[Federal Register Volume 60, Number 227 (Monday, November 27, 1995)] [Notices] [Page 58345] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 95-28789] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Docket No. CP96-71-000] Tennessee Gas Pipeline Company; Notice of Request Under Blanket Authorization November 20, 1995. Take notice that on November 15, 1995, Tennessee Gas Pipeline Company (Tennessee), P.O. Box 2511, Houston, Texas 77252, filed in Docket No. CP96-71-000 a request pursuant to Sections 157.205 and 157.212 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.212) for authorization to install a new delivery point to permit delivery of gas to Channel Industries Gas Company (Channel) under Tennessee's blanket certificate issued in Docket No. CP82-413-000 pursuant to Section 7 of the Natural Gas Act, all as more fully set forth in the request that is on file with the Commission and open to public inspection. Tennessee proposes to establish a new delivery point on Tennessee's system, within the station yard of Channel's existing compressor station No. 402-C, in Brooks County, Texas. Tennessee will install, own, operate and maintain a tap assembly and electronic gas measurement equipment (EGM) at approximate M.P. 403.1+.09. In addition, Tennessee will install, complete with appurtenances, either a 16-inch mainline valve or an actuator on existing Mainline Value 403-1. Channel will own and maintain the measurement and regulation facilities, and will install, own, operate and maintain the tie-in assembly and interconnecting pipe, as integral parts of its existing intrastate pipeline facilities. Tennessee will install and operate the measurement and regulation facilities. Tennessee will be fully reimbursed by Channel for the facilities Tennessee installs. Tennessee states that the purpose of this delivery point is to establish an interconnection between its system and that of Channel. At this point, Tennessee will deliver gas to Channel for redelivery to Mobile Gas Services Inc. (Mobil) for processing at Mobil's LaGloria Gas Processing Plant (La Gloria) in Brooks County, Texas. Tennessee's deliveries will be made under Tennessee's Part 284 blanket transportation certificate. Channel will transport the gas from the proposed interconnection with Tennessee to LaGloria pursuant to Section 311(a)(2) of the the Natural Gas Policy Act of 1978 (NGPA) and Subpart C of Part 284 of the Commission's Regulations. Tennessee states that no facilities modifications are required to allow gas processed at LaGloria to be returned to Tennessee's system; such a connection is already in place. Tennessee states that the total quantities to be delivered to Channel after the delivery point is installed will not exceed the total quantities authorized prior to this request. Tennessee asserts that the establishment of the proposed delivery point is not prohibited by Tennessee's tariff and that it has sufficient capacity to accomplish deliveries at the proposed new point without detriment or disadvantage to any of Tennessee's other customers. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. Lois D. Cashell, Secretary. [FR Doc. 95-28789 Filed 11-24-95; 8:45 am] BILLING CODE 6717-01-M