[Federal Register Volume 62, Number 189 (Tuesday, September 30, 1997)]
[Notices]
[Pages 51093-51094]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-25801]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. CP97-732-000]


Florida Gas Transmission Company; Notice of Request Under Blanket 
Authorization

September 24, 1997.
    Take notice that on September 8, 1997, Florida Gas Transmission 
Company (FGT), 1400 Smith Street, P.O. Box 1188, Houston, Texas 77251-
1188, filed in Docket No. CP97-732-000 a request pursuant to Sections 
157.205 and 157.212 of the Commission's Regulations under the Natural 
Gas Act (18 CFR 157.205, 157.212) for authorization to construct, own, 
and operate a new delivery point, located in Vermilion Parish, 
Louisiana, under FGT's blanket certificate issued in Docket No. CP82-
553-000, pursuant to Section 7(c) of the Natural Gas Act, all as more 
fully set forth in the request that is on file with the Commission and 
open to public inspection.
    FGT proposes to construct, own, and operate a delivery point in 
Vermilion Parish, Louisiana, to accommodate FGT's transportation and 
delivery of gas, on an interruptible basis, to Magnum Gas Marketing, 
Inc. (Magnum) to serve the City of Kaplan. FGT states the proposed 
delivery point will include 2-inch tap, approximately 25 feet of 2-inch 
pipeline, electronic flow measurement (EFM) equipment, and any related 
appurtenant facilities necessary for FGT to deliver up to 600 Mcf per 
day into Magnum's meter station.
    FGT declares Magnum has elected to construct their meter station 
and to reimburse FGT for all costs directly and indirectly incurred for 
the construction of the tap, connecting pipe, and EFM equipment. FGT 
states the proposed delivery point is estimated to cost $39,800 
inclusive of tax gross-up.
    Any person or the Commission's staff may, within 45 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice

[[Page 51094]]

of intervention and pursuant to Section 157.205 of the Regulations 
under the Natural Gas Act (18 CFR 157.205) a protest to the request. If 
no protest is filed within the time allowed therefor, the proposed 
activity shall be deemed to be authorized effective the day after the 
time allowed for filing a protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-25801 Filed 9-29-97; 8:45 am]
BILLING CODE 6717-01-M