[Federal Register Volume 60, Number 154 (Thursday, August 10, 1995)]
[Notices]
[Pages 40830-40833]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-19778]



-----------------------------------------------------------------------

DEPARTMENT OF ENERGY
[Docket No. EG95-63-000, et al.]


EI Power, Inc., et al.; Electric Rate and Corporate Regulation 
Filings

August 4, 1995.
    Take notice that the following filings have been made with the 
Commission:

1. EI Power, Inc.

[Docket No. EG95-63-000]

    On July 28, 1995, EI Power, Inc. (``EI Power''), c/o Energy 
Initiatives, Inc., One Upper Pond Road, Parsippany, New Jersey 07054, 
filed with the Federal Energy Regulatory Commission an application for 
determination of exempt wholesale generator (``EWG'') status pursuant 
to 18 CFR Part 365 of the Commission's Regulations.
    EI Power states that it is a Delaware corporation formed to engage 
in project development activities associated with the direct or 
indirect acquisition of ownership interests in one or more eligible 
facilities and/or EWGs. EI Power further states that it has previously 
been determined to be an EWG. According to EI Power, this filing is 
occasioned because EI Power intends to acquire all of the voting 
capital stock of (i) EI Barranquilla, Inc., a Delaware corporation and 
(ii) Guaracachi America, Inc., a Delaware corporation.
    Comment date: August 21, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

2. EI International

[Docket No. EG95-64-000]

    On July 28, 1995, EI International,
c/o Energy Initiatives, Inc, One Upper Pond Road, Parsippany, New 
Jersey, 07054, filed with the Federal Energy Regulatory Commission an 
application for redetermination of exempt wholesale generator status 
pursuant to 18 CFR Part 365 of the Commission's Regulations.
    According to the application, EI International (formerly known as 
EI Cayman) is a Cayman Islands corporation previously determined to be 
an EWG on the basis of its intention to acquire an ownership interest 
in Termobarranquilla S.A., Empresa de Servicios Publicos (``TEBSA''), a 
Colombian Corporation which was formed to develop, construct and own an 
eligible facility to be located in Soledad near Barranquilla, Colombia. 
This filing is occasioned because EI International no longer intends to 
acquire such ownership interest. Instead, according to the application, 
EI International is planning to acquire all of the capital stock of EI 
Services Colombia, a Colombian corporation which was formed to enter 
into an operation and maintenance agreement with TEBSA to operate such 
facility. All of the facility's electricity will be sold at wholesale 
to Corporacion Electrica de la Costa Atlantica, a Colombian entity. EI 
International also intends to enter into similar agreements (either 
directly or through wholly-owned subsidiaries) with one or more as-yet-
unidentified eligible facilities and EWGs.
    Comment date: August 21, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

3. EI Barranquilla, Inc.

[Docket No. EG95-65-000]

    On July 28, 1995, EI Barranquilla, Inc. (``EI Barranquilla''), c/o 
Energy Initiatives, Inc., One Upper Pond Road, Parsippany, New Jersey 
07054, filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to 18 CFR Part 365 of the Commission's Regulations.
    EI Barranquilla states that it is a Delaware corporation formed to 
acquire up to 30% but in no event less than 5% of the voting shares of 
Termobarranquilla S.A., Empresa de Servicios Publicos, a Colombian 
corporation which was formed to develop, construct and own an eligible 
facility located in Soledad, near Barranquilla, Colombia. Corporacion 
Electrica de la Costa Atlantica, a Colombian utility, will purchase all 
of the electrical output from the Facility.
    Comment date: August 21, 1995, in accordance with Standard 
Paragraph E at the end of this notice.
4. Commonwealth Electric Company v. Dartmouth Power Associates 
Limited Partnership and EMI/Dartmouth, Inc.)

[Docket No. EL95-66-000]

    Take notice that on July 27, 1995, Commonwealth Electric Company 
tendered for filing a complaint against Dartmouth Power Associates 
Limited Partnership and EMI/Dartmouth, Inc. concerning violation of 
filed rate schedule, motion for consolidation of proceedings, and 
motion for summary disposition.
    Comment date: September 5, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

5. Eastern Power Distribution, Inc.

[Docket No. ER94-964-006]

    Take notice that on July 17, 1995, Eastern Power Distribution, Inc. 
(Eastern) filed certain information as required by the Commission's 
April 5, 1994, order in Docket No. ER94-964-000. Copies of Eastern 
Power's informational filing are on file with the Commission and are 
available for public inspection.

