[Federal Register Volume 62, Number 40 (Friday, February 28, 1997)] [Notices] [Pages 9187-9188] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 97-5075] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-5477-9] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared February 10, 1997 Through February 14, 1997 pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 564-7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 5, 1996 (61 FR 15251). Draft EISs ERP No. D-BLM-K67040-CA Rating EC2, Imperial Open-Pit Heap Leach Precious Metal Mine Project, Plan of Operation, Right-of-Way Approval, Conditional-Use-Permit and Reclamation Program Approval, Imperial County, CA. Summary: EPA expressed environmental concerns based on potential impacts to surface waters and recommendations for improved facilities design, and requested additional information regarding avoidance and mitigation of impacts to waters of the U.S., reduction of PM10 emissions, and facilities design. ERP No. D-COE-C36074-NJ Rating EC2, Townsends Inlet to Cape May Inlet Feasbility Study, New Jersey Shore Protection Study, Storm Damage Reduction and Ecosystem Restoration, with in the Communities of Avalon, Stone Harbor and North Wildwood, Cape May County, NJ. Summary: EPA expressed environmental concerns over the alternatives analysis, potential impacts to benthic communities and water quality from beach nourishment activities, and the potential impacts associated with this and other erosion/storm damage protection projects in New Jersey. Additional information is requested in the final EIS to address these issues. ERP No. D-COE-G39031-LA Rating LO, Mississippi River--Gulf Outlet (MRGO) New Lock and Connecting Channels Replacement and Construction for Connection to the Mississippi River, Implementation, Orleans and St. Bernard Parishes, LA. Summary: EPA has no objection to the selection of the Tentatively Selected Plan provided that the described mitigation measures are implemented. ERP No. D-FHW-L40201-WA Rating EC2, US 101 Highway Aberdeen-Hoquian Corridor Project, Improvements, US Coast Guard and COE Section 404 Permit, Grays Harbor County, WA. Summary: EPA expressed environmental concerns based on unavoidable impacts to wetlands and potential impacts to other waters of the US. Additional information is needed to clarify design specifications resulting from certain flood frequency data, and to ensure that proper stormwater management practices will be implemented to protect receiving-water quality appropriately. ERP No. D-FTA-D54038-MD Rating EC2, Metrorail Extension--Addison Road Station to the Largo Town Center, Transportation Improvements, Prince George's County, MD. Summary: EPA expressed environmental concerns that environmental issues have not been adequately addressed. The alternatives analysis does not adequately compare alternatives. Secondary and cumulative impacts were not fully addressed as well. Information regarding environmental justices issues was not clearly documented. ERP No. D-IBR-K29000-CA Rating EO2, Interim South Delta Program (ISDP), Construction and Operation, Sacramento/San Joaquin Delta, Implementation, COE Section 404 Permit, Alameda, Contra Costa and San Joaquin Counties, CA. Summary: EPA expressed environmental objections and is concerned that all of the alternatives analyzed could have significant adverse impacts on fish and aquatic resources and that, generally, the proposed project does not advance that long-term objectives of ecosystem restoration as expressed through the CALFED Long-Term Bay-Delta Program. EPA asked that alternatives be redesigned and evaluated in the context of the Long-Term Program. ERP No. D-NAS-E12005-00 Rating EC2, Engine Technology Support, Implementation, With Emphases on Liquid Oxygen and Kerosene, Advanced Space Transportation Program, Test Sites: Marshall Space Flight Center (MSFC) in Huntsville, AL; Stennis Space Center (SSC) near Bay St. Louis, MS and Phillips Laboratory, Edwards Air Force Base, CA. Summary: EPA expressed environmental concerns regarding wetlands, groundwater and other unresolved issues; however, these can be addressed by the requested additional information. ERP No. DS-FHW-K40099-HI Rating EC2, Makai Boulevard Concept/Nimitz Highway Improvements, Updated Information, Construction from Keehi Interchange to Pier 16 (AWA Street) in the Kalihi-Palama District, Funding, US Coast Guard and COE Section 404 Permits, City of Honolulu and Honolulu County, HI Summary: EPA expressed environmental concerns with the project and asked FHA to provide more information regarding the sole source aquifer, erosion and stormwater impacts to water quality, and the alternative analysis. Final EISs ERP No. F-BLM-K67038-NV Ruby Hill Gold Mining Operations Project, Implementation, Battle Mountain District, Plan of Operations and COE Section 404 Permit, Eureka County, NV. Summary: EPA's concerns regarding the project's air emissions have been addressed in the FEIS, however mitigation measures remain vague. EPA supports BLM's decision to add partial backfilling to the preferred alternative and EPA urged BLM to reduce project disturbance by 120 acres. ERP No. F-FHW-E40757-AL Eastern Pleasure Island Hurricane Evacuation Route Construction, AL-182 in Orange Beach to CR-95 near CR- 20 (on the mainland) and CR-95 near CR-20 to I-10, Funding and US Coast Guard Bridge and COE Section 404 Permits Issuance, Baldwin County, AL. Summary: EPA's review found that impacts to wetlands were of concern and that additional wetland mitigation and agency coordination was needed. ERP No. F-FHW-E40767-FL Tampa Interstate Project, Funding, I-275 to just north of Cypress Street and I-275 from the Howard Frankland Bridge/Kennedy Boulevard ramps north to Dr. Martin Luther King, Jr. Boulevard and I-4 from I-275, Hillsborough County, FL. Summary: EPA's review found that noise impacts to urban residents were of concern and that the affected communities and housing developments should be allowed to participate in noise abatement plans. ERP No. F-FRC-L05206-WA Snoqualmie Falls Hydroelectric Project [[Page 9188]] (FERC Project No. 2493), Relicensing, Snoqualmie River, King County, WA. Summary: Review of the final EIS has been completed and the project found to be satisfactory. No formal comment letter was sent to the preparing agency. ERP No. F-NPS-L61211-AK Denali National Park and Reserve, ``Frontcountry'' Entrance Area and Road Corridor, Development Concept Plan, AK. Summary: Review of the Final EIS was not deemed necessary. No formal comment letter was sent to the preparing agency. Dated: February 25, 1997. B. Katherine Biggs, Associate Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 97-5075 Filed 2-27-97; 8:45 am] BILLING CODE 6560-50-M