Committee recognizes the critical contribution made by reserve component personnel to disaster assistance, homeland security, and national defense, including the burdens borne by the Guard and Reserve to support Overseas Contingency Operations. The Committee also acknowledges that the transition to an Operational Reserve force will increase requirements for military construction in order to provide adequate training, supply, maintenance, billeting, and quality of life facilities for Guard and Reserve personnel. The Committee has included language directing that spending plans be submitted for the funds provided no later than 30 days after the enactment of this Act. Army Trainee Troop Housing Initiative.--The Committee recommends an additional $190,000,000 for Army trainee troop housing facilities to address the unfunded backlog of modernization requirements. This added funding will nearly double the Army's request of $191,000,000 for this purpose. The Army has an estimated need for 115,413 trainee barracks spaces, only 57,753 of which will be deemed adequate as of the end of fiscal year 2010. The current Army program projects that the full amount of $1,728,000,000 in military construction funding needed to complete modernization will not be in place until fiscal year 2015, with occupancy scheduled for 2017. The Committee therefore recommends these additional funds to accelerate this program, and has included language directing the Army to submit a spending plan for these funds no later than 30 days after the enactment of this Act. Guam.--The Committee recommends $153,940,000, a reduction of $272,938,000 from the request of $426,878,000, for construction in support of the realignment of Marine Corps forces from Okinawa to Guam, in addition to $139,300,000 in other military construction projects on the island. The Committee remains supportive of the realignment of Marine Corps forces from Okinawa to Guam. At the same time, the Committee has serious concerns about the Department of Defense (DOD) proceeding with the full amount of requested military construction work for the realignment pending: (1) DOD's ability to respond satisfactorily to weaknesses in the Draft Environmental Impact Statement (DEIS) raised by the Environmental Protection Agency (EPA); (2) substantial progress to address civilian infrastructure impacts ``outside the fence line''; and (3) a clearer understanding of the Department's introduction of a new ``resiliency'' cost variable of uncertain impact in the QDR. The Committee believes that the DEIS has very limited value with respect to providing a realistic depiction of how the Guam buildup would proceed. The DEIS does not formally consider any alternatives that would extend construction and/or the relocation of personnel and assets past 2014; rather, the DEIS concedes that ``Although the desired completion date for Marine forces relocation is by 2014, the construction would likely continue to 2016.'' Even this timeline is likely to prove too optimistic; while the DEIS assumes that ``2014 is the last year that any new construction would begin'', the Navy's FYDP clearly shows significant military construction (including unspecified quality of life and base operations facilities) associated with the Marine forces relocation programmed for fiscal year 2015, likely pushing the completion date for construction to 2017 and beyond. This fundamental disconnect on the target completion date between the U.S.-Japan agreement, the DEIS, and the FYDP leaves doubt regarding the most realistic and feasible timeline for the Guam buildup. The EPA has raised a number of serious concerns regarding the quality of the DEIS, especially in relation to the cumulative impacts of the complex and interrelated actions needed not only to complete the relocation of Marine forces, but to provide transient berthing for an aircraft carrier and accommodate the expected influx of a large number of construction workers and associated personnel to execute the buildup. The EPA rated the impact of the Department's preferred alternative as ``environmentally unsatisfactory'' and rated the DEIS itself as 3 or ``Inadequate''; both ratings are the lowest possible. It remains to be seen whether, and when, the Department will be able to address these major concerns. The Committee, to date, sees little concrete evidence that the Administration is pursuing the Guam buildup as a ``whole of government'' responsibility. The buildup of Guam is not a ``military problem''; its main feature, the relocation of Marine forces from Okinawa, results from a bilateral agreement negotiated between the U.S. and Japan governments, and therefore DOD should not be isolated as the sole source of funding for the necessary improvements to physical and human capital in Guam. The Committee notes with concern that the Administration has sent mixed signals on this issue. On April 5, 2010, the Administration submitted a budget amendment to its supplemental request for fiscal year 2010 proposing that $50,000,000 in unspecified DOD funds be made available by transfer to the Port of Guam Improvement Enterprise Fund administered by the Maritime Administration in the Department of Transportation as a ``critical prerequisite'' of the buildup. Weeks later, on May 27, 2010, the Administration released a Statement of Administration Policy on H.R. 5136, the National Defense Authorization Act for Fiscal Year 2011, expressing concern with ``the provisions of the bill that suggest Guam infrastructure improvements are an exclusive DOD financial responsibility rather than a shared inter-agency, intergovernmental effort led by DOD'', even though the prior budget amendment made the same suggestion. The Committee believes that while DOD should have the greatest share of leadership for identifying and addressing island-wide impacts, non-DOD agencies must also be provided directly with the budgetary resources necessary to assist the people of Guam with ``outside the fence line'' problems. To date, however, much of the non-DOD work appears to be mired in the ``planning'' or ``under consideration'' phase. The Committee agrees with DOD, as expressed through the DEIS, that the rate of military construction execution for the Guam buildup should be seen as a tool to mitigate or avoid harmful and potentially irreparable consequences. The Committee therefore recommends the specific funding reductions described below, and will consider future military construction requests for the Guam buildup partially in light of progress on civilian infrastructure and socioeconomic support for the citizens of Guam. Additionally, the Committee is concerned by the potential impact of the Department's desire, as expressed in the 2010 QDR Report, to increase the ``resiliency'' of overseas military infrastructure, including the ``hardening'' of certain critical facilities such as aircraft shelters. Although the Air Force includes $275,000,000 for unspecified resiliency measures at Andersen Air Force Base in the outyears of its current FYDP, it is unclear whether considerations of ``resiliency'' are being taken into account for the infrastructure needed to realign Marine Corps forces, including the Air Combat Element, or to construct facilities for the Navy and Army components of the buildup. The Department needs to clarify the impact of this requirement on the Guam construction program at the earliest possible date. The Committee therefore recommends no funds for the second increments of the Andersen Air Force Base North Ramp parking and utilities projects, and a reduction of $100,000,000 from the $147,210,000 requested for site preparation and utility work at Finegayan. The Committee recommends full funding of the $106,730,000 requested for improvements to the Apra Harbor wharf and Defense Access Roads projects in order to facilitate the throughput of personnel and material associated with the buildup. Facilities management, life-cycle costs, and construction method alternatives.--The Committee believes that the military construction program best serves both our military personnel and the taxpayers when projects are open to competitive bidding from contractors representing the widest possible range of construction methods. To that end, the Committee urges the Department of Defense and the execution agents for military construction, principally the Army Corps of Engineers and the Naval Facilities Engineering Command, to ensure that requests for proposals or qualifications do not arbitrarily foreclose, discourage, or privilege any type of construction method. The Committee continues to encourage a level playing field for both traditional construction methods and alternative methods such as permanent modular construction. The Committee also encourages DOD to evaluate the regular use of carbon fiber grid precast concrete technology in military construction projects. The Committee believes that the best way to ensure a level playing field is to set and communicate clear standards and expectations regarding life-cycle cost management for military construction, backed by rigorous, objective analysis. The Committee understands that situations may arise in which objectives other than life-cycle cost may take precedence; for example, speed of construction may be a predominant concern in order to meet time-limited goals such as base realignments, force structure growth, new system beddown, or urgent operational needs. At the same time, the Committee is concerned by the recent report from the Government Accountability Office (GAO-10-436) indicating that varying service attitudes toward the life-cycle costs of different construction methods were based more on preformed opinions, personal experiences, and anecdotal evidence rather than quantitative information or analyses. The Committee therefore urges DOD and the services to conduct further research regarding comparative life-cycle costs for differing types of construction, establish clear goals and benchmarks, and ensure these standards are communicated to contracting officials. Until such an empirical basis is established, the Committee urges DOD and the services to carefully reconsider blanket use of any new life-cycle approaches that depart from prior, standard practices. The Committee also notes that over the past three years, the Deputy Under Secretary of Defense for Installations and Environment (DUSD I&E) has indicated efforts underway to shift from a measurement of the recapitalization rate of DOD facilities in terms of years to one based on the actual condition of facilities and mission priority. Under the 2007 Defense Installations Strategic Plan, this new methodology was to have been implemented by fiscal year 2010, but recent DUSD I&E testimony indicated this methodology was still under development. The Committee therefore directs the DUSD I&E to provide a status update on the development of this methodology and its implementation in the military construction program no later than January 29, 2011. Bid savings.--The Committee has ascertained from cost variation notices required by 10 U.S.C. 2853 that DOD continues to reap large bid savings on previously appropriated military construction projects. The Committee's recommendations therefore include general reductions to the Army, Navy, and Air Force military construction accounts, cumulatively representing less than 3 percent of the funds requested, in the understanding that these excess prior year savings can be applied to the fiscal year 2011 program per section 115 of this bill. These general reductions allow for a reinvestment of resources in high priority projects and initiatives such as Guard and Reserve unfunded requirements, Army trainee barracks, energy conservation, and environmental cleanup of bases closed during the four prior Base Realignment and Closure rounds. Incremental funding.--The Committee remains concerned by the Office of Management and Budget policy to disallow any new incrementally funded military construction projects, which began with the fiscal year 2010 request. The Committee repeatedly has stated that while projects should be fully funded or separated into stand-alone phases where practicable, incremental funding should remain an option when it makes fiscal and programmatic sense. In some cases, the phased approach can drive up costs by requiring inefficient designs and separate bids that leave subsequent phases vulnerable to construction price inflation. The Committee will continue to exercise its prerogative to recommend incremental funding. The Committee therefore recommends incremental funding for the following three projects included in the Administration's request: Air Force Technical Applications Center, Patrick Air Force Base, Florida; Sensitive Compartmented Information Facility, Wiesbaden, Germany; and Finegayan Site Prep and Utilities, Guam. Facilities Sustainment, Restoration and Modernization (FSRM).--The Department is directed to continue describing on form 1390 the backlog of FSRM requirements at installations with future construction projects. For troop housing requests, form 1391 should describe any FSRM conducted in the past two years. Likewise, future requirements for unaccompanied housing at the corresponding installation should be included. Additionally, the forms should include English equivalent measurements for projects presented in metric measurement. Rules for funding repairs of facilities under the Operation and Maintenance accounts are described below: (1) components of the facility may be repaired by replacement. Such replacement can be up to current standards or codes; (2) interior arrangements and restorations may be included as repair; (3) additions, new facilities, and functional conversions must be performed as military construction projects. Such projects may be done concurrently with repair projects as long as the final conjunctively funded project is a complete and usable facility; and (4) the appropriate service Secretary shall notify the appropriate committees 21 days prior to carrying out any repair project with an estimated cost in excess of $7,500,000. The Committee strongly encourages the Services and Defense agencies to indicate the plant replacement value of the facility to be repaired on each such notification. Directed designs.--The Committee directs DOD to execute all directed designs within the year of appropriation. Quarterly summary of notifications.--The Committee directs the services and the Office of the Secretary Defense (on behalf of itself and Defense agencies) to continue to submit a quarterly report listing all notifications that have been submitted to the Committees during the preceding three-month period. Transfer of funds to and from the Foreign Currency Fluctuations, Construction, Defense Account.--The Committee directs DOD to submit a quarterly report to the Committees on Appropriations of both Houses of Congress on the transfer of funds from military construction and family housing accounts to the Foreign Currency Fluctuations, Construction, Defense account. The report shall specify the amount transferred to the Foreign Currency account from each military construction and/or family housing account, and all other accounts for which an appropriation is provided in this Act, during the preceding fiscal quarter, and the amounts transferred from the Foreign Currency account to the above accounts during the same period. This report shall be submitted no later than 30 days after the close of each fiscal quarter. In addition, the Department of Defense shall notify the Committees on Appropriations of both Houses of Congress within 7 days of transferring any amount in excess of $10,000,000 to or from the Foreign Currency account. Reprogramming Guidelines.--The following reprogramming guidelines apply for all military construction and family housing projects. A project or account (including the sub- elements of an account) which has been specifically reduced by the Congress in acting on the budget request is considered to be a Congressional interest item and as such, prior approval is required. Accordingly, no reprogrammings to an item specifically reduced below the threshold by the Congress are permitted, except that the Department of Defense may seek reprogrammings for appropriated increments. The reprogramming criteria that apply to military construction projects (25 percent of the funded amount or $2,000,000, whichever is less) continue to apply to new housing construction projects and to improvements over $2,000,000. To provide the services the flexibility to proceed with construction contracts without disruption or delay, the costs associated with environmental hazard remediation such as asbestos removal, radon abatement, lead-based paint removal or abatement, and any other legislated environmental hazard remediation may be excluded, provided that such remediation requirements could not be reasonably anticipated at the time of the budget submission. This exclusion applies to projects authorized in this budget year, as well as projects authorized in prior years for which construction has not been completed. Planning and design costs associated with military construction and family housing projects may also be excluded from these guidelines. In instances where prior approval to a reprogramming request for a project or account has been received from the Committees on Appropriations of both Houses of Congress, the adjusted amount approved becomes the new base for any future increase or decrease via below-threshold reprogrammings (provided that the project or account is not a Congressional interest item as defined above). In addition to these guidelines, the services are directed to adhere to the guidance for military construction reprogrammings and notifications, including the pertinent statutory authorities contained in DOD Financial Management Regulation 7000.14-R and relevant updates and policy memoranda. The Committee further encourages the Office of the Director of National Intelligence to use a format similar to that used by the Office of the Secretary of Defense to submit reprogramming requests. Military Construction, Army Fiscal year 2010 enacted level (including rescissions) $3,456,419,000 Fiscal year 2011 budget request....................... 4,078,798,000 Committee recommendation in the bill.................. 4,051,512,000 Comparison with: Fiscal year 2010 enacted level.................... 595,093,000 Fiscal year 2011 budget request................... (27,286,000) The Committee recommends an appropriation of $4,051,512,000 for Military Construction, Army, an increase of $595,093,000 above the fiscal year 2010 enacted level and a decrease of $27,286,000 below the budget request. Of the funds provided for planning and design in this account, the Committee directs that not less than the specified amounts be made available for the design of the following projects: Texas-Fort Bliss, Alternative Energy Projects, $1,166,000. Texas-Fort Bliss, Rail Yard Improvements, $2,070,000. Texas--Fort Hood, Soldier Readiness Processing Center, $1,000,000. Virginia-Fort Belvoir, Growth Support Infrastructure, $3,060,000. Of the funds provided for minor construction in this account, the Committee directs that not less than the specified amounts be made available for construction of the following projects: Alabama-Fort Rucker, Emergency Medical Services Facility, $1,700,000. Maryland-Fort Meade, Infrastructure-Mapes Road and Cooper Avenue, $1,750,000. Army stationing decisions.--The Committee notes that the recent Government Accountability Office report (GAO-10-482) on service stationing decisions indicates that the Army has a defensible process for determining where new personnel and assets are to be located. The Committee remains concerned, however, that the Grow the Army Stationing Plan Update submitted by the Army in July 2009 leaves 13,917 soldiers unaccounted for in its current stationing dispositions. Given the somewhat turbulent history of the Grow the Army program and the new force structure requirements under the Quadrennial Defense Review, the Committee understands the Army's reluctance to provide a definitive answer regarding these personnel and the units/installations to which they may be assigned. The Committee therefore directs the Army to submit a report, or provide a briefing, to the Committees on Appropriations of both Houses of Congress describing how the Army intends to make future stationing decisions accounting for all personnel added under the Grow the Army program, as well as future unit stationing requirements stemming from the QDR. This report or briefing shall be submitted no later than March 1, 2011. Aviation Training Facility, Fort Eustis, Virginia.--The Committee urges the Army to consider including a project to expand the Aviation Training Facility at Fort Eustis, Virginia in the next Future Years Defense Program. The Army Aviation Logistics School currently is over 40 percent short of required space. The school has an annual throughput of nearly 6,000 soldiers and also provides training to Marine Corps, Air Force, and allied personnel on commonly used aircraft. This project would provide three new high-bay area additions and an applied instruction lab room addition to keep pace with current technology as well as training and safety standards. Military Construction, Navy and Marine Corps Fiscal year 2010 enacted level (including rescissions) $3,482,535,000 Fiscal year 2011 budget request....................... 3,879,104,000 Committee recommendation in the bill.................. 3,587,376,000 Comparison with: Fiscal year 2010 enacted level.................... 104,841,000 Fiscal year 2011 budget request................... (291,728,000) The Committee recommends an appropriation of $3,587,376,000 for Military Construction, Navy and Marine Corps, an increase of $104,841,000 above the fiscal year 2010 enacted level and a decrease of $291,728,000 below the budget request. Of the funds provided for planning and design in this account, the Committee directs that not less than the specified amounts be made available for the design of the following projects: Connecticut--New London NSB, Submarine Group Two Headquarters, $550,000. Indiana--Crane NSWC, Platform Protection Engineering Complex, $760,000. Prior to making a determination to shift USNS Comfort's homeport, USNS Comfort.--Prior to making a determination to shift USNS Comfort's homeport, the Navy shall conduct a cost-benefit analysis and study of the impact of such a shift on USNS Comfort's wartime and humanitarian missions and the manning of the military medical facilities which provide USNS Comfort's medical staff. The Secretary of the Navy shall certify that a homeport shift does not negatively impact cost, mission, or medical staffing flexibility. The Navy shall provide this study to the Congressional defense committees. Military Construction, Air Force Fiscal year 2010 enacted level (including rescissions) $1,348,835,000 Fiscal year 2011 budget request....................... 1,311,385,000 Committee recommendation in the bill.................. 1,276,385,000 Comparison with: Fiscal year 2010 enacted level.................... (72,450,000) Fiscal year 2011 budget request................... (35,000,000) The Committee recommends an appropriation of $1,276,385,000 for Military Construction, Air Force, a decrease of $72,450,000 below the fiscal year 2010 enacted level and a decrease of $35,000,000 below the budget request. Of the funds provided for planning and design in this account, the Committee directs that not less than the specified amounts be made available for the design of the following projects: Alabama--Maxwell AFB, Air Traffic Control Tower, $810,000. California--Travis AFB, BCE Maintenance Shops and Supply Warehouse, $387,000. Florida--MacDill AFB, Infrastructure Improvements, $249,000. Illinois--Scott AFB, New Fitness Facility, Phase 1, $396,000. North Dakota--Grand Forks AFB, Central Deployment Center, $495,000. Tennessee--Arnold AFB, Arnold Engineering Development Center Power Distribution Modernization, $378,000. Texas--Lackland AFB, Consolidated Security Forces Operations Center, Phase 1, $900,000. Of the funds provided for minor construction in this account, the Committee directs that not less than the specified amount be made available for the construction of the following project: Virginia--Langley AFB, Clear Zone Land Acquisition, Phase 1, $3,000,000. Air Force military construction.--The Committee notes that of the $1,496,203,000 requested for ``total force'' military construction supporting the Air Force, Air National Guard, and Air Force Reserve, the Air Force identifies approximately $184,000,000, or 12.3 percent, as supporting ``current mission priorities,'' with the remainder of funds devoted to new missions, support for the Combatant Commanders (COCOMs), joint basing requirements, or corporate initiatives such as reinvigorating the nuclear enterprise. The Chief of Staff of the Air Force has also indicated to the Committee for the past three years that the Air Force is taking risk in infrastructure in order to meet demands for aircraft modernization and personnel costs. The Committee is further concerned by the amount of military construction resources being made available to the Guard and Reserve. The Air Force Reserve request for fiscal year 2011 provides for a single major construction project. The Committee's recommendations are intended to partially remedy this situation by providing an additional $50,000,000 for the Air National Guard and an additional $30,000,000 for the Air Force Reserve through the Guard and Reserve Initiative. The Committee understands that the Air Force is undertaking a review of its military construction program for fiscal year 2012, and looks forward to stronger investment in Air Force facilities. The Committee further notes that the Air Force Future Years Defense Program contains an estimated future requirement of $564,000,000 to recapitalize facilities for the U.S. Strategic Command (STRATCOM), with funding anticipated to begin in fiscal year 2012, as well as an unspecified but probably large requirement to provide new facilities for the new U.S. Cyber Command (CYBERCOM). While the Committee reserves judgment on these requirements until funds are requested, it strongly believes that these COCOM headquarters requirements should not be borne by the Air Force to the detriment of its own recapitalization requirements. The Committee therefore urges Department of Defense and Air Force leadership to ensure that any STRATCOM and CYBERCOM military construction costs are treated as Department-wide priorities to be funded in addition to, and not as a subtraction from, Air Force military construction needs. Military Construction, Defense-Wide (INCLUDING TRANSFER OF FUNDS) Fiscal year 2010 enacted level (including rescissions) $2,849,251,000 Fiscal year 2011 budget request....................... 3,118,062,000 Committee recommendation in the bill.................. 2,999,612,000 Comparison with: Fiscal year 2010 enacted level.................... 150,361,000 Fiscal year 2011 budget request................... (118,450,000) The Committee recommends an appropriation of $2,999,612,000 for Military Construction, Defense-Wide, an increase of $150,361,000 above the fiscal year 2010 enacted level and a decrease of $118,450,000 below the budget request. Of the funds provided for planning and design in this account, the Committee directs that not less than the specified amount be made available for the design of the following project: Oklahoma--Tulsa IAP, Fuels Storage Complex, $1,036,000. Department of Defense (DOD) schools recapitalization.--The Committee commends the Department of Defense for its commitment to funding the recapitalization of more than half of its dependent schools by fiscal year 2015. The Committee expects that this funding will contribute greatly to the quality of life of military families. A comprehensive assessment of DOD dependent schools and construction requirements directed by the Committee in House Report 110-775 indicated that 149 of 189 schools had facilities with an overall condition rating of either Q3 (poor) or Q4 (failing) and required significant recapitalization efforts to eliminate space shortfalls and temporary facilities. The Committee recommends $438,746,000, the same as the budget request, for school construction activities and strongly encourages the Department to sustain and, if possible within the constraints of funding and executability, to accelerate this important initiative. Special Operations Command infrastructure.--The Committee understands that Special Operations Command (SOCOM) is in the process of forming a comprehensive master plan for the infrastructure within its area of responsibility. The Committee notes the extraordinary demands placed upon special operations personnel by ongoing overseas contingency operations, and urges SOCOM to brief the Committee on the results of this master planning process at the earliest possible date. Energy Conservation Investment Program.--The Committee recommends $130,000,000 for the Energy Conservation Investment Program (ECIP), an increase of $10,000,000 above the budget request. The Committee also directs that no less than $5,000,000 of funds available for Defense-Level Activities planning and design in this account shall be available for ECIP. The Committee supports ECIP goals to improve energy conservation, increase renewable energy production, and enhance installation energy security. At the same time, the Committee believes that the program lacks rigorous performance standards that effectively balance these goals and provide more effective means by which to prioritize projects and allocate appropriated funds. Currently, funding is allocated to the services and components on a ``fair share'' basis, using non-mobility installation energy consumption from the previous year combined with the ECIP obligation rate for the last five fiscal years. Projects are prioritized by a combination of savings to investment ratio (SIR), simple payback target of less than ten years, and the priorities stipulated by legislation and Executive Orders such as reducing energy consumption and greenhouse gas emissions while increasing the use of renewable energy. According to DOD, the percentage of renewable energy projects grew from 25 percent to 52 percent of total funded projects between 2007 and 2009. These projects generally have longer payback profiles and therefore have reduced the overall SIR from 4:1 to 2.4:1. The Committee believes that the Department needs to present a more coherent strategy for balancing competing priorities and allocating funds among the services according to performance- based, rather than input-based, methods. The Committee therefore directs the Deputy Under Secretary for Installations and Environment to provide a report to the Committee on options for reforming performance standards and funding allocation methods to ensure that ECIP funding is applied with maximum effectiveness. This report shall be submitted to the Congressional defense committees no later than March 1, 2011. Military Construction, Army National Guard Fiscal year 2010 enacted level (including rescissions) $549,056,000 Fiscal year 2011 budget request....................... 