[Federal Register Volume 60, Number 250 (Friday, December 29, 1995)] [Notices] [Page 67349] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 95-31451] ======================================================================== Notices Federal Register ________________________________________________________________________ This section of the FEDERAL REGISTER contains documents other than rules or proposed rules that are applicable to the public. Notices of hearings and investigations, committee meetings, agency decisions and rulings, delegations of authority, filing of petitions and applications and agency statements of organization and functions are examples of documents appearing in this section. ======================================================================== Federal Register / Vol. 60, No. 250 / Friday, December 29, 1995 / Notices [[Page 67349]] DEPARTMENT OF AGRICULTURE Rural Utilities Service Delta-Montrose Electric Association, Inc.; Finding of No Significant Impact AGENCY: Rural Utilities Service, USDA. ACTION: Notice of finding of no significant impact. ----------------------------------------------------------------------- SUMMARY: Notice is hereby given that the Rural Utilities Service (RUS) has made a finding of no significant impact (FONSI) with respect to the potential environmental impact related to the construction of a new headquarters facility proposed by Delta-Montrose Electric Association, Inc. (DMEA), of Delta, Colorado. The proposed project will be located on a site 2.0 miles north of the City of Montrose, Colorado, on County Road 6300 near U.S. Highway 50 in Montrose County, Colorado. RUS has concluded that the environmental impacts from the proposed project would not be significant and that the proposed action is not a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required. FOR FURTHER INFORMATION CONTACT: Lawrence R. Wolfe, Senior Environmental Protection Specialist, Engineering and Environmental Staff, room 1246, Ag Box 1569, South Agriculture Building, RUS, Washington, DC 20250, telephone (202) 720- 1784. SUPPLEMENTARY INFORMATION: RUS, in accordance with its environmental policies and procedures, required that DMEA prepare a Borrower's Environmental Report (BER) reflecting the potential impacts of the proposed facilities. The BER, which includes input from Federal, State and local agencies and the public, has been adopted as RUS's Environmental Assessment for the project in accordance with 7 CFR Part 1794.61. RUS has concluded that the BER represents an accurate assessment of the environmental impacts of the project. The proposed project should have no impact on cultural resources, flood-plains, wetlands, important farmland, and federally listed or proposed for listing threatened or endangered species or their critical habitat. Alternatives considered to the proposed project included no action, expansion of DMEA's existing headquarters facility, renovation of an existing commercial building, consolidation of DMEA facilities at one of the existing service center sites, and alternate sites. RUS has considered these alternatives and concluded that the project as proposed meets the needs of DMEA to reduce overcrowding at the present facility, provide increased space for equipment storage, consolidate operations done at various existing facilities and provide adequate space for future expansion. Copies of the BER and FONSI are available for review at RUS at the address provided herein; or can be reviewed at or obtained from the offices of DMEA, P.O. Box 59, Delta, Colorado 81416-0059, telephone (970) 874-8081, during normal business hours. Dated: December 21, 1995. Adam M. Golodner, Deputy Administrator, Program Operations. [FR Doc. 95-31451 Filed 12-28-95; 8:45 am] BILLING CODE 3410-15-M