[Federal Register Volume 59, Number 169 (Thursday, September 1, 1994)] [Unknown Section] [Page 0] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 94-21550] [[Page Unknown]] [Federal Register: September 1, 1994] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Docket No. CP94-713-000., et al.] ANR Pipeline Company, et al.; Natural Gas Certificate Filings August 24, 1994. Take notice that the following filings have been made with the Commission: 1. ANR Pipeline Company [Docket No. CP94-713-000] Take notice that on August 12, 1994, ANR Pipeline Company (ANR), 500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. CP94-713-000 a request pursuant to Sections 157.205 and 157.211 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.211) for authorization to construct and operate an interconnection between ANR and Wisconsin Public Service Corporation (Public Service) for delivery of natural gas to Public Service in Portage County, Wisconsin, under ANR's blanket certificate issued in Docket No. CP82- 480-000 pursuant to Section 7 of the Natural Gas Act, all as more fully set forth in the request that is on file with the Commission and open to public inspection. ANR states that the proposed interconnection, known as the Rosholt Interconnection, will consist of 2 and 4-inch turbine meters located within the existing right-of-way of the intersection of ANR's Marshfield Main line and South Stevens Point Lateral line in Portage County, Wisconsin, at an approximate cost of $121,000. This proposed interconnection will allow Public Service to provide new gas service to the Village of Rosholt, Wisconsin. ANR proposes to provide Public Service with deliveries at the proposed interconnection through a combination of services under Rate Schedule ETS (Enhanced Transportation Service), Rate Schedule FSS (Firm Storage Service), and Rate Schedule NNS (No Notice Service) of ANR's FERC Gas Tariff, Second Revised Volume No. 1. The maximum daily quantity of gas delivered under the proposed services is approximately 1,240 Mcf/d. ANR holds a Part 284 blanket transportation certificate in Docket No. CP88-532 and the volumes to be delivered will be within the certificated entitlements of the customer. ANR states that the construction of the Rosholt Interconnection will have no adverse impact on peak day or annual entitlements for any existing customers. Comment date: October 11, 1994, in accordance with Standard Paragraph G at the end of this notice. 2. East Tennessee Natural Gas Company [Docket No. CP94-723-000] Take notice that on August 18, 1994, East Tennessee Natural Gas Company (East Tennessee), P.O. Box 2511, Houston, Texas 77252, filed in Docket No. CP94-723-000 a request pursuant to Sections 157.205 and 157.212 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.212) for authorization to modify an existing receipt meter for use as a delivery point located in Morgan County, Tennessee under East Tennessee's blanket certificate issued in Docket No. CP82- 412-000 pursuant to Section 7 of the Natural Gas Act, all as more fully set forth in the request that is on file with the Commission and open to public inspection. East Tennessee proposes to reverse an existing meter tube and check valve that is currently designed for use as a receipt point so the point can be used as a delivery point. East Tennessee states that this has been requested by its customer GASCO Distribution System of Kentucky, Inc. (GASCO) and that it does not propose to increase or decrease the total daily and/or annual quantities it is authorized to deliver to GASCO. Comment date: October 11, 1994, in accordance with Standard Paragraph G at the end of this notice. 3. Florida Gas Transmission Company [Docket No. CP94-727-000] Take notice that on August 19, 1994, Florida Gas Transmission Company (FGT), 1400 Smith Street, P.O. Box 1188, Houston, Texas 77251- 1188, filed in Docket No. CP94-727-000 a request pursuant to Sections 157.205 and 157.212 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.212) for authorization to upgrade an existing meter station which serves as a delivery point located in Polk County, Florida under FGT's blanket certificate issued in Docket No. CP82-553-000 pursuant to Section 7 of the Natural Gas Act, all as more fully set forth in the request that is on file with the Commission and open to public inspection. FGT proposes to upgrade the Lake Wales Meter Station that is used to measure gas delivered to Chesapeake Utilities Corporation by replacing the regulators, the orifice meter, associated headers, and related ancillary equipment with a single 4-inch turbine meter and related appurtenant facilities. FGT states that the proposed upgrade would not impact FGT's peak day or annual deliveries. Comment date: October 11, 1994, in accordance with Standard Paragraph G at the end of this notice. Standard Paragraphs G. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. Lois D. Cashell, Secretary. [FR Doc. 94-21550 Filed 8-31-94; 8:45 am] BILLING CODE 6717-01-P