873,664,000 Committee recommendation in the bill.................. 1,020,228,000 Comparison with: Fiscal year 2010 enacted level.................... 471,172,000 Fiscal year 2011 budget request................... 146,564,000 The Committee recommends an appropriation of $1,020,228,000 for Military Construction, Army National Guard, an increase of $471,172,000 above the fiscal year 2010 enacted level and an increase of $146,564,000 above the budget request. The Committee's recommendation includes $60,000,000 for critical unfunded requirements to support the Guard and Reserve Initiative described earlier in this report. Of the funds provided for planning and design in this account, the Committee directs that not less than the specified amounts be made available for the design of the following projects: Arkansas--Camp Robinson, Regional Training Institute, Phase 2, $2,334,000. Iowa--Camp Dodge, Regional Training Institute, Phase 1, $800,000. Kentucky--Frankfort, Joint Forces Headquarters, Phase 1, $281,000. Maryland--Easton, Readiness Center Addition/Alteration, $347,000. Michigan--Fort Custer (Augusta), Troop Service Support Center, $446,000. Minnesota--Mankato, Field Maintenance Shop, $947,000. North Carolina--Camp Butner, Barracks (AT), Phase 1, $1,484,000. North Carolina--Murphy, Fire Fighting Team Support Facility, $223,000. Oregon--Salem, Armed Forces Reserve Center Addition/ Alteration (JFHQ), $1,243,000. Pennsylvania--Hermitage, Readiness Center, $671,000. Pennsylvania--Tobyhanna, Armed Forces Reserve Center, $1,513,000. Pennsylvania--Williamsport, Field Maintenance Shop, $1,508,000. Rhode Island--Quonset Point, Readiness Center, $3,729,000. Texas--Laredo, Receiving, Staging, and Onward Integration Facility/Hangar, $475,000. Texas--McLennan County, Operational Reserve Headquarters, $5,000,000. Texas--South Texas Training Center, Cantonment and Support Infrastructure, $5,000,000. West Virginia--Bridgeport, Fixed Wing Army Aviation Training Site (FWAATS) Expansion, $2,000,000. Guam--Barrigada, Joint Forces Headquarters Readiness Center Addition/Alteration, $778,000. Of the funds provided for minor construction in this account, the Committee directs that not less than the specified amounts be made available for construction of the following projects: California--Sacramento, Field Maintenance Shop Paving, $891,000. California--Ventura, Renewable Photovoltaic Solar Power, $1,466,000. Iowa--Iowa City, Simulation Center/MVSB/Helipad/Parking, $1,999,000. Ohio--Ravenna Training Site, Unit Training Equipment Site Addition/Alteration, $2,000,000. West Virginia--Bridgeport, Fixed Wing Army Aviation Training Site (FWAATS) Apron Expansion, $2,000,000. West Virginia--Glen Jean, Emergency Power Generator, $1,500,000. Military Construction, Air National Guard Fiscal year 2010 enacted level (including rescissions) $364,226,000 Fiscal year 2011 budget request....................... 176,986,000 Committee recommendation in the bill.................. 292,386,000 Comparison with: Fiscal year 2010 enacted level.................... (71,840,000) Fiscal year 2011 budget request................... 115,400,000 The Committee recommends an appropriation of $292,386,000 for Military Construction, Air National Guard, a decrease of $71,840,000 below the fiscal year 2010 enacted level and an increase of $115,400,000 above the budget request. The Committee's recommendation includes $50,000,000 for critical unfunded requirements to support the Guard and Reserve Initiative described earlier in this report. Of the funds provided for planning and design in this account, the Committee directs that not less than the specified amounts be made available for the design of the following projects: Kentucky--Standiford Field, Contingency Response Group Facility, $534,000. Louisiana--New Orleans NAS/JRB, ASA Replace Alert Complex, $2,000,000. Pennsylvania--Fort Indiantown Gap, Multipurpose Air National Guard Training Facility, $675,000. South Dakota--Joe Foss Field, Aircraft Maintenance Shops, $3,600,000. Of the funds provided for minor construction in this account, the Committee directs that not less than the specified amount be made available for construction of the following project: California--Moffett Field, Relocate Main Gate, $2,000,000. Military Construction, Army Reserve Fiscal year 2010 enacted level........................ $431,566,000 Fiscal year 2011 budget request....................... 318,175,000 Committee recommendation in the bill.................. 358,325,000 Comparison with: Fiscal year 2010 enacted level.................... (73,241,000) Fiscal year 2011 budget request................... 40,150,000 The Committee recommends an appropriation of $358,325,000 for Military Construction, Army Reserve, a decrease of $73,241,000 below the fiscal year 2010 enacted level and an increase of $40,150,000 above the budget request. The Committee's recommendation includes $30,000,000 for critical unfunded requirements to support the Guard and Reserve Initiative described earlier in this report. Military Construction, Navy Reserve Fiscal year 2010 enacted level........................ $125,874,000 Fiscal year 2011 budget request....................... 61,557,000 Committee recommendation in the bill.................. 91,557,000 Comparison with: Fiscal year 2010 enacted level.................... (34,317,000) Fiscal year 2011 budget request................... 30,000,000 The Committee recommends an appropriation of $91,557,000 for Military Construction, Navy Reserve, a decrease of $34,317,000 below the fiscal year 2010 enacted level and an increase of $30,000,000 above the budget request. The Committee's recommendation includes $15,000,000 for critical unfunded requirements for the Navy Reserve, and $15,000,000 for critical unfunded requirements for the Marine Corps Reserve, to support the Guard and Reserve Initiative described earlier in this report. Military Construction, Air Force Reserve Fiscal year 2010 enacted level........................ $112,269,000 Fiscal year 2011 budget request....................... 7,832,000 Committee recommendation in the bill.................. 48,182,000 Comparison with: Fiscal year 2010 enacted level.................... (64,087,000) Fiscal year 2011 budget request................... 40,350,000 The Committee recommends an appropriation of $48,182,000 for Military Construction, Air Force Reserve, a decrease of $64,087,000 below the fiscal year 2010 enacted level and an increase of $40,350,000 above the budget request. The Committee's recommendation includes $30,000,000 to support the Guard and Reserve Initiative described earlier in this report. North Atlantic Treaty Organization Security Investment Program Fiscal year 2010 enacted level........................ $197,414,000 Fiscal year 2011 budget request....................... 258,884,000 Committee recommendation in the bill.................. 258,884,000 Comparison with: Fiscal year 2010 enacted level.................... 61,470,000 Fiscal year 2011 budget request................... - - - The North Atlantic Treaty Organization Security Investment Program (NSIP) consists of annual contributions by NATO member countries. The program finances the costs of construction needed to support the roles of the major NATO commands. The investments cover facilities such as airfields, fuel pipelines and storage, harbors, communications and information systems, radar and navigational aids, and military headquarters, both within NATO nations and for ``out of area'' operations such as Afghanistan. The Committee recommends an appropriation of $258,884,000 for NSIP, an increase of $61,470,000 above the fiscal year 2010 enacted level and the same as the budget request. The U.S. occasionally has been forced to temporarily delay the authorization of projects due to shortfalls in U.S. obligation authority. The Committee directs the Secretary of Defense to notify the Committee within 14 days of the U.S. taking action to temporarily delay the authorization of projects, or to temporarily withhold funds from previously authorized projects, due to shortfalls in U.S. obligation authority. Family Housing Overview Fiscal year 2010 enacted level........................ $2,258,698,000 Fiscal year 2011 budget request....................... 1,823,191,000 Committee recommendation in the bill.................. 1,823,191,000 Comparison with: Fiscal year 2010 enacted level.................... (435,507,000) Fiscal year 2011 budget request................... - - - Family housing construction accounts provide funds for new construction, construction improvements, the Federal government costs for family housing privatization projects, and planning and design. The operation and maintenance accounts provide funds to pay for maintenance and repair, furnishings, management, services, utilities, leasing, interest, mortgage insurance, and miscellaneous expenses. The Committee recommends a total appropriation of $1,823,191,000 for the family housing construction, family housing operation and maintenance, and homeowners assistance accounts, a decrease of $435,507,000 below the fiscal year 2010 enacted level and the same as the budget request. The decrease below the 2010 enacted level is due partly to the Department of Defense's success in implementing the Military Housing Privatization Initiative, which has generated approximately $27,000,000,000 in family housing development on military installations and reduced the requirement for appropriated construction and operating costs. The Committee encourages the Department, where feasible, to utilize energy efficient, environmentally friendly, and easily deployable composite building materials in new family housing construction. Family housing privatization progress reports.--The Committee directs the Department of Defense to continue submitting semi-annual progress reports on the family housing privatization program, including a breakout of military tenant satisfaction rates by project. Foreign currency savings and sub-account transfers.--The Committee directs that savings in family housing operation and maintenance accounts from foreign currency re-estimates be used to maintain and repair existing family housing units. The Comptroller is directed to report to the Committees on Appropriations of both Houses of Congress on how these savings are allocated by December 1, 2010. In addition, the Committee directs the Services and Defense agencies to notify the Committees on Appropriations of both Houses of Congress within 30 days of a transfer of funds between subaccounts within the family housing construction and family housing operation and maintenance accounts, if such transfer is in excess of 10 percent of the funds appropriated to the sub-account to which the funds are being transferred. Notifications to the Committees shall indicate the sub-accounts and amounts that are being used to source the transfer. Leasing reporting requirements.--The Secretary of Defense is directed to report to the Committees on Appropriations of both Houses of Congress quarterly on the details of all new or renewed domestic leases entered into during the previous quarter that exceed the cost threshold set by 10 U.S.C. 2828(b)(2), including certification that less expensive housing was not available for lease. For foreign leases, the Department is directed to: (1) perform an economic analysis on all new leases or lease/contract agreements where more than 25 units are involved; (2) report the details of new or renewed lease agreements that exceed the cost threshold set by 10 U.S.C. 2828(e)(1) 21 days prior to entering into such an agreement; and (3) base leasing decisions on the economic analysis. Family Housing Construction, Army Fiscal year 2010 enacted level........................ $273,236,000 Fiscal year 2011 budget request....................... 92,369,000 Committee recommendation in the bill.................. 92,369,000 Comparison with: Fiscal year 2010 enacted level.................... (180,867,000) Fiscal year 2011 budget request................... - - - The Committee recommends an appropriation of $92,369,000 for Family Housing Construction, Army, a decrease of $180,867,000 below the fiscal year 2010 enacted level and the same as the budget request. The appropriation includes $55,329,000 to construct new family housing units, $35,000,000 to improve or privatize existing units, and $2,040,000 for planning and design. Family Housing Operation and Maintenance, Army Fiscal year 2010 enacted level........................ $523,418,000 Fiscal year 2011 budget request....................... 518,140,000 Committee recommendation in the bill.................. 518,140,000 Comparison with: Fiscal year 2010 enacted level.................... (5,278,000) Fiscal year 2011 budget request................... - - - The Committee recommends an appropriation of $518,140,000 for Family Housing Operation and Maintenance, Army, a decrease of $5,278,000 below the fiscal year 2010 enacted level and the same as the budget request. Family Housing Construction, Navy and Marine Corps Fiscal year 2010 enacted level........................ $146,569,000 Fiscal year 2011 budget request....................... 186,444,000 Committee recommendation in the bill.................. 186,444,000 Comparison with: Fiscal year 2010 enacted level.................... 39,875,000 Fiscal year 2011 budget request................... - - - The Committee recommends an appropriation of $186,444,000 for Family Housing Construction, Navy and Marine Corps, an increase of $39,875,000 above the fiscal year 2010 enacted level and the same as the budget request. The appropriation includes $37,169,000 to construct new family housing units, $146,020,000 to improve or privatize existing units, and $3,255,000 for planning and design. Family Housing Operation and Maintenance, Navy and Marine Corps Fiscal year 2010 enacted level........................ $368,540,000 Fiscal year 2011 budget request....................... 366,346,000 Committee recommendation in the bill.................. 366,346,000 Comparison with: Fiscal year 2010 enacted level.................... (2,194,000) Fiscal year 2011 budget request................... - - - The Committee recommends an appropriation of $366,346,000 for Family Housing Operation and Maintenance, Navy and Marine Corps, a decrease of $2,194,000 below the fiscal year 2010 enacted level and the same as the budget request. Family Housing Construction, Air Force Fiscal year 2010 enacted level........................ $66,101,000 Fiscal year 2011 budget request....................... 78,025,000 Committee recommendation in the bill.................. 78,025,000 Comparison with: Fiscal year 2010 enacted level.................... 11,924,000 Fiscal year 2011 budget request................... - - - The Committee recommends an appropriation of $78,025,000 for Family Housing Construction, Air Force, an increase of $11,924,000 above the fiscal year 2010 enacted level and the same as the budget request. The appropriation includes $73,800,000 to improve or privatize existing units and $4,225,000 for planning and design. Family Housing Operation and Maintenance, Air Force Fiscal year 2010 enacted level........................ $502,936,000 Fiscal year 2011 budget request....................... 513,792,000 Committee recommendation in the bill.................. 513,792,000 Comparison with: Fiscal year 2010 enacted level.................... 10,856,000 Fiscal year 2011 budget request................... - - - The Committee recommends an appropriation of $513,792,000 for Family Housing Operation and Maintenance, Air Force, an increase of $10,856,000 above the fiscal year 2010 enacted level and the same as the budget request. Family Housing Operation and Maintenance, Defense-Wide Fiscal year 2010 enacted level........................ $49,214,000 Fiscal year 2011 budget request....................... 50,464,000 Committee recommendation in the bill.................. 50,464,000 Comparison with: Fiscal year 2010 enacted level.................... 1,250,000 Fiscal year 2011 budget request................... - - - The Committee recommends an appropriation of $50,464,000 for Family Housing Operation and Maintenance, Defense-Wide, an increase of $1,250,000 above the fiscal year 2010 enacted level and the same as the budget request. Department of Defense Family Housing Improvement Fund Fiscal year 2010 enacted level........................ $2,600,000 Fiscal year 2011 budget request....................... 1,096,000 Committee recommendation in the bill.................. 1,096,000 Comparison with: Fiscal year 2010 enacted level.................... (1,504,000) Fiscal year 2011 budget request................... - - - The Family Housing Improvement Fund (FHIF) is authorized by section 2883, title 10, United States Code, and provides the Department of Defense with authority to finance joint ventures with the private sector to revitalize and to manage the Department's housing inventory. The statute authorizes the Department to use limited partnerships, make direct and guaranteed loans, and convey Department-owned property to stimulate the private sector to increase the availability of affordable, quality housing for military personnel. The FHIF is used to build or renovate family housing by using various legal authorities, and by utilizing private capital and expertise to the maximum extent possible. The fund is administered as a single account without fiscal year limitations and contains directly appropriated and transferred funds from family housing construction accounts. The Committee recommends an appropriation of $1,096,000 for the Department of Defense Family Housing Improvement Fund, a decrease of $1,504,000 below the fiscal year 2010 enacted level and the same as the budget request. Department of Defense Homeowners Assistance Fund Fiscal year 2010 enacted level........................ $323,225,000 Fiscal year 2011 budget request....................... 16,515,000 Committee recommendation in the bill.................. 16,515,000 Comparison with: Fiscal year 2010 enacted level.................... (306,710,000) Fiscal year 2011 budget request................... - - - The Homeowners Assistance Fund account finances the Homeowners Assistance Program (HAP), which provides assistance to individual military and Federal civilian homeowners who sustain losses on the sales of their primary residences due to declining real estate markets attributable to the closure or realignment of military installations, as well as the temporary expansion of the program to include military homeowners adversely affected by the housing crisis and the permanent extension of benefits to wounded warriors and surviving spouses. This non-expiring revolving fund receives funding from several sources, including appropriations, borrowing authority, reimbursable authority, prior fiscal year unobligated balances, appropriation transfers, revenue from sale of acquired properties, and recovery of prior year obligations. The Committee recommends an appropriation of $16,515,000 for the Department of Defense Homeowners Assistance Fund, a decrease of $306,710,000 below the fiscal year 2010 enacted level and the same as the budget request. Chemical Demilitarization Construction, Defense-Wide Fiscal year 2010 enacted level........................ $151,541,000 Fiscal year 2011 budget request....................... 124,971,000 Committee recommendation in the bill.................. 124,971,000 Comparison with: Fiscal year 2010 enacted level.................... (26,570,000) Fiscal year 2011 budget request................... - - - The Chemical Demilitarization Construction, Defense-Wide account provides funds for the design and construction of full- scale chemical disposal facilities and associated projects to upgrade installation support facilities and infrastructures required to support the Chemical Demilitarization program. The Committee recommends an appropriation of $124,971,000 for Chemical Demilitarization Construction, Defense-Wide, a decrease of $26,570,000 below the fiscal year 2010 enacted level and the same as the budget request. Base Realignment and Closure Account 1990 Fiscal year 2010 enacted level........................ $496,768,000 Fiscal year 2011 budget request....................... 360,474,000 Committee recommendation in the bill.................. 460,474,000 Comparison with: Fiscal year 2010 enacted level.................... (36,294,000) Fiscal year 2011 budget request................... 100,000,000 The Committee recommends an appropriation of $460,474,000 for the Base Realignment and Closure Account 1990, a decrease of $36,294,000 below the fiscal year 2010 enacted level and an increase of $100,000,000 above the budget request. Of the amount provided above the budget request, the Committee directs that $40,000,000 shall be made available to the Army, and $60,000,000 shall be made available to the Navy. The Committee directs the Army and Navy separately to submit spending plans for these funds no later than 30 days following the enactment of this Act. The Committee remains concerned by the Department of Defense's lack of budgetary commitment to this program. Requests for environmental cleanup frequently reflect no more than the minimal level to satisfy legal mandates. Department officials testified before the Committee that significant contract savings are being realized within the program, yet the budget request fails to fully avail the opportunities presented by such savings with an increased level of effort. Base Realignment and Closure Account 2005 Fiscal year 2010 enacted level........................ $7,455,498,000 Fiscal year 2011 budget request....................... 2,354,285,000 Committee recommendation in the bill.................. 2,354,285,000 Comparison with: Fiscal year 2010 enacted level.................... (5,101,213,000) Fiscal year 2011 budget request................... - - - The Committee recommends an appropriation of $2,354,285,000 for the Base Realignment and Closure Account 2005, a decrease of $5,101,213,000 below the fiscal year 2010 enacted level and the same as the budget request. This funding supports the most recent base realignment and closure round which affects over 800 installations and locations through 24 major closures, 24 major realignments, and 765 other actions. Mark Center office complex, Alexandria, Virginia.--The Committee is concerned by the potential traffic impacts of the new office complex under construction at the Mark Center site in Alexandria, Virginia, to implement BRAC recommendation 133. The Committee is aware that the Virginia Department of Transportation has completed an analysis demonstrating a severe impact on the surrounding transportation network from the daily ingress and egress of approximately 6,400 Department of Defense personnel upon full implementation of the BRAC recommendation. The Committee therefore strongly urges the Secretary of Defense to limit occupancy of parking spaces at this facility and in the immediate vicinity to no more than 1,000 until the Secretary completes a viable transportation plan and certifies to the Committees on Appropriations that construction has been completed to provide adequate ingress to, and egress from, the Mark Center office complex. The Committee directs the Secretary of Defense to submit a viable transportation plan that, at minimum, provides for the ingress and egress of all personnel to and from the office complex without further reducing the level of service at the following six intersections: (1) the intersection of Beauregard Street and Mark Center Drive; (2) the intersection of Beauregard Street and Seminary Road; (3) the intersection of Seminary Road and Mark Center Drive; (4) the intersection of Seminary Road and the northbound entrance- ramp to I-395; (5) the intersection of Seminary Road and the northbound exit-ramp from I-395; and (6) the intersection of Seminary Road and the southbound exit-ramp from I-395. This report shall be submitted no later than June 15, 2011. The Committee further directs the Department of Defense Inspector General (DOD-IG) to submit a report evaluating the sufficiency and coordination conducted in completing the requisite environmental studies associated with the site selection for the BRAC 133 project pursuant to the National Environmental Policy Act of 1969, with specific attention to the transportation determinations associated with the project; further, the DOD-IG shall review and provide comment upon the Secretary of Defense's transportation plan and the Secretary's efforts to limit the occupancy of parking spaces pending the implementation of such plan. This report shall be submitted no later than June 15, 2011. Administrative Provisions The bill includes 27 provisions that were included in the fiscal year 2010 enacted appropriations bill. The administrative provisions included in the bill are as follows: Section 101 prohibits the use of funds for payments under a cost-plus-a-fixed-fee contract for construction where cost estimates exceed $25,000. An exception for Alaska is provided. Section 102 permits the use of construction funds for the hire of passenger motor vehicles. Section 103 permits funds to be expended on the construction of defense access roads under certain circumstances. Section 104 prohibits construction of new bases in the United States without a specific appropriation. Section 105 limits the use of funds for the purchase of land or land easements that exceed 100 percent of value except under certain conditions. Section 106 prohibits the use of funds to acquire land, prepare sites, or install utilities for family housing except housing for which funds have been appropriated. Section 107 limits the use of minor construction funds to relocate any activity from one installation to another without prior notification. Section 108 prohibits the procurement of steel unless American producers, fabricators, and manufacturers have been allowed to compete. Section 109 prohibits the use of funds to pay real property taxes in foreign nations. Section 110 prohibits the use of funds to initiate a new installation overseas without prior notification. Section 111 establishes a preference for United States architectural and engineering services where the services are in Japan, NATO member countries, or countries within the United States Central Command area of responsibility. The Administration proposed to delete this provision. Section 112 establishes a preference for United States contractors for military construction in the United States territories and possessions in the Pacific and on Kwajalein Atoll, or countries within the United State Central Command area of responsibility, except bids by Marshallese contractors for military construction on Kwajalein Atoll. Section 113 requires the Secretary of Defense to give prior notice to Congress of military exercises where construction costs, either temporary or permanent, exceed $100,000. The Administration proposed to delete this provision. Section 114 limits obligations of funds made available for one fiscal year to no more than 20 percent during the last two months of the fiscal year. The Administration proposed to delete this provision. Section 115 allows funds appropriated in prior years to be used for new projects authorized during the current session of Congress. Section 116 allows the use of expired or lapsed funds to pay the cost of supervision for any project being completed with lapsed funds. Section 117 provides that funds for military construction projects are available until the end of the fourth fiscal year following the fiscal year in which funds are appropriated, subject to certain conditions. (INCLUDING TRANSFER OF FUNDS) Section 118 allows for the transfer of proceeds from ``Base Realignment and Closure Account, Part I'' to the continuing Base Realignment and Closure accounts. (INCLUDING TRANSFER OF FUNDS) Section 119 allows for the transfer of funds from Family Housing, Construction accounts to the Department of Defense Family Housing Improvement Fund and funds from Military Construction accounts to the Department of Defense Military Unaccompanied Housing Improvement Fund. Section 120 requires the secretaries of the military departments to notify Congressional Committees sixty days prior to issuing a solicitation for a contract with the private sector for military family housing. The Administration proposed to delete this provision. (INCLUDING TRANSFER OF FUNDS) Section 121 provides transfer authority to the Homeowners Assistance Program. Section 122 requires that funds in this title be the sole source of all operation and maintenance for flag and general officer quarter houses, and limits the repair on these quarters to $35,000 per year without notification. The Administration proposed a modification to this provision, which is not adopted. Section 123 makes funds in the Ford Island Improvement Fund available until expended. Section 124 prohibits the use of funds for military construction, family housing, or land acquisition projects at installations closed or realigned under BRAC, except under certain conditions. The Administration proposed to delete this provision. (INCLUDING TRANFER OF FUNDS) Section 125 allows the transfer of expired funds to the ``Foreign Currency Fluctuations, Construction, Defense'' account. Section 126 prohibits the use of funds for any action related to the expansion of Pinon Canyon Maneuver Site, Colorado. The Administration proposed to delete this provision. Section 127 allows for the reprogramming of construction funds among projects and activities. The Administration proposed to delete this provision. TITLE II DEPARTMENT OF VETERANS AFFAIRS Fiscal year 2010 enacted level\1\................. $109,607,626,000 Fiscal year 2011 budget request\1\................ 120,815,464,000 Committee recommendation in the bill\1\........... 120,812,964,000 Comparison with: Fiscal year 2010 enacted level................ 11,205,338,000 Fiscal year 2011 budget request............... (2,500,000) Fiscal year 2012 advance budget request\1\........ 