[Federal Register Volume 59, Number 116 (Friday, June 17, 1994)] [Unknown Section] [Page 0] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 94-14838] [[Page Unknown]] [Federal Register: June 17, 1994] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [ER-FRL-4712-4] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared May 30, 1994 Through June 3, 1994, pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and section 102(2)(C) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities At (202) 260-5076. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 08, 1994 (59 FR 16807). Draft EISs ERP No. D-DOE-L05205-00 Rating LO, PacifiCorp Capacity Power Sale Contract for 1100 Megawatts (MW) Long-Term Contract for Peaking Capacity, Implementation, WA, OR, ID, MT, WY, UT, CO, CA, NV, AZ, NM and British Columbia. Summary: EPA had no objections to the draft EIS. ERP No. D-COE-E39034-KY Rating EC2, Louisville Waterfront Park/ Falls Harbor Development Project, Construction, COE Section 10 and 404 Permits, Ohio River, Louisville, Jefferson County, KY. Summary: EPA had an environmental concern regarding the uncertainty/lack of data associated with the historical contamination at the site. Additional data regarding the environmental consequences are needed. ERP No. D-DOD-A10067-00 Rating LO, Ballistic Missile Defense (BMD) Program, Implementation, which includes the Theater Missile Defense (TMD) and National Missile Defense (NMD) Initiatives, Programmatic EIS, United States. Summary: EPA had a lack of objections to the document. ERP No. D-DOD-G11010-00 Rating LO, Joint Task Force (JTF)--Six Support Services Continuation Program, Implementation, Programmatic EIS, TX, NM, AZ, CA, U.S./Mexico Border and Texas Gulf Coast. Summary: EPA had no objections to the continuation of Joint Task Force Six's program. ERP No. D-DOE-L03007-OR Rating EC1, Hermiston Generating Project, Construction of a Gas-fired Cogeneration Power Plant, Approval of Permits, Umatilla County, OR. Summary: EPA requested additional information be included in the final EIS concerning wetlands, air quality, and mitigation measures for transmission lines. ERP No. D-FAA-G51027-AR Rating LO, Northwest Arkansas Regional Airport, Construction of Replacement Airport for Drake Field in Fayetteville, Funding, Land Acquisition and Airport Layout Plan, City of Fayetteville, AR. Summary: EPA had no objections to the proposed action. ERP No. D-SFW-G64011-LA Rating EC2, Bayou Savauge National Wildlife Refuge Master Plan, Implementation, Orleans Parish, LA. Summary: EPA had environmental concerns with the potential adverse impacts from hazardous substances found at the sites on and near refuge boundaries and requests further investigation in the final EIS. ERP No. D-UAF-B11015-ME Rating EO2, Loring Air Force Base (AFB) Disposal and Reuse, Implementation, Aroostook County, ME. Summary: EPA expressed environmental objections relating to the magnitude of potential wetland impacts up to 418 acres; and the failure to include adequate provisions for minimizing and mitigating wetland impacts. EPA requested additional clarifying information be included in the final EIS. ERP No. D-USN-B11008-RI Rating EC2, Davisville Naval Construction Battalion Center, Base Reuse and Development Plan, Implementation, Town of North Kingstown, Washington County, RI. Summary: EPA expressed environmental concerns with the insufficient alternatives analysis; inadequate analysis of potential air quality problems from increased traffic; lack of cumulative traffic impacts, water supply alternatives, and lack of mitigation commitments. FINAL EISs ERP No. F-AFS-L64042-AK Main Bay Salmon Hatchery Expansion, Implementation, Special-Use-Permit and COE Section 404 Permit, Prince William Sound, Chugach National Forest, Glacier Ranger District, AK. Summary: Review of the Final EIS was not deemed necessary. No formal letter was sent to the preparing agency. ERP No. F-AFS-L65181-WA East Curlew Creek Analysis Area, Harvesting Timber and Road Construction, Portion of Profanity Roadless Area, Colville National Forest, Republic Ranger District, Ferry County, WA. Summary: EPA had no objections to the preferred alternative as described in the EIS. ERP No. F-COE-G32052-00 West Pearl River Navigation Project, Operation and Maintenance, Portions of West Pearl River to the vicinity of Bogalusa, Implementation, Washington and St. Tammany Parishes, LA and Pearl River County, MS. Summary: EPA believed that the assessment of potential environmental effects may have been insufficient to fully address recent water quality concerns regarding the effects of dredging in the West Pearl River. ERP No. F-FHW-L40183-WA I-5/196th Street SW/WA-524 Interchange Project, Improvements, Funding, NPDES and COE Section 404 Permits, Snohomish County, WA. Summary: EPA made numerous comments/recommendations on the draft EIS and, in general was pleased with the FHWA's responses. EPA believed that the EIS should have included a wetland mitigation plan. Dated: June 14, 1994. Marshall Cain, Senior Legal Advisor, Office of Federal Activities. [FR Doc. 94-14838 Filed 6-16-94; 8:45 am] BILLING CODE 6560-50-P