[Federal Register Volume 60, Number 175 (Monday, September 11, 1995)] [Notices] [Page 47193] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 95-22462] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-334 and 50-412] Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company, Beaver Valley Power Station, Units 1 and 2; Notice of Partial Withdrawal of Application for Amendment to Facility Operating License The United States Nuclear Regulatory Commission (the Commission) has granted the request by Duquesne Light Company (the licensee) to withdraw a portion of its August 31, 1994, application for a proposed amendment to Facility Operating License Nos. DPR-66 and NPF-73 for Beaver Valley Power Station, Units 1 and 2, located in Beaver County, Pennsylvania. The proposed amendment involved deletion of certain license conditions and the following changes to the technical specifications (TSs): 1. Elimination of the references to specific frequencies for each of the Technical Specification required audits. 2. Elimination of the references to reviews and audits of the Emergency Plan and Security Plan. 3. Separation of the Inservice Inspection (ISI) and Inservice Testing (IST) Programs surveillance requirements and removal of the requirement that relief requests be granted before they are implemented for both IST and ISI. 4. Editorial changes which were necessitated by a reorganization. 5. Elimination of the reference to Appendix A of 10 CFR Part 55. 6. Elimination of the requirement to perform an independent fire protection and loss prevention program inspection annually. 7. Inclusion of the Offsite Dose Calculation Manual and Process Control Program and associated implementing procedures into the list of required audits. On May 18, 1995, the licensee submitted a letter to the NRC requesting withdrawal of the proposed changes to the TSs dealing with audits of the Beaver Valley Power Station fire protection program and withdrawal of a proposed 25-percent grace period for all audit frequencies (Item 6 of August 31, 1994 application). The Commission has previously issued a Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, which was published in the Federal Register on December 21, 1994 (59 FR 65812). For further details with respect to this action, see the application for amendment dated August 31, 1994, and the licensee's letter of May 18, 1995, which withdrew the portion of the application for license amendment. The above documents are available for public inspection at the Commission's Public Document Room, 2120 L Street, NW., Washington, DC 20555 and at the B.F. Jones Memorial Library, 663 Franklin Avenue, Aliquippa, Pennsylvania 15001. Dated at Rockville, Maryland, this 31st day of August, 1995. For the Nuclear Regulatory Commission. Donald S. Brinkman, Senior Project Manager, Project Directorate I-2, Division of Reactor Projects--I/II, Office of Nuclear Reactor Regulation. [FR Doc. 95-22462 Filed 9-8-95; 8:45 am] BILLING CODE 7590-01-P