50,610,985,000 Fiscal year 2012 Committee recommendation in the 50,610,985,000 bill\1\.......................................... \1\All funding cited excludes amounts in the Medical Care Collections Fund. The Department of Veterans Affairs (VA) serves almost 59 million people--23,100,000 veterans and 35,200,000 family members of living veterans or survivors of deceased veterans. This group constitutes almost 20 percent of the United States population. To serve adequately the nation's veterans, the VA employs more than 284,000 people, making it one of the largest Federal agencies in terms of employment. The Committee recommends a total of $120,812,964,000 in budget authority for programs in fiscal year 2011, an increase of $11,205,338,000 or 10.2 percent above the fiscal year 2010 enacted level and $2,500,000 below the budget request. In addition, advance appropriations of $50,610,985,000 are provided for fiscal year 2012. The funds recommended provide compensation payments to 3,815,081 veterans with service-connected disabilities and survivors of deceased veterans; pension payments to 503,039 non-service-connected disabled veterans, widows, and children in need of financial assistance; education training, tuition assistance, and vocational assistance to 778,111 veterans, servicemembers, and reservists, and 83,207 eligible dependents of deceased veterans or seriously disabled veterans; housing credit assistance in the form of 240,117 guaranteed loans to veterans and servicemembers; administration or supervision of life insurance programs with 6,918,910 policies for veterans and active duty servicemembers providing coverage of $1,336,891,080,000; inpatient care and treatment of beneficiaries in 153 hospitals, 54 domiciliary residential rehabilitation treatment programs, 135 nursing homes, 299 Vet Centers, 50 mobile Vet Centers, and 849 outpatient clinics, which include independent, satellite, community-based, and rural outreach clinics. Workload at the various medical facilities of the VA is projected to be 86,964,000 outpatient visits and 964,500 inpatient stays in fiscal year 2011. The funding recommended also pays for administration of the National Cemetery Administration for burial of eligible veterans, servicemembers and their survivors. Veteran-owned small businesses.--The Committee supports the VA program to purchase goods and services from veteran-owned small businesses. However, the Committee believes that better monitoring and verification of veteran ownership is necessary and requests a report by March 1, 2011 identifying: the number of self-representing businesses as well as the number of businesses that have submitted for verification which are at least 51 percent owned and controlled by veterans or service- disabled veterans; the number of self-representing businesses and the number of businesses which have submitted for verification that meet Federal small business size standards; the VA's current ranking versus the 3 percent subcontract and prime contract goals; current efforts to promote the formation and expansion of verified veteran-owned businesses; and current efforts to verify ownership and control of veteran-owned businesses. The Committee requests that the report disaggregate the data to identify demographics of veteran-owned versus service-disabled veteran-owned small businesses. Environmental sustainability goals.--The Department currently submits information to Congress through the Department of Energy and the Office of Management and Budget on its progress in meeting several environmental sustainability goals established by Executive Order 13514, including the: (1) 2020 greenhouse gas emissions reduction target; (2) 30 percent reduction in vehicle fleet petroleum use by 2020; (3) 26 percent improvement in water efficiency by 2020; (4) 50 percent recycling and waste diversion by 2015; and (5) the goal that 95 percent of all applicable contracts will meet sustainability requirements. Not later than 180 days after the enactment of this Act, the Committee directs that the Department report to the Committee information on the Department's progress in meeting the other requirements of the Executive Order: (1) implementation of the 2030 net-zero-energy building requirement; (2) implementation of the stormwater provisions of the Energy Independence and Security Act of 2007, section 438; and (3) development of guidance for sustainable Federal building locations in alignment with the Livability Principles put forward by the Department of Housing and Urban Development, the Department of Transportation, and the Environmental Protection Agency. Filipino Veterans.--The Committee commends the VA for promptly processing the benefits of Filipino veterans who aided American troops in World War II, as authorized in the 2009 American Recovery and Reinvestment Act, but is concerned about reports that possibly legitimate claims have been denied. The Committee encourages the VA to continue to process claims expeditiously to distribute the designated funding of $198,000,000 by the October 1, 2010 deadline and to review its current practices to ensure that all claims are reviewed in a fair and thorough manner. The Committee requests that the VA submit a report on the status of awarded, pending, and denied claims by December 1, 2010. Asian Americans and Pacific Islanders (AAPIs).--The Committee is pleased with the re-establishment of the White House Initiative on Asian Americans and Pacific Islanders and recognizes the importance of its broad mission to improve their quality of life through increased participation in Federal programs in which they may be underrepresented. The Committee expects the VA to join with other Federal departments, agencies, and offices to contribute resources, including time, personnel, and expertise, to ensure the success of the Initiative in increasing AAPI access and participation in Federal programs. Veterans Benefits Administration COMPENSATION AND PENSIONS (INCLUDING TRANSFER OF FUNDS) Fiscal year 2010 enacted level........................ $47,396,106,000 Fiscal year 2011 budget request....................... 53,492,234,000 Committee recommendation in the bill.................. 53,492,234,000 Comparison with: Fiscal year 2010 enacted level.................... 6,096,128,000 Fiscal year 2011 budget request................... - - - This appropriation provides funds for service-connected compensation payments to an estimated 3,816,000 veterans, survivors, and dependents. In addition, pension payments are funded for 309,000 veterans and 194,000 survivors. The average cost per compensation case for veterans in 2011 is estimated at $12,354, and pension payments are projected at a unit cost of $10,816. The Committee recommends an appropriation of $53,492,234,000 for compensation, pension, and burial benefits, an increase of $6,096,128,000 above the fiscal year 2010 enacted level and the same as the budget request. The appropriation includes authority to transfer funding not to exceed $30,424,000, of which $10,435,000 is for the General Operating Expenses account, $10,874,000 is for the Medical Support and Compliance account, and $9,115,000 is for the Information Technology Systems account. These funds are for the administrative expenses of implementing cost-saving provisions required by the Omnibus Budget Reconciliation Act of 1990, Public Law 101-508, the Veterans' Benefits Act of 1992, Public Law 102-568, and the Veterans' Benefits Improvements Act of 1994, Public Law 103-446. These cost-saving provisions include verifying pension income against Internal Revenue Service (IRS) and Social Security Administration (SSA) data; establishing a match with the SSA to obtain verification of Social Security numbers; and applying the VA pension cap for Medicaid-eligible single veterans and surviving spouses alone in Medicaid-covered nursing homes. The bill also continues to include language permitting this appropriation to reimburse such sums as may be earned to the Medical Care Collections Fund to help defray the operating expenses of individual medical facilities for nursing home care provided to pensioners. Plot allowances.--The Committee is concerned about the eroding value of the plot allowance and burial benefits provided to the Nation's veterans. Because the benefits are not indexed to inflation, their value continues to diminish each year since the last increase provided in 2001. As a result, families and state veterans' cemeteries have been left to cover the increasing costs. The Committee directs the Department to assess the viability of increasing the plot allowance and burial benefits to cover the same percentage of veterans' burial costs that they covered in 1973, when they were initiated. READJUSTMENT BENEFITS Fiscal year 2010 enacted level........................ $9,232,369,000 Fiscal year 2011 budget request....................... 10,440,245,000 Committee recommendation in the bill.................. 10,440,245,000 Comparison with: Fiscal year 2010 enacted level.................... 1,207,876,000 Fiscal year 2011 budget request................... - - - This appropriation finances the education and training of veterans and servicemembers whose initial entry to active duty took place on or after July 1, 1985. These benefits are included in the All-Volunteer Force Educational Assistance Program, for which eligibility began in 1987. Basic benefits are funded through appropriations made to the Readjustment Benefits appropriation and transfers from the Department of Defense. Supplemental education benefits are also provided to certain veteran members of the Selected Reserve and are funded through transfers from the Department of Defense. This account also includes the cost of education benefits for servicemembers whose service took place on or after September 11, 2001. In addition, certain disabled veterans are provided with vocational rehabilitation, specially adapted housing grants, and grants for automobiles with approved adaptive equipment. This account also finances educational assistance allowances for eligible dependents of veterans who died from service-connected causes or have a total and permanent service- connected disability, as well as dependents of servicemembers who were captured or are missing in action. The Committee recommends an appropriation of $10,440,245,000 for Readjustment Benefits, an increase of $1,207,876,000 above the fiscal year 2010 enacted level and the same as the budget request. The significant funding increase is a result of continuing implementation of the Post 9/11 GI Bill (chapter 33). Wounded warriors on campus.--The Committee encourages the VA to work with colleges and universities to create programs to support the successful post-war adjustment and social reintegration of wounded veteran students. The completion of initial medical treatment and subsequent discharge from active duty status often present additional challenges to wounded military personnel as they become full time students. These wounded veterans often need specialized physical and mental rehabilitation, career counseling, skills or placement testing, and academic mentoring. The VA is encouraged to work with accredited colleges to strengthen existing programs and to develop new pilot programs that integrate these resources across campus. VETERANS INSURANCE AND INDEMNITIES Fiscal year 2010 enacted level........................ $49,288,000 Fiscal year 2011 budget request....................... 62,589,000 Committee recommendation in the bill.................. 62,589,000 Comparison with: Fiscal year 2010 enacted level.................... 13,301,000 Fiscal year 2011 budget request................... - - - The Veterans Insurance and Indemnities appropriation is made up of the former appropriations for military and naval insurance, applicable to World War I veterans; national service life insurance (NSLI), applicable to certain World War II veterans; servicemen's indemnities, applicable to Korean conflict veterans; and the veterans mortgage life insurance, applicable to individuals who have received a grant for specially adapted housing. The Committee recommends an appropriation of $62,589,000 for Veterans Insurance and Indemnities, an increase of $13,301,000 above the fiscal year 2010 enacted level and the same as the budget request. The amount provided will enable the Department to transfer funding to the service-disabled veterans insurance fund and transfer additional amounts for payments for policies under the veterans mortgage life insurance program. These policies are identified under the Veterans Insurance and Indemnity appropriation since they provide insurance to service-disabled veterans unable to qualify under basic NSLI. VETERANS HOUSING BENEFIT PROGRAM FUND PROGRAM ACCOUNT ---------------------------------------------------------------------------------------------------------------- Limitation on direct loans for Administrative Program account specially adapted expenses housing loans ---------------------------------------------------------------------------------------------------------------- Fiscal year 2010 enacted level......................... $23,553,000 $500,000 $165,082,000 Fiscal year 2011 budget request........................ 19,078,000 500,000 163,646,000 Committee recommendation in the bill................... 19,078,000 500,000 163,646,000 Comparison with: Fiscal year 2010 enacted level..................... -4,475,000 - - - -1,436,000 Fiscal year 2011 budget request.................... - - - - - - - - - ---------------------------------------------------------------------------------------------------------------- The purpose of the home loan guaranty program is to facilitate the extension of mortgage credit on favorable terms by private lenders to eligible veterans. This appropriation provides for all costs, with the exception of the Native American veterans housing loan program, of the Department's direct and guaranteed loans programs. The Federal Credit Reform Act of 1990 requires budgetary resources to be available prior to incurring a direct loan obligation or a loan guaranty commitment. In addition, the bill requires all administrative expenses of a direct or guaranteed loan program to be funded through a program account. Loan guaranties are made to servicemembers, veterans, reservists, and single surviving spouses for the purchase of homes, condominiums, and manufactured homes and for refinancing loans. The Department guarantees part of the total loan, permitting the purchaser to obtain a mortgage with a competitive interest rate, even without a down payment if the lender agrees. The Department requires that a down payment be made for a manufactured home. With a Department guaranty, the lender is protected against loss, up to the amount of the guaranty, if the borrower fails to repay the loan. The Committee recommends such sums as may be necessary (currently estimated to total $19,078,000) for funding subsidy payments, $500,000 for the limitation on direct loans for specially adapted housing loans, and $163,646,000 for administrative expenses. VOCATIONAL REHABILITATION LOANS PROGRAM ACCOUNT (INCLUDING TRANSFER OF FUNDS) ---------------------------------------------------------------------------------------------------------------- Limitation on Administrative Program account direct loans expenses ---------------------------------------------------------------------------------------------------------------- Fiscal year 2010 enacted level......................... $29,000 $2,298,000 $328,000 Fiscal year 2011 budget request........................ 48,000 3,042,000 337,000 Committee recommendation in the bill................... 48,000 3,042,000 337,000 Comparison with: Fiscal year 2010 enacted level..................... 19,000 744,000 9,000 Fiscal year 2011 budget request.................... - - - - - - - - - ---------------------------------------------------------------------------------------------------------------- This appropriation covers the funding subsidy cost of direct loans for vocational rehabilitation of eligible veterans and includes administrative expenses necessary to carry out the direct loan program. Loans of up to $1,095 (based on indexed chapter 31 subsistence allowance rate) are available to service-connected disabled veterans enrolled in vocational rehabilitation programs when the veteran is temporarily in need of additional assistance. Repayment is made in monthly installments, without interest, through deductions from future payments of compensation, pension, subsistence allowance, educational assistance allowance, or retirement pay. Most loans are repaid in full in less than one year. The Federal Credit Reform Act of 1990 requires budgetary resources to be available prior to incurring a direct loan obligation. The Committee recommends $48,000 for funding subsidy program costs and $337,000 for administrative expenses. The administrative expenses may be paid to the General Operating Expenses account. In addition, the Committee includes language limiting direct loans to $3,042,000. It is estimated that the Department will make 3,286 loans in fiscal year 2011, with an average amount of $926. NATIVE AMERICAN VETERAN HOUSING LOAN PROGRAM (INCLUDING TRANSFER OF FUNDS) Administrative expenses: Fiscal year 2010 enacted level........................ $664,000 Fiscal year 2011 budget request....................... 707,000 Committee recommendation in the bill.................. 707,000 Comparison with: Fiscal year 2010 enacted level.................... 43,000 Fiscal year 2011 budget request - - - The Native American Veteran Housing Loan Program, as authorized by title 38 United States Code, chapter 37, subchapter V, provides the Secretary with authority to make direct housing loans to Native American veterans for the purpose of purchasing, constructing, or improving dwellings on trust lands. The Committee recommends the budget request of $707,000 for administrative expenses of the Native American Veteran Housing Loan Program. GUARANTEED TRANSITIONAL HOUSING LOANS FOR HOMELESS VETERANS PROGRAM ACCOUNT No funds have been provided for this program, which was funded as a pilot in fiscal year 2000 to expand the supply of transitional housing for homeless veterans. This is the same as the Administration request. No new loans will be executed and no additional program account dollars are required to service the one existing loan. Up to $750,000 was made available in fiscal year 2010 to service the loans. Veterans Health Administration The Department operates the largest Federal medical care delivery system in the country, with 153 hospitals, 54 domiciliary residential rehabilitation treatment programs, 135 nursing homes, 299 Vet Centers, 50 mobile Vet Centers, and 849 outpatient clinics which include independent, satellite, community-based, and rural outreach clinics. Approximately 6,100,000 patients will be treated in 2011. The Veterans Health Administration (VHA) is comprised of four accounts: Medical Services, Medical Support and Compliance, Medical Facilities, and Medical and Prosthetic Research. For these accounts, the Administration has requested total resources for fiscal year 2012 of $50,610,985,000 in direct appropriations and $3,393,000,000 in Medical Care Collections Fund appropriations, to fund the three advance appropriations of the VHA. This is an increase of $2,427,985,000 above the fiscal year 2011 enacted level of $48,183,000,000 and the same as the budget request. The Committee also provides the budget request of $590,000,000 for medical and prosthetic research. Medical school affiliations with VA health care facilities.--The Committee is pleased with the recommendations of the Blue Ribbon Panel on VA Medical School Affiliations, especially the recommendations encouraging a stronger collaborative relationship with historically black health professions schools. The Committee encourages the VA to strengthen its partnerships with graduate health professions schools at historically black health professions institutions and to report to the Committee on the steps taken to do so. Rural health.--The Committee is concerned that the VA has not implemented the rural health initiative in a manner fully consistent with Congressional intent. The Committee provided $250,000,000 for the Office of Rural Health to support national programs and initiatives that would be appropriate across the country. It appears that $200,000,000 of the fiscal year 2010 total is being used for a one-time rural fee pilot program that will not be replicated or continued in fiscal year 2011. Further, the Committee understands that the VA intends to designate $100,000,000 of the fiscal year 2011 funding for an enhanced contract care pilot program and $87,800,000 for rural community-based outpatient clinics. These two large programs with multi-year costs do not represent the national seed projects envisioned with the initiative. The Committee directs the VA to report, within 60 days of enactment of this Act, to the Committee on its fiscal year 2011 and fiscal year 2012 rural health spending plans prior to the obligation of any funding. MEDICAL SERVICES (INCLUDING TRANSFER OF FUNDS) Fiscal year 2010 enacted level........................ $34,707,500,000 Fiscal year 2011 enacted level........................ 37,136,000,000 Fiscal year 2012 advance budget request............... 39,649,985,000 Committee 2012 recommendation in the bill............. 39,649,985,000 Comparison with: Fiscal year 2011 enacted level.................... 2,513,985,000 Fiscal year 2012 budget request................... - - - This appropriation provides for medical services of eligible veterans and beneficiaries in Department medical centers, outpatient clinic facilities, contract hospitals, State homes, and outpatient programs on a fee basis. Hospital and outpatient care is also provided by the private sector for certain dependents and survivors of veterans under the civilian health and medical programs for the VA. The Committee provides an advance appropriation of $39,649,985,000 for Medical Services for fiscal year 2012, an increase of $2,513,985,000, or 6.8 percent, above the fiscal year 2011 enacted level and the same as the budget request. The Committee has included bill language to make available through September 30, 2013, $1,015,000,000 of the Medical Services appropriation for fiscal year 2012. Funding is included to implement the recently enacted authorization of assistance and support services for caregivers of eligible veterans. The Committee provides sufficient resources to fully implement VA homeless assistance programs, including the Homeless Providers Grant and Per Diem, the Domiciliary Care for Homeless Veterans, and the Department of Housing and Urban Development--Department of Veterans Affairs Supported Housing programs. Mental health services.--The Committee encourages the VA to consider utilizing the expert resources available in academic medical centers to assist in providing treatment for servicemembers suffering from post-traumatic stress disorder, depression, and other mental health conditions. A number of these centers have developed innovative programs that include outreach, clinical research, evidence-based therapies, and services for family members. Treatment in these units may also help address any stigma issue for veterans who are unwilling to seek mental health services within a VA facility. The Committee requests a report by February 1, 2011 describing the degree to which the VA presently utilizes academic medical centers to deliver mental health services and its future plans to expand this usage. Further, these centers also have the capability and expertise to diagnose mental health conditions, and the Committee encourages the VA to consider diagnoses from these centers, especially in the area of post-traumatic stress disorder when evaluating servicemembers for benefits for this condition. Tobacco use.--The Committee recognizes the significant health burden caused by tobacco use in the Nation's veteran population, including lung cancer and chronic obstructive pulmonary disease. The Committee urges the Department to move quickly to implement the recommendations outlined in the Institute of Medicine report, Combating Tobacco Use in Military and Veteran Populations. Such action is necessary to reduce tobacco use among veterans to improve health and prevent serious chronic health conditions. Nurse training.--The Committee requests the Department to assess the need to support additional higher education nursing programs to provide quality health care to veterans in rural areas. The Department is directed to report to the Committee its findings by February 1, 2011. Guide and service dog program.--The Committee is disturbed by the Department's slow pace in implementing its new authority to provide service dogs to veterans with mental impairments, including post-traumatic stress disorder. The Committee understands that the VA is providing fewer than ten guide dogs to veterans and no service dogs for veterans with mental impairments. The Committee directs the VA to finalize regulations governing such a program by September 1, 2010 and to report to the Committee the operational details of the program established. HIV/AIDS among veterans.--The Committee commends the VA health care system on its swift adoption of new HIV testing policy guidelines, which closely mirror the Revised Recommendations for HIV Testing of Adults, Adolescents, and Pregnant Women in Heathcare Settings issued in September 2006 by the U.S. Centers for Disease Control and Prevention (CDC). The Committee requests a report from the Department by January 1, 2011 on the number and percentage of VA medical facilities where the revised HIV testing policy has been implemented and the timeframe for its implementation at all VA sites. The report should include data on the number of VA patients who have tested positive for HIV and AIDS since the new guidance has been mandated, along with information about the extent to which HIV testing information and queries are captured on the Computerized Patient Record System. Mental health services underreporting.--The Committee is concerned by Government Accountability Office (GAO) findings in its May 2010 report (GAO-10-570) that the VA does not publicly report information about its spending for mental health services from non-VA providers, such as community-based hospitals and mental health professionals, or at VA settings not primarily used for providing mental health services. The Committee directs the VA to include the data identified by the GAO in the VA budget justifications for fiscal year 2012 and subsequent fiscal years. If current year data are not readily available at the time the justifications are compiled, prior year data so identified may be used. Reporting this additional information will enhance Congressional oversight of VA services to veterans for post-traumatic stress disorder, suicide prevention and other mental health issues. Telehealth counseling.--The Committee encourages the VA to continue and expand its use of a telehealth platform to provide mental health outreach and health coaching services to veterans and their families, regardless of their geographic location. This approach provides help when and where the veteran chooses and can eliminate any stigma the veteran may feel in seeking mental health services. Non-Veterans Equitable Resource Allocation (VERA) distributions.--The Committee directs the VA to provide to the Committee within 30 days of enactment of this Act a detailed listing of all fiscal year 2011 Medical Services activities that are not funded through the VERA allocation method. The list should identify all programs, initiatives, areas of Congressional interest, and activities described as being supported through ``specific purpose'' funds. The document should compare these activities in funding amount and type to the activities funded outside the VERA allocation model in fiscal year 2010. Prescription drug monitoring programs.--The Committee directs the VA to provide a report, within 60 days of enactment of this Act, to the Committee on the feasibility of VA's participation in state-run prescription drug monitoring programs (PDMP). The report should include an analysis of any legal and/or administrative issues that would prohibit VA's participation in state-run PDMP, and, if such issues exist, recommendations to overcome those issues. medical support and compliance Fiscal year 2010 enacted level........................ $4,930,000,000 Fiscal year 2011 enacted level........................ 5,307,000,000 Fiscal year 2012 advance budget request............... 5,535,000,000 Committee 2012 recommendation in the bill............. 5,535,000,000 Comparison with: Fiscal year 2011 enacted level.................... 228,000,000 Fiscal year 2012 advance budget request........... - - - The Medical Support and Compliance appropriation funds the expenses of management and administration of the Department's health care system to include financial management, public health and environmental hazard, quality and performance management, medical inspection, human research oversight, training programs and continuing education, security, volunteer operations, and human resources. The Committee recommends an advance appropriation of $5,535,000,000 for Medical Support and Compliance for fiscal year 2012, an increase of $228,000,000 above the fiscal year 2011 enacted level and the same as the budget request. The Committee has included bill language to make available through September 30, 2013, $145,000,000 of the Medical Support and Compliance appropriation for fiscal year 2012. Patient safety.--Reports from the VA Office of Inspector General during the past year document lapses in the proper use and reprocessing of flexible fiberoptic endoscopes at VA medical facilities. These lapses resulted in several known cases of the transmission of blood-borne diseases and exposed more than 10,000 veterans to hepatitis B, hepatitis C, and HIV. The Committee directs the Department to collaborate with the CDC to develop and assess systems for complete and consistent adherence to injection safety and infection control guidelines across the VA healthcare system. The Department is directed to report to the Committee by July 1, 2011 the actions it has undertaken in response to this directive. The Committee is concerned about reports indicating that an employee at the John Cochran VA Medical Center in St. Louis was fired after months of warning her supervisors about inadequate sterilization of dental equipment. Had these warnings been heeded, more than 1,800 veterans may have avoided possible exposure to the HIV, Hepatitis B and C viruses. The Committee directs the Department to reestablish an anonymous patient safety reporting hotline to ensure that all reports regarding matters of patient safety are promptly investigated and VA employees making reports are not subjected to retaliatory actions. In addition to current notification procedures, the Committee directs the VA to notify, by telephone, veterans who may have been exposed to improperly sterilized medical equipment. This notification should occur within 30 days of the VA determination that such exposure may have occurred. medical facilities Fiscal year 2010 enacted level........................ $4,859,000,000 Fiscal year 2011 enacted level........................ 5,740,000,000 Fiscal year 2012 advance budget request............... 5,426,000,000 Committee 2012 recommendation in the bill............. 5,426,000,000 Comparison with: Fiscal year 2011 enacted level.................... (314,000,000) Fiscal year 2012 advance budget request........... - - - The Medical Facilities appropriation provides funds for the operation and maintenance of the Department's health care system's capital infrastructure. Included under this heading are provisions for costs associated with utilities, engineering, capital planning, leases, laundry, groundskeeping, garbage, housekeeping, facility repair, and property disposition and acquisition. The Committee recommends an advance appropriation of $5,426,000,000 for Medical Facilities for fiscal year 2012, a decrease of $314,000,000 below the fiscal year 2011 enacted level and the same as the budget request. The Committee has included bill language to make available through September 30, 2013, $145,000,000 of the advance Medical Facilities appropriation for fiscal year 2012. The Committee continues bill language designating that $130,000,000 of the funds made available for non-recurring maintenance is to be distributed in a manner not subject to the Veterans Equitable Resource Allocation model. Community-based outpatient clinics.--The Committee urges the Department to examine the need for, and to report to the Committee on the feasibility of, a community-based outpatient clinic within the following counties in South Central Illinois: Pike, Calhoun, Jersey, Greene, Macoupin, Montgomery, Madison, Bond, and Fayette. Child care availability.--The Committee directs the VA to report to the Committee by March 1, 2011 on the number of child care slots the Department supports at medical centers, broken out by slots reserved for children of patients and for employees. This analysis should indicate the unmet demand for child care slots in each category and the plans the VA has developed to address the demand. medical and prosthetic research Fiscal year 2010 enacted level........................ $581,000,000 Fiscal year 2011 budget request....................... 590,000,000 Committee recommendation in the bill.................. 590,000,000 Comparison with: Fiscal year 2010 enacted level.................... 9,000,000 Fiscal year 2011 budget request................... - - - This appropriation provides for medical, rehabilitative, and health services research. Medical research is an important aspect of the Department's programs, providing complete medical and hospital services for veterans. The prosthetic research program is also essential in the development and testing of prosthetic, orthopedic, and sensory aids for the purpose of improving the care and rehabilitation of eligible disabled veterans, including amputees, paraplegics, and the blind. The health services research program provides unique opportunities to improve the effectiveness and efficiency of the health care delivery system. In addition, budgetary resources from a number of areas including appropriations from the medical care accounts, reimbursements from the Department of Defense, grants from the National Institutes of Health, private proprietary sources, and voluntary organizations provide support for the Department's researchers. Estimated total research resources in 2011 are $1,890,000,000. The VA will support about 2,350 research projects during fiscal year 2011. The Committee recommends $590,000,000 for Medical and Prosthetic Research, an increase of $9,000,000 above the fiscal year 2010 enacted level and the same as the budget request. Vietnam veterans longitudinal study.--The Committee understands that the VA has reincarnated the national longitudinal study of Vietnam veterans that has been moribund for much of the decade and that awards are due to be made in August 2010. The Committee urges the VA to proceed as quickly as possible with the study. The longer the study is delayed, the harder it becomes to locate study subjects and develop representative sample populations. The Committee directs the VA to submit a report by January 1, 2011 detailing the progress made with award of the contract; identification of sample populations; development of study protocol and research questions; and timeframes for completion of research, data analysis, and publication of results. In addition, the Secretary is urged to conduct epidemiological studies of existing VA medical data to determine if there are anomalies and differences that become apparent based on location of different duty stations or periods of service. Results of these studies shall be made public by means of submission of articles to recognized peer reviewed scientific and medical publications. Infrastructure review.--The Committee has not yet received the report, requested in 2005, on a comprehensive review of VA research facilities and their deficiencies. The Committee understands that the work on this report is largely complete and directs the VA to provide it by September 1, 2010. As part of this review, the Committee also requests an analysis of the square footage dedicated to research space that was renovated, modified, or constructed in fiscal year 2009 with funding from Medical Facilities or Major or Minor Construction and the priority ranking of each research facility project in Major or Minor Construction for fiscal years 2010 and 2011. medical care collections fund The Department of Veterans Affairs Medical Care Collections Fund (MCCF) was established by the Balanced Budget Act of 1997 (Public Law 105-33). The Department deposits first-party and pharmacy co-payments, third-party insurance payments and enhanced-use collections, long-term care co-payments, Compensated Work Therapy Program collections, Compensation and Pension Living Expenses Program collections, and Parking Program fees into the MCCF. The Department uses these funds for medical care and services to veterans. The Congressional Budget Office estimate of fees that will be collected in fiscal year 2011 is $3,393,000,000. National Cemetery Administration Fiscal year 2010 enacted level........................ $250,000,000 Fiscal year 2011 budget request....................... 250,504,000 Committee recommendation in the bill.................. 259,004,000 Comparison with: Fiscal year 2010 enacted level.................... 9,004,000 Fiscal year 2011 budget request................... 8,500,000 The National Cemetery Administration was established in accordance with Public Law 93-43, the National Cemeteries Act of 1973. It has a fourfold mission: to provide for the interment of, in any national cemetery with available grave space, the remains of eligible deceased servicemembers and discharged veterans, together with their spouses and certain dependents, and to permanently maintain their graves; to provide headstones for, and to mark graves of eligible persons in national, State, and private cemeteries; to administer the grant program for aid to States in establishing, expanding, or improving State veterans' cemeteries; and to administer the Presidential Memorial Certificate Program. This appropriation will provide for the operation and maintenance of 164 cemeterial installations in 39 States, the District of Columbia, and Puerto Rico. The Committee recommends an appropriation of $259,004,000 for the National Cemetery Administration, an increase of $9,004,000 above the fiscal year 2010 enacted level and $8,500,000 above the budget request. The increase is to maintain funding for the National Shrine Commitment program, which is an initiative to improve the overall appearance and condition of cemeteries as identified in the study on cemeteries that was submitted to the Congress in 2002. Departmental Administration GENERAL OPERATING EXPENSES Fiscal year 2010 enacted level........................ $2,086,707,000 Fiscal year 2011 budget request....................... 2,588,389,000 Committee recommendation in the bill.................. 2,601,389,000 Comparison with: Fiscal year 2010 enacted level.................... 514,682,000 Fiscal year 2011 budget request................... 13,000,000 The General Operating Expenses appropriation provides for the administration of non-medical veterans benefits through the Veterans Benefits Administration and departmental management and support. The Committee recommends an appropriation of $2,601,389,000 for General Operating Expenses, an increase of $514,682,000 above the fiscal year 2010 appropriation and $13,000,000 above the budget request. The amount provided includes $2,162,776,000 for the Veterans Benefits Administration. The Committee recommendation endorses the budget proposal to increase the number of disability claims processors by approximately 4,048 (including 1,696 Recovery Act employees made permanent). The Committee has been committed to expanding the workforce of claims processors since fiscal year 2007, with funding provided for over 8,000 new claims processors over the last four years. The Committee also endorses the Department's initiative to explore new technologies and processes to decrease the time it takes to process claims and ensure the accuracy of final decisions. The Committee does not concur with the budget request to reduce 306 Direct FTEs from the Education program, and provides $14,000,000 to cover the cost of maintaining these FTEs in the Education program. The Committee notes that the VA is projecting a 31 percent workload increase from fiscal year 2009 to fiscal year 2011 due to the new Post-9/11 GI bill program. The Committee believes that Veterans would be better served by having a claims processing workforce that is adequately trained and experienced. The IG noted in a November 2009 report that the VBA had to pay $4,300,000 in overtime to process education claims, and recommended that the VBA come up with a plan to reduce overtime or risk ``employee burn out and diminishing returns''. In addition to the funds provided in this account, section 229 of the bill provides an additional $23,584,000 for the General Operating Expenses appropriation, as requested by the Administration, to increase the Department's acquisition workforce capacity and capabilities. The Committee requests a report within thirty days of enactment of this Act describing how the VA plans to allocate these funds across the permissible uses of funds identified in section 229. GAO review.--The Committee requests that the Government Accountability Office (GAO) prepare a comparative analysis by June 1, 2011 of the disability claims process employed by the Social Security Administration (SSA) versus that used by the VA. The SSA currently receives 1,000,000 disability claims annually, while the VA expects to receive more than 1,300,000 in 2011. The Committee recognizes that there are differences in the two systems in areas such as the complexity of disabilities, age of the beneficiary, information that must be obtained, and VA statutory timelines that protect beneficiaries. However, the Committee believes that comparing two similarly sized organizations with similar missions could provide useful information as the VA struggles to modernize its disability claims processing and shorten the time required for each claim. Additional budgetary information.--The Committee believes that the Congressional budget justifications submitted each year with the Administration's budget should be expanded to include the following information which would help inform Congressional decisions: Charts listing major budget increases and decreases, split into the categories of `built in' and `program' for each account. A brief explanation of each proviso in an account's appropriation bill language and the proposed language changes. A list of the authorization citations for each program that is funded, along with a list of the citations for authorized but unfunded programs. Include the authorization level and the year the authorization expired or will expire for each program. A consolidated administrative expenses chart for the entire Department. A section identifying each piece of directive report language from the previous year's House, Senate and conference reports and the VA response/action taken for each item. A chart identifying the number of employees in each GS, ES and non-GS level by account as well as the average salary of each level for prior year, current year and budget year. The chart shall include a breakout between Headquarters and Field employees. An organization chart for the VA as well as the individual Administrations with the names of the occupant of each position on the chart. A program narrative for the medical facilities section. A narrative describing each of the programs in the readjustment benefits programs rather than just a description of increases and decreases. Tabs to identify the chapters within the justifications. INFORMATION TECHNOLOGY SYSTEMS Fiscal year 2010 enacted level........................ $3,307,000,000 Fiscal year 2011 budget request....................... 3,307,000,000 Committee recommendation in the bill.................. 3,222,000,000 Comparison with: Fiscal year 2010 enacted level.................... (85,000,000) Fiscal year 2011 budget request................... (85,000,000) The Information Technology Systems account was established in P.L. 109-114. The account previously encompassed the entire non-pay information technology portfolio for the Department of Veterans Affairs, including all automation efforts in all Administrations. Starting in fiscal year 2007, and reflected for the first time in the budget request for fiscal year 2008, this account also includes pay and associated costs for information technology staff. The Committee recommends an appropriation of $3,222,000,000 for Information Technology Systems, which is $85,000,000 below both the fiscal year 2010 appropriation and the budget request. The Committee is concerned about the Department's continued sluggish expenditure of information technology systems funding as the Department works toward implementation of new program management processes. The delay in execution is reflected in the budget estimate of more than $1,700,000,000 projected to be unobligated at the end of both fiscal years 2010 and 2011. While the 2.6 percent funding reduction recommendation by the Committee is not severe, it makes possible a modest reallocation of funding to areas of greater need in the Department. The Committee has included bill language requiring the Department to submit an expenditure plan for the total amount provided, not later than 30 days after enactment of this Act. In addition, an administrative provision is included in the bill which allows for the reprogramming of funds in this account among projects upon prior notification to, and approval by, the Committee. Obligations report.--The Committee expects the Department to continue its quarterly obligation report on information technology systems using the framework established in the initial reprogramming letter received after enactment of the appropriations bill. The quarterly obligations report should include additional information: a comparison to the total project costs included in the base reprogramming letter submitted to the Congress, and an explanation for any differences in excess of $1,000,000; columns indicating the total and fiscal year 2011 cost of the project as reflected in the OMB 300b form; the status of the project in the Program Management Accountability System (under review, completed, outcome); and expected quarterly obligations for each quarter of the current and budget fiscal years. OFFICE OF INSPECTOR GENERAL Fiscal year 2010 enacted level........................ $109,000,000 Fiscal year 2011 budget request....................... 109,367,000 Committee recommendation in the bill.................. 115,367,000 Comparison with: Fiscal year 2010 enacted level.................... 6,367,000 Fiscal year 2011 budget request................... 6,000,000 The Office of Inspector General was established by the Inspector General Act of 1978 and is responsible for the audit, investigation, and inspection of all Department of Veterans Affairs programs and operations. The overall operational objective is to focus available resources on areas which would help improve services to veterans and their beneficiaries, assist managers of Department programs to operate economically in accomplishing program goals, and to prevent and deter recurring and potential fraud, waste, and inefficiencies. The Committee recommends an appropriation of $115,367,000 for the Office of Inspector General, an increase of $6,367,000 above the fiscal year 2010 enacted level and $6,000,000 above the budget request. The Committee includes an increase of $6,000,000 above the budget request to allow the Office of Inspector General to focus on high priority needs, including, but not limited to, the quality of outsourced care; investigations to expose fiduciary, and procurement fraud; increase use of computer forensics; allow for timely investigations of alleged misconduct and allow the expansion of audit coverage of information technology systems development, acquisition, and implementation. CONSTRUCTION, MAJOR PROJECTS Fiscal year 2010 enacted level........................ $1,194,000,000 Fiscal year 2011 budget request....................... 1,151,036,000 Committee recommendation in the bill.................. 1,166,036,000 Comparison with: Fiscal year 2010 enacted level.................... (27,964,000) Fiscal year 2011 budget request................... 15,000,000 The Construction, Major Projects appropriation provides for constructing, altering, extending, and improving any of the facilities under the jurisdiction or for the use of the Department of Veterans Affairs, including planning, architectural and engineering services, assessments, and site acquisition where the estimated cost of a project is $10,000,000 or more. The Committee recommends an appropriation of $1,166,036,000 for Construction, Major Projects, a decrease of $27,964,000 from the fiscal year 2010 enacted level and $15,000,000 above the budget request. The Committee recommendation includes language in Administrative Provisions which requires the Department to notify the Congress of bid savings on contracts for construction projects and requires notification to the Congress of any changes from original scope of work identified in the justification material submitted with the budget for each project. Health Care Center Facilities.--The Committee urges the Department to reevaluate its scheduled lease of a new medical facility in South Bend, Indiana in light of the urgent need for the planned facility expansion of outpatient and specialty care and contracted inpatient hospital care. The Committee also requests the Department to report by February 15, 2011 its plans and completion date for a new facility at Leestown Road, Lexington, Kentucky. Evaluating site feasibility.--The Committee requests the Department to evaluate the benefits of relocating the Carl D. Hayden Medical Center in Phoenix, Arizona, to a more accessible downtown site. The review should include consideration of the specific population to be served, along with possible improvements that could be achieved by leveraging the facility with other hospitals in the area. The VA should report its finding to the Committee by April 1, 2011. The specific amounts recommended by the Committee are as follows: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2011 Committee Location Description request recommendation ---------------------------------------------------------------------------------------------------------------- Veterans Health Administration (VHA): New Orleans, LA............................ New Medical Facility.............. 310,000 310,000 Denver, CO................................. New Medical Facility.............. 450,700 450,700 Palo Alto, CA.............................. Polytrauma/Ambulatory Care........ 30,000 30,000 Alameda Point, CA.......................... Outpatient Clinic and Columbarium 17,332 17,332 (Design). Omaha, NE.................................. Replacement Facility (Design)..... 56,000 56,000 Advance Planning Fund...................... .................................. 89,750 89,750 HCC Advance Planning....................... .................................. 0 15,000 Facility Security Projects................. .................................. 41,390 41,390 BRAC Land Acquisition...................... .................................. 13,000 13,000 Judgment Fund.............................. .................................. 6,000 6,000 Resident Engineers......................... .................................. 23,964 23,964 ---------------------------- Total VHA................................ .................................. 1,038,136 1,053,136 National Cemetery Administration (NCA): Indiantown Gap, PA......................... Gravesite Expansion and Cemetery 23,500 23,500 Improvements. Los Angeles, CA............................ Columbarium Expansion............. 27,600 27,600 Tahoma, WA................................. Gravesite Expansion and Cemetery 25,800 25,800 Improvements. Advance Planning Fund...................... .................................. 20,000 20,000 NCA Land Acquisition Fund.................. .................................. 10,000 10,000 Total NCA................................ .................................. 106,900 106,900 ---------------------------- General Administration Staff Offices .................................. 6,000 6,000 Advance Planning Fund. ---------------------------- Major construction total................. .................................. 1,151,036 1,166,036 ---------------------------------------------------------------------------------------------------------------- CONSTRUCTION, MINOR PROJECTS Fiscal year 2010 enacted level........................ $703,000,000 Fiscal year 2011 budget request....................... 467,700,000 Committee recommendation in the bill.................. 507,700,000 Comparison with: Fiscal year 2010 enacted level.................... (195,300,000) Fiscal year 2011 budget request................... 40,000,000 The Construction, Minor Projects appropriation provides for constructing, altering, extending, and improving any of the facilities under the jurisdiction or for the use of the Department, including planning, assessment of needs, architectural and engineering services, and site acquisition, where the estimated cost of a project is less than $10,000,000. The Committee recommends an appropriation of $507,700,000 for Construction, Minor Projects, a decrease of $195,300,000 below the fiscal year 2010 enacted level and $40,000,000 above the budget request. The additional funding is to be used for high priority minor construction projects. GRANTS FOR CONSTRUCTION OF STATE EXTENDED CARE FACILITIES Fiscal year 2010 enacted level........................ $100,000,000 Fiscal year 2011 budget request....................... 85,000,000 Committee recommendation in the bill.................. 85,000,000 Comparison with: Fiscal year 2010 enacted level.................... (15,000,000) Fiscal year 2011 budget request................... - - - This appropriation provides grants to assist States to construct State home facilities, for furnishing domiciliary or nursing home care to veterans, and to expand, remodel or alter existing buildings for furnishing domiciliary, nursing home or hospital care to veterans in State homes. A grant may not exceed 65 percent of the total cost of the project. The Committee recommends an appropriation of $85,000,000 for Grants for Construction of State Extended Care Facilities, a decrease of $15,000,000 below the fiscal year 2010 enacted level and the same as the budget request. GRANTS FOR CONSTRUCTION OF STATE VETERANS CEMETERIES Fiscal year 2010 enacted level........................ $46,000,000 Fiscal year 2011 budget request....................... 46,000,000 Committee recommendation in the bill.................. 46,000,000 Comparison with: Fiscal year 2010 enacted level.................... - - - Fiscal year 2011 budget request................... - - - This program provides grants to assist States with the establishment, expansion, and improvement of State veterans cemeteries which are operated and permanently maintained by the States. Grants under this program fund up to 100 percent of construction costs and the initial equipment expenses when the cemetery is established. The States remain responsible for providing the land and for paying all costs related to the operation and maintenance of the State cemeteries, including the costs for subsequent equipment purchases. The Committee recommends an appropriation of $46,000,000 for Grants for Construction of State Veterans Cemeteries, the same as the fiscal year 2010 enacted level and the budget request. Administrative Provisions The bill includes 24 provisions that were included in the fiscal year 2010 enacted appropriations bill and eight new provisions, five of which were proposed by the Administration. The administrative provisions included in the bill are as follows: (INCLUDING TRANSFER OF FUNDS) Section 201 allows for the transfer of funds among three mandatory appropriations. The Administration proposal to modify this provision is not adopted. (INCLUDING TRANSFER OF FUNDS) Section 202 allows the Department to transfer funding among the three medical appropriations accounts in fiscal year 2011. The Administration proposal to modify this provision is not adopted. Section 203 allows for salaries and expenses funds to be used for hire of passenger vehicles, lease of facilities or land, and purchase of uniforms. Section 204 provides that only funding in the ``Construction, major projects'' and ``Construction, minor projects'' accounts can be used for the purchase of any site for any new hospital or home or to construct any new hospital or home. Section 205 requires the Department to be reimbursed for medical services it provides to any person not defined as a beneficiary to ensure the Department is receiving payment for all medical services provided. Section 206 allows for the use of funds appropriated in fiscal year 2011 for ``Compensation and pensions'', ``Readjustment benefits'', and ``Veterans insurance and indemnities'' for payment of accrued obligations recorded in the last quarter of fiscal year 2010. Section 207 allows for the use of fiscal year 2011 funds to pay prior year obligations resulting from implementation of sections 3328(a), 3334, and 3712(a) of title 31, United States Code. (INCLUDING TRANSFER OF FUNDS) Section 208 allows the Department to use surplus earnings from the national service life insurance, U.S. Government life insurance, and veterans special life insurance program, to administer these programs. Section 209 allows the Department to cover the administrative expenses of enhanced-use lease services and provides authority to obligate these reimbursements in the year funds are received. (INCLUDING TRANSFER OF FUNDS) Section 210 limits the amount of reimbursement the Office of Resolution Management and the Office of Employment Discrimination Complaint Adjudication can charge other offices and accounts of the Department for services provided. Section 211 requires the Secretary to submit a report to the Committees on Appropriations to approve new leases of real property if the estimated annual rental cost is more than $1,000,000. The Administration proposal to modify this provision is not adopted. Section 212 requires the Department to collect current and accurate third-party reimbursement information for the purposes of third-party insurance collections. If persons receiving care or medical services do not disclose this information, the Department is allowed to bill them reasonable charges for services provided. (INCLUDING TRANSFER OF FUNDS) Section 213 allows the Department to use enhanced-use leasing funds for construction and alteration of medical facilities. Section 214 allows the Department to use the ``Medical services'' appropriation for expenses related to the broader mission of medical care to veterans. (INCLUDING TRANSFER OF FUNDS) Section 215 allows the Department to transfer Medical Care Collections to the ``Medical services'' appropriation to be used for veterans medical care. Section 216 allows veterans who reside in Alaska to obtain medical services from medical facilities supported by the Indian Health Service or tribal organizations, and provides for reimbursement for those services from the Department of Veterans Affairs. (INCLUDING TRANSFER OF FUNDS) Section 217 allows the Department to transfer the proceeds received from the transfer of real property deposited into the Department of Veterans Affairs Capital Asset Fund (CAF) to the major and minor construction appropriations. Section 218 provides that no funds may be used to prohibit Directors of Veterans Integrated Service Networks (VISN) from conducting outreach or marketing programs. The Administration proposed to delete this provision. Section 219 requires the Secretary to submit quarterly reports to the Committees on Appropriations of the House and Senate on the financial status of the Veterans Health Administration. (INCLUDING TRANSFER OF FUNDS) Section 220 requires the Department to notify and receive approval from the Committees on Appropriations of any proposed transfer of funding to or from the ``Information technology systems'' account. The Administration proposal to modify this provision is not adopted. (INCLUDING TRANSFER OF FUNDS) Section 221 requires the Department to notify and receive approval from the Committees on Appropriations of any proposed transfer of funding in excess of $1,000,000 between information technology system projects. The Administration proposal to modify this provision is not adopted. Section 222 prohibits funds being used in a manner that is inconsistent with the outsourcing limitations of Public Law 109-115. Section 223 limits the amount of funding made available under the ``Medical facilities'' account for non-recurring maintenance that may be obligated during the last two months of the fiscal year. The Administration proposal to delete this provision is not adopted. Section 224 permits the Secretary to use $5,000,000 for cooperative agreements with State and local governments to conduct outreach to ensure that veterans in underserved areas receive care and benefits for which they are eligible. (INCLUDING TRANSFER OF FUNDS) Section 225 permits the transfer of funds appropriated for medical accounts and information technology systems to the Joint Department of Defense-Department of Veterans Affairs Medical Facility Demonstration Fund for the operation of the integrated Lovell Federal Health Care Center. (INCLUDING TRANSFER OF FUNDS) Section 226 permits the transfer of funds deposited in the Medical Care Collections Fund to the joint Medical Facility Demonstration Fund for the operation of the Lovell Federal Health Care Center. (INCLUDING TRANSFER OF FUNDS) Section 227 directs that a minimum of $15,000,000 shall be transferred from three medical appropriations to the Department of Defense/Department of Veterans Affairs Health Care Sharing Incentive Fund, to be available until expended. (INCLUDING RESCISSION OF FUNDS) Section 228 rescinds fiscal year 2011 funds from three medical accounts and appropriates them for fiscal year 2011 with two-year availability. The amounts provided are the same as those given two-year availability in the fiscal year 2010 appropriation rather than the amounts requested by the Administration. (INCLUDING TRANSFER OF FUNDS) Section 229 appropriates $23,584,000 to increase the Department of Veterans Affairs acquisition workforce capacity and permits the Secretary to transfer these funds to any other account in the Department. The Administration proposed this language as a general provision. Section 230 directs the Secretary to report to the Committee within 30 days of enactment of this Act the planned funding allocation from each of the Veterans Health Administration accounts to the National Reserve Fund and any subsequent increase in these allocations of ten percent or more. The Secretary is directed to notify the Committees on Appropriations of both Houses of Congress of any planned obligation of the National Reserve Fund fifteen days before such obligation takes place, as well as the intended use of the funds. Section 231 requires the Secretary to notify the Committees on Appropriations of both Houses of Congress of all bid savings in Major Construction projects that total at least $5,000,000, or five percent of the programmed amount, whichever is less. Such notification must occur within 14 days after the date on which funds are obligated. Section 232 prohibits the original scope of a Major Construction project from being increased without prior notification to the Committees on Appropriations of both Houses of Congress. TITLE III RELATED AGENCIES American Battle Monuments Commission SALARIES AND EXPENSES Fiscal year 2010 enacted level........................ $62,675,000 Fiscal year 2011 budget request....................... 64,200,000 Committee recommendation in the bill.................. 65,667,000 Comparison with: Fiscal year 2010 enacted level.................... 2,992,000 Fiscal year 2011 budget request................... 1,467,000 The American Battle Monuments Commission is responsible for the administration, operation and maintenance of cemetery and war memorials to commemorate the achievements and sacrifices of the American Armed Forces where they have served since April 6, 1917. In performing these functions, the Commission maintains 24 permanent American military cemetery memorials and 31 monuments, memorials, markers, and offices in 15 foreign countries, the Commonwealth of the Northern Mariana Islands, and the British dependency of Gibraltar. In addition, six memorials are located in the United States: the East Coast Memorial in New York; the West Coast Memorial, The Presidio in San Francisco; the Honolulu Memorial in the National Memorial Cemetery of the Pacific in Honolulu, Hawaii; and the American Expeditionary Forces Memorial, the World War II, and Korean War Veterans Memorials in Washington, DC. The Committee recommends an appropriation of $65,667,000 for the American Battle Monuments Commission's salaries and expenses account, $1,467,000 above the budget request. Language is included allowing up to $7,500 to be used for official reception and representation expenses. The increased funding above the budget request will enable the Commission to expand its interpretive program in the area of interactive programs, similar to those already in place for the Normandy campaign and the battle of Pointe du Hoc. The Committee directs the Secretary of the Commission to submit a report to the Committees on Appropriations, no later than 30 days after the date of enactment of this Act, detailing the spending plan for expansion of the interactive program of the interpretive program. FOREIGN CURRENCY FLUCTUATIONS ACCOUNT Fiscal year 2010 enacted level........................ $17,100,000 Fiscal year 2011 budget request est................... 20,200,000 Committee recommendation in the bill est.............. 20,200,000 Comparison with: Fiscal year 2010 enacted level.................... 3,100,000 Fiscal year 2011 budget request................... - - - The Commission's Foreign Currency Fluctuations Account is authorized pursuant to 36 U.S.C. 2109 to pay the costs of salaries and expenses that exceed the amount appropriated for salaries and expenses because of fluctuations in currency exchange rates of foreign countries occurring after a budget request for the Commission is submitted to the Congress. The account may not be used for any other purpose. The Committee recommendation includes bill language as proposed which makes ``such sums as may be necessary'' available to the Commission to cover unanticipated foreign currency fluctuations, currently estimated at $20,200,000. United States Court of Appeals for Veterans Claims SALARIES AND EXPENSES Fiscal year 2010 enacted level........................ $27,115,000 Fiscal year 2011 budget request....................... 90,147,000 Committee recommendation in the bill.................. 90,147,000 Comparison with: Fiscal year 2010 enacted level.................... 63,032,000 Fiscal year 2011 budget request................... - - - The Veterans' Judicial Review Act established the U.S. Court of Appeals for Veterans Claims. The Court reviews appeals from claimants seeking review of a benefit denial. The Court has the authority to overturn findings of fact, regulations, and interpretations of law. The Committee recommends an appropriation of $90,147,000 for the U.S. Court of Appeals for Veterans Claims, an increase of $63,032,000 above the fiscal year 2010 enacted level and the same as the budget request. Of the amount provided, $2,515,229 is to be used for the pro bono representation program. The Committee notes that the President's budget request includes $62,000,000, which shall be transferred to the General Services Administration, for construction of a Veterans Courthouse and Justice Center. The Committee recommendation includes the amount requested. However, the Committee is aware that the initial estimate for the construction of this facility is in the process of being revised and directs the Court and GSA to keep the Committee fully informed of the most current estimates as they are developed. Department of Defense--Civil Cemeterial Expenses, Army SALARIES AND EXPENSES Fiscal year 2010 enacted level........................ $39,850,000 Fiscal year 2011 budget request....................... 38,100,000 Committee recommendation in the bill.................. 39,600,000 Comparison with: Fiscal year 2010 enacted level.................... (250,000) Fiscal year 2011 budget request................... 1,500,000 The Secretary of the Army is responsible for the administration, operation and maintenance of Arlington National Cemetery and the Soldiers' and Airmen's Home National Cemetery. In addition to its principal function as a national cemetery, Arlington is the site of approximately 3,100 non-funeral ceremonies each year and has approximately 4,000,000 visitors annually. The Committee recommends an appropriation of $39,600,000 for Cemeterial Expenses, Army, salaries and expenses, a decrease of $250,000 below the fiscal year 2010 enacted level and an increase of $1,500,000 above the budget request. The Committee recommendation includes a provision of bill language which prohibits the use of any funding for the construction of a new perimeter wall at Arlington National Cemetery. The Committee is very disturbed by the information contained in the June 10, 2010 report from the Army Inspector General documenting significant problems with the operation of Arlington National Cemetery. While the report will be an important trigger for management changes at the Cemetery, the Committee is dismayed that the report appears to be the first independent review since the 1997 Military District of Washington Inspector General report. The lack of vigorous oversight by the Department of the Army is inexcusable. For example, although the Inspector General report highlighted deficiencies in the Total Cemetery Management System under development at Arlington, two reports from the Department, requested by the Committee in 2005 and 2007, indicated that project was on track and within cost. This system will be a vital component to assuring that grave sites and interments are identified and appropriately allocated now and in the future. The Committee directs the Department of the Army to provide an analysis of the Total Cemetery Management System by September 1, 2010. The analysis should include an assessment of whether TCMS has the capacity required for cemetery management as well as a list of all funds obligated to this program to date. The Department should also identify specific deliverable benchmarks which must be achieved in the TCMS development and implementation process. These benchmarks must be achieved before additional funds are to be obligated. If the benchmark deliverable dates are missed, the Committee must be notified within five days as to why the benchmark was not met. If three deliverable dates are missed, the program must be halted and reevaluated. The Committee is also concerned about human resources management at Arlington National Cemetery. In eight of the last eleven years the Congress has provided more funding than requested in the President's budget for Arlington National Cemetery, but personnel resources appear to be stretched thin according to the Inspector General report. The Committee directs the Cemetery to provide by August 1, 2010 a staffing plan identifying the number of personnel required to maintain the Cemetery and coordinate interments using historical timeliness standards compared to current staffing levels and timeframes along with the associated funding requirements. As a placeholder pending receipt of this report on personnel, review of the Total Cemetery Management System analysis, and analysis of pending unobligated balances in the Cemetery account, the Committee recommendation includes an increase of $1,500,000 for additional personnel and related costs in fiscal year 2011. Armed Forces Retirement Home OPERATION AND MAINTENANCE Fiscal year 2010 enacted level........................ $62,000,000 Fiscal year 2011 budget request....................... 69,200,000 Committee recommendation in the bill.................. 69,200,000 Comparison with: Fiscal year 2010 enacted level.................... 7,200,000 Fiscal year 2011 budget request................... - - - The Armed Forces Retirement Home (AFRH) consists of two retirement communities, one in Washington, D.C. and the other in Gulfport, Mississippi. The Washington, D.C. facility was established in 1851 as a soldiers' home for elderly and disabled veterans. The original home for Navy officers, sailors, and Marines was established in Philadelphia, Pennsylvania in 1811, and was relocated to Gulfport, Mississippi almost a century and a half later. The Committee recommendation provides authority to expend $69,200,000 from the Armed Forces Retirement Home Trust Fund to operate and maintain the Armed Forces Retirement Home-- Washington, District of Columbia, and the Armed Forces Retirement Home--Gulfport, Mississippi. The amount recommended is $7,200,000 above the fiscal year 2010 enacted level and equal to the budget request. CAPITAL PROGRAM Fiscal year 2010 enacted level........................ $72,000,000 Fiscal year 2011 budget request....................... 2,000,000 Committee recommendation in the bill.................. 2,000,000 Comparison with: Fiscal year 2010 enacted level.................... (70,000,000) Fiscal year 2011 budget request................... - - - The Committee recommendation provides authority to expend $2,000,000 from the Armed Forces Retirement Home Trust Fund for construction and renovations. The amount recommended is $70,000,000 below the fiscal year 2010 enacted level and equal to the budget request. The fiscal year 2010 program included a one-time expense associated with replacement of the Scott building on the Washington, DC campus. TITLE IV OVERSEAS CONTINGENCY OPERATIONS Department of Defense Overseas Contingency Operations.--The Committee recognizes that the existing military construction authorization and appropriation process presents a challenge to meeting the dynamic and uncertain conditions on the ground in Afghanistan. The procedures developed to plan and execute projects for peacetime use at domestic military bases are often inadequate for to the demands of a theater of war, where shifts in mission sets are frequent and a premium is placed on adaptation to counter insurgent activity. Projects that have taken months to develop for submission to the Congress may be rendered unnecessary by events at the time they are approved by law; new projects or needs for revised scope may arise which are urgent but which cannot be addressed without resorting to statutory emergency authorities and an often lengthy process of notification, approval, and reprogramming. The commanders in theater must have some flexibility to address new facility requirements without burdensome delay. For the past several years, beginning with the National Defense Authorization Act for Fiscal Year 2004, the Department of Defense has obtained ``Contingency Construction Authority'' to use operation and maintenance funds to address such emergent and unforeseen needs in Iraq, Afghanistan, and other locations in Southwest and Central Asia. As of the end of the second quarter of fiscal year 2010, a total of $1,376,737,000 has been obligated pursuant to this authority. The use of operation and maintenance funding, however, must be weighed against other critical requirements funded by these accounts, and defeats the purpose of having dedicated military construction funding. At the same time, the Committee must preserve its ability and responsibility to conduct oversight of military construction for Afghanistan or any other contingency operation. The Committee therefore recommends the funding according to categories utilized by the Construction Exhibit, or C-1, that was submitted with the budget request. The Committee directs the Secretaries of the Army and Air Force to submit spending plans for the funds provided in the bill no later than 30 days after enactment of this Act, and thereafter to submit a quarterly update on the use of funds, using the same format as the quarterly reports provided for the use of the Contingency Construction Authority. Additionally, the Committee directs that the following guidelines and restrictions shall apply to the military construction funds provided in this title: --The Secretaries of the Army and Air Force shall notify the Committee within 7 days of any scope or cost variations (both increases and decreases) exceeding 20 percent or $2,000,000, whichever is less, for any projects identified in the spending plans. The Secretaries shall also notify the Committee of new projects not identified in the spending plans 14 days prior to obligation; --The funds for each category shall be available for any project eligible for that category according to the guidelines used in the C-1. Should the Secretary of the Army or the Air Force determine that funds are required for any project that will cause obligations to exceed any of the category amounts specified in this report, or to provide for a construction project that falls under a category not specified in this report, he or she shall notify the Committee of this determination 14 days prior to obligating funds for the project; --Minor construction projects are not required to be identified in the spending plans but remain subject to the requirements of 10 U.S.C. 2805; and --Funds made available to the Army and Air Force shall only be available for projects to support contingency operations in Afghanistan and shall not be used to support any enduring missions. Military Construction, Army (INCLUDING TRANSFER OF FUNDS) Fiscal year 2010 enacted level........................ $924,484,000 Fiscal year 2011 budget request....................... 929,996,000 Committee recommendation in the bill\1\............... 929,996,000 Comparison with: Fiscal year 2010 enacted level...................... 5,512,000 Fiscal year 2011 budget request..................... - - - \1\Designated as emergency funding. The Committee recommends an additional $929,996,000 in emergency funding for Military Construction, Army, an increase of $5,512,000 above the fiscal year 2010 enacted level and the same as the request, in support of Overseas Contingency Operations. Of the amount recommended, the Committee provides that $10,000,000 shall be made available by transfer to the Department of Defense Inspector General for the purpose of auditing military construction projects in Afghanistan. The Committee includes this provision to ensure that such projects are being constructed according to standards and procedures that ensure protection of the life, health, and safety of U.S. military and civilian personnel while safeguarding the interests of taxpayers. Military Construction, Air Force Fiscal year 2010 enacted level........................ $474,500,000 Fiscal year 2011 budget request....................... 280,506,000 Committee recommendation in the bill\1\............... 280,504,000 Comparison with: Fiscal year 2010 enacted level...................... (193,996,000) Fiscal year 2011 budget request..................... (2,000) \1\Designated as emergency funding. The Committee recommends an additional $280,504,000 in emergency funding for Military Construction, Air Force, a decrease of $193,996,000 below the fiscal year 2010 enacted level and $2,000 below the request, in support of Overseas Contingency Operations. Military Construction, Defense-Wide Fiscal year 2010 enacted level........................ $ - - - Fiscal year 2011 budget request....................... 46,500,000 Committee recommendation in the bill\1\............... 46,500,000 Comparison with: Fiscal year 2010 enacted level...................... 46,500,000 Fiscal year 2011 budget request..................... - - - \1\Designated as emergency funding. The Committee recommends an additional $46,500,000 in emergency funding for Military Construction, Defense-Wide, the same as the request, in support of Overseas Contingency Operations. Administrative Provisions The bill includes three new provisions. The provisions are as follows: Section 401 designates funds made available by this title as an emergency pursuant to the concurrent resolution on the budget for fiscal year 2010. Section 402 establishes a preference for United States architectural and engineering services. Section 403 establishes a preference for United States contractors for military construction, except that the Secretary of Defense may waive this preference if it is deemed inconsistent with national security. TITLE V GENERAL PROVISIONS The bill includes eleven provisions that were included in the fiscal year 2010 enacted appropriations bill and two new provisions as follows: Section 501 prohibits the obligation of funds beyond the current fiscal year unless expressly so provided. Section 502 requires pay raises to be absorbed within the levels appropriated in the bill. Section 503 prohibits the use of funds for programs, projects or activities not in compliance with Federal law relating to risk assessment, the protection of private property rights, or unfunded mandates. Section 504 prohibits the use of funds to support or defeat legislation pending before Congress. Section 505 encourages all departments and agencies funded in this Act to expand the use of E-Commerce technologies and procedures. Section 506 limits funds from being transferred from this appropriations measure to any instrumentality of the United States Government without authority from an appropriation Act. The Administration proposed to delete this provision. Section 507 specifies the Congressional committees that are to receive all reports and notifications. Section 508 prohibits any funds in this Act to be used for a project or program named for an individual serving as a Member, Delegate, or Resident Commissioner of the United States Congress. Section 509 requires all reports submitted to the Congress to be posted on official websites of the submitting agency. Section 510 prohibits funds in this Act for the Association of Community Organizations for Reform Now. Section 511 prohibits the obligation of funds in this Act in contravention of the new certification requirement established by section 6(b) of the Iran Sanctions Act of 1996, which is to be included in revisions to the Federal Acquisition Regulation pursuant to that section. The revised FAR will require a certification from each prospective contractor that it does not engage in any activity for which sanctions may be imposed under section 5 of the Iran Sanctions Act of 1996. Section 6(b) of the Iran Sanctions Act of 1996 was added by section 102(b) of the recent Comprehensive Iran Sanctions, Accountability, and Divestment Act of 2010. Section 512 prohibits the use of funds to establish or maintain a computer network unless such network blocks the viewing, downloading, and exchanging of pornography, except for law enforcement investigation, prosecution or adjudication activities. Section 513 prohibits the use of funds to process a new enhanced-use lease at the National Home for Disabled Volunteer Soldiers located in Milwaukee, Wisconsin. House of Representatives Report Requirements The following items are included in accordance with various requirements of the rules of the House of Representatives. Changes in Application of Existing Law Pursuant to clause 3(f)(1)(A) of rule XIII of the Rules of the House of Representatives, the following statements are submitted describing the effect of provisions in the accompanying bill that directly or indirectly change the application of existing law. Language is included in various parts of the bill to continue on-going activities that require annual authorization or additional legislation, which to date have not been enacted. Language is included in various parts of the bill to place limitations on the use of funds in the bill or change existing limitations and which might, under some circumstances, be construed as changing the application of existing law. Language is included in various parts of the bill to allow the Secretary of Defense to exceed certain limitations upon notification to the Committee. Language is included in various parts of the bill to allow funding to be used for official reception and representation expenses. Language is included in various parts of the bill to enable various appropriations to remain available for more than one year for some programs for which the basic authority legislation does not presently authorize such extended availability. Language is included in various parts of the bill to permit the transfer of funds to other accounts. Language is included in various parts of the bill to allow funds to be used for the hire of passenger motor vehicles. Language is included under Title I to prohibit payments for cost-plus-a-fixed-fee contracts under certain circumstances. Language is included under Title I to allow advances to the Federal Highway Administration, Department of Transportation under certain circumstances. Language is included under Title I to prohibit the use of funds to begin construction of new bases without specific appropriations. Language is included under Title I to prohibit the use of funds for purchase of land or land easements under certain circumstances. Language is included under Title I to prohibit the use of funds for land acquisition, site preparation, and utility installation for family housing unless funds have been made available in annual appropriations Acts. Language is included under Title I to prohibit the use of minor construction funds to transfer an activity between installations without prior notification. Language is included under Title I to prohibit the use of funds for the procurement of steel for any activity if American steel producers have been denied the opportunity to compete for such steel procurements. Language is included under Title I to prohibit the use of funds to pay real property taxes in any foreign nation. Language is included under Title I to prohibit the use of funds to initiate a new installation overseas without prior notification. Language is included under Title I to limit the use of funds for architect and engineer contracts under certain circumstances. Language is included under Title I to limit the use of funds for awarding contracts to foreign contractors under certain circumstances. Language is included under Title I to require the Department of Defense to notify the appropriate committees of Congress of any proposed military exercises under certain circumstances. Language is included under Title I to limit funding obligations for certain appropriations in the last two months of the fiscal year to 20 percent. Language is included under Title I to allow prior year construction funding to be available for currently authorized projects. Language is included under Title I to allow payment for the cost associated with supervision, inspection, overhead, engineering and design on family housing or military construction projects that are being completed with expired or lapsed funds. Language is included under Title I to allow funds to be expended on military construction projects for four fiscal years after enactment under certain circumstances. Language is included under Title I to allow for the transfer of BRAC proceeds to the BRAC account. Language is included under Title I to allow construction funds to be transferred to Housing Improvement Funds. Language is included under Title I to require the various military departments to submit prior notice to the Committee of solicitation for contracts with the private sector for military family housing under certain circumstances. Language is included under Title I to allow for the transfer of BRAC funds to the Homeowners Assistance Program. Language is included under Title I to limit funds for the operation and maintenance of family housing to those provided in this appropriation and to limit amounts expended on repairs of general and flag officer quarters under certain circumstances. Language is included under Title I to allow funds in the Ford Island Improvement Account to be available until expended for certain purposes. Language is included under Title I to limit funds for projects at closed or realigned installations under certain circumstances. Language is included under Title I to allow for the transfer of expired funding to the Foreign Currency Fluctuation Account under certain circumstances. Language is included under Title I to prohibit the use of funds to expand Pinon Canyon Maneuver Site. Language is included under Title I to allow funds to be transferred among projects or activities within accounts under certain circumstances. Language is included under Title II to require that the Secretary of Veterans Affairs establish a priority for treatment of veterans who are service-connected disabled, lower income, or have special needs. Language is included under Title II to require that the Secretary of Veterans Affairs give priority funding of basic medical benefits to priority groups 1 through 6. Language is included under Title II to allow the Secretary of Veterans Affairs to dispense prescription drugs from VHA facilities to enrolled veterans with privately written prescriptions. Language is included under Title II to allocate a portion of non-recurring maintenance funds outside the Veterans Equitable Resource Allocation. Language is included under Title II providing for the reimbursement to the Department of Defense for the costs of overseas employee mail. Language is included under Title II to require approval of a transfer between projects of the information technology systems account. Language is included under Title II establishing time limitations and reporting requirements concerning the obligation of major construction funds, limiting the use of funds, and allowing the use of funds for program costs. Language is included under Title II to allow minor construction funds to be used to repair non-medical facilities damaged by natural disaster or catastrophe. Language is included under Title II permitting transfers between mandatory and discretionary accounts, limiting and providing for the use of certain funds, funding administrative expenses associated with life insurance programs from excess program revenues, allowing reimbursement from enhanced-use leases and for certain services, requiring notification of new lease agreements, requiring disclosure of insurance and income information, allowing a recovery audit collection program, allowing veterans in the state of Alaska to use Indian Health Service facilities under certain conditions, allowing medical services funds for recreational and funeral expenses, and limiting the obligation of non-recurring maintenance funds during the last two months of the fiscal year. Language is included under the Court of Appeals for Veterans Claims, Salaries and Expenses, to permit the use of funds for a pro bono program. Language is included under Cemeterial Expenses, Army, Salaries and Expenses, to permit the use of funds for parking maintenance and repairs. Language is included under Title IV to limit the use of funds for architect and engineer contracts under certain circumstances. Language is included under Title IV to limit the use of funds for awarding contracts to foreign contractors under certain circumstances. Language is included under Title V to require sums necessary for pay raises to be absorbed within levels appropriated. Language is included under Title V to limit the use of funds for Federal entities when they are not in compliance with Federal law relating to risk assessment, the protection of private property rights, or unfunded mandates. Language is included under Title V to limit the use of funds for publicity or propaganda designed to support or defeat legislation pending before Congress. Language is included under Title V to prohibit the transfer of any funds except pursuant to authority provided in appropriations Acts. Language is included under Title V to prohibit the use of funds for a project or program named for a serving Member of the United States Congress. Language is included under Title V to prohibit funding being distributed to the Association of Community Organizations for Reform Now or its subsidiaries. Language is included under Title V prohibiting funding of a contractor that has not certified that it does not engage in activities for which sanctions may be imposed under section 5 of the Iran Sanctions Act of 1996. Language is included under Title V prohibiting funds from being used to maintain or establish a computer network unless such network blocks the viewing, downloading, and exchanging of pornography. Language is included under Title V prohibiting funds from being used for processing new enhanced-use leases at the National Home for Disabled Volunteer Soldiers in Milwaukee, Wisconsin. Appropriations Not Authorized by Law Pursuant to clause 3(f)(1)(B) of rule XIII of the Rules of the House of Representatives, the following table lists the appropriations in the accompanying bill which are not authorized by law for the period concerned: [Dollars in thousands] ---------------------------------------------------------------------------------------------------------------- Appropriations in Agency/program Last year of Authorization last year of Appropriations in authorization level authorization this bill ---------------------------------------------------------------------------------------------------------------- Military Construction, Army......... 2010 4,643,903 4,413,903 4,981,508 Military Construction, Navy......... 2010 3,769,003 3,534,003 3,587,376 Military Construction, Air Force.... 