[Federal Register Volume 63, Number 53 (Thursday, March 19, 1998)] [Notices] [Pages 13436-13437] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 98-7113] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: U.S. Nuclear Regulatory Commission (NRC). ACTION: Notice of pending NRC action to submit an information collection request to OMB and solicitation of public comment. ----------------------------------------------------------------------- SUMMARY: The NRC is preparing a submittal to OMB for review of continued approval of information collections under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The title of the information collection: NRC Form 474, ``Simulation Facility Certification.'' 2. Current OMB approval number: 3150-0138. 3. How often the collection is required: One-time requirement for initial certification and quadrennial thereafter. 4. Who is required or asked to report: All power reactor licensees and applicants for an operating license. 5. The number of annual respondents: 20. 6. The number of hours needed annually to complete the requirement or request: 2,400 hours. 7. Abstract: Licensed power facilities that propose the use of a simulation facility consisting solely of a plant-referenced simulator for the conduct of NRC licensing operating tests are required to submit NRC Form 474. The information on the form consists of the results of performance testing completed on the subject simulation facility and a schedule for the conduct of performance tests for the subsequent four-year period. NRC uses this information to ascertain the acceptability of simulation facilities for use in the conduct of operating tests for nuclear power plant operator and senior operator candidates and to determine whether to initiate a simulation facility inspection at a specific site due to concerns about their suitability for use in operating tests. Submit by May 18, 1998, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? [[Page 13437]] 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, 2120 L Street, NW (lower level), Washington, DC. OMB clearance requests are available at the NRC worldwide web site (http://www.nrc.gov) under the FedWorld collection link on the home page tool bar. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions about the information collection requirements may be directed to the NRC Clearance Officer, Brenda Jo. Shelton, U.S. Nuclear Regulatory Commission, T-6 F33, Washington, DC 20555-0001, or by telephone at 301-415-7233, or by Internet electronic mail at [email protected]. Dated at Rockville, Maryland, this 12th day of March 1998. For the Nuclear Regulatory Commission. Brenda Jo. Shelton, NRC Clearance Officer, Office of the Chief Information Officer. [FR Doc. 98-7113 Filed 3-18-98; 8:45 am] BILLING CODE 7590-01-P