[Federal Register Volume 63, Number 32 (Wednesday, February 18, 1998)] [Notices] [Page 8194] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 98-3946] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Conduit Exemption February 11, 1998. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Conduit Exemption. b. Project No: 11468-001. c. Date filed: January 28, 1998. d. Applicant: North Side Canal Company. e. Name of Project: Crossroads Conduit Project. f. Location: On the North Side canal system in Jerome County, Idaho (T. 7S. R. 16E., Sections 23, 24, and 25). g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)- 825(r). h. Applicant Contact: Randolph J. Hill, Ida-West Energy Company, P.O. Box 7867, Boise, ID 83707, (208) 395-8930 or John Rosholt, Rosholt, Robertson & Tucker, P.O. Box 1906, Twin Falls, ID 83301, (208) 734-0700. i. FERC Contact: Hector M. Perez at (202) 219-2843. j. Description of Project: The proposed project would consist of: (1) A 900-foot-long, 150-foot-wide forebay with a normal water surface elevation of 3,773.5 feet formed by two dikes with a maximum height above existing ground surface of 9 feet; (2) a primary overflow bypass channel with a top elevation of 3,774 feet and a secondary overflow bypass channel with a top elevation of 3,774.75 feet, both at the forebay; (3) a reinforced concrete intake structure; (4) a 10-foot- diameter, 1,750-foot-long steel penstock; and (5) a reinforced concrete powerhouse with a 3,200-kilowatt turbine-generator unit. k. Under Section 4.32(b)(7) of the Commission's regulations (18 CFR), if any resource agency, Indian Tribe, or person believes that the applicant should conduct an additional scientific study to form an adequate factual basis for a complete analysis of the application on its merits, they must file a request for the study with the Commission, not later than 60 days after the application is filed, and must serve a copy of the request on the applicant. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 98-3946 Filed 2-17-98; 8:45 am] BILLING CODE 6717-01-M