2010 1,890,426 1,860,835 1,556,889 Military Construction, Defense-Wide. 2010 2,822,823 3,093,679 3,046,112 Military Construction, Army National 2010 582,056 582,056 1,020,228 Guard.............................. Military Construction, Air National 2010 364,226 371,226 292,386 Guard.............................. Military Construction, Army Reserve. 2010 431,566 431,566 358,325 Military Construction, Navy Reserve. 2010 125,874 125,874 91,557 Military Construction, Air Force 2010 112,269 112,269 48,182 Reserve............................ North Atlantic Treaty Organization 2010 197,414 197,414 258,884 Security Investment Program........ Family Housing Construction, Army... 2010 273,236 273,236 92,369 Family Housing Operation and 2010 523,418 523,418 518,140 Maintenance, Army.................. Family Housing Construction, Navy 2010 146,569 146,569 186,444 and Marine Corps................... Family Housing Operation and 2010 368,540 368,540 366,346 Maintenance, Navy and Marine Corps. Family Housing Construction, Air 2010 66,101 66,101 78,025 Force.............................. Family Housing Operation and 2010 502,936 502,936 513,792 Maintenance, Air Force............. Family Housing Construction, Defense- 2010 2,859 2,859 - - - Wide............................... Family Housing Operation and 2010 49,214 49,214 50,464 Maintenance, Defense-Wide.......... Department of Defense Family Housing 2010 2,600 2,600 1,096 Improvement Fund................... Homeowners Assistance Program....... 2010 300,000 323,225 16,515 Chemical Demilitarization 2010 151,541 151,541 124,971 Construction, Defense-Wide......... Base Realignment and Closure, 1990.. 2010 496,768 496,768 460,474 Base Realignment and Closure, 2005.. 2010 7,455,498 7,455,498 2,354,285 Department of Veterans Affairs, 2010 1,183,810 1,194,000 1,166,036 Construction, Major Projects....... ---------------------------------------------------------------------------------------------------------------- Transfer of Funds Pursuant to clause 3(f)(2) of rule XIII of the Rules of the House of Representatives, the following statements are submitted describing the transfer of funds provided in the accompanying bill. Language is included to allow Military Construction, Defense-Wide funds to be transferred to other military construction and family housing appropriations to be merged with and available for the same purpose and same time period. Language is included to allow BRAC proceeds to be transferred to the BRAC account to be merged with and available for the same purpose and same time period. Language is included to allow for the transfer of funds from Family Housing, Construction accounts to the Department of Defense Family Housing Improvement Fund and funds from Military Construction accounts to the Department of Defense Military Unaccompanied Housing Improvement Fund. Language is included to provide transfer authority from the BRAC account to the Homeowners Assistance Program. Language is included to allow the transfer of expired funds to the ``Foreign Currency Fluctuations, Construction, Defense'' account. Language is included to transfer not to exceed $30,423,000 from Compensation and Pensions to General Operating Expenses, Medical Support and Compliance, and Information Technology Systems. These funds are for the administrative costs of implementing cost-savings proposals required by the Omnibus Budget Reconciliation Act of 1990 and the Veterans' Benefits Act of 1992. Language is also included permitting necessary sums to be transferred to the medical facilities revolving fund to augment funding of medical centers for nursing home care provided to pensioners as authorized by the Veterans' Benefits Act of 1992. Language is included to provide authority for the Department of Veterans Affairs for any funds appropriated in 2011 for Compensation and Pensions, Readjustment Benefits, and Veterans Insurance and Indemnities to be transferred among those three accounts. Language is included to transfer funds among the Medical Services, Medical Support and Compliance, and Medical Facilities accounts. Language is included to permit the funds from three life insurance funds to be transferred to General Operating Expenses and Information Technology Systems for the costs of administering such programs. Language is included to permit up to $38,544,000 to be transferred to General Operating Expenses and Information Technology Systems from any funds appropriated in fiscal year 2011 to reimburse the Office of Resolution Management and the Office of Employment Discrimination Complaint Adjudication for services provided. Language is included to transfer certain funds derived from enhanced-use leasing activities to the Construction, Major Projects and Construction, Minor Projects accounts. Language is included to transfer funds from the Medical Care Collections Fund to Medical Services. Language is included to allow the transfer of funds from the Capital Asset Fund to the Construction, Major Projects and Construction, Minor Projects accounts. Language is included to allow the transfer of funds from various accounts to the Information Technology Systems account. Language is included to allow the transfer of funds within Information Technology Systems between projects subject to approval by the Committee. Language is included to allow the transfer of funds provided for the Department of Veterans Affairs to the Joint Department of Defense-Department of Veterans Affairs Medical Facility Demonstration Fund to operate the integrated Captain James A. Lovell Federal Health Care Center. Language is included permitting funds deposited to the Medical Care Collections Fund for health care provided at the Lovell Federal Health Care Center to be transferred to the Joint Department of Defense-Department of Veterans Affairs Medical Facility Demonstration Fund to fund operations of the Love Center. Language is included under the Department of Veterans Affairs that would transfer no less than $15,000,000 for the DoD/VA Health Care Sharing Incentive Fund as authorized by section 8111(d) of title 38, United States Code. Language is included requiring that $10,000,000 of the funds provided for Overseas Contingency Operations, Department of Defense, Military Construction, Army, be transferred to the Department of Defense Office of the Inspector General for audits of military construction projects in Afghanistan. Constitutional Authority Clause 3(d)(1) of rule XIII requires each committee report on a public bill or joint resolution to contain a statement citing the specific powers granted to Congress in the Constitution to enact the law proposed by the bill or joint resolution. The Committee on Appropriations bases its authority to report this legislation on clause 7 of section 9 of article I of the Constitution of the United States, which states ``No money shall be drawn from the Treasury, but in Consequence of Appropriations made by Law. ...'' Appropriations contained in this Act are made pursuant to this specific power granted by the Constitution. Comparison With the Budget Resolution Pursuant to clause 3(c)(2) of rule XIII of the Rules of the House of Representatives and section 308(a)(1)(A) of the Congressional Budget Act of 1974, the following table compares the levels of new budget authority provided in the bill with the appropriate allocation under section 302(b) of the Budget Act. [In millions of dollars] ---------------------------------------------------------------------------------------------------------------- 302(b) allocation This bill --------------------------------------------------- Budget Budget authority Outlays authority Outlays ---------------------------------------------------------------------------------------------------------------- Discretionary............................................... 75,998 80,895 75,998 80,887 Mandatory................................................... 69,190 69,000 69,190 69,000 ---------------------------------------------------------------------------------------------------------------- Five-Year Projection of Outlays Pursuant to section 308(a)(1)(B) of the Congressional Budget Act of 1974, the following table contains five-year projections prepared by the Congressional Budget Office of outlays associated with the budget authority provided in the accompanying bill: Millions Budget Authority........................................ 75,998 Outlays: 2011................................................ 73,584 2012................................................ 10,026 2013................................................ 6,882 2014................................................ 2,741 2015................................................ 1,913 Assistance to State and Local Governments Pursuant to section 308(a)(1)(C) of the Congressional Budget Act of 1974, the amount of financial assistance to State and local governments is as follows: Millions Budget Authority........................................ 199 Fiscal Year 2011 outlays resulting therefrom............ 47 Statement of General Performance Goals and Objectives Pursuant to clause 3(c)(4) of rule XIII of the Rules of the House of Representatives, the following is a statement of general performance goals and objectives for which this measure authorizes funding: The Committee on Appropriations considers program performance, including a program's success in developing and attaining outcome-related goals and objectives, in developing funding recommendations. Compliance With Rule XIII, Cl. 3(e) (Ramseyer Rule) In compliance with clause 3(e) of rule XIII of the Rules of the House of Representatives, the Committee notes that the accompanying bill does not propose to repeal or amend a statute or part thereof. Full Committee Votes Pursuant to the provisions of clause 3(b) of rule XIII of the House of Representatives, the results of each roll call vote on an amendment or on the motion to report, together with the names of those voting for and those voting against, are required to be included in the Committee report. No roll call votes were ordered on an amendment to, or the motion to report, this bill. Disclosure of Earmarks and Congressionally Directed Spending Items The following table is submitted in compliance with clause 9 of rule XXI, and lists the Congressional earmarks (as defined in paragraph (e) of clause 9) contained in the bill or in this report. Neither the bill nor the report contains any limited tax benefits or limited tariff benefits as defined in paragraphs (f) or (g) of clause 9 of rule XXI. DEPARTMENT OF DEFENSE, MILITARY CONSTRUCTION [Presidentially Directed Spending Items] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Requester(s) Account State: Location Project Title Amount --------------------------------------------------------------- Administration House ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alabama: Fort Rucker Aviation Component Maintenance Shop $29,000,000 The President Bright ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alabama: Fort Rucker Aviation Maintenance Facility $36,000,000 The President Bright ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alabama: Fort Rucker Training Aids Center $4,650,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Alabama: Mobile T-6 Solo Capable Outlying Landing Field $29,082,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Alabama: Maxwell AFB Add/Alter Air University Library $13,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Alabama: Montgomery ANGB Fuel Cell and Corrosion Control Hangar $7,472,000 The President Bright ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alaska: Fort Greely Fire Station $26,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alaska: Fort Richardson Brigade Complex, Ph 1 $67,038,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alaska: Fort Richardson Multipurpose Machine Gun Range $12,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alaska: Fort Richardson Simulations Center $34,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alaska: Fort Wainwright Aviation Task Force Complex, Ph 2A (Hangar) $142,650,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alaska: Fort Wainwright Aviation Task Force Complex, Ph 2B (COF) $27,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alaska: Fort Wainwright Urban Assault Course $3,350,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Alaska: Eielson AFB Repair Central Heat Plant & Boilers $28,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Alaska: Elmendorf AFB Add/Alter Operations Squadron Tra. $4,749,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Alaska: Elmendorf AFB Railhead Operations Facility $15,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Alaska: Elmendorf AFB F-22 Add/Alter Weapons System Release Shop $10,525,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ FH Army Alaska: Fort Wainwright Family Housing Replacement (110 Units) $21,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Arizona: Yuma MCAS Aircraft Mainenance Hangar $63,280,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Arizona: Yuma MCAS Aircraft Mainenance Hangar $40,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Arizona: Yuma MCAS Communications Infrastructure Upgrade $63,730,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Arizona: Yuma MCAS Intermediate Maintenance Activity Facility $21,480,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Arizona: Yuma MCAS Simulator Facility $36,060,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Arizona: Yuma MCAS Utilities Infrastructure Upgrade $44,320,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Arizona: Yuma MCAS Van Pad Complex Relocation $15,590,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Arizona: Davis-Monthan AFB AMARG Hangar $25,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Arizona: Davis-Monthan AFB HC-130 AGE Maintenance Facility $4,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Arizona: Davis-Monthan AFB HC-130 Aerial Cargo Facility $10,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Arizona: Davis-Monthan AFB HC-130J Parts Store $8,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Arizona: Fort Huachuca Reaper LRE Beddown $11,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Arizona: Yuma Proving Ground SOF Military Free Fall Simulator $8,977,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Arizona: Florence Readiness Center $16,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Arizona: Davis-Monthan AFB Predator FOC Active Duty Associate $4,650,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Arkansas: Camp Robinson Combined Support Maintenance Shop $30,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Arkansas: Fort Chaffee Combined Arms Collective Training Facility $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Arkansas: Fort Chaffee Live Fire Shoot House $2,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army California: Presidio of Monterey Advanced Individual Training Barracks $63,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army California: Presidio of Monterey General Instruction Building $39,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army California: Presidio of Monterey Satellite Communications Facility $38,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton BEQ--13 Area $42,864,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton BEQ--Las Flores $37,020,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton CNATT/FRS--Aviation Training and BEQ $66,110,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton Conveyance/Water Treatment $100,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton MALS-39 Mainenance Hangar Expansion $48,230,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton Marine Corps Energy Initiative $9,950,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton North Region Tertiary Treatment Plant, Incr 2 $30,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton Small Arms Magazine--Edson Range $3,760,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Camp Pendleton Truck Company Operations Complex $53,490,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Coronado NAB Rotary Hangar $67,160,000 The President Davis (CA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Miramar MCAS Aircraft Mainenance Hangar $90,490,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Miramar MCAS Hangar 4 $33,620,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Miramar MCAS Parking Apron/Taxiway Expansion $66,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: San Diego BEQ, Homeport Ashore $75,342,000 The President Davis (CA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: San Diego Berthing Pier 12 Replace & Dredging, Ph 1 $108,414,000 The President Davis (CA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: San Diego Marine Corps Energy Initiative $9,950,000 The President Davis (CA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Twentynine Palms MCB BEQ and Parking Structure $53,158,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide California: Point Loma Annex Replace Storage Facility, Incr 3 $20,000,000 The President Davis (CA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide California: Point Mugu Aircraft Direct Fueling Station $3,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG California: Camp Roberts Combined Arms Collective Training Facility $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve California: Fairfield Army Reserve Center $26,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve California: Fort Hunter Liggett ECS Tactical Equipment Maintenance Facility $22,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve California: Fort Hunter Liggett ECS Warehouse $15,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve California: Fort Hunter Liggett Grenade Launcher Range $1,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve California: Fort Hunter Liggett Hand Grenade Familiarization Range (Live) $1,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve California: Fort Hunter Liggett Light Demolition Range $2,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve California: Fort Hunter Liggett Tactical Vehicle Wash Rack $9,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Reserve California: Twentynine Palms MCB Tank Vehicle Mainenance Facility $5,991,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Colorado: Fort Carson Automated Sniper Field Fire Range $3,650,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Colorado: Fort Carson Battalion Headquarters $6,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Colorado: Fort Carson Brigade Complex $56,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Colorado: Fort Carson Simulations Center $40,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Colorado: Buckley AFB Security Forces Operations Facility $12,160,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Colorado: Peterson AFB RAIDRS Space Control Facility $24,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Colorado: U.S. Air Force Academy Center for Character & Leadership Development $27,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Colorado: Fort Carson SOF Tactical UAV Hangar $3,717,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Colorado: Colorado Springs Readiness Center $20,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Colorado: Fort Carson Regional Training Institute $40,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Colorado: Gypsum HAATS/AASF $39,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Colorado: Windsor Readiness Center $7,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Chem Demil Colorado: Pueblo Depot Ammunition Demilitarization Facility, Ph XII $65,569,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Connecticut: Windsor Locks Aviation Readiness Center $41,000,000 The President DeLauro; Larson ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Delaware: New Castle Armed Forces Reserve Center (JFHQ) $27,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Delaware: Dover AFB C-5M/C-17 Maintenance Training Facility, Ph 2 $3,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Delaware: New Castle CAP Joint Forces Operations Center--ANG Share $1,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force District of Columbia: Bolling AFB Joint Air Defense Operations Center $13,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide District of Columbia: Bolling AFB Replace Parking Structure, Ph 1 $3,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Florida: Eglin AFB Chapel $6,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Florida: Miami-Dade County Command and Control Facility $41,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Florida: Miami USAG Commissary (SOUTHCOM HQ) $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Florida: Blount Island MCSF Consolidated Warehouse Facility $17,260,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Florida: Blount Island MCSF Container Staging and Loading Lot $5,990,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Florida: Blount Island MCSF Container Storage Lot $4,910,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Florida: Blount Island MCSF Hardstand Extension $17,930,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Florida: Blount Island MCSF Paint and Blast Facility $18,840,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Florida: Blount Island MCSF Washrack Expansion $9,690,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Florida: Tampa JCSE Vehicle Paint Facility $2,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Florida: Eglin AFB F-35 Fuel Cell Maintenance Hangar $11,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Florida: Hurlburt Field Add/Alter Special Operations School Facility $6,170,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Florida: Hurlburt Field Add to Visiting Quarters (24 Room) $4,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Florida: Hurlburt Field Base Logistics Facility $24,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Florida: Patrick AFB Air Force Technical Applications Center $79,009,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Florida: Eglin AFB SOF Ground Support Battalion Detachment $6,030,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Florida: Jacksonville IAP Security Forces Training Facility $6,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Florida: North Fort Myers Army Reserve Center/Land $13,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Florida: Orlando Army Reserve Center/Land $10,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Florida: Tallahassee Army Reserve Center/Land $10,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Reserve Florida: Patrick AFB Weapons Maintenance Facility $3,420,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Benning Land Acquisition $12,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Benning Museum Operations Support Building $32,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Benning Trainee Barracks Ph 2 $51,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Benning Training Battalion Complex, Ph 2 $14,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Benning Training Battalion Complex, Ph 2 $14,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Benning Vehicle Maintenance Shop $53,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Gordon Training Aids Center $4,150,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Stewart Automated Infantry Platoon Battle Course $6,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Stewart Automated Multipurpose Machine Gun Range $9,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Stewart Aviation Unit Operations Complex $47,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Stewart Battalion Complex $18,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Stewart General Instruction Building $8,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Stewart Modified Record Fire Range $3,750,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Stewart Simulations Center $26,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Georgia: Fort Stewart Training Aids Center $7,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Georgia: Kings Bay NSB Security Enclave & Vehicle Barriers $45,004,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Georgia: Kings Bay NSB Waterfront Emergency Power $15,660,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Georgia: Fort Benning Dexter Elementary School Gym $2,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Georgia: Fort Benning SOF Company Support Faciliy $20,441,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Georgia: Fort Benning SOF Military Working Dog Kennel Complex $3,624,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Georgia: Augusta NSA/CSS Georgia Training Facility $12,855,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Georgia: Fort Stewart Health Clinic Add/Alt $35,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Georgia: Hunter AAF SOF TEMF Expansion $3,318,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Georgia: Hunter ANGS Fuel Unload Facility $2,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Georgia: Cumming Readiness Center $17,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Georgia: Dobbins ARB Readiness Center Add/Alt $10,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Georgia: Savannah/Hilton Head IAP Relocate ASOS Facility $7,450,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Georgia: Macon Army Reserve Center/Land $11,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Hawaii: Fort Shafter Command and Control Facility, Ph 1 $58,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Hawaii: Fort Shafter Flood Mitigation $23,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Hawaii: Schofield Barracks Barracks $98,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Hawaii: Schofield Barracks Barracks $90,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Hawaii: Schofield Barracks Training Aids Center $24,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Hawaii: Tripler AMC Barracks $28,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Hawaii: Camp H.M. Smith Physical Fitness Center $29,960,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Hawaii: Kaneohe Bay BEQ $90,530,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Hawaii: Kaneohe Bay Waterfront Operations Facility $19,130,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Hawaii: Pearl Harbor Center for Disaster Mgmt./Humanitarian Assistance $9,140,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Hawaii: Pearl Harbor Joint POW/MIA Accounting Command $99,328,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Hawaii: Hickam AFB Alter Fuel Storage Tanks $8,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Hawaii: Pearl Harbor NSWG3 Command and Operations Facility $28,804,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Hawaii: Kalaeloa Combined Support Maintenance Shop $38,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Hawaii: Hickam AFB F-22 Beddown Infrastructure Support $5,950,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Hawaii: Hickam AFB F-22 Hangar, Squadron Operations & AMU $48,250,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Hawaii: Hickam AFB F-22 Upgrade Munitions Complex $17,250,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Idaho: Mountain Home AFB Replace POL Fuel Storage Tanks $27,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Idaho: Gowen Field Barracks (ORTC) Ph 1 $17,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Idaho: Mountain Home AFB Tactical UAS Facility $6,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Illinois: Scott AFB Field Command Facility Upgrade (DISA) $1,388,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Illinois: Springfield Add/Alt Combined Support Maintenance Shop $15,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Illinois: Capital MAP CNAF Beddown