[Federal Register Volume 61, Number 136 (Monday, July 15, 1996)] [Notices] [Pages 36872-36873] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 96-17839] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Docket No. CP96-541-000] Southern Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Zone III Expansion Project and Request for Comments on Environmental Issues July 9, 1996. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the construction and operation of the facilities proposed in the Zone III Expansion Project.\1\ This EA will be used by the Commission in its decision-making process to determine whether an environmental impact statement is necessary and whether to approve the project. --------------------------------------------------------------------------- \1\ Southern Natural Gas Company's application was filed with the Commission under Section 7 of the Natural Gas Act and Part 157 of the Commission's regulations. --------------------------------------------------------------------------- Summary of the Proposed Project Southern Natural Gas Company (Southern) wants to expand the capacity of its facilities in Alabama, Georgia, and Mississippi to transport an additional 45,880 cubic feet per day of natural gas to nine companies and two municipalities. Southern seeks authority to construct and operate:4.6 miles of 30-inch-diameter loop in Crawford and Monroe Counties, Georgia; 5.1 miles of 16-inch-diameter loop in Jones and Twiggs Counties, Georgia; 5.9 miles of 30-inch-diameter loop in Lee County, Alabama; 7.3 miles of 24-inch-diameter loop in Pickens and Tuscaloosa Counties, Alabama; and 4.6 miles of 30-inch-diameter loop in Walthall, Lawrence, and Marion Counties, Mississippi. Southern has also proposed to upgrade four turbine compressor engines which are located within the Selma Compressor Station in Dallas County, Alabama and the Bay Springs Compressor Station in Jasper County, Mississippi. In addition, Southern would place an existing 104.6 mile 20-inch- diameter pipeline back in service. The Wrens-Savannah Pipeline is in Jefferson, Burke, Jenkins, Screven, Effingham, and Chantham Counties, Georgia. The general location of the project facilities and specific locations for facilities on new sites are shown in appendix 1.\2\ --------------------------------------------------------------------------- \2\ The appendices referenced in this notice are not being printed in the Federal Register. Copies are available from the Commission's Public Reference and Files Maintenance Branch, 888 First Street, N.E., Washington, D.C. 20426, or call (202) 208-1371. Copies of the appendices were sent to all those receiving this notice in the mail. --------------------------------------------------------------------------- Land Requirements for Construction Construction of the proposed facilities would require about 83.38 acres of land. Following construction, about 19.52 acres would be maintained as new right-of-way. The remaining 63.86 acres of land would be restored and allowed to revert to its former use. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. We call this ``scoping.'' The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this Notice of Intent, the Commission requests public comments on the scope of the issues it will address in the EA. All comments received are considered during the preparation of the EA. State and local government representatives are encouraged to notify their constituents of this proposed action and encourage them to comment on their areas of concern. The EA will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: Geology and soils. Water resources, fisheries, and wetlands. Vegetation and wildlife. Land use. Cultural resources. Air quality and noise. Endangered and threatened species. Public safety. We will also evaluate possible alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. Our independent analysis of the issues will be in the EA. Depending on the comments received during the scoping process, the EA may be published and mailed to Federal, state, and local agencies, public interest groups, interested individuals, affected landowners, newspapers, libraries, and the Commission's official service list for this proceeding. A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we recommend that the Commission approve or not approve the project. Currently Identified Environmental Issues We have already identified several issues that we think deserve attention based on a preliminary review of the proposed facilities and the environmental information provided by Southern. This preliminary list of issues may be changed based on your comments and our analysis. Two federally listed endangered species may occur in the proposed project area. Three residences are located within 50 feet of the proposed construction right-of-way. Public Participation You can make a difference by sending a letter addressing your specific comments or concerns about the project. You should focus on the potential environmental effects of the proposals, alternatives to the proposal including alternative routes, and measures to avoid or lessen environmental impact. The more specific your comments, the more useful they will be. Please follow the instructions below to ensure that your comments are received and properly recorded: Address your letter to: Lois Cashell, Secretary, Federal Energy Regulatory Commission, 888 First St., N.E., Washington, DC 20426. Reference Docket No. CP96-541-000. Send a copy of your letter to: Ms. Amy Olson, EA Project Manager, Federal Energy Regulatory Commission, 888 First St., N.E., PR- 11.1, Washington, DC 20426; and [[Page 36873]] Mail your comments so that they will be received in Washington, DC on or before August 19, 1996. If you wish to receive a copy of the EA, you should request one from Ms. Olson at the above address. Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an official party to the proceeding or become an ``intervenor''. Among other things, intervenors have the right to receive copies of case-related Commission documents and filings by other intervenors. Likewise, each intervenor must provide copies of its filings to all other parties. If you want to become an intervenor you must file a motion to intervene according to Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.214) (see appendix 2). The date for filing timely motions to intervene in this proceeding has passed. Therefore, parties now seeking to file late interventions must show good cause, as required by section 385.214(b)(3), why this time limitation should be waived. Environmental issues have been viewed as good cause for late intervention. You do not need intervenor status to have your scoping comments considered. Additional information about the proposed project is available from Ms. Amy Olson, EA Project Manager, at (202) 208-1199. Lois D. Cashell, Secretary. [FR Doc. 96-17839 Filed 7-12-96; 8:45 am] BILLING CODE 6717-01-M