[Federal Register Volume 61, Number 251 (Monday, December 30, 1996)] [Notices] [Pages 68741-68742] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 96-33189] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Notice of Minor New License December 24, 1996. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Minor New License. b. Project No.: 2032-001. c. Dated filed: September 25, 1996. d. Applicant: Lower Valley Power & Light, Inc. e. Name of Project: Strawberry. f. Location: On the Strawberry Creek, in Lincoln County, Wyoming. g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r). h. Applicant Contact: Mr. Winston G. Allred, Lower Valley Power & Light, Inc., 345 North Washington Street, P.O. Box 188, Ofton, WY 83110, (307) 886-3175. i. FERC Contact: Hector M. Perez, (202) 219-2843. j. Deadline for filing interventions and protests: March 4, 1997. k. Status of Environmental Analysis: This application is not ready for environmental analysis at this time--see attached paragraph E. [[Page 68742]] l. Brief Description of Project: The project consists of: (1) A 22- foot-high, 110-foot-long reinforced concrete gravity dam with a 24- foot-long right abutment, a 40-foot-long overflow spillway with a crest elevation of 7,020 feet NGVD, a 16-foot-long intake sluice section, and a 30-foot-long left abutment; (2) a reservoir with a surface area of 2.8 acres at normal pool elevation of 7,021 feet; (3) an 11,300-foot- long, 36-inch-diameter steel penstock; (4) a powerhouse with three turbine-generator units with a total installed capacity of 1,500 kilowatts; (5) a substation; and (6) other appurtenances. m. This notice also consists of the following standard paragraph: B1, and E. B1. Protests or Motions to Intervene--Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. E. Filing and Service of Responsive Documents--The application is not ready for environmental analysis at this time; therefore, the Commission is not now requesting comments, recommendations, terms and conditions, or prescriptions. When the application is ready for environmental analysis, the Commission will notify all persons on the service list and affected resource agencies and Indian tribes. If any person wishes to be placed on the service list, a motion to intervene must be filed by the specified deadline date herein for such motions. All resource agencies and Indian tribes that have official responsibilities that may be affected by the issues addressed in this proceeding, and persons on the service list will be able to file comments, terms and conditions, and prescriptions within 60 days of the date the Commission issues a notification letter that the application is ready for an environmental analysis. All reply comments must be filed with the Commission within 105 days from the date of that letter. All filings must (1) bear in all capital letters the title ``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Any of these documents must be filed by providing the original and the number of copies required by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. An additional copy must be sent to Director, Division of Project Review, Office of Hydropower Licensing, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. Lois D. Cashell, Secretary. [FR Doc. 96-33189 Filed 12-27-96; 8:45 am] BILLING CODE 6717-01-M