Upgrade Facilities $16,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Illinois: Quincy Army Reserve Center/Land $12,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Indiana: Hulman RAP ASOS Beddown Upgrade Facilities $4,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Indiana: Michigan City Army Reserve Center/Land $15,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Iowa: Des Moines Army Reserve Center $8,175,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kansas: Fort Leavenworth Vehicle Maintenance Shop $7,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kansas: Fort Riley Automated Infantry Squad Battle Course $4,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kansas: Fort Riley Automated Qualification Training Range $14,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kansas: Fort Riley Battalion Complex, Ph 1 $31,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kansas: Fort Riley Known Distance Range $7,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Kansas: Wichita Field Maintenance Shop $24,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Kansas: Wichita Readiness Center $43,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Campbell Automated Sniper Field Fire Range $1,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Campbell Brigade Complex $67,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Campbell Company Operations Facilities $25,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Campbell Rappelling Training Area $5,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Campbell Unit Operations Facilities $26,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Campbell Urban Assault Course $3,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Campbell Vehicle Maintenance Shop $15,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Knox Access Corridor Improvements $6,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Kentucky: Fort Knox MOUT Collective Training Facility $12,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Kentucky: Fort Campbell SOF Battalion Operations Complex $38,095,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Kentucky: Burlington Readiness Center $19,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Chem Demil Kentucky: Blue Grass Depot Ammunition Demilitarization Facility, Ph XI $59,402,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Louisiana: Fort Polk Barracks $29,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Louisiana: Fort Polk Heavy Sniper Range $4,250,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Louisiana: Fort Polk Land Acquisition $6,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Louisiana: Fort Polk Land Acquisition $24,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Louisiana: Barksdale AFB Weapons Load Crew Training Facility $18,140,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Louisiana: Fort Polk Tactical UAS Facility $5,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Louisiana: Camp Minden Readiness Center $28,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Reserve Louisiana: New Orleans NAS/JRB Joint Air Traffic Control Facility $16,281,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Maryland: Aberdeen Proving Ground Auto Tech Evaluation Facility Ph 2 $14,600,000 The President Ruppersberger ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Maryland: Fort Meade Indoor Firing Range $7,600,000 The President Ruppersberger ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Maryland: Fort Meade Wideband SATCOM Operations Center $25,000,000 The President Ruppersberger ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Maryland: Indian Head NSWC Agile Chemical Facility, Ph 2 $34,238,000 The President Hoyer ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Maryland: Patuxent River NAS Broad Area Maritime Surveillance T&E Facility $42,211,000 The President Hoyer ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Aberdeen Proving Ground USAMRICD Replacement, Incr 3 $105,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Andrews AFB Replace Fuel Storage & Distribution Facility $14,000,000 The President Edwards (MD) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Bethesda WRNNMC Parking Expansion $17,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Bethesda Transient Wounded Warrior Lodging $62,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Fort Detrick Consolidated Logistics Facility $23,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Fort Detrick Information Services Facility Expansion $4,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Fort Detrick NIBC Security Fencing and Equipment $2,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Fort Detrick Supplemental Water Storage $3,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Fort Detrick USAMRIID Stage I, Incr 5 $17,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Fort Detrick Water Treatment Plant Repair & Supplement $11,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Maryland: Fort Meade North Campus Utility Plant $219,360,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Maryland: St. Inigoes (Webster Tactical UAS Facility $5,500,000 The President Hoyer Field) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Maryland: Martin State Airport Replace Operations & Medical Training Facility $11,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Massachusetts: Hanscom AFB Mental Health Clinic Addition $2,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Massachusetts: Hanscom AFB Armed Forces Reserve Center (JFHQ), Ph 2 $23,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Massachusetts: Devens RFTA Automated Record Fire Range $4,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Michigan: Camp Grayling Combined Arms Collective Training Facility $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Minnesota: Arden Hills Field Maintenance Shop $29,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Minnesota: Camp Ripley Infantry Squad Battle Course $4,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Minnesota: Camp Ripley Tactical UAS Facility $4,450,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Missouri: Fort Leonard Wood Barracks $29,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Missouri: Fort Leonard Wood Brigade Headquarters $12,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Missouri: Fort Leonard Wood General Instruction Building $7,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Missouri: Fort Leonard Wood Information Systems Facility $15,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Missouri: Fort Leonard Wood Training Barracks $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Missouri: Fort Leonard Wood Transient Advanced Trainee Barracks, Ph 2 $29,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Missouri: Belton Army Reserve Center $11,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Nebraska: Lincoln Readiness Center Add/Alt $3,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Nebraska: Mead Readiness Center $11,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Nevada: Creech AFB UAS Airfield Fire/Crash Rescue Station $11,710,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Nevada: Nellis AFB F-35 Add/Alt 422 Test Evaluation Squadron Fac. $7,870,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Nevada: Nellis AFB F-35 Add/Alt Flight Test Instrumentation Facility $1,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Nevada: Nellis AFB F-35 Flight Simulator Facility $13,110,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Nevada: Nellis AFB F-35 Maintenance Hangar/AMU $28,760,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG New Hampshire: Pembroke Barracks Facility (RTI) $15,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG New Hampshire: Pembroke Classroom Facility (RTI) $21,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Jersey: McGuire AFB Base Operations/Command Post Facility $8,000,000 The President Rothman ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Jersey: McGuire AFB Dormitory (120 Room) $18,440,000 The President Rothman ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New Mexico: White Sands Missile Barracks $29,000,000 The President Range ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Cannon AFB Dormitory (96 Room) $14,000,000 The President Lujan ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Cannon AFB UAS Squadron Operations Facility $20,000,000 The President Lujan ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Holloman AFB UAS Add/Alt Maintenance Hangar $15,470,000 The President Teague ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Holloman AFB UAS Maintenance Hangar $22,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Kirtland AFB Aerial Delivery Facility Addition $3,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Kirtland AFB Armament Shop $6,460,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Kirtland AFB H/MC-130 Fuel System Maintenance Facility $14,142,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide New Mexico: Cannon AFB SOF Add/Alt Simulator Facility for MC-130 $13,287,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide New Mexico: Cannon AFB SOF C-130 Parking Apron Ph I $26,006,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide New Mexico: Cannon AFB SOF Aircraft Parking Apron (MC-130J) $12,636,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide New Mexico: Cannon AFB SOF Hangar/AMU (MC-130J) $24,622,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide New Mexico: Cannon AFB SOF Operations and Training Complex $39,674,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide New Mexico: White Sands Missile Health and Dental Clinics $22,900,000 The President Range ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG New Mexico: Farmington Readiness Center Add/Alt $8,500,000 The President Lujan ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve New Mexico: Las Cruces Army Reserve Center/Land $11,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: Fort Drum Aircraft Fuel Storage Complex $14,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: Fort Drum Aircraft Mainenance Hangar $16,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: Fort Drum Battalion Complex $61,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: Fort Drum Brigade Complex, Ph 1 $55,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: Fort Drum Infantry Squad Battle Course $8,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: Fort Drum Training Aids Center $18,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: Fort Drum Transient Training Barracks $55,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: U.S. Military Academy Science Facility, Ph 2 $130,624,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: U.S. Military Academy Urban Assault Course $1,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New York: Fort Drum 20th Air Support Operations Squadron Complex $20,440,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide New York: Fort Drum West Point Middle School Add/Alt $27,960,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG New York: Fort Drum Reaper Infrastructure Support $2,500,000 The President Maffei ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG New York: Stewart IAP Base Defense Group Beddown $14,250,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve New York: Binghamton Army Reserve Center/Land $13,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Battalion Complex $33,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Brigade Complex $50,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Brigade Complex $25,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Brigade Complex $41,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Command and Control Facility (82nd Airborne) $53,000,000 The President Etheridge ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Company Operations Facilities $12,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Dining Facility $11,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Murchison Road Right of Way Acquisition $17,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Staging Area Complex $14,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Student Barracks $18,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Vehicle Maintenance Shop $28,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army North Carolina: Fort Bragg Vehicle Maintenance Shop $7,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune 2nd Intel Battalion Maintenance/Ops Complex $90,270,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Armory--II MEF--Wallace Creek $12,280,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune BEQ--Camp Johnson $46,550,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune BEQ--Courthouse Bay $42,330,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune BEQ--Courthouse Bay $40,780,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune BEQ--French Creek $43,640,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune BEQ--Rifle Range $55,350,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune BEQ--Wallace Creek $51,660,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune BEQ--Wallace Creek North $46,290,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune EOD Addition--2nd Marine Logistics Group $7,420,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Hangar $73,010,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Maintenance Hangar (HMLA) $74,260,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Maintenance/Ops Complex--2nd ANGLICO $36,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Marine Corps Energy Initiative $9,950,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Mess Hall--French Creek $25,960,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Mess Hall Addition--Courthouse Bay $2,553,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Motor Transportation/Comm. Maintenance Facility $18,470,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Utility Expansion--French Creek $56,050,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Camp Lejeune Utility Expansion--Hadnot Point $56,470,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Cherry Point MCAS BEQ $42,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Cherry Point MCAS Mariners Bay Land Acquisition--Bogue $3,790,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Cherry Point MCAS Missile Magazine $13,420,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy North Carolina: Cherry Point MCAS Station Infrastructure Upgrades $5,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Camp Lejeune Tarawa Terrace I Replace Elementary School $16,646,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Fort Bragg Replace McNair Elementary School $23,086,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Fort Bragg Replace Murray Elementary School $22,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Fort Bragg SOF Admin/Company Operations $10,347,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Fort Bragg SOF C4 Facility--JSOC $41,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Fort Bragg SOF Joint Intelligence Brigade Facility $32,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Fort Bragg SOF Operational Communications Facility $11,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Fort Bragg SOF Operational Support Facility $13,465,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide North Carolina: Fort Bragg SOF Operations Additions $15,795,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG North Carolina: High Point Readiness Center Add/Alt $1,551,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG North Carolina: Stanly County Upgrade ASOS Facilities $2,000,000 The President Airport ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force North Dakota: Minot AFB Control Tower/Base Operations Facility $18,770,000 The President Pomeroy ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG North Dakota: Camp Grafton Readiness Center Add/Alt $11,200,000 The President Pomeroy ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Ohio: Columbus Replace Public Safety Facility $7,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Oklahoma: Fort Sill General Purpose Storage Building $13,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Oklahoma: Fort Sill Museum Operations Support Building $12,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Oklahoma: McAlester AAP Igloo Storage, Depot Level $3,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Oklahoma: Tinker AFB Upgrade Building 3001 Infrastructure, Ph III $14,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Pennsylvania: New Cumberland Depot Replace Headquarters Facility $96,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Pennsylvania: State College ANGS Add/Alter AOS Facility $4,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Rhode Island: Newport NS Electromagnetic Sensor Facility $27,007,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Rhode Island: East Greenwich U.S. Property and Fiscal Office $27,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army South Carolina: Fort Jackson Trainee Barracks $28,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army South Carolina: Fort Jackson Trainee Barracks Complex, Ph 1 $46,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army South Carolina: Fort Jackson Training Aids Center $17,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy South Carolina: Beaufort MCAS AICUZ Land Acquisition $21,190,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy South Carolina: Beaufort MCAS Aircraft Hangar--VMFAT-502 $46,550,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy South Carolina: Beaufort MCAS Physical Fitness Center $15,430,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy South Carolina: Beaufort MCAS Training and Simulator Facility $46,240,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force South Carolina: Charleston AFB Civil Engineer Complex--Ph 1 $15,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG South Dakota: Watertown Readiness Center $25,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Tennessee: Nashville IAP Renovate Intel Squadron Facilities $5,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Automated Multipurpose Machine Gun Range $6,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Company Operations Facilities $18,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Digital Multipurpose Training Range $22,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Heavy Sniper Range $3,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Indoor Swimming Pool $15,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Light Demolition Range $2,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Live Fire Exercise Shoothouse $3,150,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Scout/RECCE Gunnery Complex $15,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Squad Defense Range $3,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss THAAD Battery Complex $17,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Transient Training Complex $31,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Urban Assault Course $2,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Vehicle Bridge Overpass $8,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Hood Battalion Complex $40,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Hood Brigade Complex $38,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Hood Company Operations Facilities $4,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Hood Convoy Live Fire $3,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Hood Live Fire Exercise Shoothouse $2,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Hood UAS Hangar $55,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Hood Urban Assault Course $2,450,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Sam Houston Simulations Center $16,000,000 The President Rodriguez ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Sam Houston Training Aids Center $6,200,000 The President Rodriguez ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Texas: Dyess AFB C-130J Add/Alt Flight Simulator Facility $4,080,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Texas: Ellington Field Upgrade UAV Maintenance Hangar $7,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Texas: Lackland AFB BMT Satellite Classroom/Dining Facility No. 2 $32,000,000 The President Gonzalez; Rodriguez ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Texas: Lackland AFB One Company Fire Station $5,500,000 The President Gonzalez; Rodriguez ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Texas: Lackland AFB Recruit Dormitory, Ph 3 $67,980,000 The President Gonzalez; Rodriguez ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Texas: Lackland AFB Recruit/Family Inprocessing & Info Center $21,800,000 The President Gonzalez; Rodriguez ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Texas: Fort Bliss Hospital Replacement, Incr 2 $147,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Texas: Lackland AFB Ambulatory Care Center, Ph 2 $162,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Texas: Camp Maxey Combat Pistol/Military Pistol Qualification Course $2,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Texas: Camp Swift Urban Assault Course $2,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Texas: Denton Army Reserve Center/Land $12,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Texas: Rio Grande Army Reserve Center/Land $6,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Texas: San Marcos Army Reserve Center/Land $8,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Utah: Hill AFB F-22 T-10 Engine Test Cell $2,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Utah: Camp Williams Data Center, Incr 2 $398,358,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort A.P. Hill 1200 Meter Range $14,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort A.P. Hill Indoor Firing Range $6,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort A.P. Hill Known Distance Range $3,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort A.P. Hill Light Demolition Range $4,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort A.P. Hill MOUT Collective Training Facility $65,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort Eustis Warrior in Transition Complex $18,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort Lee Automated Qualification Training Range $7,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort Lee Company Operations Facilities $4,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort Lee Museum Operations Support Building $30,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort Lee Training Aids Center $5,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Virginia: Norfolk Pier 1 Upgrades to Berth USNS Comfort $10,035,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Virginia: Norfolk Piers 9 and 10 Upgrades for DDG 1000 $2,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Virginia: Portsmouth Ship Repair Pier Replacement, Incr 2 $100,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Virginia: Quantico MCB Academic Facility Addition--SNCOA $12,080,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Virginia: Quantico MCB BEQ--WTBN $37,810,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Virginia: Quantico MCB Research Center Addition--MCU $37,920,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Virginia: Quantico MCB Student Officer Quarters--TBS $55,822,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Virginia: Langley AFB F-22 Add/Alter Hangar Bay LO/CR Facility $8,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Virginia: Craney Island Replace Fuel Pier $58,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Virginia: Fort Belvoir Dental Clinic Replacement $6,300,000 The President Moran (VA); Connolly ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Virginia: Pentagon Reservation Pentagon Metro & Corridor 8 Screening Facility $6,473,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Virginia: Pentagon Reservation Power Plant Modernization Ph 3 $51,928,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Virginia: Pentagon Reservation Secure Access Lane--Remote Vehicle Screening $4,923,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Virginia: Quantico MCB New Consolidated Elementary School $47,355,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Virginia: Fort A.P. Hill Army Reserve Center $15,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Virginia: Roanoke Army Reserve Center/Land $14,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Virginia: Virginia Beach Army Reserve Center $11,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Reserve Virginia: Fort Story Navy Ordnance Cargo Logistics Training Comp. $21,346,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Washington: Fort Lewis Barracks $47,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Washington: Fort Lewis Barracks Complex $40,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Washington: Fort Lewis Rappelling Training Area $5,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Washington: Fort Lewis Regional Logistic Support Complex Warehouse $16,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Washington: Fort Lewis Regional Logistic Support Complex $63,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Washington: Yakima Sniper Field Fire Range $3,750,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Washington: Bangor CSDS-5 Laboratory Expansion Ph 1 $16,170,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Washington: Bangor Limited Area Emergency Power $15,810,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Washington: Bangor Waterfront Restricted Area Emergency Power $24,913,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Washington: Bremerton Limited Area Production/Staging Complex, Incr $19,116,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Washington: Fort Lewis Preventive Medicine Facility $8,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Washington: Tacoma Combined Support Maintenance Shop $25,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Reserve Washington: Yakima Marine Corps Reserve Center $13,844,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG West Virginia: Moorefield Readiness Center $14,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG West Virginia: Morgantown Readiness Center $21,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Wisconsin: Madison Aircraft Parking $5,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Wisconsin: Fort McCoy AT/MOB Billeting Complex Ph I $9,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve Wisconsin: Fort McCoy NCO Academy Ph II $10,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Wyoming: Camp Guernsey Nuclear/Space Security Tactics Training Center $4,650,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Wyoming: Laramie Field Maintenance Shop $14,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Afghanistan: Bagram AB Army Aviation HQ Facilities $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Afghanistan: Bagram AB Barracks $18,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Afghanistan: Bagram AB Consolidated Community Support Area $14,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Afghanistan: Bagram AB Eastside Electrical Distribution $10,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Afghanistan: Bagram AB Eastside Utilities Infrastructure $29,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Afghanistan: Bagram AB Entry Control Point $7,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Afghanistan: Bagram AB Joint Defense Operations Center $2,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Afghanistan: Bagram AB Consolidated Rigging Facility $9,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Afghanistan: Bagram AB Fighter Hangar $16,480,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Afghanistan: Bagram AB MEDEVAC Ramp Expansion/Fire Station $16,580,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Bahrain: Bahrain NSA NAVCENT Ammunition Magazines $89,280,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Bahrain: Bahrain NSA Operations and Support Facilities $60,002,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Bahrain: Bahrain NSA Waterfront Development, Ph 3 $63,871,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Bahrain: Shaikh Isa AB North Apron Expansion $45,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Belgium: Brussels NATO Headquarters Facility $31,863,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Belgium: Brussels Replace SHAPE Middle School/High School $67,311,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Djibouti: Camp Lemonier Headquarters Facility $12,407,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Djibouti: Camp Lemonier General Warehouse $7,324,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Djibouti: Camp Lemonier Horn of Africa Joint Operations Center $28,076,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Djibouti: Camp Lemonier Pave External Roads $3,824,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Ansbach Physical Fitness Center $13,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Ansbach Vehicle Maintenance Shop $18,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Grafenwoehr Barracks $17,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Grafenwoehr Barracks $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Grafenwoehr Barracks $20,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Grafenwoehr Barracks $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Rhine Ordnance Barracks Barracks Complex $35,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Sembach Confinement Facility $9,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Wiesbaden AB Command and Battle Center, Incr 2 $59,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Wiesbaden AB New Access Control Point $5,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Wiesbaden AB Information Processing Center $30,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Germany: Wiesbaden AB Sensitive Compartmented Information Facility Inc 1 $46,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Germany: Kapaun Dormitory (128 Room) $19,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Germany: Ramstein AB C-130J Flight Simulator Facility $8,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Germany: Ramstein AB Deicing Fluid Storage & Dispensing Facility $2,754,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Germany: Ramstein AB UAS SATCOM Relay Pads & Facility $10,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Germany: Vilseck ASOS Complex $12,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Germany: Katterbach Health/Dental Clinic Replacement $37,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Germany: Panzer Kaserne Replace Boeblingen High School $48,968,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Germany: Vilseck Health Clinic Add/Alt $34,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ FH Army Germany: Baumholder Family Housing Replacement (64 Units) $34,329,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Guam: Guam NB Apra Harbor Wharves Improvements, Ph 1, Incr 2 $40,000,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Guam: Guam NB Defense Access Road Improvements $66,730,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Guam: Guam NB Finegayan Site Prep and Utilities $47,210,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Guam: Andersen AFB Guam Strike Ops Group & Tanker Task Force Ren. $9,100,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Guam: Andersen AFB Guam Strike South Ramp Utilities, Ph 1 $12,200,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Guam: Andersen AFB PRTC--Combat Communications Operations Facility $9,200,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Guam: Andersen AFB PRTC--Red Horse Headquarters/Engineering Facility $8,000,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Guam: Andersen AFB PRTC--Commando Warrior Open Bay Student Barracks $11,800,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Guam: Guam NH Hospital Replacement, Incr 2 $70,000,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Guam: Barrigada Combined Support Maintenance Shop, Ph 1 $19,000,000 The President Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ FH Navy Guantanamo Bay: Guantanamo NS Replace GTMO Housing $37,169,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Honduras: Soto Cano AB Barracks $20,400,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Italy: Vicenza Brigade Complex--Barracks/Community, Incr 4 $13,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Italy: Vicenza Brigade Complex--Operations Support Facility, Incr $13,000,000 The President 4 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Italy: Aviano AB ASOS Facility $10,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Italy: Aviano AB Dormitory (144 Room) $19,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Japan: Atsugi NAF MH-60R/S Trainer Facility $6,908,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Japan: Kadena AB Install Fuel Filters-Separators $3,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Japan: Misawa AB Hydrant Fuel System $31,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Korea: Camp Walker Electrical System Upgrade & Natural Gas System $19,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Korea: Kunsan AB DMT Flight Simulator Facility $7,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Korea: Camp Carroll Health/Dental Clinic Replacement $19,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Puerto Rico: Fort Buchanan Antilles ES/IS--Replace School $58,708,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Puerto Rico: Camp Santiago Live Fire Shoot House $3,100,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Puerto Rico: Camp Santiago Multipurpose Machine Gun Range $9,200,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Qatar: Al Udeid AB Blatchford-Preston Complex, Ph III $62,300,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Qatar: Al Udeid AB NSA Warehouse $1,961,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Spain: Rota NS Air Traffic Control Tower $23,190,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force United Kingdom: RAF Mildenhall Extend Taxiway Alpha $15,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide United Kingdom: RAF Alconbury Alconbury Elementary School Replacement $30,308,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide United Kingdom: Menwith Hill PSC Construction--Generators 10 & 11 $2,000,000 The President Station ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide United Kingdom: RAF Mildenhall Replace Hydrant Fuel Distribution System $15,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Virgin Islands: St. Croix Readiness Center (JFHQ) $25,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Worldwide Unspecified F-35 Flight Simulator Facility $12,190,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Worldwide Unspecified F-35 Academic Training Center $54,150,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Worldwide Unspecified F-35 Squadron Operations Facility $10,260,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Worldwide Unspecified Classified Project $41,900,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ DEPARTMENT OF DEFENSE [Congressionally Directed Spending Items] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Account State: Location Project Title Amount Requester(s) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Alabama: Fort Rucker Emergency Medical Services Facility $1,700,000 Bright ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Alabama: Maxwell AFB Air Traffic Control Tower $810,000 Bright ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Arizona: Marana SOF Parachute Training Facility $6,250,000 Giffords ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Arkansas: Camp Robinson Regional Training Institute, Ph 2 $2,334,000 Snyder ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Coronado NAB MESG-1 Consolidated Boat Maintenance Facility $6,890,000 Davis (CA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force California: Los Angeles AFB Parking Structure, Ph 2 $4,500,000 Sanchez, Loretta ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG California: Moffett Field Relocate Main Gate $2,000,000 Eshoo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy California: Monterey NSA International Academic Instruction Building $11,960,000 Farr ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG California: Sacramento Field Maintenance Shop Paving $891,000 Matsui ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force California: Travis AFB BCE Maintenance Shops and Supply Warehouse $387,000 Garamendi; Miller, George; Thompson (CA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG California: Ventura Renewable Photovoltaic Solar Power $1,466,000 Capps ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Colorado: Buckley AFB Repair Taxiways Juliet and Lima $4,000,000 Perlmutter ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Colorado: Watkins Parachute Maintenance Facility $3,569,000 Salazar ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Connecticut: New London NSB Submarine Group Two Headquarters $550,000 Courtney; DeLauro ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Florida: MacDill AFB Infrastructure Improvements $249,000 Castor (FL) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Florida: Panama City NSA Land Acquisition--9 Acres $5,960,000 Boyd ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Georgia: Albany MCLB Maintenance Center Test Firing Range $5,180,000 Bishop (GA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Georgia: Robins AFB Combat Communications Squadron Warehouse $5,500,000 Marshall ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Illinois: Marseilles Training Area Simulation Center $2,500,000 Halvorson ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Illinois: Scott AFB New Fitness Facility, Ph 1 $396,000 Jackson (IL); Costello ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Indiana: Crane NSWC Platform Protection Engineering Complex $760,000 Ellsworth ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Iowa: Camp Dodge Regional Training Institute, Ph 1 $800,000 Boswell ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Iowa: Des Moines Corrosion Control Hangar $4,750,000 Boswell ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Iowa: Iowa City Simulation Center/MVSB/Helipad/Parking $1,999,000 Loebsack ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Kentucky: Frankfort Joint Forces Headquarters, Ph 1 $281,000 Chandler ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Kentucky: Standiford Field Contingency Response Group Facility $534,000 Yarmuth ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Louisiana: New Orleans NAS/JRB ASA Replace Alert Complex $2,000,000 Cao; Melancon ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Maine: Portsmouth NSY Consolidation of Structural Shops, Ph 1 $11,910,000 Shea-Porter; Pingree ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Maryland: Easton Readiness Center Add/Alt $347,000 Kratovil ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Maryland: Fort Meade Infrastructure--Mapes Road & Cooper Avenue $1,750,000 Ruppersberger; Kratovil; Sarbanes ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Maryland: Patuxent River NAS Atlantic Test Range Addition $10,160,000 Hoyer ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Massachusetts: Barnes ANGB Add to Aircraft Maintenance Hangar $6,000,000 Olver ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Michigan: Fort Custer (Augusta) Troop Service Support Center $446,000 Schauer ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Minnesota: Duluth Load Crew Training & Weapons Release Shops $8,000,000 Oberstar ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Minnesota: Mankato Field Maintenance Shop $947,000 Walz ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Mississippi: Stennis Space Center SOF Land Acquisition, Ph 3 $8,000,000 Taylor ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Missouri: Whiteman AFB Consolidated Air Operations Facility $23,500,000 Skelton ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Nevada: Las Vegas Civil Support Team Ready Building $8,771,000 Titus; Berkley ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG New Jersey: Atlantic City IAP Fuel Cell and Corrosion Control Hangar $8,500,000 Andrews; Rothman (NJ) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Reserve New Jersey: Fort Dix Automated Multipurpose Machine Gun Range $9,800,000 Adler (NJ); Andrews; Rothman (NJ) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Holloman AFB Parallel Taxiway, Runway 07/25 $8,000,000 Teague ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force New Mexico: Kirtland AFB Replace Fire Station 3 $6,800,000 Heinrich ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army New York: Fort Drum Alert Holding Area Facility $6,700,000 Owens ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Reserve New York: Niagara Falls ARS C-130 Flightline Operations Facility, Ph 1 $9,500,000 Slaughter ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG New York: Ronkonkoma (MacArthur Flightline Rehabilitation $2,780,000 Israel Airport) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG New York: Stewart ANGB Aircraft Conversion Facility $3,750,000 Hinchey; Hall (NY) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG North Carolina: Camp Butner Barracks (AT), Ph 1 $1,484,000 Butterfield; Miller (NC) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG North Carolina: Morrisville AASF 1 Fixed Wing Hangar Annex $8,815,000 Price (NC) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG North Carolina: Murphy Fire Fighting Team Support Facility $223,000 Shuler ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force North Carolina: Pope AFB Crash/Fire/Rescue Station $13,500,000 Kissell; McIntyre ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force North Dakota: Grand Forks AFB Central Deployment Center $495,000 Pomeroy ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Ohio: Camp Sherman Maintenance Building Add/Alt $3,100,000 Space ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Ohio: Ravenna Training Site Unit Training Equipment Site Add/Alt $2,000,000 Ryan (OH) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Ohio: Toledo Express Airport Replace Security Forces Complex $7,300,000 Kaptur ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Oklahoma: Tulsa IAP Fuels Storage Complex $1,036,000 Boren ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Oregon: Salem Armed Forces Reserve Center Add/Alt (JFHQ) $1,243,000 Schrader ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG Pennsylvania: Fort Indiantown Gap Multipurpose Air National Guard Training Facility $675,000 Holden ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Pennsylvania: Hermitage Readiness Center $671,000 Dahlkemper ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Pennsylvania: Tobyhanna Armed Forces Reserve Center $1,513,000 Kanjorski ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Pennsylvania: Williamsport Field Maintenance Shop $1,508,000 Carney ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Rhode Island: Middletown Readiness Center Add/Alt $3,646,000 Kennedy ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Rhode Island: Quonset Point Readiness Center $3,729,000 Langevin ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG South Carolina: McEntire JRB Replace Operations and Training Facility $9,100,000 Clyburn ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air NG South Dakota: Joe Foss Field Aircraft Maintenance Shops $3,600,000 Herseth Sandlin ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Tennessee: Arnold AFB AEDC Power Distribution Modernization $378,000 Davis (TN) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Corpus Christi Depot Rotor Blade Processing Facility, Ph 2 $13,400,000 Ortiz ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Alternative Energy Projects $1,166,000 Reyes ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Bliss Rail Yard Improvements $2,070,000 Reyes ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Texas: Fort Hood Soldier Readiness Processing Center $1,000,000 Edwards (TX) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Texas: Kingsville NAS Youth Center $2,610,000 Ortiz ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Texas: Lackland AFB Consolidated Security Forces Ops Center, Ph 1 $900,000 Gonzalez; Rodriguez ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Texas: Laughlin AFB Community Event Complex $10,500,000 Rodriguez ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Texas: Laredo Receiving, Staging, & Onward Integration Facility/ $475,000 Cuellar Hangar ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Texas: McLennan County Operational Reserve Headquarters $5,000,000 Edwards (TX) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Texas: South Texas Training Center Cantonment and Support Infrastructure $5,000,000 Cuellar; Edwards (TX); Ortiz ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army Virginia: Fort Belvoir Growth Support Infrastructure $3,060,000 Moran (VA); Connolly ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Air Force Virginia: Langley AFB Clear Zone Land Acquisition, Ph 1 $3,000,000 Nye; Scott (VA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Defense-Wide Washington: Fort Lewis SOF Military Working Dog Kennel $4,700,000 Smith (WA) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Navy Washington: Kitsap NB Charleston Gate ECP Improvements $6,150,000 Dicks ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG West Virginia: Bridgeport FWAATS Apron Expansion $2,000,000 Mollohan ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG West Virginia: Bridgeport FWAATS Expansion $2,000,000 Mollohan ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG West Virginia: Glen Jean Emergency Power Generator $1,500,000 Rahall ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Wisconsin: Wausau Field Maintenance Shop $12,008,000 Obey ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Army NG Guam: Barrigada Joint Forces HQ Readiness Center Add/Alt $778,000 Bordallo ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ DEPARTMENT OF VETERANS AFFAIRS [Presidentially Directed Spending Items] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Requester(s) Account State: Location Project Title Amount ----------------------------------------------------------------- Administration House ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Major Projects Louisiana: New Orleans New Medical Facility $310,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Major Projects Colorado: Denver New Medical Facility $450,700,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Major Projects California: Palo Alto Polytrauma/Ambulatory Care $30,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Major Projects California: Alameda Outpatient Clinic and Columbarium (Design) $17,332,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Major Projects Nebraska: Omaha Replacement Medical Facility (Design) $56,000,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Major Projects Pennsylvania: Indiantown Gap Gravesite Expansion and Cemetery Improvements $23,500,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Major Projects California: Los Angeles Columbarium Expansion $27,600,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Major Projects Washington: Tahoma Gravesite Expansion and Cemetery Improvements $25,800,000 The President ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ AMERICAN BATTLE MONUMENTS COMMISSION [Congressionally Directed Spending Item] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Account State: Location Project Title Amount Requester(s) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Salaries and Expenses Philippines: Cabanatuan American Memorial Improve and Rehabilitate Bataan Death March Memorial $1,000,000 Israel ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ ADDITIONAL VIEWS OF REPRESENTATIVES LEWIS, WAMP, YOUNG, CRENSHAW, AND CARTER This year for the first time since the enactment of the 1974 Congressional Budget Act, the Democrat controlled U.S. House of Representatives failed to consider and pass a budget. According to the nonpartisan Congressional Research Service, the House has passed a budget every year since the Congressional Budget Act first took effect for fiscal year 1976. This represents a historic and unprecedented failure by the Democrat controlled Congress to meet a basic responsibility on fiscal issues: to annually adopt a spending plan that sets priorities for spending, revenues, deficits and debt for at least the next five years. Instead, the Democrat Majority resorted to a tortuous procedural sleight-of-hand to evade a direct vote in order to ``deem'' the adoption of a one-year resolution that provided the Appropriations Committee a topline discretionary amount for FY 2011 while failing to provide a designation for overseas military contingencies despite promising for years that they would never fund the war in Iraq, Afghanistan and elsewhere as an emergency or outside the regular budget process. This unwillingness to pass a real budget was only necessary because of the explosion of debt and deficits unleashed by the reckless spending of Congressional Democrats and the President. In contrast, the Republican Members of the Appropriations Committee recognize the Nation can't afford another trillion dollar Democrat spending spree or the massive borrowing that will be needed to finance it, meaning even more taxes in the future on American families, small businesses and entrepreneurs. CBO's recent report on the Long-Term Budget Outlook shows that under our current budget path, U.S. debt will soon reach unsustainable levels. Additionally, Appropriations Republicans proposed an alternative FY 2011 spending allocation that would have provided $1.090 trillion in regular discretionary spending, the same as last year's level, and put the brakes on the runaway growth in discretionary spending. This responsible spending plan proposed by Committee Republicans would have saved the taxpayer $31 billion this year alone compared to the suballocations adopted by the majority and at least $39 billion, if not more, compared to the President's Budget request. And by ensuring the Democrat spending increase was not permanently added to future budgets, the Republican plan saved $341 billion in budget authority over the next decade compared to the House Democrat allocation. The Republican plan included the funding levels that the President requested in his fiscal year 2011 budget for the agencies and programs funded in this Military Construction, Veterans Affairs and Related Agencies bill. The fiscal year 2011 appropriations bill for Military Construction, Veterans' Affairs and Related Agencies provides $18.7 billion for military construction, family housing and quality of life projects for those serving in our all-volunteer military. For those that have served our nation in the military, the bill provides nearly $121 billion for mandatory and discretionary programs within the Department of Veterans Affairs. The bill also provides $286 million for the monuments and cemeteries that honor our fallen heroes, and $1.3 billion for the war on terror. The Military Construction portion of this bill includes $18.7 billion in new budget authority for fiscal year 2011. These funds will allow the military to construct projects that are a high priority for the services, the commanders in the field, and to the families that equally share in the burden of service to our country. To that end, we want to recognize the continuation of the guard/reserve and troop trainee barracks initiatives that are funded in the bill. The $390 million to fund these critical unmet needs are a prime example of this subcommittee ensuring that we are working together to meet unbudgeted, yet high priority, requirements for all of our troops. We support the decision to promote the more efficient and expeditious use of funding for the war on terror by providing these funds to construction categories rather than to specific projects. This approach should allow commanders in the field some flexibility to address facility requirements without the notification requirements that can take several weeks to clear through the bureaucracy. We look forward to working with the majority to ensure that this approach is adopted by the conference committee. Funding for the Department of Veterans Affairs in the bill is $121 billion, of which $64 billion is mandatory. The bill includes $50.6 billion in advance appropriations for VA medical care for fiscal year 2012. This is in addition to the $48.6 billion in advance appropriations for VA medical care that the fiscal year 2010 bill made available ensuring that regardless of where we stand on October 1, 2010 with the appropriations process, our veterans should have full access to their medical care. While on the subject of advance appropriations, we are concerned that the timeframes for OMB's apportionment process and VA's allocation process are hard to predict, and as a result advance appropriations may not get apportioned/allocated in a timely manner. We remain committed to the language in the fiscal year 2010 conference report and we expect the advance appropriations funds to be made available to the Veterans Integrated Service Networks on October 1, 2010. The Chairman's subcommittee mark recommended a $50 million cut to the VA Information Technology (IT) account. While the cut is minuscule in contrast to the $1.7 billion in unobligated balances that the VA is projecting at the end of fiscal year 2010 and fiscal year 2011 in this account, the fact that it represents a cut is commendable. The Committee has used these funds to increase VA's Minor Construction account by $40 million, the National Cemetery Administration by $8.5 million, and Arlington National Cemetery by $1.5 million. There were three amendments that were offered at the Subcommittee that cut an additional $35 million from this account. VA's IT account has consistently received negative reviews from the General Accounting Office and VA's Inspector General. The VA has taken steps to address IT management, and we believe they have made some improvements; however, $1.7 billion in unobligated balances projected for two successive fiscal years illustrate that the VA has a ways to go before these issues are resolved. The Office of Inspector General provides invaluable audit and inspection oversight to the Committee, the Congress and the Secretary. Unfortunately, this is the only account in VA that did not receive an increase even though the fiscal year 2011 budget request increased overall by more than 10 percent over fiscal year 2010. The IG's budget request of $109 million would only have allowed it to maintain current services. The IG testified in February, and indicated additional funds above the request would allow the IG to focus on the quality of outsourced care which has grown to $3.8 billion; increase proactive investigations to expose fiduciary and procurement fraud; expose VHA employee drug diversion; increase use of computer forensics; allow for timely investigations of alleged misconduct by senior officials; and allow the expansion of audit coverage of IT systems development, acquisition, and implementation. This is the one account that represents effective stewardship of taxpayer dollars, and, as such, Ranking Member Wamp offered an amendment at Subcommittee to provide an additional $6 million for the VA Inspector General. The Subcommittee overwhelmingly adopted the amendment. The budget submitted by the President proposed to cut 306 claims processors from the Education program. At the same time, the VA is projecting a 30 percent increase in workload for GI Bill benefit claims between fiscal year 2009 and fiscal year 2011. The justification to reduce claims processors is based on the assumption that productivity from more experienced staff and automated processing of new GI bill claims would allow this staff reduction. The OIG has noted that it takes about a year to become proficient in processing claims, but the Veterans Benefit Administration (VBA) was having claims processers process claims after only 2 months of training. This led to errors and time wasted. A November 2009 OIG report said that VBA paid $4.3 million in overtime to process education claims, with the most overtime being in September and October. The IG recommended that VBA come up with a plan to reduce its overtime or risk ``employee burn out and diminishing returns''. Reducing claims processors at this time will only add to this problem. The first phase of long term IT solution was supposed to begin in spring 2010, but the VA has not shown any evidence that the solution is going to be in place to have an impact for the fall 2010 application surge. The IG is currently engaged in an audit into the emergency payments that were being made last fall/spring in which some VA offices were hand-writing benefit checks. Mr. Crenshaw offered an amendment that restored this critical staffing in the Education Program, and the amendment was adopted by the Subcommittee on a bipartisan vote. The majority included provisions in the bill and report that direct the VA to be more transparent with their budget documents and other reporting requirements. We commend the majority for including these provisions. There is an alarming rate of growth in Departmental Administration accounts at the VA. Since fiscal year 2009, Departmental Administration has grown overall by 38 percent, from $336 million in fiscal year 2009 to $463 million in fiscal year 2011, an increase of $127 million. A look inside some of the individual offices reveals some of the astonishing growth: DEPARTMENT OF VETERANS AFFAIRS--DEPARTMENTAL ADMINISTRATION* [Dollars in thousands] ------------------------------------------------------------------------ Change 2009 FY 2009 FY 2011 v. 2011 ------------------------------------------------------------------------ Office of Public and $10,005 $23,705 +$13,700 Intergovernmental Affairs....... 137% Office of Policy and Planning.... $14,602 $28,783 +$14,181 97% Office of Operations............. $12,025 $22,091 +$10,066 84% Office of Acquisitions, $45,243 $79,582 +$34,339 Logistics, & Construction....... 76% Office of Congressional and $4,379 $7,247 +$2,868 Legislative Affairs............. 65% Office of the Secretary.......... $7,146 $10,808 +$3,662 51% Office of Management............. $37,546 $48,557 +$11,101 29% Office of Human Resources........ $61,901 $76,177 +$14,276 23% Office of the General Counsel.... $74,343 $91,049 +$16,706 22% ------------------------------------------------------------------------ *Accounts showing 20 percent or more increase since FY 2009. While it is important that Departmental Administration accounts have adequate funding to provide necessary services, we believe that some of these funds would be put to better use by hiring more claims processors or even reducing the deficit. The bill provides $286 million for the Related Agencies. The Committee's recommendation of $39.6 million for Arlington National Cemetery (ANC) is $1.5 million above the request. The additional funding is to pay for resource requirements in response to recent Army Office of Inspector General findings at the cemetery. The new Executive Director at Arlington reported on July 1 that it would take at least 45 to 60 days before she has a handle on what additional requirements she may need. The Committee also included language directing the ANC to submit a report on implementation of the Total Cemetery Management System (TCMS). Mr. Young of Florida offered an amendment that was adopted by the Subcommittee that includes reporting requirements on benchmarks/deliverables of the TCMS. The Committee included $64.667 million for the American Battle Monuments Commission (ABMC), an increase of $467,000 above the budget request to pay for an enhanced web-based virtual tour system for the ABMC. The Committee has not received any justification for this increase. The Commission Secretary did testify that the ABMC would like to begin working on this enhancement; however, this increase is without any justification whatsoever. Mr. Lewis offered an amendment at Subcommittee that requires a spending plan be submitted to the Committee before these funds can be obligated. The amendment received the full support of the Subcommittee. In conclusion, we commend the majority for doing an excellent job of producing a bill that shows unwavering support for our men and women in uniform, for those who have served our country in the military, and for the monuments and cemeteries that honor our fallen heroes. This bill deserves the support of all Members of the House.