6. Morgan Stanley Capital Group, Inc.

[Docket No. ER94-1384-006]

    Take notice that on July 26, 1995, Morgan Stanley Capital Group, 
Inc. tendered for filing certain information as required by the 
Commission's order dated November 8, 1994. Copies of the informational 
filing are on file with the Commission and are available for public 
inspection.

7. Mesquite Energy Services, Inc.

[Docket No. ER95-74-002]

    Take notice that on July 31, 1995, Mesquite Energy Services Inc. 
tendered for filing certain information as required by the Commission's 
order dated 

[[Page 40831]]
January 4, 1995. Copies of the informational filing are on file with 
the Commission and are available for public inspection.

8. National Power Management Company

[Docket No. ER95-192-002]

    Take notice that on July 28, 1995, National Power Management 
Company (National Power) filed certain information as required by the 
Commission's January 4, 1995, order in Docket No. ER95-192-000. Copies 
of National Power's informational filing are on file with the 
Commission and are available for public inspection.

9. Wickland Power Services

[Docket No. ER95-300-003]

    Take notice that on July 26, 1995, Wickland Power Services tendered 
for filing certain information as required by the Commission's order 
dated March 16, 1995. Copies of the informational filing are on file 
with the Commission and are available for public inspection.

10. Stand Energy Corporation

[Docket No. ER95-362-002]

    Take notice that on July 26, 1995, Stand Energy Corporation filed 
certain information as required by the Commission's February 24, 1995, 
letter-order in Docket No. ER95-362-000. Copies of Stand Energy 
Corporation's informational filing are on file with the Commission and 
are available for public inspection.

11. CLP Hartford Sales L.L.C.

[Docket No. ER95-393-004]

    Take notice that on July 28, 1995, CLP Hartford Sales L.L.C. filed 
certain information as required by the Commission's February 22, 1995, 
order in Docket No. ER95-393-000. Copies of CLP Hartford Sales L.L.C.'s 
informational filing are on file with the Commission and are available 
for public inspection.

12. Audit Pro Incorporated

[Docket No. ER95-878-001]

    Take notice that on July 28, 1995, Audit Pro Incorporated (Audit 
Pro) filed certain information as required by the Commission's June 2, 
1995, order in Docket No. ER95-878-000. Copies of Audit Pro's 
informational filing are on file with the Commission and are available 
for public inspection.

13. PECO Energy Company

[Docket No. ER95-1155-000]

    Take notice that on July 19, 1995, PECO Energy Company tendered for 
filing an amendment in the above-referenced docket.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.
14. Dayton Power and Light Company

[Docket Nos. ER95-1158-000 and ER95-1256-000]

    Take notice that on July 28, 1995, Dayton Power and Light Company 
tendered for filing an amendment in the above-referenced docket.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

15. Prairie Winds Energy, Inc.

[Docket No. ER95-1234-000]

    Take notice that on July 5, 1995, Prairie Winds Energy, Inc. 
tendered for filing an amendment in the above-referenced docket.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

16. Wisconsin Power & Light Company

[Docket No. ER95-1384-000]

    Take notice that on July 17, 1995, Wisconsin Power & Light Company 
(WP&L) tendered for filing an amended Wholesale Contract dated July 10, 
1995, between Pioneer Power & Light Company and WP&L. WP&L states that 
this amended Wholesale Power Contract revises the previous agreement 
between the two parties dated December 15, 1977, and designated Rate 
Schedule Number 118 by the Commission.
    The parties have amended the Wholesale Power Contract to add an 
additional delivery point. Service under this amended Wholesale Power 
Contract will be in accordance with standard WP&L Rate Schedule W-3.
    WP&L requests an effective date of July 15, 1995 which is 
concurrent with the expected in service date. WP&L states that copies 
of the amended Wholesale Power Contract and the filing have been 
provided to Pioneer Power & Light Company and the Public Service 
Commission of Wisconsin.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

