NUCLEAR REGULATORY COMMISSION
[Docket No. 50-352]

 

Philadelphia Electric Company (Limerick Generating Station, Unit 
1)

Exemption

I

    Philadelphia Electric Company (the licensee), is the holder of 
Facility Operating License No. NPF-39, which authorizes operation of 
the Limerick Generating Station (LGS), Unit 1. The license provides, 
among other things, that the licensee is subject to all rules, 
regulations, and orders of the Nuclear Regulatory Commission (the 
Commission) now and hereafter in effect.
    The LGS, Unit 1 facility consists of a boiling water reactor 
located in Chester and Montgomery Counties, Pennsylvania.

II

    In its letter dated November 30, 1993, the licensee requested an 
exemption from the Commission's regulations. The subject exemption is 
from a requirement in appendix J to 10 CFR part 50 that a set of three 
Type A tests (Containment Integrated Leakage Rate Tests, or CILRTs) be 
performed, at approximately equal intervals, during each 10-year 
service period. The exemption applies to the first 10-year service 
period; subsequent service periods are not changed. In the same letter, 
the licensee applied for an amendment to Operating License No. NPF-39 
to change certain provisions of the LGS Technical Specifications (TSs).
    The type A test is defined in 10 CFR part 50, appendix J, section 
II.F, as ``tests intended to measure the primary reactor containment 
overall integrated leakage rate (1) after the containment has been 
completed and is ready for operation, and (2) at periodic intervals 
thereafter.'' The 10-year service period begins with the inservice 
date. The first CILRT testing interval was 36 months, and the second 
was 39 months. The time interval between CILRTs should be about 40 
months based on performing three such tests at approximately equal 
intervals during each 10-year service period.
    The request for a one-time exemption would allow the third Type A 
CILRT within the first 10-year service period to be conducted during 
the sixth refueling outage. This requested exemption is a one-time 
schedular extension of the third interval to 65 months. It does not 
affect the second 10-year service period.
    With respect to the subject exemption request, the NRC staff notes 
that the first and second CILRTs of the set of three tests for the 
first 10-year service period for LGS were conducted in August 1987 and 
November 1990. The third of the first set of three CILRTs will be 
scheduled for Refueling Outage 6, projected to start in January 1996, 
pending approval of the exemption request. The current third test 
period in the first 10-year service period will actually be exceeded by 
approximately 15 months.
    Data from the first August 1989 and second November 1990 CILRT at 
LGS, Unit 1 indicates that most of the measured leakage is from the 
containment penetrations and not from the containment barrier. The 
``as-left'' leakage rate was well below the 10 CFR part 50 Appendix J 
limit. Both Appendix J and the TS require that the leakage rate be less 
than 75% of La to allow for deterioration in leakage paths between 
tests. The allowable leakage rate, La, is 0.5 wt.%/day. Therefore, 
the established acceptable limit is <0.375 wt.%/day. The ``as-left'' 
leakage rates for the first two CILRTs were 0.178 and 0.334 wt.%/day, 
which is below the acceptance limit. The Type B and C test (Local 
Leakage Rate test or LLRT) program also provides assurance that 
containment integrity has been maintained. LLRTs demonstrate 
operability of components and penetrations by measuring penetration and 
valve leakage. Additionally, there have been no modifications made to 
the plant that could adversely affect the test results.
    The licensee further notes that the performance of a fourth test in 
the first 10-year service period to meet the requirements of the TSs 
and Appendix J would result in additional radiation exposure to 
personnel. Omitting the test will result in additional dose savings by 
eliminating contamination and by reducing exposure from venting and 
draining and from setups and restorations of instrumentation required 
to perform the test. These factors and the costs associated with a 
fourth test for a 15-month difference in interval time are not offset 
by the benefits of the fourth test.
    For the reasons set forth above, the NRC staff concludes that this 
deviation from the 10-year service period ending August 1994 is not 
significant in terms of complying with the safety or scheduling 
requirements of Section III.D.1.(a) of Appendix J. Accordingly, the 
staff finds that the additional test would not provide substantially 
different information and that the intent of Appendix J is met. 
Therefore, the subject exemption request meets the special 
circumstances of 10 CFR 50.12(a)(2)(ii), in that the fourth test is not 
necessary to achieve the underlying purpose of the rule.
    On this basis, the NRC staff finds that the licensee has 
demonstrated that special circumstances are present as required by 10 
CFR 50.12(a)(2). Further, the staff also finds that extending the 
service period will not present an undue risk to the public health and 
safety; since the licensee has justified the leaktight integrity of the 
containment based on previous leakage test results, the staff concludes 
that a one-time extension of approximately 15 months beyond the maximum 
permitted third test interval within the first 10-year service period 
will not have a significant safety impact.

III

    Accordingly, the Commission has determined that, pursuant to 10 CFR 
50.12, an exemption is authorized by law and will not endanger life or 
property or the common defense and security and is otherwise in the 
public interest and hereby grants the following exemption with respect 
to a requirement of 10 CFR part 50, appendix J, Section III.D.1(a):
    For the Limerick Generating Station, Unit 1, the current third test 
period within the first 10-year service period may be extended by 
approximately 15 months, so that the third periodic Type A test may be 
performed during the Sixth refueling outage scheduled for January, 
1996.
    Pursuant to 10 CFR 51.32, the Commission has determined that the 
granting of this exemption will not have a significant effect on the 
quality of the human environment (59 FR 5785).
    This exemption is effective upon issuance.

    For the Nuclear Regulatory Commission.

    Dated at Rockville, Maryland this 16 day of February 1994.

Gus C. Lainas,
Acting Director, Division of Reactor Projects - I/II, Office of Nuclear 
Reactor Regulation.