17. Southern California Edison Company

[Docket No. ER95-1402-000]

    Take notice that on July 20, 1995, Southern California Edison 
Company tendered for filing a Notice of Cancellation of FERC Rate 
Schedule No. 246.18 and all supplements thereto in the above-referenced 
docket.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

18. Southern California Edison Company

[Docket No. ER95-1403-000]

    Take notice that on July 20, 1995, Southern California Edison 
Company tendered for filing a Notice of Cancellation of FERC Rate 
Schedule No. 248.16 and FERC Rate Schedule No. 248.17 and all 
supplements thereto in the above-referenced docket.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

19. Southern California Edison Company

[Docket No. ER95-1405-000]

    Take notice that on July 20, 1995, Southern California Edison 
Company tendered for filing a Notice of Cancellation of FERC Rate 
Schedule No. 249.17 and FERC Rate Schedule No. 249.18 and all 
supplements thereto in the above-referenced docket.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

20. JPower

[Docket No. ER95-1421-000]

    Take notice that on July 21, 1995, Jpower tendered for filing a 
power marketing application under rate schedule No. 1 to become 
effective September 1, 1995.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

21. Southern Indiana Gas and Electric Company

[Docket No. ER95-1429-000]

    Take notice that on July 25, 1995, Southern Indiana Gas and 
Electric Company (SIGECO), tendered for filing to a proposed 
Interchange Agreement with AES Power, Inc. (AES).
    The proposed revised Interchange Agreement will provide for the 
purchase, sale, and transmission of capacity and energy by either party 
under the following Service Schedules: (a) SIGECO Power Sales; (b) AES 
Power Sales, and (c) Transmission Service.
    Waiver of the Commission's Notice Requirements is requested to 
allow for an effective date of July 28, 1995.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

22. New England Power Company

[Docket No. ER95-1430-000]

    Take notice that on July 25, 1995, New England Power Company, 
tendered 

[[Page 40832]]
for filing a parallel transmission supply agreement executed by New 
England Power Company, Massachusetts Electric Company and General 
Electric in Lynn, Massachusetts.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

23. Virginia Electric and Power Company

[Docket No. ER95-1431-000]

    Take notice that on July 25, 1995, Virginia Electric and Power 
Company (Virginia Power), tendered for filing a Service Agreement 
between LG&E Power Marketing Inc. and Virginia Power, dated December 
31, 1994 under the Power Sales Tariff to Eligible Purchasers dated May 
27, 1994. Under the tendered Service Agreement Virginia Power agrees to 
provide services LG&E Power Marketing Inc. under the rates, terms and 
conditions of the Power Sales Tariff as agreed by the parties pursuant 
to the terms of the applicable Service Schedules included in the Power 
Sales Tariff.
    Copies of the filing were served upon the Kentucky Public Service 
Commission, Virginia State Corporation Commission and the North 
Carolina Utilities Commission.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

24. Allegheny Power Service Corporation on Behalf of West Penn 
Power Company

[Docket No. ER95-1432-000]

    Take notice that on July 26, 1995, Allegheny Power Service 
Corporation on behalf of West Penn Power Company and its wholesale 
Customers submitted Supplement No. 4 to the above-referenced docket, a 
filing to change rates to reflect a reduction in corporate net income 
tax legislated by the Pennsylvania General Assembly. Allegheny Power 
Service Corporation requests waiver of notice requirements and asks the 
Commission to grant a August 1, 1995, effective date.
    Copies of the filing have been provided to the Pennsylvania Public 
Utility Commission and all parties of record.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

25. Proler Power Marketing, Inc.

[Docket No. ER95-1433-000]

    Take notice that on July 25, 1995, Proler Power Marketing, Inc. 
(the Petitioner), tendered for filing pursuant to Rule 207 of the 
Commission's Rules of Practice and Procedure, 18 CFR 385.207, a 
petition for waivers and blanket approvals under various regulations of 
the Commission, and an order accepting its Rate Schedule No. 1.
    The Petitioner intends to engage in wholesale electric power 
transactions as a marketer. The Petitioner will purchase power, 
including capacity and related services from electric utilities, 
qualifying facilities and independent power producers, and resell such 
power to other purchasers. The Petitioner proposes to charge rates 
mutually agreed upon by the parties. The Petitioner is not in the 
business of producing or transmitting electric power. The Petitioner 
does not currently have or contemplate acquiring title to any electric 
power transmission or generation facilities.
    Rate Schedule No. 1 provides for the sale of energy and capacity at 
agreed prices.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.
26. CINergy Services, Inc.

[Docket No. ER95-1434-000]

    Take notice that on July 26, 1995, CINergy Services, Inc. (CIN), 
tendered for filing on behalf of its operating companies, The 
Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. (PSI), an 
Interchange Agreement, dated June 1, 1995, between CIN, CG&E, PSI and 
MidCon Power Services Corp. (MidCon).
    The Interchange Agreement provides for the following service 
between CIN and MidCon:

1. Exhibit A--Power Sales by MidCon
2. Exhibit B--Power Sales by CIN

    CIN and MidCon have requested an effective date of August 1, 1995.
    Copies of the filing were served on MidCon Power Services Corp., 
the Kentucky Public Service Commission, Public Utilities Commission of 
Ohio, Illinois Commerce Commission and the Indiana Utility Regulatory 
Commission.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

27. Great Bay Power Corporation

[Docket No. ER95-1435-000]

    Take notice that on July 26, 1995, Great Bay Power Corporation 
(Great Bay), tendered for filing a service agreement between Catex 
Vitol Electric Inc. and Great Bay for service under Great Bay's Tariff 
for Short Term Sales. This Tariff was accepted for filing by the 
Commission on November 11, 1993, in Docket No. ER93-524-000. The 
service agreement is proposed to be effective August 1, 1995.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

28. Commonwealth Electric Company, Cambridge Electric Light Co.

[Docket No. ER95-1436-000]

    Take notice that on July 27, 1995, Commonwealth Electric Company 
(Commonwealth) on behalf of itself and Cambridge Electric Light Company 
(Cambridge), collectively referred to as the ``Companies'', tendered 
for filing with the Federal Energy Regulatory Commission executed 
Service Agreements between the Companies and the following Customers:

Engelhard Power Marketing, Inc., New York State Electric & Gas 
Corporation, Northeast Utilities Service Company

    These Service Agreements specify that the Customers have signed on 
to and have agreed to the terms and conditions of the Companies' Power 
Sales and Exchanges Tariffs designated as Commonwealth's Power Sales 
and Exchanges Tariff (FERC Electric Tariff Original Volume No. 3) and 
Cambridge's Power Sales and Exchanges Tariff (FERC Electric Tariff 
Original Volume No. 5). These Tariffs, approved by FERC on April 13, 
1995, and which have an effective date of March 20, 1995, will allow 
the Companies and the Customers to enter into separately scheduled 
transactions under which the Companies will sell to the Customers 
capacity and/or energy as the parties may mutually agree.
    The Companies request an effective date as specified on each 
Service Agreement.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

29. Union Electric Company

[Docket No. ER95-1437-000]

    Take notice that on July 27, 1995, Union Electric Company, tendered 
for filing Fourth Revised Exhibit A to its Wholesale Electric Service 
Agreements with the Cities of California, Centralia, AWP, 
Fredericktown, Hannibal, Kahoka, Kirkwood, Linneus, Marceline, 
Owensville, Perry, Rolla, and St. James, Missouri; Citizens Electric 
Corporation; and Sho-Me Power; and the First Revised Exhibit C for the 
City of Jackson, Missouri, providing for a decrease in the rates 
charged pursuant to said Agreements.
    Said decrease in rates follows a decrease in the Company's Missouri 
retail rates and is being applied to the Company's wholesale customer's 
settlement rates pursuant to Section 2 of said Wholesale Electric 
Service 

[[Page 40833]]
Agreements (and Item 3 for the City of Jackson).
    Copies of the filing were served upon the public utility's 
jurisdictional customers and the Missouri Public Service Commission.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.
30. New England Power Company

[Docket No. ER95-1438-000]

    Take notice that on July 27, 1995, New England Power Company and 
Massachusetts Electric Company tendered for filing an Agreement for 
Transmission Study Services executed with Boston Edison Company.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

31. IGM, Inc.

[Docket No. ER95-1439-000]

    Take notice that on July 27, 1995, IGM, Inc. (IGM), tendered for 
filing pursuant to Rule 205, 18 CFR 385.205, a petition for waiver and 
blanket approvals under various regulations of the Commission and for 
an order accepting its FERC Electric Rate Schedule No. 1 to be 
effective October 1, 1995.
    IGM intends to engage in electric power and energy transactions as 
a marketer and a broker. In transactions where IGM sells electric 
energy it proposes to make such sales on rates, terms, and conditions 
to be mutually agreed to with the purchasing party. IGM is not in the 
business of generating, transmitting, or distributing electric power.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

32. Portland General Electric Company

[Docket No. ER95-1440-000]

    Take notice that on July 26, 1995, Portland General Electric 
Company (PGE), filed an executed Service Agreement with Coastal 
Electric Services Company. The Service Agreement is submitted pursuant 
to the tariff provisions pertaining to unit contingent capacity and/or 
energy sale agreement under Service Schedule E of FERC Electric Tariff, 
1st Revised Volume No. 2 (Docket No. ER95-734-000).
    PGE requests that the Service Agreement become effective on August 
1, 1995 and requests waiver of the Commission's Regulations.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

33. Conoco Power Marketing Inc.

[Docket No. ER95-1441-000]

    Take notice that on July 27, 1995, Conoco Power Marketing Inc. 
(CPMI), tendered for filing an application for waivers and blanket 
approvals under various regulations of the Commission and for an order 
accepting its FERC Electric Rate Schedule No. 1 to be effective on the 
date of the Commission's order accepting the Rate Schedule for filing.
    CPMI intends to engage in electric power and energy transactions as 
a marketer. In these transactions, CPMI proposes to charge market-
determined rates, mutually agreed upon by the parties. All sales and 
purchases will be arms-length transactions.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

34. Bangor Hydro-Electric Company

[Docket No. ER95-1442-000]

    Take notice that on July 28, 1995, Bangor Hydro-Electric Company 
(Bangor), tendered for filing Rate Schedule No. FERC No. 7 (Fifteenth 
Revision) for partial requirements service to Eastern Maine Electric 
Cooperative, Inc.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

35. Montaup Electric Company

[Docket No. ER95-1443-000]

    Take notice that on July 27, 1995, Montaup Electric Company 
(Montaup or the Company), filed amendments to the budgets included n 
the report titled Conservation and Load Management Annual Report 
Information Filing and Projected Revenue Requirements dated October 31, 
1994 (the Informational Filing). Conservation and Load Management 
(C&LM) activities in Blackstone Valley Electric Company's (Blackstone) 
service area have been more successful than was originally expected 
when the 1995 C&LM budgets were developed. As a result, actual 
expenditures for C&LM in Blackstone's service area will be 
approximately 30 percent higher than was projected when the 
Informational Filing was submitted to the Commission. The purpose of 
the filing is to amend Montaup's 1995 C&LM budget to better reflect the 
actual C&LM expenses anticipated in Blackstone's service area and 
minimize the true-up that will follow in 1996. Montaup requests that 
the filing be allowed to become effective on October 1, 1995.
    Comment date: August 18, 1995, in accordance with Standard 
Paragraph E at the end of this notice.

36. Englehard Power Marketing, Inc.

[Docket No. ER94-1690-005]

    Take notice that on July 28, 1995, Englehard Power Marketing, Inc. 
filed certain information as required by the Commission's December 29, 
1994, letter-order in Docket No. ER94-1690-000. Copies of Englehard 
Power Marketing, Inc.'s informational filing are on file with the 
Commission and are available for public inspection.

Standard Paragraph

    E. Any person desiring to be heard or to protest said filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
20426, in accordance with Rules 211 and 214 of the Commission's Rules 
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
motions or protests should be filed on or before the comment date. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a motion to intervene. Copies of this filing are on file with the 
Commission and are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 95-19778 Filed 8-9-95; 8:45 am]